CN107563714A - The method and device of business process map generation - Google Patents
The method and device of business process map generation Download PDFInfo
- Publication number
- CN107563714A CN107563714A CN201710579789.4A CN201710579789A CN107563714A CN 107563714 A CN107563714 A CN 107563714A CN 201710579789 A CN201710579789 A CN 201710579789A CN 107563714 A CN107563714 A CN 107563714A
- Authority
- CN
- China
- Prior art keywords
- flow
- node
- flow part
- business process
- process map
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention relates to a kind of method and device of business process map generation.Wherein it the described method comprises the following steps:The initial flowchart of business flow processing is set, and the position of flow part is determined in initial flowchart;The flow part is read, and is put into correspondence position in the initial flowchart;The flow that the flow part includes is performed into flow with other in the initial flowchart in addition to the flow part to merge, generates final business process map.And more than one operation flow node is included in the flow part.Split flow in the middle part of operation flow is extracted out and is packaged into a flow part by it, and it is can be with the base unit of independent authorization.When establishing operation flow, stored flow part can be directly invoked, avoids a large amount of repetitive operations.And relative to using each operation flow truly performed as a processing unit, part flow is fabricated to the shared flexibility for using, adding operation flow structure of a flow chart.
Description
Technical field
The present invention relates to field of computer technology, more particularly to a kind of method and device of business process map generation.
Background technology
In enterprise's routine matter processing procedure, the examination & approval of various lists, especially expense document can be related to, and typically
All it is complex by some, more personal, multi-level examination & approval, execution flow.And different types of list, the different amount of money
Expense list approving person it is different, approval process is different.In traditional business, (operation flow is set approval process designer
Personnel) can be according to the set examination & approval rule setting approval process of different type list, and generate business process map.But traditional process
The method of figure generation is handled using whole flow process as minimum unit, needs to carry out whole flow configuration processors every time
Set, flow setting flexibility ratio is poor.
The content of the invention
Based on this, it is necessary to whole installation is needed for above-mentioned business process map, the problem of flexibility ratio difference, there is provided Yi Zhongneng
Enough it is combined the method and device of the business process map generation of calling.
To realize a kind of method of business process map generation of the object of the invention offer, comprise the following steps:
The initial flowchart of business flow processing is set, and the position of flow part is determined in initial flowchart;
The flow part is read, and is put into correspondence position in the initial flowchart;
The flow that the flow part includes is held with other in the initial flowchart in addition to the flow part
Row flow merges, and generates final business process map;
More than one operation flow node is included in the flow part.
The method of the business process map generation of one of embodiment, includes two or more Business Stream in the flow part
Cheng Jiedian, and a flow part is a complete operation flow.
The method of the business process map generation of one of embodiment, uses node connecting line in the initial flowchart
And placeholder determines the position of the flow part.
The method of the business process map generation of one of embodiment, in the initial flow of the setting business flow processing
It is further comprising the steps of before figure:
The operation flow node that part in one business flow processing is continuously performed or the generation of whole operation flow
One component flow diagram, and be encapsulated into the flow part.
The method of the business process map generation of one of embodiment, the flow that the flow part is included and institute
State other execution flows in initial flowchart in addition to the flow part to merge, generate final business process map, including
Following steps:
Determine first operation flow node adjacent with the flow part in the initial flowchart and in rear Business Stream
Cheng Jiedian;
The operation flow node that the flow part includes is determined, and deletes the start node and knot in the flow part
Shu Jiedian;
The order performed according to the operation flow node in the flow part, will be performed at first in the flow part
The operation flow node connection formerly operation flow node, the operation flow node that will finally be performed in the flow part
Connection is described in rear operation flow node;
Show the design sketch that connection is completed, generate final business process map.
The method of the business process map generation of one of embodiment, the modification to the flow part include following step
Suddenly:
Receive the modification signal of the flow part;
Judge whether the modification signal person of sending has modification authority;
If so, then the flow part is modified according to the modification signal;
Modification is forbidden to alarm if it is not, then sending.
A kind of device of business process map generation based on same design, including:
Initial flowchart setup module, for setting the initial flowchart of business flow processing, and in initial flowchart
Determine the position of flow part;
Flow part read module, for reading the flow part, and it is put into the initial flowchart and corresponds to position
Put;
Flow chart generation module, for the flow for including the flow part and remove the stream in the initial flowchart
Other beyond journey part perform flow merging, generate final business process map;
More than one operation flow node is included in the flow part.
The device of the business process map generation of one of embodiment, uses node connecting line in the initial flowchart
And placeholder determines the position of the flow part.
The device of the business process map generation of one of embodiment, the flow chart generation module include:
Position determination sub-module, for determining first Business Stream adjacent with the flow part in the initial flowchart
Cheng Jiedian and in rear operation flow node;
Flow part processing submodule, the operation flow node included for determining the flow part, and described in deletion
Start node and end node in flow part;
Part connection processing submodule, for according in the flow part operation flow node perform order,
The operation flow node performed at first in the flow part is connected into the formerly operation flow node, by the flow part
In the operation flow node connection that finally performs it is described in rear operation flow node;
Pattern exhibition submodule, the design sketch completed for showing connection, generates final business process map.
The device of the business process map generation of one of embodiment, in addition to part modified module, for the stream
Journey part is modified;
The part modified module includes:
Signal receiving submodule, for receiving the modification signal of the flow part;
Authority judging submodule, for judging whether the modification signal person of sending has modification authority;
Modification processing submodule, for the judged result according to the authority judging submodule, when the modification signal hair
When the person of going out has modification authority, then the flow part is modified according to the modification signal;When the modification signal hair
When the person of going out does not have modification authority, then send and forbid modification to alarm.
Beneficial effects of the present invention include:The method of business process map generation provided by the invention, it is by operation flow
Part flow is extracted out and is packaged into a flow part, and it is can be with the base unit of independent authorization., can when establishing operation flow
To directly invoke stored flow part, a large amount of repetitive operations are avoided.And truly performed relative to by each
Part flow is fabricated to the shared use of a flow chart, adds operation flow structure by operation flow as a processing unit
The flexibility built.
Brief description of the drawings
Fig. 1 is a kind of procedure chart of a specific embodiment of the method for business process map generation of the present invention;
Fig. 2 is a flow component flow diagram in a kind of instantiation of method one of business process map generation of the present invention;
Fig. 3 is initial schematic flow sheet in a kind of instantiation of method one of business process map generation of the present invention;
Fig. 4 is the operation flow signal generated in a kind of instantiation of method one of business process map generation of the present invention
Figure;
Fig. 5 is flow chart details of construction process in an a kind of specific embodiment of the method for business process map generation of the present invention
Figure;
Fig. 6 is that flow part changes process in an a kind of specific embodiment of the method for business process map generation of the present invention
Figure;
Fig. 7 is that an a kind of specific embodiment of the device of business process map generation of the present invention forms schematic diagram;
Fig. 8 is that flow chart generation module is formed in an a kind of specific embodiment of the method for business process map generation of the present invention
Schematic diagram;
Fig. 9 is that part modified module composition is shown in an a kind of specific embodiment of the method for business process map generation of the present invention
It is intended to.
Embodiment
In order to make the purpose , technical scheme and advantage of the present invention be clearer, below in conjunction with accompanying drawing to the present invention's
The embodiment of the method and device of business process map generation illustrates.It is it should be appreciated that described herein specific real
Example is applied only to explain the present invention, is not intended to limit the present invention.
As shown in figure 1, the method for the business process map generation of an example, comprises the following steps:
S100, the initial flowchart of business flow processing is set, and the position of flow part is determined in initial flowchart.
Wherein, the flow part is a packaged part process program, in the flow part comprising one with
Upper operation flow node, it can typically include two or more operation flow node.And it is encapsulated in generally as a flow part
Multiple operation flow nodes together are an interim permit business set, and a flow part is a complete Business Stream
Journey.Such as leader's examination & approval partial encapsulation in the conventional approval process of a department is risen and is used as a flow part, in flow portion
Multiple leaders examined successively are encapsulated in part.For another example in the operation flow of a group company, the industry of general branch company
Flow of being engaged in will also pass through parent company and examine after examination & approval completion inside branch company, and examination & approval of the parent company to Duo Jia branch companies
Flow is consistent.The examination & approval of parent company can be packaged together as to parent company's approval process part in a point public affairs in this method
It is added at any time in business process map during department's examination & approval.And the flow part of parent company's examination & approval is in other un-added Business Streams
Cheng Zhong, it is an independent flow chart when not combined with other operation flows, is a base that can individually carry out authorisation process
This unit, it is formed as shown in Fig. 2 comprising parent company's financial approval, parent company leader with specific duties examination & approval and parent company's manager's examination & approval
Three operation flow nodes, also comprising start node and end node.
As shown in figure 3, in an instantiation, branch company, which carries out the examination & approval of financial account operation flow, to be needed by department
Manager's examination & approval, leader with specific duties's examination & approval, then examined by subsidiary general manager, when Payment Amount is less than 4000, subsidiary always passes through
Operation flow terminates after reason examination & approval;But when Payment Amount is more than 4000, it is also necessary to which parent company examines, and now examines parent company
The flow part criticized is set to the position between subsidiary general manager examination & approval and end node.Subsequently can be according to the position of setting
Flow part is added in business process map.
Operation flow described in this step refers to the processing procedure for the item for needing multiple personnel to be examined.It is described initial
Flow chart refers to the operation flow node and execution sequence required in set flow implementation procedure, but the initial flow
Figure is not the flow chart of commencement of commercial operation circulation, simply first for flow part because containing flow part in the flow chart
Step sets the position of its execution, but the Business Stream in it can't specify flow part before not transferring the flow part
Cheng Jiedian and execution sequence, therefore the detailed process of current business cannot be also determined, so the initial flowchart is one
Individual flow chart blank, operating execution can't be carried out according to it.
And for the position of flow part, placeholder and node connecting line can be used to determine.The placeholder clearly flows
Relative position of the journey part in initial flowchart;And the connecting line then accurately determines the section that flow part both ends are connected
Point.
S200, flow part is read, and be put into correspondence position in initial flowchart.In this step, read stored
Flow part, and parse the flow configuration processor of initial flowchart having been built up, flow part be added to initial flow
Specified location in figure.
It should be noted that for the flow part, as it was previously stated, can be according to the need of the use occasions such as group company
Ask structure multiple.Also the operation flow node or whole Business Stream continuously performed the part in a business flow processing
Mono- component flow diagram of Cheng Shengcheng, and be encapsulated into flow part, and stored according to certain rule, such as according to frequency of use
Storage etc. is numbered.Detailed flow part can also be write using detail and using rule, so as to carry out operation flow
During configuration, the setting of flow part can be carried out according to demand, and program file corresponding to reading enters the splicing integration of line program, with
Complete flow chart is made.
S300, other in the flow that flow part is included and initial flowchart in addition to flow part perform flows and closed
And generate final business process map.
Flow included in flow part described in this step is the multiple operation flow nodes included in flow part
And the execution sequence between operation flow node.Referring to Fig. 2, Fig. 3, it will be understood by those skilled in the art that in flow charts, it is more
Individual operation flow node can perform according to the direction order that arrow indicates.Include in the flow part being packaged together and completely hold
Row flow, the execution flow in part is merged with the flow outside part in this step.Those skilled in the art can manage
Solution, the merging of flow part is that the configuration processor of flow part is added to two business of initial flowchart according to specified location
Between flow nodes.And by program code by SVG (scalable vector graphicses), the JSON ((JavaScript of two flow charts
Object Notation, JS object tag)) etc. information spliced, ensure graphics proportion, object oriented uniformity, and handle
Line inside and outside part, start over the information such as node.As shown in figure 3, the front and rear operation flow node difference in flow part
For subsidiary's general manager's node and end node, between flow part is added into two operation flow nodes, so as to be added to
In flow.Ultimately generate business as shown in Figure 4 and perform flow.
The method of the business process map generation of the present embodiment, it will audit section with the operation flow compared with independent completion implication
Put assembled package together, the elementary cell as an independent authorization management.And multiple flow parts can be established and deposited
Storage, can directly read calling when in use, add the flexibility of operation flow setting.And multiple operation flows can be shared
One flow part, operation expense are low.
Encapsulation for flow part, it is also necessary to explanation, the encapsulation of flow part can be completed before step S100,
Specifically, the operation flow node that the part in a business flow processing is continuously performed or whole operation flow generation one
Individual component flow diagram (including start node and end node), and be encapsulated into flow part.Can be straight in follow-up process setting
Reading is connect to call.
Specifically, as shown in figure 5, flow part is removed in flow and initial flowchart that step S300 includes flow part
In addition other perform flow merging, generate final business process map, comprise the following steps:
S310, determine first operation flow node adjacent with flow part in initial flowchart and in rear operation flow section
Point.Referring to Fig. 3, shown in figure in business process map, the first operation flow node being connected with flow part always passes through for subsidiary
Reason, is end node in rear operation flow node.Determine the first operation flow node and the purpose in rear operation flow node
It is subsequently to be attached the operation flow node outside with it of the operation flow node in flow part, improves operation flow.
S320 determines the operation flow node that flow part includes, and deletes the start node in flow part and terminate to save
Point.It is in order to ensure the integrality of file, just to carry out processing as a complete flow chart when encapsulating flow part
In the maintenance of file.When flow part is added in flow chart as a part for a flow, it is necessary to will encapsulation when both ends
The start node and end node of addition are deleted, and flow part both ends and initial flowchart could be established into new connection, so as to
Form an operation flow for being used to perform.
The order that S330 performs according to the operation flow node in flow part, the industry that will be performed at first in flow part
Flow nodes of being engaged in connect first operation flow node, and the operation flow node finally performed in flow part is connected into rear business
Flow nodes.
In this step, the operation flow node performed at first in the flow part is to go out to open in flow component flow diagram
First operation flow node (such as Tu4Zhong parent companys financial approval node) of beginning node.It is used as in flow part and individually held
It is first node examined during row flow, accordingly, after flow part is added in initial flowchart, the node needs
To be connected as external connection node with the operation flow node of external connection position.It is appreciated that finally held in flow part
Capable service node (such as Tu4Zhong parent companys general manager examines) needs the operation flow node outside connection.
S340, show the design sketch that connection is completed, generate final business process map.As shown in figure 4, after the completion of merging,
The flow chart of generation is identical with the flow chart directly disposably designed.And in the present embodiment, position/layout of flow part
Shown etc. information using figure, What You See Is What You Get, user is easy to use to be understood.
In addition, in another embodiment, the step of modification of flow part is audited is further comprises, specifically, referring to Fig. 6, bag
Containing following steps:
S001, receive the modification signal of flow part.When enterprise personnel has variation, the industry in the flow part of original storage
The auditor of business flow nodes can change, and now need to modify to flow part.Certainly, institutional framework becomes
Changing or setting when personnel feel the need to can modify.The modification includes deleting operation flow node, increase industry
Business flow nodes, modification service node correspond to the details such as auditor's title and modification process components interior operation flow performs
Order etc..
S002, judge to change whether the signal person of sending has modification authority.The judgement for whether having modification authority needs basis
The modification authority condition to prestore before is compared.Can be set as the flow part examined for parent company allows parent company
Some or certain several responsible persons can modify, and the personnel of each branch company do not allow typically to flow portion of parent company
Part is modified.After adding modification authority restriction, can solve the control of authority of Business group mid-span organization flow
Problem.
If so, performing step S003, flow part is modified according to modification signal.
If it is not, performing step S004, send and forbid modification to alarm.Such as pop-up box and warning-sign.
Based on same inventive concept, a kind of device of business process map generation is also provided, because this device solves problem
Principle is similar to a kind of foregoing method of business process map generation, and therefore, the implementation of the device can be according to the tool of preceding method
Body step is realized, is repeated part and is repeated no more.
As shown in fig. 7, the device of the business process map generation of an embodiment, including initial flowchart setup module 100, stream
Journey part read module 200 and flow chart generation module 300.Wherein, the initial flowchart setup module 100, for setting
The initial flowchart of business flow processing, and in initial flowchart determine flow part position;The flow part is read
Module 200, for reading flow part, and it is put into correspondence position in initial flowchart;The flow chart generation module 300,
Merge for the flow that flow part includes to be performed into flow with other in initial flowchart in addition to flow part, generation is most
Whole business process map.And more than one operation flow node is included in flow part, and generally comprise two or more.
The device of the business process map generation of the present embodiment, it will audit section with the operation flow compared with independent completion implication
Point assembled package together, as the elementary cell of an independent authorization management, is easy to store, shared.And it can establish multiple
Flow part is stored, and can directly read calling when in use, adds the flexibility of operation flow setting.And multiple industry
Business flow can share a flow part, and operation expense is low.
In one of the embodiments, the position of flow part is determined using placeholder in initial flowchart.
As shown in figure 8, in the device of the business process map generation of wherein one embodiment, the flow chart generation module
300 include position determination sub-module 310, flow part processing submodule 320, part connection processing submodule 330 and image exhibition
Existing submodule 340.Wherein, the position determination sub-module 310, for determine in initial flowchart it is adjacent with flow part
First operation flow node and in rear operation flow node;The flow part handles submodule 320, for determining flow part bag
The operation flow node contained, and delete start node and end node in flow part;The part connection processing submodule
330, for the order performed according to the operation flow node in flow part, the Business Stream that will be performed at first in flow part
The first operation flow node of Cheng Jiedian connections, the operation flow node finally performed in flow part is connected to rear operation flow
Node;The pattern exhibition submodule 340, the design sketch completed for showing connection, generates final business process map.
The information such as position/layout of flow part is shown using figure in the present embodiment, What You See Is What You Get, facilitates user
Use.
As shown in figure 9, in another example, in addition to part modified module, for being modified to flow part.Specifically
, the part modified module includes signal receiving submodule, authority judging submodule and modification processing submodule.Wherein,
The signal receiving submodule, for receiving the modification signal of flow part;The authority judging submodule, for judging to change
Whether the signal person of sending has modification authority;The modification processing submodule, for the judgement knot according to authority judging submodule
Fruit, when the modification signal person of sending has modification authority, then flow part is modified according to modification signal;When modification signal
When the person of sending does not have modification authority, then send and forbid modification to alarm.
One of ordinary skill in the art will appreciate that realize all or part of flow in above-described embodiment method, being can be with
The hardware of correlation is instructed to complete by computer program, described program can be stored in a computer read/write memory medium
In, the program is upon execution, it may include such as the flow of the embodiment of above-mentioned each method.Wherein, described storage medium can be magnetic
Dish, CD, read-only memory (Read-Only Memory, ROM) or random access memory (Random Access
Memory, RAM) etc..
Embodiment described above only expresses the several embodiments of the present invention, and its description is more specific and detailed, but simultaneously
Therefore the limitation to the scope of the claims of the present invention can not be interpreted as.It should be pointed out that for one of ordinary skill in the art
For, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to the guarantor of the present invention
Protect scope.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.
Claims (10)
- A kind of 1. method of business process map generation, it is characterised in that comprise the following steps:The initial flowchart of business flow processing is set, and the position of flow part is determined in initial flowchart;The flow part is read, and is put into correspondence position in the initial flowchart;Other in the flow that the flow part is included and the initial flowchart in addition to the flow part perform stream Journey merges, and generates final business process map;More than one operation flow node is included in the flow part.
- 2. the method for business process map generation according to claim 1, it is characterised in that two are included in the flow part Individual above operation flow node, and a flow part is a complete operation flow.
- 3. the method for business process map generation according to claim 1, it is characterised in that make in the initial flowchart The position of the flow part is determined with node connecting line and placeholder.
- 4. the method for business process map generation according to claim 1, it is characterised in that at the setting operation flow It is further comprising the steps of before the initial flowchart of reason:The operation flow node that part in one business flow processing is continuously performed or whole operation flow generate one Component flow diagram, and be encapsulated into the flow part.
- 5. the method for business process map generation according to claim 1, it is characterised in that described by the flow part bag The flow contained performs flow with other in the initial flowchart in addition to the flow part and merged, and generates final business Flow chart, comprise the following steps:Determine first operation flow node adjacent with the flow part in the initial flowchart and in rear operation flow section Point;The operation flow node that the flow part includes is determined, and deletes the start node in the flow part and terminates to save Point;The order performed according to the operation flow node in the flow part, the industry that will be performed at first in the flow part Flow nodes of the being engaged in connection formerly operation flow node, the operation flow node finally performed in the flow part is connected It is described in rear operation flow node;Show the design sketch that connection is completed, generate final business process map.
- 6. the method for the business process map generation according to any one of claim 1 to 5, it is characterised in that to the flow The modification of part comprises the following steps:Receive the modification signal of the flow part;Judge whether the modification signal person of sending has modification authority;If so, then the flow part is modified according to the modification signal;Modification is forbidden to alarm if it is not, then sending.
- A kind of 7. device of business process map generation, it is characterised in that including:Initial flowchart setup module, for setting the initial flowchart of business flow processing, and determined in initial flowchart The position of flow part;Flow part read module, for reading the flow part, and it is put into correspondence position in the initial flowchart;Flow chart generation module, for the flow for including the flow part and remove the flow portion in the initial flowchart Other beyond part perform flow merging, generate final business process map;More than one operation flow node is included in the flow part.
- 8. the device of business process map generation according to claim 7, it is characterised in that make in the initial flowchart The position of the flow part is determined with node connecting line and placeholder.
- 9. the device of business process map generation according to claim 7, it is characterised in that the flow chart generation module bag Include:Position determination sub-module, for determining first operation flow section adjacent with the flow part in the initial flowchart Put and in rear operation flow node;Flow part handles submodule, the operation flow node included for determining the flow part, and deletes the flow Start node and end node in part;Part connection processing submodule, for the order performed according to the operation flow node in the flow part, by institute State the operation flow node connection performed at first in flow part the formerly operation flow node, by the flow part most The operation flow node connection performed afterwards is described in rear operation flow node;Pattern exhibition submodule, the design sketch completed for showing connection, generates final business process map.
- 10. the device of the business process map generation according to any one of claim 7 to 9, it is characterised in that also including part Modified module, for being modified to the flow part;The part modified module includes:Signal receiving submodule, for receiving the modification signal of the flow part;Authority judging submodule, for judging whether the modification signal person of sending has modification authority;Modification processing submodule, for the judged result according to the authority judging submodule, as the modification signal person of sending During with modification authority, then the flow part is modified according to the modification signal;As the modification signal person of sending During without modification authority, then send and forbid modification to alarm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710579789.4A CN107563714A (en) | 2017-07-17 | 2017-07-17 | The method and device of business process map generation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710579789.4A CN107563714A (en) | 2017-07-17 | 2017-07-17 | The method and device of business process map generation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107563714A true CN107563714A (en) | 2018-01-09 |
Family
ID=60973594
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710579789.4A Pending CN107563714A (en) | 2017-07-17 | 2017-07-17 | The method and device of business process map generation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107563714A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108958714A (en) * | 2018-07-02 | 2018-12-07 | 平安科技(深圳)有限公司 | Service Component formula development approach, device, computer equipment and storage medium |
CN109559099A (en) * | 2018-11-30 | 2019-04-02 | 广州净松软件科技有限公司 | Early warning rule configuration method, device and the computer equipment of observation system |
CN109684057A (en) * | 2018-12-11 | 2019-04-26 | 咪咕文化科技有限公司 | Task processing method, device and storage medium |
CN109933315A (en) * | 2019-02-26 | 2019-06-25 | 广州衡昊数据科技有限公司 | A kind of patterned transaction processing system and method |
Citations (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101387958A (en) * | 2008-10-20 | 2009-03-18 | 东软集团股份有限公司 | Image data processing method and apparatus |
CN101404076A (en) * | 2008-11-13 | 2009-04-08 | 吴素研 | Method for implementing dynamic flow path used for office automation official document circulation |
CN103207730A (en) * | 2013-04-03 | 2013-07-17 | 珠海飞企软件有限公司 | Generation method and generator for localizable dragging type flow chart |
CN104281906A (en) * | 2013-07-11 | 2015-01-14 | 江苏达科信息科技有限公司 | Process engine achieving method and system in service process |
CN105468371A (en) * | 2015-11-23 | 2016-04-06 | 赣南师范学院 | Business process chart combination method based on topic clustering |
CN105894142A (en) * | 2014-10-21 | 2016-08-24 | 北京京航计算通讯研究所 | Electronic process based filing and modeling method |
CN105988815A (en) * | 2015-03-04 | 2016-10-05 | 银联商务有限公司 | Business process development method and system |
CN106203167A (en) * | 2016-07-08 | 2016-12-07 | 北京小米移动软件有限公司 | Application rights management method and device |
CN106408170A (en) * | 2016-08-30 | 2017-02-15 | 北京北信源软件股份有限公司 | Electronic worksheet processing method, workflow engine and electronic worksheet system |
CN106445506A (en) * | 2016-09-06 | 2017-02-22 | 北京恒华伟业科技股份有限公司 | Business flow chart generation method, device and system |
CN106649231A (en) * | 2016-10-27 | 2017-05-10 | 深圳市元征科技股份有限公司 | Method and device for generating flow chart |
CN106648695A (en) * | 2016-12-31 | 2017-05-10 | 深圳市优必选科技有限公司 | Flow-diagram generating method and device |
CN106845741A (en) * | 2015-12-03 | 2017-06-13 | 北大方正集团有限公司 | The customization device and customization method of workflow |
CN106897630A (en) * | 2017-01-24 | 2017-06-27 | 柳州得实科技有限公司 | A kind of accurate Rights Management System |
-
2017
- 2017-07-17 CN CN201710579789.4A patent/CN107563714A/en active Pending
Patent Citations (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101387958A (en) * | 2008-10-20 | 2009-03-18 | 东软集团股份有限公司 | Image data processing method and apparatus |
CN101404076A (en) * | 2008-11-13 | 2009-04-08 | 吴素研 | Method for implementing dynamic flow path used for office automation official document circulation |
CN103207730A (en) * | 2013-04-03 | 2013-07-17 | 珠海飞企软件有限公司 | Generation method and generator for localizable dragging type flow chart |
CN104281906A (en) * | 2013-07-11 | 2015-01-14 | 江苏达科信息科技有限公司 | Process engine achieving method and system in service process |
CN105894142A (en) * | 2014-10-21 | 2016-08-24 | 北京京航计算通讯研究所 | Electronic process based filing and modeling method |
CN105988815A (en) * | 2015-03-04 | 2016-10-05 | 银联商务有限公司 | Business process development method and system |
CN105468371A (en) * | 2015-11-23 | 2016-04-06 | 赣南师范学院 | Business process chart combination method based on topic clustering |
CN106845741A (en) * | 2015-12-03 | 2017-06-13 | 北大方正集团有限公司 | The customization device and customization method of workflow |
CN106203167A (en) * | 2016-07-08 | 2016-12-07 | 北京小米移动软件有限公司 | Application rights management method and device |
CN106408170A (en) * | 2016-08-30 | 2017-02-15 | 北京北信源软件股份有限公司 | Electronic worksheet processing method, workflow engine and electronic worksheet system |
CN106445506A (en) * | 2016-09-06 | 2017-02-22 | 北京恒华伟业科技股份有限公司 | Business flow chart generation method, device and system |
CN106649231A (en) * | 2016-10-27 | 2017-05-10 | 深圳市元征科技股份有限公司 | Method and device for generating flow chart |
CN106648695A (en) * | 2016-12-31 | 2017-05-10 | 深圳市优必选科技有限公司 | Flow-diagram generating method and device |
CN106897630A (en) * | 2017-01-24 | 2017-06-27 | 柳州得实科技有限公司 | A kind of accurate Rights Management System |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108958714A (en) * | 2018-07-02 | 2018-12-07 | 平安科技(深圳)有限公司 | Service Component formula development approach, device, computer equipment and storage medium |
WO2020006910A1 (en) * | 2018-07-02 | 2020-01-09 | 平安科技(深圳)有限公司 | Business componentization development method and apparatus, computer device, and storage medium |
CN108958714B (en) * | 2018-07-02 | 2021-08-24 | 平安科技(深圳)有限公司 | Business component type development method and device, computer equipment and storage medium |
CN109559099A (en) * | 2018-11-30 | 2019-04-02 | 广州净松软件科技有限公司 | Early warning rule configuration method, device and the computer equipment of observation system |
CN109684057A (en) * | 2018-12-11 | 2019-04-26 | 咪咕文化科技有限公司 | Task processing method, device and storage medium |
CN109684057B (en) * | 2018-12-11 | 2021-10-29 | 咪咕文化科技有限公司 | Task processing method and device and storage medium |
CN109933315A (en) * | 2019-02-26 | 2019-06-25 | 广州衡昊数据科技有限公司 | A kind of patterned transaction processing system and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107563714A (en) | The method and device of business process map generation | |
Bernardes et al. | Environmental correlations and Markovian to non-Markovian transitions in collisional models | |
WO2021042809A1 (en) | Asset purchase method and apparatus based on blockchain, and electronic device | |
Kim | Managing the transition of technology life cycle | |
Engels et al. | A combined reference model-and view-based approach to system specification | |
CN109102389A (en) | Financial asset circulation method, apparatus and storage medium in supply chain | |
US20030101133A1 (en) | Workflow management system for an automated credit application system | |
WO1991015828A1 (en) | Method and apparatus for creating and executing graphical models of complex systems | |
CN107274023A (en) | Flow of insuring generation method, insure request processing method and device and electronic equipment | |
Lee et al. | Measuring efficiency and ICT ecosystem impact: Hardware vs. software industry | |
CN111524008B (en) | Rule engine and modeling method, modeling device and instruction processing method thereof | |
CN110417857A (en) | Block chain protocol processes device, processing method and block chain | |
US8527322B2 (en) | Proactive demand shaping for a configurable product portfolio with uncertain demand | |
CN109960696A (en) | A kind of configuration method, equipment and the storage medium of intelligence contract | |
US8571929B2 (en) | Non pre-approved channel filtering for card acquisition | |
Granot et al. | Spanning network games | |
CN109284342A (en) | Method and apparatus for output information | |
CN112487453A (en) | Data security sharing method and device based on central coordinator | |
Feinstein et al. | Scalar multivariate risk measures with a single eligible asset | |
Farzi | Investigation of the Place of BIAN Standard in Digital Banking Enterprise Architecture | |
CN109767204A (en) | A kind of block chain advance payment financing method | |
US11449415B2 (en) | Self-service integration and feature testing | |
CN106875188A (en) | A kind of management by synchronization system of trading object, method and device | |
Lee | INTERPROCS: a Java-based prototyping environment for distributed electronic trade procedures | |
CN106095427B (en) | A kind of application component system suitable for on-line transaction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180109 |