CN107576829A - A kind of single-phase electronic energy meter galvanic element structure - Google Patents

A kind of single-phase electronic energy meter galvanic element structure Download PDF

Info

Publication number
CN107576829A
CN107576829A CN201710971014.1A CN201710971014A CN107576829A CN 107576829 A CN107576829 A CN 107576829A CN 201710971014 A CN201710971014 A CN 201710971014A CN 107576829 A CN107576829 A CN 107576829A
Authority
CN
China
Prior art keywords
conducting strip
energy meter
relay
transformer
galvanic element
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710971014.1A
Other languages
Chinese (zh)
Inventor
郭永旺
秦天福
刘建新
姬光锋
邓恒军
陈卫国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Newcapec Electronics Co Ltd
Original Assignee
Newcapec Electronics Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Newcapec Electronics Co Ltd filed Critical Newcapec Electronics Co Ltd
Priority to CN201710971014.1A priority Critical patent/CN107576829A/en
Publication of CN107576829A publication Critical patent/CN107576829A/en
Pending legal-status Critical Current

Links

Landscapes

  • Measuring Instrument Details And Bridges, And Automatic Balancing Devices (AREA)

Abstract

The invention discloses a kind of single-phase electronic energy meter galvanic element structure, including relay (1), transformer (2), preceding conducting strip (3), rear conducting strip (4) and flexible conductor (5), the preceding conducting strip (3) is welded through (2) after transformer and one end of flexible conductor (5), and one of current sheet of the other end of flexible conductor (5) and relay (1) welds, another current sheet and the rear conducting strip (4) of the relay (1) are welded.Each conductive component of the present invention is attached by welding manner, and can effectively reduce caloric value using transformer, is effectively reduced the thermal runaway probability of electric energy meter, is drastically increased reliability.

Description

A kind of single-phase electronic energy meter galvanic element structure
Technical field
The present invention relates to a kind of electric energy meter component structural, more particularly to a kind of structure of electric energy meter internal current part.
Background technology
Electric energy meter is the instrument for measuring electric energy, also known as kilowatt-hour meter, energy meter, kilowatt-hour table, refers to the various electricity of measurement The instrument of amount.The galvanic element of traditional single-phase electronic energy meter uses mode connects for screw using current divider and conducting strip, is fully loaded with Caloric value is big during excessively stream, exists and burns risk.
The content of the invention
Goal of the invention:In order to overcome the deficiencies in the prior art, the present invention provides a kind of single-phase electricity of high reliability Minor electric energy meter current modular construction.
Technical scheme:To achieve the above object, the technical solution adopted by the present invention is:
A kind of single-phase electronic energy meter galvanic element structure, including relay, transformer, preceding conducting strip, rear conducting strip And flexible conductor, the preceding conducting strip are welded after passing through transformer with one end of flexible conductor, and the other end of flexible conductor with One of current sheet welding of relay, another current sheet and the rear conducting strip of the relay are welded.
Preferably:The preceding conducting strip and rear conducting strip are Z-shaped.
Preferably:The transformer, rear conducting strip are respectively arranged at the both sides of relay.
The present invention compared with prior art, has the advantages that:
The single-phase electronic energy meter galvanic element structure of the present invention, each conductive component are attached by welding manner, And caloric value can be effectively reduced using transformer, the thermal runaway probability of electric energy meter is effectively reduced, drastically increases reliability.
Brief description of the drawings
Fig. 1 is the structural representation of the present invention.
Wherein, 1 relay is represented, 2 represent transformer, and conducting strip before 3 expressions, conducting strip after 4 expressions, 5 represent flexible conductors.
Embodiment
Below in conjunction with the accompanying drawings and specific embodiment, the present invention is furture elucidated, it should be understood that these examples are merely to illustrate this Invention rather than limitation the scope of the present invention, after the present invention has been read, those skilled in the art are various to the present invention's The modification of the equivalent form of value falls within the application appended claims limited range.
A kind of single-phase electronic energy meter galvanic element structure, as shown in figure 1, including relay 1, transformer 2, preceding conduction Piece 3, rear conducting strip 4 and flexible conductor 5, the preceding conducting strip 3 pass through after transformer 2 to be welded with one end of flexible conductor 5, and The other end of flexible conductor 5 welds with one of current sheet of relay 1, another current sheet of the relay 1 and rear conduction The complete single-phase electronic energy meter galvanic element of shape one after piece 4 is welded.The preceding conducting strip 3 and rear conducting strip 4 are equal To be Z-shaped.The transformer 2, rear conducting strip 4 are respectively arranged at the both sides of relay 1.
The current divider of existing electric energy meter is actual be exactly a resistance sincereness very little resistance, because its is cheap, mesh Preceding single-phase electric meter generally uses, and when meter case is designed as narrow volume, the heating of current divider just becomes extremely important , because amount of heat caused by current divider can not be dissipated by the shell of narrow volume, ultimately result in current-carrying in ammeter Part temperature rise is too high so as to cause insulated support not bear, and internal short-circuit can be caused to trigger electrical fire when serious, and originally The galvanic element of the single-phase electronic energy meter of invention uses transformer, while each conductive component takes welding manner to complete Connect, and transformer 2, rear conducting strip 4 are separately positioned on to the both sides of relay 1, found through temperature rise test comparing result, application The structure of the present invention can effectively reduce preceding conducting strip 3 and rear more than the surface temperature rise 10K of conducting strip 4, so as to effectively reduce electric energy The thermal runaway probability of table, drastically increases reliability.
Described above is only the preferred embodiment of the present invention, it should be pointed out that:For the ordinary skill people of the art For member, under the premise without departing from the principles of the invention, some improvements and modifications can also be made, these improvements and modifications also should It is considered as protection scope of the present invention.

Claims (3)

  1. A kind of 1. single-phase electronic energy meter galvanic element structure, it is characterised in that:Including relay (1), transformer (2), preceding Conducting strip (3), rear conducting strip (4) and flexible conductor (5), the preceding conducting strip (3) pass through (2) and flexible conductor (5) after transformer One end welded, and one of current sheet of the other end of flexible conductor (5) and relay (1) welds, the relay (1) another current sheet is welded with rear conducting strip (4).
  2. 2. single-phase electronic energy meter galvanic element structure according to claim 1, it is characterised in that:The preceding conducting strip (3) it is Z-shaped with rear conducting strip (4).
  3. 3. single-phase electronic energy meter galvanic element structure according to claim 1, it is characterised in that:The transformer (2), Conducting strip (4) is respectively arranged at the both sides of relay (1) afterwards.
CN201710971014.1A 2017-10-18 2017-10-18 A kind of single-phase electronic energy meter galvanic element structure Pending CN107576829A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710971014.1A CN107576829A (en) 2017-10-18 2017-10-18 A kind of single-phase electronic energy meter galvanic element structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710971014.1A CN107576829A (en) 2017-10-18 2017-10-18 A kind of single-phase electronic energy meter galvanic element structure

Publications (1)

Publication Number Publication Date
CN107576829A true CN107576829A (en) 2018-01-12

Family

ID=61037131

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710971014.1A Pending CN107576829A (en) 2017-10-18 2017-10-18 A kind of single-phase electronic energy meter galvanic element structure

Country Status (1)

Country Link
CN (1) CN107576829A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111830301A (en) * 2019-04-23 2020-10-27 宁波三星智能电气有限公司 Electric energy meter

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2345983Y (en) * 1998-01-09 1999-10-27 张务正 Anti-steal electrical apparatus for single-phase pre-payment electric energy meter
KR20090103018A (en) * 2008-03-27 2009-10-01 주식회사 한산에이엠에스텍크 Watt-Hour Meter With Removed Current Terminal Block Using Clamp Current Transfomer
CN201383186Y (en) * 2009-02-28 2010-01-13 浙江永昌仪表有限公司 Electric relay terminal base for prepaid single-phase electric energy meter
CN201397543Y (en) * 2009-02-28 2010-02-03 浙江永昌仪表有限公司 Relay with current transformer and electric energy meter
CN201490102U (en) * 2009-04-17 2010-05-26 郁晓亮 Three-phase electric energy meter load modular magnetic latching relay
CN202351287U (en) * 2011-11-18 2012-07-25 浙江朗万电气科技有限公司 Installation structure for built-in magnetic latching relay of intelligent electric meter
CN207281133U (en) * 2017-10-18 2018-04-27 新开普电子股份有限公司 A kind of single-phase electronic energy meter galvanic element structure

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2345983Y (en) * 1998-01-09 1999-10-27 张务正 Anti-steal electrical apparatus for single-phase pre-payment electric energy meter
KR20090103018A (en) * 2008-03-27 2009-10-01 주식회사 한산에이엠에스텍크 Watt-Hour Meter With Removed Current Terminal Block Using Clamp Current Transfomer
CN201383186Y (en) * 2009-02-28 2010-01-13 浙江永昌仪表有限公司 Electric relay terminal base for prepaid single-phase electric energy meter
CN201397543Y (en) * 2009-02-28 2010-02-03 浙江永昌仪表有限公司 Relay with current transformer and electric energy meter
CN201490102U (en) * 2009-04-17 2010-05-26 郁晓亮 Three-phase electric energy meter load modular magnetic latching relay
CN202351287U (en) * 2011-11-18 2012-07-25 浙江朗万电气科技有限公司 Installation structure for built-in magnetic latching relay of intelligent electric meter
CN207281133U (en) * 2017-10-18 2018-04-27 新开普电子股份有限公司 A kind of single-phase electronic energy meter galvanic element structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111830301A (en) * 2019-04-23 2020-10-27 宁波三星智能电气有限公司 Electric energy meter
CN111830301B (en) * 2019-04-23 2023-03-31 宁波三星智能电气有限公司 Electric energy meter

Similar Documents

Publication Publication Date Title
CN103399184B (en) Conveniently can adjust the combined connection box of phase sequence
CN202930567U (en) Copper aluminum transitional device cable clamp
CN207281133U (en) A kind of single-phase electronic energy meter galvanic element structure
CN107576829A (en) A kind of single-phase electronic energy meter galvanic element structure
CN103337760A (en) Secondary short circuiting line for CT and PT
CN207651616U (en) A kind of lithium battery structure
CN202940537U (en) Fixing device for connecting component between transformer and power distribution line
CN202455061U (en) Intelligent comprehensive resonance elimination device
CN205982388U (en) New forms of energy electric automobile uses novel shunt
CN209231397U (en) With heat dissipation effect and jamproof manganese copper diverter
CN204595063U (en) A kind of electrical circuit inspection and contact electroscope
CN203787497U (en) Adapter plate and lithium ion battery pack with same
CN209656752U (en) A kind of current divider that can be radiated
CN209515585U (en) A kind of conductor connecting structure of leakage circuit breakers
CN102593813A (en) Intelligent comprehensive resonance elimination device
CN206564318U (en) Precision attenuator rock-steady structure
CN110895323A (en) Portable mutual inductor test rod
CN207053816U (en) A kind of resistant to elevated temperatures electric heating tube
CN201829629U (en) Neutral wire connecting device of high-voltage parallel capacitor group
CN207457329U (en) A kind of checking of great current equipment
CN209087593U (en) Converter station alternating current filter condenser terminal connection structure
CN102121945A (en) Anti-overburning single-phase energy meter
CN110211827A (en) A kind of processing method reducing the nigrescence carbonization of timer contact
CN208754569U (en) A kind of eduction rod structure of solid heat storage device
CN213988453U (en) Resistance wire

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination