CN107604823B - It is a kind of to cross the construction method for shipping beam by railway - Google Patents
It is a kind of to cross the construction method for shipping beam by railway Download PDFInfo
- Publication number
- CN107604823B CN107604823B CN201710975791.3A CN201710975791A CN107604823B CN 107604823 B CN107604823 B CN 107604823B CN 201710975791 A CN201710975791 A CN 201710975791A CN 107604823 B CN107604823 B CN 107604823B
- Authority
- CN
- China
- Prior art keywords
- steel
- platform
- railway
- pier
- lumps
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
It is a kind of to cross the construction method for shipping beam by railway.It includes that steel platform is prefabricated;It is laid with protection steel plate;The interim pier of casting concrete;Transport beam road in drop-over two sides;It is laid with lumps of wood boarding;Steel platform traction is in place;Place the support of inclined-plane steel in lay railway sleepers pier and both ends of platform gap;Beam-transporting Vehicle passes through steel platform;Remove steel platform;Remove sleeper and the support of inclined-plane steel;Remove lumps of wood plank;The interim pier of dismantling concrete;Remove protection steel plate;Recovery route and etc..It is provided by the invention to cross the construction method for shipping beam solves the problems, such as how Beam-transporting Vehicle safely and fast passes through existing railway and reduce to existing railway Influence to operation when Urban Bridge construction by railway.The present invention takes a series of technical measures, it is ensured that the safety of construction overall process existing railway track and related facility ensure that the transportation safety of Beam-transporting Vehicle, reduces construction risk, has saved cost of investment, improved fortune beam efficiency.
Description
Technical field
The invention belongs to Municipal Engineering Construction technical field, the construction party of beam is shipped more particularly to a kind of cross by railway
Method.
Background technique
With the continuous progress of Urbanization Progress, the existing highway communication in city has been unable to satisfy present situation transport need, therefore
It needs largely to reconstruct, enlarging, newly-built municipal highway traffic, but since existing railway route plan mostly, it is more early to build, railway is all
Side infrastructure construction is substantially perfect, this has resulted in the shape that new (changing) builds municipal highway route Yu existing railway crisscross traffic
Condition increases significantly.Past highway and railway intersection generally use level crossing, when train passes through above-mentioned level crossing, highway
Temporarily break off a friendship.But with the quickening of the railroad train speed of service and the increasing of freight volume, the existing peace of this level crossing
Full property difference and the drawbacks of influencing highway normal traffic, day by day show, therefore are gradually changed to intersection, on point across and undercrossing tunnel
Two ways makes highway and railway separate operation, substantially increases safety.In upper across mode work progress, new highway
Bridge is faced with that railway two sides town and country existing building is more, influences the current situation of Beam-transporting Vehicle, and due to Beam-transporting Vehicle category
It in overlength, transfinites, overweight vehicle, therefore existing urban and suburban roads is difficult to meet its passage condition.If the newly-built road Yun Liang detoured,
Removal need to be reorganized, cost is too high, and the duration not can guarantee;According to newly-built temporary road degree of lip-rounding formula, then it is unfavorable for traffic safety,
And construction cost is high, and long construction period not can guarantee the duration.
Summary of the invention
To solve the above-mentioned problems, the purpose of the present invention is to provide a kind of crossed by railway to ship the construction method of beam.
In order to achieve the above object, provided by the invention to cross that ship beam construction method include carrying out in order by railway
The following steps:
1) muti-piece plate steel platform is made, four corners reserve a towing pad respectively on steel platform surface and setting one rises
Drop formula universal wheel;
2) one layer of aggregate chips is first laid on the ground of two existing railway two sides in construction area, then on aggregate chips layer upper berth
If one layer of protection steel plate, to be protected to existing cable;
3) supporting module on the ground on protection steel plate and between two existing railways, and coagulation is poured in template
Soil and two interim side piers and a Temporary central pier is made, wherein pier top surface in side is interior in high outside and low outside faulting of slab ends shape
It is flushed at the top of side top surface and rail;It is flushed at the top of the top surface of Temporary central pier and rail;
4) fill two-ash broken stones slope on the outside ground of side pier, and be compacted with small rammer, with the road Yun Liang
Road drop-over;
5) one layer of lumps of wood, lumps of wood both ends difference are laid with along perpendicular to rail direction on two rail of every existing railway
It is placed on the inside top surface of interim side pier and the top surface outside left of Temporary central pier, then edge is parallel on the lumps of wood
Rail direction is laid with one layer of plank and forms lumps of wood boarding;
6) steel platform is supported using jack, adjusts lift universal wheel and stretches out idler wheel thereon under steel platform
End, then the wirerope on loading machine is fastened on towing pad and steel platform is drawn in lumps of wood boarding, then with very heavy
Topmast props up steel platform, adjusts lift universal wheel and makes inside idler wheel retraction steel platform thereon, and unloading jack keeps steel flat
Platform falls in lumps of wood boarding surface, and support pad is firm, successively draws muti-piece steel platform and continuous laying is in every existing railway
In lumps of wood boarding;The gap on two existing railways between steel platform is filled using sleeper pier later;
7) column inclined-plane steel support is laid in the outer top surface of each interim side pier, and by pre- on interim side pier
It buries bolt the support of inclined-plane steel and interim side pier are fixed together;The outside inclined downward in surface of inclined-plane steel support, at this time inclined-plane steel
The inside top of support is flushed with steel platform surface;
8) after the completion of above-mentioned construction, Beam-transporting Vehicle is flat by two-ash broken stones slope, the support of inclined-plane steel, steel from existing railway side
Platform is moved to the other side;
9) after every completion a batch fortune beam task, unscrew pre-embedded bolt first, remove the support of inclined-plane steel, withdraw from sleeper pier;Later
Steel platform is supported using jack, adjusts lift universal wheel and the idler wheel that makes thereon stretches out the lower end of steel platform, utilizes dress
Carrier aircraft is successively drawn muti-piece steel platform and is removed;Last manual demolition lumps of wood boarding, restores existing railway operation;
10) when needing to transport beam again, step 5)-step 9) is repeated, after the completion of all beams all transport, is removed interim
Side pier and Temporary central pier withdraw from protection steel plate, restore existing railway original state.
In step 1), the steel platform is made of steel plate panel, plurality of steel plates bottom plate and Duo Gen I-steel;Wherein steel
Plate face plate is rectangle structure, is horizontally disposed with;More I-steel spacing distances are arranged side by side, and upper end wing plate is welded on steel plate panel
Bottom surface on;Steel plate bottom plate is string configuration, and plurality of steel plates bottom plate spacing distance is arranged side by side, with the side vertical with I-steel
Formula is welded on the lower end wing plate of I-steel.
In step 1), the size of the steel platform upper steel plate panel is 4m × 2.4m × 20mm, the ruler of steel plate bottom plate
Very little is 2.4m × 0.5m × 20mm;I-steel uses I18 I-steel.
In step 1), the lift universal wheel be arranged in the steel plate bottom plate interspaces at steel platform both ends with most
The crossover location of outside I-steel is made of hoistable platform, idler wheel and adjusting screw rod, and wherein hoistable platform is welded on I-steel
On, it adjusts screw rod and is located at upper end, idler wheel is located at lower end.
In step 2), the aggregate chips layer with a thickness of 5cm;The size for protecting steel plate is 6m × 1.5m × 20mm;
In step 3), the width of inside top surface is 0.3m, inside top surface and outer top surface on the interim side pier
Between difference in height be 0.15m.
In step 5), the size of the lumps of wood is 400cm × 10cm × 10cm;The size of plank be 250cm ×
25cm×5cm。
Provided by the invention crossed by railway ships the construction method of beam and has the following beneficial effects: solve Urban Bridge
How Beam-transporting Vehicle safely and fast passes through existing railway and reduces the problem to existing railway Influence to operation when construction.This hair
It is bright to take a series of technical measures, it is ensured that the safety of construction overall process existing railway track and related facility ensure that fortune
The transportation safety of beam vehicle reduces construction risk, has saved cost of investment, improved fortune beam efficiency.
Detailed description of the invention
Fig. 1 be using it is provided by the invention the construction method for shipping beam is crossed by railway when the structural schematic diagram built.
Fig. 2 be using it is provided by the invention the construction method for shipping beam is crossed by railway when build structure transverse face signal
Figure.
Fig. 3 is steel platform perspective view.
Fig. 4 is steel platform schematic cross-sectional view.
Fig. 5 is steel platform schematic longitudinal section.
Specific embodiment
Cross the construction method progress for shipping beam by railway to provided by the invention in the following with reference to the drawings and specific embodiments
It is described in detail.
Certain city road planning is city thoroughfare, is located near suburban railway station, and construction area is served as theme overpass
Structure, on across existing electrified railway, needed altogether railway set up 84 48mT beams, monolithic T beam weight 188t, scene and peripheral path
Do not had the execution conditions of railway fortune beam.The engineering uses construction method provided by the invention.
As Figure 1-Figure 5, provided in this embodiment to cross that ship beam construction method include carrying out in order by railway
The following steps:
1) muti-piece plate steel platform 5 is made, reserves a towing pad 12 and setting one respectively in 5 surface four corners of steel platform
A lift universal wheel 13;The steel platform 5 is made of steel plate panel 9, plurality of steel plates bottom plate 10 and Duo Gen I-steel 11;Its
Light plate panel 9 is rectangle structure, is horizontally disposed with;More 11 spacing distances of I-steel are arranged side by side, and upper end wing plate is welded on
On the bottom surface of steel plate panel 9;Steel plate bottom plate 10 be string configuration, 10 spacing distance of plurality of steel plates bottom plate be arranged side by side, with
The vertical mode of I-steel 11 is welded on the lower end wing plate of I-steel 11.Every piece of 5 upper steel plate panel 9 of steel platform in the present embodiment
Size be 4m × 2.4m × 20mm, the size of steel plate bottom plate 10 is 2.4m × 0.5m × 20mm, uses 5 pieces altogether;I-steel 11
Using I18 I-steel, 8 are used altogether.Lift universal wheel 13 is arranged in 10 gaps of steel plate bottom plate at 5 both ends of steel platform
With the crossover location of outermost I-steel 11, it is made of hoistable platform, idler wheel and adjusting screw rod, wherein hoistable platform is welded on work
On word steel 11, adjusts screw rod and be located at upper end, idler wheel is located at lower end.
2) one layer of aggregate chips is first laid on the ground of two existing railway two sides in construction area, then on aggregate chips layer upper berth
If one layer of protection steel plate 1, to be protected to existing cable;In the present embodiment, aggregate chips layer with a thickness of 5cm;Protect steel plate 1
Having a size of 6m × 1.5m × 20mm;
3) supporting module on the ground on protection steel plate 1 and between two existing railways, and pour in template mixed
It coagulates soil and two interim side piers 2 and a Temporary central pier 14 is made, wherein pier 2 top surface in side is in high outside and low outside faulting of slab ends
Shape, inside top surface are flushed with the top of rail 15;The top surface of Temporary central pier 14 is flushed with the top of rail 15;The present embodiment
In, the width of inside top surface is 0.3m on interim side pier 2, and the difference in height between inside top surface and outer top surface is 0.15m.
4) fill two-ash broken stones slope on the outside ground of side pier 2, and be compacted with small rammer, with the road Yun Liang
Road drop-over;
5) one layer of lumps of wood, lumps of wood both ends are laid with along perpendicular to 15 direction of rail on two rail 15 of every existing railway
It is individually positioned in the inside top surface of interim side pier 2 and the top surface outside left of Temporary central pier 14, then on the lumps of wood
Lumps of wood boarding 4 is formed along 15 direction of rail, one layer of plank of laying is parallel to;In the present embodiment, the size of the lumps of wood is
400cm×10cm×10cm;The size of plank is 250cm × 25cm × 5cm;
6) steel platform 5 is supported using jack, adjusts lift universal wheel 13 and idler wheel thereon is made to stretch out steel platform 5
Lower end, then the wirerope on loading machine is fastened on towing pad 12 and steel platform 5 is drawn in lumps of wood boarding 4,
Steel platform 5 is supported with jack again, lift universal wheel 13 is adjusted and makes inside idler wheel retraction steel platform 5 thereon, is unloaded
Jack makes steel platform 5 fall in 4 surface of lumps of wood boarding, and support pad is firm, successively draws muti-piece steel platform 5 and continuous laying exists
In the lumps of wood boarding 4 of every existing railway;The gap on two existing railways between steel platform 5 is used into sleeper pier later
6 fillings;
7) column inclined-plane steel support 7 is laid in the outer top surface of each interim side pier 2, and by interim side pier 2
Pre-embedded bolt 8 by inclined-plane steel support 7 and interim side pier 2 be fixed together;The outside inclined downward in surface of inclined-plane steel support 7, this
When inclined-plane steel support 7 inside top flushed with 5 surface of steel platform;
8) after the completion of above-mentioned construction, Beam-transporting Vehicle supports 7, steel by two-ash broken stones slope, inclined-plane steel from existing railway side
Platform 5 is moved to the other side;
9) after every completion a batch fortune beam task, unscrew pre-embedded bolt 8 first, remove inclined-plane steel support 7, withdraw from sleeper pier 6;It
Steel platform 5 is supported using jack afterwards, adjusts lift universal wheel 13 and the idler wheel that makes thereon stretches out the lower end of steel platform 5,
Muti-piece steel platform 5 is successively drawn using loading machine and is removed;Last manual demolition lumps of wood boarding 4, restores existing iron
Road transport battalion;
10) when needing to transport beam again, step 5)-step 9) is repeated, after the completion of all beams all transport, is removed interim
Side pier 2 and Temporary central pier 14 withdraw from protection steel plate 1, restore existing railway original state.
Claims (7)
1. one kind is crossed by railway ships beam construction method, it is characterised in that: described crossed by railway ships beam construction method
Including the following steps carried out in order:
1) muti-piece plate steel platform (5) are made, four corners reserve a towing pad (12) and setting respectively on steel platform (5) surface
One lift universal wheel (13);
2) one layer of aggregate chips is first laid on the ground of two existing railway two sides in construction area, is then laid with one on aggregate chips layer
Layer protection steel plate (1), to be protected to existing cable;
3) supporting module on the ground in protection steel plate (1) and between two existing railways, and coagulation is poured in template
Soil and two interim side piers (2) and a Temporary central pier (14) is made, wherein side pier (2) top surface be in it is high outside and low outside
Faulting of slab ends shape flushes at the top of inside top surface and rail (15);The top surface of Temporary central pier (14) and the top of rail (15) are neat
It is flat;
4) fill two-ash broken stones slope on the outside ground of side pier (2), and be compacted with small rammer, with fortune beam road
Drop-over;
5) one layer of lumps of wood, lumps of wood both ends are laid with along perpendicular to rail (15) direction on two rail (15) of every existing railway
It is individually positioned in the inside top surface of interim side pier (2) and the top surface outside left of Temporary central pier (14), then in side
Lumps of wood boarding (4) are formed along rail (15) direction one layer of plank of laying is parallel on wood;
6) it is supported steel platform (5) using jack, adjusts lift universal wheel (13) and idler wheel thereon is made to stretch out steel platform
(5) then the wirerope on loading machine is fastened on towing pad (12) and steel platform (5) is drawn to lumps of wood plank knot by lower end
It on structure (4), then is supported steel platform (5) with jack, adjusts lift universal wheel (13) and keep idler wheel retraction steel thereon flat
Platform (5) is internal, and unloading jack makes steel platform (5) fall in lumps of wood boarding (4) surface, and support pad is firm, successively draws muti-piece
Steel platform (5) and continuous laying are in the lumps of wood boarding (4) of every existing railway;Steel on two existing railways is put down later
It is filled using sleeper pier (6) in gap between platform (5);
7) it is laid with column inclined-plane steel support (7) in the outer top surface of each interim side pier (2), and passes through interim side pier (2)
On pre-embedded bolt (8) by inclined-plane steel support (7) and interim side pier (2) be fixed together;Under the surface of inclined-plane steel support (7) is outside
Side's inclination, the inside top of inclined-plane steel support (7) is flushed with steel platform (5) surface at this time;
8) after the completion of above-mentioned construction, Beam-transporting Vehicle is flat by two-ash broken stones slope, inclined-plane steel support (7), steel from existing railway side
Platform (5) is moved to the other side;
9) after every completion a batch fortune beam task, unscrew first pre-embedded bolt (8), remove inclined-plane steel support (7), withdraw from sleeper pier (6);
It is supported steel platform (5) using jack later, adjusts lift universal wheel (13) and idler wheel thereon is made to stretch out steel platform (5)
Lower end, muti-piece steel platform (5) is successively drawn using loading machine and is removed;Last manual demolition lumps of wood boarding (4),
Restore existing railway operation;
10) when needing to transport beam again, step 5)-step 9) is repeated, after the completion of all beams all transport, removes interim side pier
Platform (2) and Temporary central pier (14) withdraw from protection steel plate (1), restore existing railway original state.
2. according to claim 1 crossed by railway ships beam construction method, it is characterised in that: described in step 1)
Steel platform (5) be made of steel plate panel (9), plurality of steel plates bottom plate (10) and more I-steel (11);Wherein steel plate panel (9)
For rectangle structure, it is horizontally disposed with;More I-steel (11) spacing distances are arranged side by side, and upper end wing plate is welded on steel plate panel
(9) on bottom surface;Steel plate bottom plate (10) be string configuration, plurality of steel plates bottom plate (10) spacing distance be arranged side by side, with work
The vertical mode of word steel (11) is welded on the lower end wing plate of I-steel (11).
3. according to claim 1 crossed by railway ships beam construction method, it is characterised in that: described in step 1)
The size of steel platform (5) upper steel plate panel (9) be 4m × 2.4m × 20mm, the size of steel plate bottom plate (10) is 2.4m × 0.5m
×20mm;I-steel (11) uses I18 I-steel.
4. according to claim 1 crossed by railway ships beam construction method, it is characterised in that: described in step 1)
Lift universal wheel (13) be arranged in gap and outermost I-steel between the steel plate bottom plate (10) at steel platform (5) both ends
(11) crossover location is made of hoistable platform, idler wheel and adjusting screw rod, and wherein hoistable platform is welded on I-steel (11),
It adjusts screw rod and is located at upper end, idler wheel is located at lower end.
5. according to claim 1 crossed by railway ships beam construction method, it is characterised in that: described in step 2)
Aggregate chips layer with a thickness of 5cm;The size for protecting steel plate (1) is 6m × 1.5m × 20mm.
6. according to claim 1 crossed by railway ships beam construction method, it is characterised in that: described in step 3)
Interim side pier (2) on the width of inside top surface be 0.3m, difference in height between inside top surface and outer top surface is 0.15m.
7. according to claim 1 crossed by railway ships beam construction method, it is characterised in that: described in step 5)
The lumps of wood size be 400cm × 10cm × 10cm;The size of plank is 250cm × 25cm × 5cm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710975791.3A CN107604823B (en) | 2017-10-19 | 2017-10-19 | It is a kind of to cross the construction method for shipping beam by railway |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710975791.3A CN107604823B (en) | 2017-10-19 | 2017-10-19 | It is a kind of to cross the construction method for shipping beam by railway |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107604823A CN107604823A (en) | 2018-01-19 |
CN107604823B true CN107604823B (en) | 2018-12-11 |
Family
ID=61077504
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710975791.3A Active CN107604823B (en) | 2017-10-19 | 2017-10-19 | It is a kind of to cross the construction method for shipping beam by railway |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107604823B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110373969A (en) * | 2019-07-19 | 2019-10-25 | 郭斯羽 | A kind of anti-jump vehicle transition plates for road rail intersection region |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4948041B2 (en) * | 2006-05-31 | 2012-06-06 | 日本車輌製造株式会社 | Bridge erection method |
CN200988741Y (en) * | 2006-07-07 | 2007-12-12 | 中铁建工集团有限公司 | Over railway line transport mounting positioning trolley |
CN201598546U (en) * | 2009-12-08 | 2010-10-06 | 济南金力液压机械有限公司 | Quick telescopic railway span bridge |
CN104652299B (en) * | 2015-02-05 | 2016-05-11 | 中铁六局集团有限公司 | Construction method is shifted out in the whole hole of a kind of existing bridges and culverts of electric railway |
CN104787568B (en) * | 2015-03-27 | 2017-08-25 | 华电重工股份有限公司 | The cross-line carrying method and system of a kind of pile heap |
-
2017
- 2017-10-19 CN CN201710975791.3A patent/CN107604823B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN107604823A (en) | 2018-01-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102926299B (en) | Railway elevating and fixing device and railway bridge and culvert construction method adopting railway elevating and fixing device | |
CN100441779C (en) | Space-precasting translation-emplacing method for bridge construction | |
CN103485288B (en) | A kind ofly pass through both wired double-deck jacking culvert construction technology | |
CN101781878B (en) | Integral lifting template of main pylon of single-pylon cable-stayed bridge without dorsal cables and lifting construction method thereof | |
CN203487475U (en) | Line suspending and reinforcing structure for existing line jacking bridge and culvert construction | |
CN113152306B (en) | Small-radius large-gradient prefabricated T beam frame construction method | |
CN106192620B (en) | A kind of railway ballastless track supporting layer and substructure change method | |
CN108374297B (en) | Business Line tunnel, bridge section concrete sleeper swap method | |
CN105908583A (en) | System for replacing tunnel ballast track bed with ballastless track under non-interruption traveling condition | |
CN107604823B (en) | It is a kind of to cross the construction method for shipping beam by railway | |
KR101234090B1 (en) | Method for changing girder of railway plate girder bridge | |
CN208995842U (en) | Level crossing mouth railway roadbed | |
CN208328660U (en) | The U-shaped girder construction of the Two bors d's oeuveres of combined bridge | |
CN217324965U (en) | Face track laying base bridge that combines forever | |
CN107245960A (en) | A kind of segmented construction system updated for urban viaduct and method | |
CN105926381A (en) | Method for changing ballast track bed of tunnel to ballastless track under condition of uninterrupted train working | |
CN113106877B (en) | Existing bridge rotation utilization method | |
CN107988854A (en) | A kind of later stage of subway upper cover vehicle base stopping train checkup shed reserves structure | |
CN110184929B (en) | Comprehensive construction method for main and auxiliary lines of public rail co-constructed bridge | |
CN208072089U (en) | A kind of subway upper cover vehicle base stopping train checkup shed later stage reserved structure | |
CN113529516A (en) | Pile plate roadbed structure of underpass railway bridge and highway and construction method thereof | |
CN202865708U (en) | Railway aerial fixing device | |
CN102619523B (en) | Unequal-height tank whole jacking construction method | |
CN117188347B (en) | Through bridge dismounting method | |
CN212714587U (en) | Equipment for removing and rebuilding superstructure of widened bridge across electrified railway |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |