CN107604891A CN201710848730.0A CN201710848730A CN107604891A CN 107604891 A CN107604891 A CN 107604891A CN 201710848730 A CN201710848730 A CN 201710848730A CN 107604891 A CN107604891 A CN 107604891A
Authority
CN
China
Prior art keywords
ore drawing
ore
ikeda
pond
dam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710848730.0A
Other languages
Chinese (zh)
Inventor
马纪鑫
徐连生
黄贵臣
孙孝东
陈小艳
李铁柱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ansteel Mining Co Ltd
Angang Group Mining Co Ltd
Original Assignee
Angang Group Mining Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Angang Group Mining Co Ltd filed Critical Angang Group Mining Co Ltd
Priority to CN201710848730.0A priority Critical patent/CN107604891A/en
Publication of CN107604891A publication Critical patent/CN107604891A/en
Pending legal-status Critical Current

Links

Landscapes

  • Revetment (AREA)

Abstract

The present invention relates to a kind of flow-guiding type ore drawing Ikeda and its ore drawing method, it is characterised in that makes some groups of ore drawing Ikedas along dam direction on dry sand of tailings reservoir surface, every group of ore drawing Ikeda is made up of two or more ore drawing pond;Described ore drawing pond is made up of pool wall, cut-off dam and drawhole, and each ore drawing pond drawhole corresponds to more than one ore drawing branch pipe, and also staggeredly the training dyke ridge is provided with each ore drawing pond;During ore drawing, ore drawing is carried out using the method for secondary ore drawing.It is an advantage of the invention that:This ore drawing method, it can make to remain in ore pulp in ore drawing Ikeda, Gan Tan surfaces are by ore pulp all standing inside ore drawing Ikeda, it is big that ore pulp covers dry beach face product, ore pulp, which covers dry beach face product, can reach more than 90%, greatly reduce dam Nei Gan beaches and play dirt area, play effective dust suppression effect.

Description

Flow-guiding type ore drawing Ikeda and its ore drawing method
Technical field
The invention belongs to the dust suppression technology field of mine tailing mud, more particularly to a kind of flow-guiding type ore drawing Ikeda and its ore drawing side Method.
Background technology
Iron ore mine dry sand of tailings reservoir in dry season or wind season by generating region property dust pollution question, due to the main work(of Tailings Dam Can store last person's slag in metal mine production process and ring water is reclaimed for selecting factory to recycle by natural filtration, Tailings Dam Including dam body, Gan Tan, water catchment area, formed wherein dry beach is all mill tailings natural sedimentation, powder can be formed in dry season or wind season Dirt pollution problem, the dust-suppression method of present comparative maturity is sprinkling dust suppressant solidification Gan Tan surfaces, watering dust suppression method and multitube pond Field ore drawing method.It is preferable to spray dust suppressant anti-dust effect, but dry beach face product is big, and dynamic ore drawing, and after dust suppressant solidification again Ore drawing will fail, so being applicable the Tailings Dam for having closed storehouse.The shortcomings that dust suppression method of sprinkling water is that spray area is big, and up-front investment takes With big, later maintenance cost is big, and dam facing constantly increases, and watering pipeline periodically also needs to raise, and is largely applicable in storehouse Water, influence backwater amount in storehouse.Ikeda ore drawing dust suppression method is a kind of dust-suppression method of low-cost high-efficiency, and this method is directed to tail The dry beach face product in ore deposit storehouse is big, the unfixed feature in ore drawing position, surface configuration in utilizing works mechanical alteration dam, in storehouse Nei Gan beaches table Ikeda is built in face, and ore pulp is placed in Ikeda, and dry beach all standing, holding are done into beach surface wettability with ore pulp, suppress airborne dust.Solve With two key problems of ore pulp dust suppression.First, because storehouse Nei Gan beaches are the part high-land close to dam body, close to water catchment area Dry beach gesture it is low, ore pulp flows along physical features after ore drawing, forms zanjon, and ore pulp flows in ditch, and it is very small to cover dry beach face product, More than 85% dry beach can not be covered by ore pulp.Second, doing beach by ore pulp covering part, because mortar retention time is short, water penetration arrives It is shallow under Gan Tan top layers, so having dried dirt after ore drawing again soon, in the dry wind season such as spring, autumn, done after general ore drawing Beach dries 48 hours or so and begins to play dirt again.
The content of the invention
It is an object of the invention to provide a kind of flow-guiding type ore drawing Ikeda and its ore drawing method, solve Ikeda ore drawing at initial stage due to Pond inner slope spends the uneven influence Ikeda ore drawing anti-dust effect at initial stage of ore pulp covering in Ikeda caused by big, physical features is uneven Problem, improve coverage rate of the ore drawing ore pulp at initial stage in Ikeda to Ikeda Nei Gantan.
The purpose of the present invention is achieved through the following technical solutions:
A kind of flow-guiding type ore drawing Ikeda of the present invention, it is characterised in that:On dry sand of tailings reservoir surface some groups are made along dam direction Ore drawing Ikeda, multiple ore drawing branch pipes are set on the ore drawing main pipeline of Tailings Dam ring dam laying, every group of ore drawing Ikeda by two with On ore drawing pond formed;
Described ore drawing pond is made up of pool wall, cut-off dam and drawhole, and each drawhole corresponds to more than one ore drawing branch pipe, Also staggeredly the training dyke ridge is provided with each ore drawing pond.
Two or three overflow pipes are arranged with the cut-off dam in each ore drawing pond.
The length in the ore drawing pond in each ore drawing Ikeda incremented by successively, and cut-off in the latter pond into dam from dam root The dam crest height on dam is higher 300mm-500 mm than corresponding previous pond cut-off dam dam root.
It is to set an ore drawing branch pipe on described ore drawing main pipeline at 25-30 rice.
In described cut-off dam surface covering Air Filter or straw mattress.
A kind of ore drawing method of flow-guiding type ore drawing Ikeda, it is characterised in that comprise the following steps:
1)The making of ore drawing Ikeda
Some groups of ore drawing Ikedas are made along dam direction on dry sand of tailings reservoir surface, on the ore drawing main pipeline of Tailings Dam ring dam laying Multiple ore drawing branch pipes are set, and every group of ore drawing Ikeda is made up of two or more ore drawing pond;
Described ore drawing pond is made up of pool wall, cut-off dam and drawhole, and each ore drawing pond drawhole corresponds to more than one Ore drawing branch pipe, also staggeredly the training dyke ridge is provided with each ore drawing pond;
2)Ore drawing
2.1 are first turned on first of ore drawing main pipeline corresponding with first ore drawing pond drawhole of first group of ore drawing Ikeda Ore drawing branch pipe(tube), ore drawing in first ore drawing pond into the first ore drawing group Ikeda, ore pulp are being put in the presence of the Liu Ba ridge Ore deposit pond infolding is backflowed dynamic, is reduced ore pulp flowing velocity, is accelerated sedimentation;Maintain an equal level when CHARACTERISTICS OF TAILINGS SAND is accumulated to the training dyke ridge When, stop ore drawing, now, ore pulp runner of turning back is formed on first ore drawing pond Nei Gantan surfaces;First group of ore drawing is opened again Ore drawing branch pipe(tube) corresponding to second ore drawing pond drawhole in Ikeda, ore pulp by diversion channel enter corresponding to second put In ore deposit pond, start to carry out ore drawing to second ore drawing pond, ore pulp is in the presence of the Liu Ba ridge, in second ore drawing pond Turn back flowing, when CHARACTERISTICS OF TAILINGS SAND, which is accumulated to, to maintain an equal level with the training dyke ridge, stop ore drawing, the first time for completing first group of ore drawing Ikeda puts Ore deposit, then by that analogy, complete the first time ore drawing of each group ore drawing Ikeda;
After the first time ore drawing of 2.2 all ore drawing Ikedas terminates, second of ore drawing is carried out,
During second of ore drawing, while ore drawing branch pipe(tube) corresponding to each pond drawhole in each group ore drawing Ikeda is opened, to each Ore drawing is carried out simultaneously in ore drawing pond, after being covered after the dry beach more than 90% in pond by ore pulp, closes corresponding ore drawing branch pipe, By that analogy, ore drawing is carried out to the pond in each group of Ikeda from the Ikeda of abutment to the Ikeda of dam tail in order, realizes closed loop Ore drawing.
The beneficial effects of the invention are as follows:
The setting of the flow-guiding type ore drawing Ikeda of the present invention, is effectively shortened the Ikeda ore drawing time, improve ore drawing Ikeda efficiency and Ore pulp coverage rate in Ikeda, first ore drawing branch pipe(tube) ore drawing concentration is big when making full use of ore drawing total pipeline ore drawing, coverage rate The wide characteristic of product, at it, into dam, the training dyke ridge of simple folded plate type is built in ore pulp trickling direction, is increased ore pulp area coverage, is protected Shield cut-off dam sand running-down, reduces quantities.Solve to be put into that pulp density in Ikeda is big, and Ikeda Nei Gantan accumulated simultaneously It hurry up, absolute altitude increases too fast the problem of influenceing service life.
After installing overflow pipe due to ore drawing Ikeda, mineral pulp level overflows automatically after reaching the absolute altitude of overflow pipe in ore drawing Ikeda Stream, be not in that water level is too high, separate dam dam break the problem of.
Because present invention employs ore drawing twice, the dry beach that such high concentration at initial stage ore drawing heap comes is in dampness Will not airborne dust, improve coverage rate of the ore drawing Ikeda ore drawing ore pulp at initial stage to Ikeda Nei Gantan, improve the suppression at Ikeda ore drawing initial stage Dirt effect.
There is single ore drawing branch pipe in each pond of second of ore drawing, realizes that each ore drawing pond individually enters ore deposit, stops ore deposit, pond Pool wall and cut-off dam will not be damaged by ore pulp, this ore drawing method, can make to remain in ore pulp in Ikeda, inside Ikeda dry beach Surface is by ore pulp all standing, and ore pulp covers dry beach face product greatly, and ore pulp, which covers dry beach face product, can reach more than 90%, greatly reduce Dirt area is played on dam Nei Gan beaches, plays effective dust suppression effect.
Brief description of the drawings
Fig. 1 is the structural representation of the flow-guiding type ore drawing Ikeda of the present invention.
Fig. 2 is that the present invention is provided with the structural representation of overflow pipe on the cut-off dam of flow-guiding type ore drawing Ikeda.
Embodiment
The invention will be further described with reference to the accompanying drawings and examples.
A kind of as shown in figure 1, flow-guiding type ore drawing Ikeda of the present invention, it is characterised in that:In dry sand of tailings reservoir surface Yan Ba Direction makes some groups of ore drawing Ikedas 3, sets multiple ore drawing branch pipes 2 on the ore drawing main pipeline 1 of Tailings Dam ring dam laying, often Group ore drawing Ikeda 3 is made up of more than two ore drawing ponds;
Described ore drawing pond is made up of pool wall 3-2, cut-off dam 3-3 and drawhole 3-1, and each drawhole 3-1 is corresponding one Above ore drawing branch pipe 2, also staggeredly the training dyke ridge 5 is provided with each ore drawing pond.
As shown in Fig. 2 two or three overflow pipes 6 are arranged with the cut-off dam 3-3 in each pond.
The length in the ore drawing pond in each ore drawing Ikeda incremented by successively, and cut-off in the latter pond into dam from dam root The dam crest height on dam is higher 300mm-500 mm than corresponding previous pond cut-off dam dam root.
It is to set an ore drawing branch pipe 2 on described ore drawing main pipeline 1 at 25-30 rice.
In described cut-off dam 3-3 surfaces covering Air Filter or straw mattress.
The ore drawing method of a kind of flow-guiding type ore drawing Ikeda of the present invention, it is characterised in that comprise the following steps:
The making of ore drawing Ikeda
Some groups of ore drawing Ikedas 3 are made along dam direction on dry sand of tailings reservoir surface, in the ore drawing main pipeline 1 of Tailings Dam ring dam laying Upper to set multiple ore drawing branch pipes 2, every group of ore drawing Ikeda 3 is made up of two or more ore drawing pond;
Described ore drawing pond is made up of pool wall 3-2, cut-off dam 3-3 and drawhole 3-1, and each drawhole 3-1 is corresponding one Above ore drawing branch pipe 2, also staggeredly the training dyke ridge 5 is provided with each ore drawing pond.
The present invention is according to total ore deposit amount is exported in ore drawing main pipeline 1, to determine to set how many individual ore drawing branch pipes and how many group to put Ore deposit Ikeda, determines to set the number in every group of ore drawing Ikeda pond according to the actual physical features in dry beach, on general ore drawing main pipeline 1 every One ore drawing branch pipe 2 is set at 25-30 rice, to meet that the drying after first group of ore drawing Ikeda ore drawing of abutment plays dirt again Time is more than the condition of the total time finished from first group of ore drawing Ikeda of abutment to last group of ore drawing Ikeda ore drawing of dam tail.So Closed loop ore drawing is realized, is not in that the problem of playing dirt in dam during ore drawing is circulated in Ikeda, just can ensure that the anti-dust effect of Tailings Dam. If dam body length more than more than 3 kilometers, can be arranged at intervals ore drawing Ikeda group, the dry beach between every group of ore drawing Ikeda can pass through The mode of multitube ore drawing goes to cover with ore pulp.
The training dyke ridge 5 that the present invention is staggered in each ore drawing pond, makes flow direction of the ore pulp in ore drawing Ikeda Turn back, improve the coverage rate of the ore pulp in ore drawing ore drawing at initial stage Ikeda.
The present invention is also arranged with two or three overflow pipes 6 on the cut-off dam 3-3 in each ore drawing pond.Due to putting After ore deposit Ikeda installation overflow pipe, mineral pulp level reaches automatic overflow after the absolute altitude of overflow pipe in ore drawing Ikeda, is not in water Position it is too high, separate dam dam break the problem of.
As embodiment, the present invention puts an ore deposit branch pipe 2, every 6 branch pipe(tube)s on ore drawing main pipeline 1 every 30 meters of settings One group of ore drawing Ikeda 3 is made, two ore drawing ponds is provided with every group of ore drawing Ikeda, three ore drawing ponds, Mei Gefang can also be set The drawhole 3-1 in ore deposit pond corresponds to two ore drawing pipes 2, is set in each ore drawing pond and is staggeredly provided with two training dyke ridge 5, ore drawing pond After the completion of field 3 is built, start ore drawing, use secondary ore drawing method during ore drawing, be first turned on first with first group of ore drawing Ikeda 3 First ore drawing branch pipe(tube) 2 of ore drawing main pipeline 1 corresponding to the drawhole of individual ore drawing pond, first into the first ore drawing group Ikeda Ore drawing in individual ore drawing pond, due to first ore drawing branch pipe of ore drawing main pipeline 1 or the pulp density of second ore drawing branch pipe 2 Greatly, typically more than 35%, it is not easy to form zanjon on Gan Tan surfaces, and ore pulp separates dam in the presence of the Liu Ba ridge 5 in Ikeda 3-3 and the training dyke ridge 5 meet ore faces and can accumulate a large amount of CHARACTERISTICS OF TAILINGS SANDs quickly, and the width of flow path between the training dyke ridge 5 narrows, in pond The progress of Gan Tan surfaces is preliminary levelling, treats that beach absolute altitude is done on the training dyke ridge 5 in first ore drawing pond, cut-off dam 3-3 mineral slurry level of meeting After substantially increasing, when CHARACTERISTICS OF TAILINGS SAND, which is accumulated to, to maintain an equal level with the training dyke ridge 5, stop ore drawing, now, done in first ore drawing pond Beach surface forms ore pulp runner of turning back;Open and put corresponding to second ore drawing pond drawhole in first group of ore drawing Ikeda 3 again Ore deposit branch pipe(tube), ore pulp corresponding to the entrance of diversion channel 4 by second ore drawing pond, starting to put second ore drawing pond Ore deposit, ore pulp backflows dynamic in the presence of the Liu Ba ridge 5 in second ore drawing pond infolding, when CHARACTERISTICS OF TAILINGS SAND is accumulated to and the training dyke ridge When maintaining an equal level, stop ore drawing, complete the first time ore drawing of first group of ore drawing Ikeda 3, then by that analogy, complete each group ore drawing Ikeda First time ore drawing.
After the first time ore drawing of all ore drawing Ikedas terminates, second of ore drawing is carried out,
During second of ore drawing, while ore drawing branch pipe(tube) corresponding to each ore drawing pond drawhole in each group ore drawing Ikeda is opened, Ore drawing is carried out simultaneously into each ore drawing pond, now ore pulp is below 25%, so in ore drawing Ikeda before not long-pending full ore pulp, Ore pulp always backflow dynamic by the infolding in Ikeda, increases area coverage, efficiently solves ore drawing Ikeda and starts ore drawing to piling ore deposit During Ikeda Nei Gantan airborne dust problem.After being covered after the dry beach more than 90% in pond by ore pulp, corresponding ore drawing branch is closed Pipe, by that analogy, ore drawing is carried out to the pond in each group of Ikeda from the Ikeda of abutment to the Ikeda of dam tail in order, realization is closed Ring ore drawing.
Ore drawing number is more, and the Gan Tan surfaces in Ikeda can be more flat, and ponding can be fewer, and the ore drawing time is also shorter and shorter, institute Not interfere with safety of dam body, Gan Tan surfaces can maintain the moistening of more than 15 days in ore drawing after-bay, will not play dirt.

Claims (6)

  1. A kind of 1. flow-guiding type ore drawing Ikeda, it is characterised in that:On dry sand of tailings reservoir surface some groups of ore drawing ponds are made along dam direction Field, multiple ore drawing branch pipes are set on the ore drawing main pipeline of Tailings Dam ring dam laying, every group of ore drawing Ikeda is put by more than two Ore deposit pond is formed;
    Described ore drawing pond is made up of pool wall, cut-off dam and drawhole, and each drawhole corresponds to more than one ore drawing branch pipe, Also staggeredly the training dyke ridge is provided with each ore drawing pond.
  2. 2. flow-guiding type ore drawing Ikeda according to claim 1, it is characterised in that on the cut-off dam in each ore drawing pond It is arranged with two or three overflow pipes.
  3. 3. flow-guiding type ore drawing Ikeda according to claim 1, it is characterised in that ore drawing pond in each ore drawing Ikeda Length from dam root into dam it is incremented by successively, and the latter pond cut-off dam dam crest height than corresponding previous pond every The high 300mm-500 mm of disconnected dam dam root.
  4. 4. the combined type ore drawing Ikeda according to claim 1 with overflow pipe, it is characterised in that described ore drawing master One ore drawing branch pipe is set on pipeline at 25-30 rice.
  5. 5. the combined type ore drawing Ikeda according to claim 1 with overflow pipe, it is characterised in that in described cut-off Dam surface covers Air Filter or straw mattress.
  6. A kind of 6. ore drawing method of flow-guiding type ore drawing Ikeda, it is characterised in that comprise the following steps:
    1)The making of ore drawing Ikeda
    Some groups of ore drawing Ikedas are made along dam direction on dry sand of tailings reservoir surface, on the ore drawing main pipeline of Tailings Dam ring dam laying Multiple ore drawing branch pipes are set, and every group of ore drawing Ikeda is made up of two or more ore drawing pond;
    Described ore drawing pond is made up of pool wall, cut-off dam and drawhole, and each ore drawing pond drawhole corresponds to more than one Ore drawing branch pipe, also staggeredly the training dyke ridge is provided with each ore drawing pond;
    2)Ore drawing
    2.1 are first turned on first of ore drawing main pipeline corresponding with first ore drawing pond drawhole of first group of ore drawing Ikeda Ore drawing branch pipe(tube), ore drawing in first ore drawing pond into the first ore drawing group Ikeda, ore pulp are being put in the presence of the Liu Ba ridge Ore deposit pond infolding is backflowed dynamic, is reduced ore pulp flowing velocity, is accelerated sedimentation;Maintain an equal level when CHARACTERISTICS OF TAILINGS SAND is accumulated to the training dyke ridge When, stop ore drawing, now, ore pulp runner of turning back is formed on first ore drawing pond Nei Gantan surfaces;First group of ore drawing is opened again Ore drawing branch pipe(tube) corresponding to second ore drawing pond drawhole in Ikeda, ore pulp by diversion channel enter corresponding to second put In ore deposit pond, start to carry out ore drawing to second ore drawing pond, ore pulp is in the presence of the Liu Ba ridge, in second ore drawing pond Turn back flowing, when CHARACTERISTICS OF TAILINGS SAND, which is accumulated to, to maintain an equal level with the training dyke ridge, stop ore drawing, the first time for completing first group of ore drawing Ikeda puts Ore deposit, then by that analogy, complete the first time ore drawing of each group ore drawing Ikeda;
    After the first time ore drawing of 2.2 all ore drawing Ikedas terminates, second of ore drawing is carried out,
    During second of ore drawing, while ore drawing branch pipe(tube) corresponding to each pond drawhole in each group ore drawing Ikeda is opened, to each Ore drawing is carried out simultaneously in ore drawing pond, after being covered after the dry beach more than 90% in pond by ore pulp, closes corresponding ore drawing branch pipe, By that analogy, ore drawing is carried out to the pond in each group of Ikeda from the Ikeda of abutment to the Ikeda of dam tail in order, realizes closed loop Ore drawing.
CN201710848730.0A 2017-09-20 2017-09-20 Flow-guiding type ore drawing Ikeda and its ore drawing method Pending CN107604891A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710848730.0A CN107604891A (en) 2017-09-20 2017-09-20 Flow-guiding type ore drawing Ikeda and its ore drawing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710848730.0A CN107604891A (en) 2017-09-20 2017-09-20 Flow-guiding type ore drawing Ikeda and its ore drawing method

Publications (1)

Publication Number Publication Date
CN107604891A true CN107604891A (en) 2018-01-19

Family

ID=61060916

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710848730.0A Pending CN107604891A (en) 2017-09-20 2017-09-20 Flow-guiding type ore drawing Ikeda and its ore drawing method

Country Status (1)

Country Link
CN (1) CN107604891A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108842724A (en) * 2018-06-13 2018-11-20 国家安全生产监督管理总局信息研究院 A kind of fine tailings and high concentration do not sort the quick damming method of tailing
CN110029631A (en) * 2018-12-07 2019-07-19 包头钢铁(集团)有限责任公司 A kind of high-quality operation operating method in extremely frigid zones high-concentration tailings library
CN112575746A (en) * 2020-12-28 2021-03-30 金川集团股份有限公司 Ore drawing method for improving stability of dam body

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1616158A (en) * 2003-11-11 2005-05-18 天津渤海化工有限责任公司天津碱厂 Method for stocking caustic sludge
CN1828018A (en) * 2006-04-17 2006-09-06 中国科学院力学研究所 Ribbed terrace method for wet type stack of fine tailings
CN101825226A (en) * 2010-04-15 2010-09-08 云南大红山管道有限公司 Circulating pulp preparation system used in iron ore concentrate pipeline transportation and control method thereof
CN207267981U (en) * 2017-09-20 2018-04-24 鞍钢集团矿业有限公司 Flow-guiding type ore drawing Ikeda

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1616158A (en) * 2003-11-11 2005-05-18 天津渤海化工有限责任公司天津碱厂 Method for stocking caustic sludge
CN1828018A (en) * 2006-04-17 2006-09-06 中国科学院力学研究所 Ribbed terrace method for wet type stack of fine tailings
CN101825226A (en) * 2010-04-15 2010-09-08 云南大红山管道有限公司 Circulating pulp preparation system used in iron ore concentrate pipeline transportation and control method thereof
CN207267981U (en) * 2017-09-20 2018-04-24 鞍钢集团矿业有限公司 Flow-guiding type ore drawing Ikeda

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
朱开桂: "池填法筑坝的应用", 《化工矿物与加工》 *
程永维: "池填法筑坝工艺在歪头山铁矿小西沟尾矿库加高增容工程中的应用", 《本钢技术》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108842724A (en) * 2018-06-13 2018-11-20 国家安全生产监督管理总局信息研究院 A kind of fine tailings and high concentration do not sort the quick damming method of tailing
CN108842724B (en) * 2018-06-13 2019-05-21 国家安全生产监督管理总局信息研究院 A kind of fine tailings and high concentration do not sort the quick damming method of tailing
CN110029631A (en) * 2018-12-07 2019-07-19 包头钢铁(集团)有限责任公司 A kind of high-quality operation operating method in extremely frigid zones high-concentration tailings library
CN112575746A (en) * 2020-12-28 2021-03-30 金川集团股份有限公司 Ore drawing method for improving stability of dam body

Similar Documents

Publication Publication Date Title
CN107604891A (en) Flow-guiding type ore drawing Ikeda and its ore drawing method
CN104480889B (en) A kind of urban pavement cooling dust falling system and construction method thereof
CN103397645B (en) A kind of dry heap arranges with wet the tailings pile discharge method combined
CN205284277U (en) Grass planting ditch with rainwater guide filtering capability
CN206895309U (en) A kind of stereo greening apparatus
CN109267772A (en) A kind of Ecological Landscape gallery and its workflow of intelligent three-dimensional rainwater reuse
CN107162201A (en) A kind of multifunctional ecological canalization applied to water conservancy structure side slope
CN207419435U (en) Combined type ore drawing Ikeda with overflow pipe
CN207267981U (en) Flow-guiding type ore drawing Ikeda
CN203782850U (en) Rainwater regulation, storage and reuse system
CN211353410U (en) Sloping field tea garden infiltration pipe water intaking drip irrigation system that catchments
CN206521728U (en) A kind of hydraulic engineering ecological protection slope
CN209194665U (en) Cell storm sewer exhaust system
CN107447743A (en) Combined type ore drawing Ikeda and ore drawing method with overflow pipe
CN105908820B (en) Water storage water purification integral system under a kind of sponge urban land
CN207553071U (en) Combined type ore drawing Ikeda
CN207553115U (en) Tailings Dam " day " font ore drawing Ikeda
CN208965501U (en) One kind being used for high precipitous rock slope Ecosystem restoration system
CN205575876U (en) Ecological retaining grass planting ditch
CN106272928A (en) A kind of automatic maintenance device to building concrete
CN201801798U (en) Water supply and drainage system based on flexible athletic field
CN208733588U (en) It is a kind of to be arranged in without the combined system according to flow control suspended load separate mode that pressure is dark to be contained
CN212561003U (en) Greening environment-friendly efficient water control ground system
CN205444086U (en) A water intaking structure for pump station river course
CN211285099U (en) Energy-saving drainage system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180119