CN107615186A - 模型预测控制的方法和装置 - Google Patents
模型预测控制的方法和装置 Download PDFInfo
- Publication number
- CN107615186A CN107615186A CN201580001162.XA CN201580001162A CN107615186A CN 107615186 A CN107615186 A CN 107615186A CN 201580001162 A CN201580001162 A CN 201580001162A CN 107615186 A CN107615186 A CN 107615186A
- Authority
- CN
- China
- Prior art keywords
- variable
- control
- time
- theta
- moment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B13/00—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion
- G05B13/02—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric
- G05B13/04—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric involving the use of models or simulators
Landscapes
- Engineering & Computer Science (AREA)
- Health & Medical Sciences (AREA)
- Artificial Intelligence (AREA)
- Computer Vision & Pattern Recognition (AREA)
- Evolutionary Computation (AREA)
- Medical Informatics (AREA)
- Software Systems (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Automation & Control Theory (AREA)
- Feedback Control In General (AREA)
Abstract
一种模型预测控制的方法和装置,该方法包括:确定在k时刻的参数变量θ(k)(S110);通过单层递归神经网络算法,根据k‑1时刻的控制变量u(k‑1)、k时刻的状态变量x(k)和参数变量θ(k),确定满足预测模型性能指标的控制增量Δu(k)(S120);将该预测模型的该控制变量u(k‑1)和该控制增量Δu(k)之和确定为该预测模型在该k时刻的控制变量u(k)(S130);根据该预测模型的该控制变量u(k),进行模型预测控制(S140)。根据当前时刻k时刻的状态变量x(k)和参数变量θ(k),以及前一时刻的控制变量u(k‑1),通过单层递归神经网络算法,确定满足预测模型性能指标的控制变量u(k),根据该控制变量u(k),进行模型预测控制,能够提高计算效率,可以保证性能指标的可靠性。
Description
PCT国内申请,说明书已公开。
Claims (14)
- PCT国内申请,权利要求书已公开。
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/CN2015/086848 WO2017024583A1 (zh) | 2015-08-13 | 2015-08-13 | 模型预测控制的方法和装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107615186A true CN107615186A (zh) | 2018-01-19 |
Family
ID=57984055
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201580001162.XA Pending CN107615186A (zh) | 2015-08-13 | 2015-08-13 | 模型预测控制的方法和装置 |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN107615186A (zh) |
WO (1) | WO2017024583A1 (zh) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108549228A (zh) * | 2018-04-18 | 2018-09-18 | 南京工业大学 | 一种基于交叉评估的多变量dmc***模型失配通道定位方法 |
CN110689164A (zh) * | 2019-08-26 | 2020-01-14 | 阿里巴巴集团控股有限公司 | 用户解约行为的预测方法及其*** |
CN112684699A (zh) * | 2020-11-10 | 2021-04-20 | 北京京能科技有限公司 | 变量幅值约束的超临界机组运行的控制方法及超临界机组 |
CN112925271A (zh) * | 2019-12-06 | 2021-06-08 | 阿里巴巴集团控股有限公司 | 数据处理方法、自动控制方法及装置 |
CN113325694A (zh) * | 2021-05-26 | 2021-08-31 | 西安交通大学 | 一种基于机器学习的模型预测控制参数的整定方法 |
WO2024098908A1 (zh) * | 2022-11-11 | 2024-05-16 | 中国长江三峡集团有限公司 | 风储协同宽频振荡抑制方法、装置 |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109460846B (zh) * | 2018-06-19 | 2022-04-01 | 国网浙江省电力有限公司湖州供电公司 | 一种基于数据挖掘的设备状态预测分析方法 |
CN110213784B (zh) * | 2019-07-05 | 2022-05-20 | 中国联合网络通信集团有限公司 | 一种流量预测方法及装置 |
CN110457750B (zh) * | 2019-07-09 | 2023-10-24 | 国家电网有限公司 | 基于神经网络响应面的有载分接开关弹簧储能不足故障识别方法 |
CN112888076B (zh) * | 2019-11-29 | 2023-10-24 | 华为技术有限公司 | 一种调度方法及装置 |
CN111525607A (zh) * | 2020-04-17 | 2020-08-11 | 中国电力科学研究院有限公司 | 用于光储联合发电***的光伏发电计划跟踪方法及装置 |
CN112462019A (zh) * | 2020-11-14 | 2021-03-09 | 北京工业大学 | 一种基于cl-rnn的出水氨氮软测量方法 |
CN112906291B (zh) * | 2021-01-25 | 2023-05-19 | 武汉纺织大学 | 一种基于神经网络的建模方法及装置 |
CN113805587B (zh) * | 2021-09-17 | 2023-08-15 | 中国人民解放军国防科技大学 | 多无人车分布式编队控制方法、装置和设备 |
CN114371619B (zh) * | 2021-12-17 | 2024-04-23 | 上海电力大学 | 一种mgt-cchp变工况动态能效优化控制方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20090299933A1 (en) * | 2008-05-28 | 2009-12-03 | Sony Corporation | Data processing apparatus, data processing method, and computer program |
CN102830625A (zh) * | 2012-09-10 | 2012-12-19 | 江苏科技大学 | 基于神经网络预测控制的过程控制***及方法 |
CN103345161A (zh) * | 2013-07-05 | 2013-10-09 | 杭州电子科技大学 | 废塑料裂解炉余热烘干装置压力控制方法 |
CN104776446A (zh) * | 2015-04-14 | 2015-07-15 | 东南大学 | 一种锅炉燃烧优化控制方法 |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101923083B (zh) * | 2009-06-17 | 2013-04-10 | 复旦大学 | 基于支持向量机和神经网络的污水化学需氧量软测量方法 |
WO2013061126A1 (en) * | 2011-10-24 | 2013-05-02 | Abb Research Ltd | A method and a system for tuning multivariable pid controller |
CN104156628B (zh) * | 2014-08-29 | 2017-05-31 | 东南大学 | 一种基于多核学习判别分析的舰船辐射信号识别方法 |
CN104268650B (zh) * | 2014-09-28 | 2016-11-30 | 山东科技大学 | 一种煤层底板破坏深度的预测方法 |
-
2015
- 2015-08-13 CN CN201580001162.XA patent/CN107615186A/zh active Pending
- 2015-08-13 WO PCT/CN2015/086848 patent/WO2017024583A1/zh active Application Filing
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20090299933A1 (en) * | 2008-05-28 | 2009-12-03 | Sony Corporation | Data processing apparatus, data processing method, and computer program |
CN102830625A (zh) * | 2012-09-10 | 2012-12-19 | 江苏科技大学 | 基于神经网络预测控制的过程控制***及方法 |
CN103345161A (zh) * | 2013-07-05 | 2013-10-09 | 杭州电子科技大学 | 废塑料裂解炉余热烘干装置压力控制方法 |
CN104776446A (zh) * | 2015-04-14 | 2015-07-15 | 东南大学 | 一种锅炉燃烧优化控制方法 |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108549228A (zh) * | 2018-04-18 | 2018-09-18 | 南京工业大学 | 一种基于交叉评估的多变量dmc***模型失配通道定位方法 |
CN108549228B (zh) * | 2018-04-18 | 2021-02-02 | 南京工业大学 | 一种基于交叉评估的多变量dmc***模型失配通道定位方法 |
CN110689164A (zh) * | 2019-08-26 | 2020-01-14 | 阿里巴巴集团控股有限公司 | 用户解约行为的预测方法及其*** |
CN112925271A (zh) * | 2019-12-06 | 2021-06-08 | 阿里巴巴集团控股有限公司 | 数据处理方法、自动控制方法及装置 |
CN112684699A (zh) * | 2020-11-10 | 2021-04-20 | 北京京能科技有限公司 | 变量幅值约束的超临界机组运行的控制方法及超临界机组 |
CN113325694A (zh) * | 2021-05-26 | 2021-08-31 | 西安交通大学 | 一种基于机器学习的模型预测控制参数的整定方法 |
WO2024098908A1 (zh) * | 2022-11-11 | 2024-05-16 | 中国长江三峡集团有限公司 | 风储协同宽频振荡抑制方法、装置 |
Also Published As
Publication number | Publication date |
---|---|
WO2017024583A1 (zh) | 2017-02-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107615186A (zh) | 模型预测控制的方法和装置 | |
Han et al. | Self-organizing RBF neural network using an adaptive gradient multiobjective particle swarm optimization | |
Boulkaibet et al. | A new TS fuzzy model predictive control for nonlinear processes | |
Chen et al. | Optimal control via neural networks: A convex approach | |
WO2016047118A1 (ja) | モデル評価装置、モデル評価方法、及び、プログラム記録媒体 | |
Khater et al. | A novel structure of actor-critic learning based on an interval type-2 TSK fuzzy neural network | |
CN111126605A (zh) | 一种基于强化学习算法的数据中心机房控制方法及装置 | |
CN106530118B (zh) | 多区互联电力***负荷频率的约束gpc优化控制方法 | |
Tian et al. | Time-delay compensation method for networked control system based on time-delay prediction and implicit PIGPC | |
Zhang et al. | Recurrent neural network‐based model predictive control for multiple unmanned quadrotor formation flight | |
CN113819636B (zh) | 辐射空调***的控制方法、装置及存储介质 | |
Mahmoud et al. | Direct adaptive control for nonlinear systems using a TSK fuzzy echo state network based on fractional-order learning algorithm | |
Perng et al. | FOPID controller optimization based on SIWPSO-RBFNN algorithm for fractional-order time delay systems | |
Wei et al. | Monte Carlo-based reinforcement learning control for unmanned aerial vehicle systems | |
Homod et al. | Deep clustering of Lagrangian trajectory for multi-task learning to energy saving in intelligent buildings using cooperative multi-agent | |
Yousefi et al. | A hybrid neuro-fuzzy approach for greenhouse climate modeling | |
Lu et al. | Data‐driven optimal control of operational indices for a class of industrial processes | |
Baranilingesan | Optimization algorithm-based Elman neural network controller for continuous stirred tank reactor process model. | |
Yan et al. | Robust model predictive control of nonlinear affine systems based on a two-layer recurrent neural network | |
CN116880191A (zh) | 一种基于时序预测的过程工业生产***的智能控制方法 | |
Liang et al. | Data fusion combined with echo state network for multivariate time series prediction in complex electromechanical system | |
CN114384931B (zh) | 一种基于策略梯度的无人机多目标最优控制方法和设备 | |
Scheurenberg et al. | Evaluation of data enhanced model predictive control for a coupled tank system | |
Li et al. | Neuro-fuzzy-based dynamic quadratic criterion-iterative learning control for batch process | |
CN112379601A (zh) | 基于工业过程的mfa控制***设计方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180119 |