CN107559592A - Shield mixing plant mortar jar delivery pipe and its construction method - Google Patents

Shield mixing plant mortar jar delivery pipe and its construction method Download PDF

Info

Publication number
CN107559592A
CN107559592A CN201710756737.XA CN201710756737A CN107559592A CN 107559592 A CN107559592 A CN 107559592A CN 201710756737 A CN201710756737 A CN 201710756737A CN 107559592 A CN107559592 A CN 107559592A
Authority
CN
China
Prior art keywords
pipe
mortar
feed pipe
protection
mixing plant
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710756737.XA
Other languages
Chinese (zh)
Inventor
李海
刘后华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201710756737.XA priority Critical patent/CN107559592A/en
Publication of CN107559592A publication Critical patent/CN107559592A/en
Pending legal-status Critical Current

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The present invention relates to a kind of shield mixing plant mortar jar delivery pipe, including the protection pipe of underground is embedded in advance;The feed pipe for mortar being arranged in the protection pipe;And it is located in the cushion block between the protection pipe and the feed pipe for mortar.Beneficial effects of the present invention are:Using the structure composition shield mixing plant mortar jar delivery pipe of internal and external casing; pre-buried pipeline is taken out so as to which ground need not be broken when plugging occurs; but only the inner sleeve of defeated slurry is extracted out from pre-buried protection pipe and can dredged; it is construction is simple, time-consuming short; shield grouting can be recovered in time to work continuously, the influence to the duration is small.

Description

Shield mixing plant mortar jar delivery pipe and its construction method
Technical field
The present invention relates to Shield Construction Technique field, refers in particular to a kind of shield mixing plant mortar jar delivery pipe and its construction party Method.
Background technology
The pipeline of shield mixing plant mortar jar conveying mortar is normally in the interim hardened place in ground, in order to not influence Road traffic, conveyance conduit are generally embedded under the passageway of ground.Due to the characteristic of mortar, once the mortar in delivery pipe is not defeated for a long time Send and be stranded in pipeline, mortar will harden generation plugging in the duct.However, shield grouting is to work continuously, delivery pipe It must recover in time after generation plugging.And because shield mixing plant mortar jar conveyance conduit is embedded in underground in advance, when plugging occurs, Have to break road surface, the pipeline that is embedded in underground will be dug out and taken out, dredged section by section, it is dredged, and the difficulty of construction is big, consumption Duration, working continuously for shield grouting is easily interrupted, has a strong impact on the duration.
The content of the invention
The defects of it is an object of the invention to overcome prior art, there is provided a kind of shield mixing plant mortar jar delivery pipe and its Construction method, the shield mixing plant mortar jar delivery pipe that can solve to be embedded in underground is dredged when plugging occurs to be taken too long Problem.
Realizing the technical scheme of above-mentioned purpose is:
The invention provides a kind of shield mixing plant mortar jar delivery pipe, including:
The pre- protection pipe for being embedded in underground;
The feed pipe for mortar being arranged in the protection pipe;And
The cushion block being located between the protection pipe and the feed pipe for mortar.
The invention has the advantages that using the structure composition shield mixing plant mortar jar delivery pipe of internal and external casing, so that Ground need not be broken when plugging occurs and takes out pre-buried pipeline, but only by the inner sleeve of defeated slurry from pre-buried protection pipe Extraction can be dredged, construction is simple, time-consuming short, recovered shield grouting in time and worked continuously, the influence to the duration is minimum.
Shield mixing plant mortar jar delivery pipe of the present invention further improvement is that, the protection pipe connects including multiple head and the tail The protection pipe unit connect, by protecting pipe flange and bolt connection to fix between two adjacent protection pipe units.
Shield mixing plant mortar jar delivery pipe of the present invention further improvement is that, the feed pipe for mortar connects including multiple head and the tail The feed pipe for mortar unit connect, fixed by feed pipe for mortar flange and bolt connection between two adjacent feed pipe for mortar units.
Shield mixing plant mortar jar delivery pipe of the present invention further improvement is that, pass through the cushion block and support the defeated slurry Pipe so that the feed pipe for mortar is located at the center of the protection pipe.
Shield mixing plant mortar jar delivery pipe of the present invention further improvement is that, the first face of the cushion block and the guarantor The inwall fitting of pillar, the second face is bonded with the outer wall of the feed pipe for mortar.
Present invention also offers a kind of construction method of shield mixing plant mortar jar delivery pipe, including:
One protection pipe is provided, the protection pipe is embedded in underground in advance;
Slurry-conveying tube is provided, the feed pipe for mortar is penetrated in the protection pipe;And
Multiple cushion blocks are provided, the cushion block is located between the protection pipe and the feed pipe for mortar.
Shield mixing plant mortar jar delivery pipe of the present invention construction method further improvement is that, by multiple protection pipe lists First head and the tail connection forms the protection pipe, specifically includes:
By protecting pipe flange and bolt that two adjacent protection pipe units are connected.
Shield mixing plant mortar jar delivery pipe of the present invention construction method further improvement is that, by multiple feed pipe for mortar lists First head and the tail connection forms the feed pipe for mortar, specifically includes:
Two adjacent feed pipe for mortar units are connected by feed pipe for mortar flange and bolt.
Shield mixing plant mortar jar delivery pipe of the present invention construction method further improvement is that, by the cushion block sandwiched Specifically included between the protection pipe and the feed pipe for mortar:
The position of the cushion block is adjusted, the cushion block is supported the feed pipe for mortar and the feed pipe for mortar is located at the protection The center of pipe.
Shield mixing plant mortar jar delivery pipe of the present invention construction method further improvement is that, by the cushion block sandwiched Specifically included between the protection pipe and the feed pipe for mortar:
First face of the cushion block is bonded with the inwall of the protection pipe, by the second face of the cushion block and the defeated slurry The outer wall fitting of pipe.
Brief description of the drawings
Fig. 1 is the sectional view of shield mixing plant mortar jar delivery pipe of the present invention.
Fig. 2 is the sectional elevation of shield mixing plant mortar jar delivery pipe of the present invention.
Description of reference numerals:
Protection pipe 10;Protect pipe flange 11;Feed pipe for mortar 20;Feed pipe for mortar flange 21;Cushion block 30;Bolt 40.
Embodiment
The invention will be further described with specific embodiment below in conjunction with the accompanying drawings.
Refering to Fig. 1, the invention provides a kind of shield mixing plant mortar jar delivery pipe and its construction method, it has structure Simply, the features such as convenient, good reliability of constructing, effectively solve existing pre-buried shield mixing plant mortar jar delivery pipe and plugging occurs The problem of Shi Shutong takes too long.
Shield mixing plant mortar jar delivery pipe of the present invention is illustrated below in conjunction with the accompanying drawings.
As depicted in figs. 1 and 2, shield mixing plant mortar jar delivery pipe of the present invention includes protection pipe 10;Feed pipe for mortar 20;Cushion block 30;Bolt 40.
Wherein, protection pipe 10 is embedded in underground in advance, and feed pipe for mortar 20 is arranged in protection pipe 10, and cushion block 30 is located in protection pipe 10 Between feed pipe for mortar 20, the center of protection pipe 10, i.e. protection pipe are located at by the support feed pipe for mortar 20 of feed pipe for mortar 20 of cushion block 30 10 form concentric structure with the section of feed pipe for mortar 20.
Protection pipe 10 includes the protection pipe unit of multiple head and the tail connection, passes through protection between adjacent two protection pipe units Pipe flange 11 and bolt 40 are connected.Protection pipe flange 11 is tightly sheathed on the end of protection pipe unit, and protects pipe flange 11 is raised formed with a circle along the circumference of protection pipe unit, offers through hole in the projection, bolt 40 passes through two neighboring protection Through hole and fixation on the flange of pipe unit end, so as to realize that protection pipe unit joins end to end.Preferably, the protection pipe 10 For wall thickness 5mm Q235 steel pipes.
Feed pipe for mortar 20 includes the feed pipe for mortar unit of multiple head and the tail connection, passes through defeated slurry between adjacent two feed pipe for mortar units Pipe flange 21 and bolt 40 are connected.Feed pipe for mortar flange 21 is tightly sheathed on the end of feed pipe for mortar unit, and feed pipe for mortar flange 21 is raised formed with a circle along the circumference of feed pipe for mortar unit, offers through hole in the projection, bolt 40 passes through two neighboring defeated slurry Through hole and fixation on the flange of pipe unit end, so as to realize that feed pipe for mortar unit joins end to end.Preferably, the feed pipe for mortar 20 For wall thickness 24mm Q235 steel pipes.
Cushion block 30 is arranged at intervals between elongated protection pipe 10 and feed pipe for mortar 20.First face of cushion block 30 forms evagination Arc, the arc of the evagination are bonded with the inwall of protection pipe 10;Second face forms the arc of indent, the arc of the indent and defeated slurry The outer wall fitting of pipe 20.Preferably, cushion block 30 is arranged at intervals along feed pipe for mortar 20 and the bearing of trend of protection pipe 10, and same transversal The quantity of cushion block 30 on face is six, and six cushion blocks 30 are uniformly laid, so as to be lifted to the feed pipe for mortar 20 inside protection pipe 10 Support strength.In addition, by the setting of cushion block 30, also act and reduce frictional force between feed pipe for mortar 20 and protection pipe 10 Effect, is easy to extract feed pipe for mortar 20 out protection pipe 10 when plugging occurs.Preferably, the cushion block 30 is wooden unit.
The use process of shield mixing plant mortar jar delivery pipe of the present invention is illustrated below.
Mortar is continually entered by feed pipe for mortar by mixing plant input port, mortar is injected by shield by feed pipe for mortar.Work as generation During plugging, disconnect with the connection of mixing plant input port, feed pipe for mortar is extracted out and dredged from protection pipe, blocking can be unloaded during dredging Feed pipe for mortar unit both ends flange, only for block feed pipe for mortar unit dredged, re-attached is defeated after dredging Starch pipe flange.After completing dredging, feed pipe for mortar is worn back again in protection pipe and noted with the connection of mixing plant input port, continuation shield Starch operation.
The construction method of shield mixing plant mortar jar delivery pipe of the present invention is illustrated below in conjunction with the accompanying drawings.
As depicted in figs. 1 and 2, shield mixing plant mortar jar delivery pipe of the present invention includes:
One protection pipe 10 is provided, protection pipe 10 is embedded in underground in advance.
Multiple protection pipe unit head and the tail connections are formed into protection pipe 10, specifically included:
The end that pipe flange 11 will be protected to be placed on two neighboring protection pipe unit, two neighboring protection is passed through using bolt 40 Through hole and fixation on the flange of pipe unit end, so as to which protection pipe unit head and the tail be connected.
Slurry-conveying tube 20 is provided, feed pipe for mortar 20 is arranged in protection pipe 10.
The head and the tail connection of multiple feed pipe for mortar units is formed into feed pipe for mortar 20, specifically included:
Feed pipe for mortar flange 21 is placed on to the end of two neighboring feed pipe for mortar unit, two neighboring defeated slurry is passed through using bolt 40 Through hole and fixation on the flange of pipe unit end, so as to which feed pipe for mortar unit head and the tail be connected.
Multiple cushion blocks 30 are provided, cushion block 30 is located between protection pipe 10 and feed pipe for mortar 20, specifically included:By defeated slurry When in the penetration protecting pipe 10 of pipe 20, cushion block 30 is positioned apart from, the first face of cushion block 30 is bonded with the inwall of protection pipe 10, will Second face of cushion block 30 is bonded with the outer wall of feed pipe for mortar 20, and adjusts the position of cushion block 30, cushion block 30 is supported feed pipe for mortar 20 simultaneously Feed pipe for mortar 20 is set to be located at the center of protection pipe 10.
Shield mixing plant mortar jar delivery pipe of the present invention has the beneficial effect that:
Using the structure composition shield mixing plant mortar jar delivery pipe of internal and external casing, so that need not when plugging occurs Break ground and take out pre-buried pipeline, but only the inner sleeve of defeated slurry is extracted out from pre-buried protection pipe and can dredged, have Effect solves the problems, such as that existing pre-buried shield mixing plant mortar jar delivery pipe occurs to be difficult to dredging during plugging.In addition, with it is existing Delivery pipe is compared, the protection pipe and cushion block set by feed pipe for mortar outer layer, is reduced the extraneous load action that feed pipe for mortar receives, is kept away Exempt from external force to act directly on feed pipe for mortar, serve the effect of protection feed pipe for mortar, while also increase conveyance conduit durability.This Invention have the characteristics that it is simple in construction, construction convenient, good reliability, compared with existing scheme highly shortened dredging pipeline when Between, accelerating construction progress, when plugging occurs can recover shield grouting in time works continuously, and the influence to the duration is small.
The present invention is described in detail above in association with accompanying drawing embodiment, those skilled in the art can be according to upper State and bright many variations example is made to the present invention.Thus, some details in embodiment should not form limitation of the invention, this Invention will be used as protection scope of the present invention using the scope that appended claims define.

Claims (10)

  1. A kind of 1. shield mixing plant mortar jar delivery pipe, it is characterised in that including:
    The pre- protection pipe for being embedded in underground;
    The feed pipe for mortar being arranged in the protection pipe;And
    The cushion block being located between the protection pipe and the feed pipe for mortar.
  2. 2. shield mixing plant mortar jar delivery pipe as claimed in claim 1, it is characterised in that the protection pipe includes multiple head The protection pipe unit of tail connection, by protecting pipe flange and bolt connection to fix between two adjacent protection pipe units.
  3. 3. shield mixing plant mortar jar delivery pipe as claimed in claim 1, it is characterised in that the feed pipe for mortar includes multiple head The feed pipe for mortar unit of tail connection, is fixed by feed pipe for mortar flange and bolt connection between two adjacent feed pipe for mortar units.
  4. 4. shield mixing plant mortar jar delivery pipe as claimed in claim 1, it is characterised in that by described in cushion block support Feed pipe for mortar so that the feed pipe for mortar is located at the center of the protection pipe.
  5. 5. shield mixing plant mortar jar delivery pipe as claimed in claim 1, it is characterised in that the cushion block is along the feed pipe for mortar Outside wall surface uniformly lay.
  6. A kind of 6. construction method of shield mixing plant mortar jar delivery pipe, it is characterised in that including:
    One protection pipe is provided, the protection pipe is embedded in underground in advance;
    Slurry-conveying tube is provided, the feed pipe for mortar is penetrated in the protection pipe;And
    Multiple cushion blocks are provided, the cushion block is located between the protection pipe and the feed pipe for mortar.
  7. 7. the construction method of shield mixing plant mortar jar delivery pipe as claimed in claim 6 a, it is characterised in that protection is provided Pipe, including:
    Multiple protection pipe units are provided, by multiple protection pipe units by protecting pipe flange and bolt head and the tail connection to form the guarantor Pillar.
  8. 8. the construction method of shield mixing plant mortar jar delivery pipe as claimed in claim 6, it is characterised in that a defeated slurry is provided Pipe, including:
    Multiple feed pipe for mortar units are provided, by multiple feed pipe for mortar units by feed pipe for mortar flange and bolt head and the tail connection formed it is described defeated Slurry pipe.
  9. 9. the construction method of shield mixing plant mortar jar delivery pipe as claimed in claim 6, it is characterised in that by the cushion block It is located between the protection pipe and the feed pipe for mortar and further comprises:
    The position of the cushion block is adjusted, the cushion block is supported the feed pipe for mortar and the feed pipe for mortar is located at the protection pipe Center.
  10. 10. the construction method of shield mixing plant mortar jar delivery pipe as claimed in claim 6, it is characterised in that by the pad Block is located between the protection pipe and the feed pipe for mortar and specifically included:
    Outside wall surface of the cushion block along the feed pipe for mortar is uniformly laid.
CN201710756737.XA 2017-08-29 2017-08-29 Shield mixing plant mortar jar delivery pipe and its construction method Pending CN107559592A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710756737.XA CN107559592A (en) 2017-08-29 2017-08-29 Shield mixing plant mortar jar delivery pipe and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710756737.XA CN107559592A (en) 2017-08-29 2017-08-29 Shield mixing plant mortar jar delivery pipe and its construction method

Publications (1)

Publication Number Publication Date
CN107559592A true CN107559592A (en) 2018-01-09

Family

ID=60977506

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710756737.XA Pending CN107559592A (en) 2017-08-29 2017-08-29 Shield mixing plant mortar jar delivery pipe and its construction method

Country Status (1)

Country Link
CN (1) CN107559592A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111852420A (en) * 2019-04-28 2020-10-30 中国石油化工股份有限公司 Carbonate oil reservoir water injection structure and application method thereof

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1888509A (en) * 2006-07-20 2007-01-03 三一重工股份有限公司 Concrete conveying pipe connecting device
KR20120015696A (en) * 2010-08-12 2012-02-22 주식회사 삼천리이엔지 Pipage insertion equipment for underground laying
CN202327488U (en) * 2011-12-06 2012-07-11 广东省大宝山矿业有限公司 Conveying pipeline for ore pulp
CN202467205U (en) * 2012-03-20 2012-10-03 长沙科达建设机械制造有限公司 Hard tube conveying device of concrete jet mechanical arm
CN203668937U (en) * 2014-01-15 2014-06-25 浙江省地质矿产工程公司 Gas lift reverse circulation device
CN105059943A (en) * 2015-09-06 2015-11-18 衢州妙凯节能科技有限公司 Mortar conveying pipe
CN206419680U (en) * 2017-01-13 2017-08-18 南京金鲁溧城燃气有限公司 A kind of natural-gas transfer pipeline monitoring device
CN207298385U (en) * 2017-08-29 2018-05-01 中国建筑第八工程局有限公司 Shield mixing plant mortar jar delivery pipe

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1888509A (en) * 2006-07-20 2007-01-03 三一重工股份有限公司 Concrete conveying pipe connecting device
KR20120015696A (en) * 2010-08-12 2012-02-22 주식회사 삼천리이엔지 Pipage insertion equipment for underground laying
CN202327488U (en) * 2011-12-06 2012-07-11 广东省大宝山矿业有限公司 Conveying pipeline for ore pulp
CN202467205U (en) * 2012-03-20 2012-10-03 长沙科达建设机械制造有限公司 Hard tube conveying device of concrete jet mechanical arm
CN203668937U (en) * 2014-01-15 2014-06-25 浙江省地质矿产工程公司 Gas lift reverse circulation device
CN105059943A (en) * 2015-09-06 2015-11-18 衢州妙凯节能科技有限公司 Mortar conveying pipe
CN206419680U (en) * 2017-01-13 2017-08-18 南京金鲁溧城燃气有限公司 A kind of natural-gas transfer pipeline monitoring device
CN207298385U (en) * 2017-08-29 2018-05-01 中国建筑第八工程局有限公司 Shield mixing plant mortar jar delivery pipe

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
夏于飞: "油气管道抢维修技术", 30 September 2010, 中国科学技术出版社, pages: 84 - 87 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111852420A (en) * 2019-04-28 2020-10-30 中国石油化工股份有限公司 Carbonate oil reservoir water injection structure and application method thereof

Similar Documents

Publication Publication Date Title
CN105019919B (en) Tunnel and its construction method for transmitting fluid
CN104594914A (en) Coal mine tunnel broken surrounding rock layering grouting technology and method
CN103089276B (en) Deep-shallow hole and high-low pressure coupling grouting technology
CN104533467A (en) High confined water and fault broken roadway supporting method
CN109630151A (en) Rectangular top pipe tunneling construction method
CN104879149A (en) Bolt-grouting support method for roadway in three-soft high-stress region
CN105221168A (en) Shield method tunnel construction portal Water sealing method under a kind of rich depth of water underground layering part
CN205877405U (en) Push pipe butt -joint structural
CN107559592A (en) Shield mixing plant mortar jar delivery pipe and its construction method
CN107083973A (en) The gas prevention method of region slip casting combination antiseepage supporting is carried out during Tunnel Passing coal seam
CN207298385U (en) Shield mixing plant mortar jar delivery pipe
CN205605165U (en) A slip casting pipe for gushing prevent string thick liquid and overfall in gushing water slip casting punishment
CN102852530A (en) Tunnel buffering multilayered water-discharging-preventing structure and construction method
CN102182481B (en) Anchor rope grouting-stop plug
CN103089280A (en) Grouting water sealing and reinforcement construction process capable of realizing draining and plugging combined effect for underground water in tunnel
CN204781973U (en) Antiseep plugging device in split bolt hole
CN102787851A (en) Leaking stoppage method for seam of duct piece of power cable tunnel
CN203097906U (en) Pipe piece structure capable of conducting grouting
CN206972266U (en) A kind of tunnel arch heavy in section junction steel plate structure with ribbing
CN108662283A (en) earth pressure balance pipe jacking construction method
CN204715427U (en) A kind of inclinometer pipe spreading casing protection structure
CN106285696A (en) Sand-pebble layer rectangular shield top digging pressure balanced sets up construction method
CN203130097U (en) Small guide pipe for grouting
CN117552806B (en) Grouting reinforcement device and method for shield tunnel in service period
CN202577327U (en) Grout stopping structure for final joint of immersed tube tunnel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination