CN107558805B - Municipal road construction enclosing board mounting structure and its construction method - Google Patents

Municipal road construction enclosing board mounting structure and its construction method Download PDF

Info

Publication number
CN107558805B
CN107558805B CN201710478538.7A CN201710478538A CN107558805B CN 107558805 B CN107558805 B CN 107558805B CN 201710478538 A CN201710478538 A CN 201710478538A CN 107558805 B CN107558805 B CN 107558805B
Authority
CN
China
Prior art keywords
barrier
conveyer belt
engineering truck
anchoring
doorframe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710478538.7A
Other languages
Chinese (zh)
Other versions
CN107558805A (en
Inventor
郑达明
渠承明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Haoyuan Construction Co., Ltd.
Original Assignee
Guangdong Haoyuan Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Haoyuan Construction Co Ltd filed Critical Guangdong Haoyuan Construction Co Ltd
Priority to CN201910097175.1A priority Critical patent/CN109812129B/en
Priority to CN201710478538.7A priority patent/CN107558805B/en
Publication of CN107558805A publication Critical patent/CN107558805A/en
Application granted granted Critical
Publication of CN107558805B publication Critical patent/CN107558805B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses municipal road construction enclosing board mounting structures, including anchoring, engineering truck, barrier, it is characterised in that: the engineering truck is connect by traction device with anchoring;Barrier is whole one block of plate, and top is equipped with the hook for catching on wirerope;The leading portion of the engineering truck is equipped with push arm, the push arm is connect with the hydraulic push rod being fixed on above engineering truck, and baffle is equipped at the hydraulic push rod and push arm contact, and conveyer belt is installed in the middle section of the engineering truck, rear end is equipped with frame body, and the side of frame body is equipped with doorframe;It is equipped on frame body through motor-driven driving wheel, the driving wheel is laid in the top of the discharge end of conveyer belt, and the driving wheel drives auxiliary wheel rotation, and the auxiliary wheel is equipped with barrier conveyer belt one up and down;The invention has the advantages that the present invention builds the arrangement achieves surrounding baffle and removes mechanization by designing automanual machine application in surrounding baffle Fast Installation, speed is fast, high degree of automation, reduces manual operation and saves human cost, and it is highly-safe, it is suitble to promote the use of.

Description

Municipal road construction enclosing board mounting structure and its construction method
Technical field
The present invention relates to a kind of municipal road construction enclosing board mounting structure and its construction method, belongs to civil engineering technology neck Domain.
Background technique
Surrounding baffle be a kind of a kind of building site maintenance after the processing such as machine die mould, spray painting, bending and with the external world every From a kind of profile, be suitable for construction site, highway maintenance, the light-duty plate that is isolated from the outside of one kind of construction site.It is prevented fires, Waterproof, it is moisture-proof light-weight the features such as be widely used.
As Publication No. CN106285195A is disclosed, the present invention relates to a kind of adjustable construction enclosings of Novel engineering height Plate is made of overhead gage and lower baffle plate, and overhead gage is plugged on lower baffle plate top, to adjust the height of whole surrounding baffle.By upper gear Plate moves down, and shank is inserted into inserting groove, the panel of overhead gage is embedded into panel slot and is pinched, by fixed lockhole and grafting The fixed hole of bar lower part is coaxial, and runs through a pin, upper lower baffle plate is fixed together, and then have adjusted the height of surrounding baffle Degree.The adjustable construction of Novel engineering height provided by the present application is formed with ventilation hole with surrounding baffle on baffle, guarantees wind from ventilation hole Pass through, reduce the pressure of surrounding baffle, increases the stability of surrounding baffle.
For another example the Publication No. CN203783244U utility model discloses a kind of angle-inserting type fast-assembling enclosing plate, including plate Block matrix and the reinforcing rib being set on plate matrix, the transverse ends of the plate matrix are respectively equipped with one in the of C font One fastener and one be in J font the second fastener, wherein the notch of the C font of the first fastener is towards the second fastener;Second fastener The circular arc shaped portion of J font is connect with plate matrix, and the center of circle of the circular arc shaped portion deviates from the first fastener, and the circular arc shaped portion Internal diameter matched with the outer diameter of the C font of the first fastener.The utility model, will be between existing enclosing plate by cleverly designing C-J type connection structure is changed by C-C type connection structure, keeps the first fastener of C font direct by way of oblique cutting It protrudes into and carries out snapping positioning in the second fastener of J font, complete the interplate splicing of enclosing, it is very convenient quick, form oblique cutting The enclosing that formula fast-assembling enclosing plate is constituted is time saving and energy saving.
Existing surrounding baffle is all to be packaged to be transported to building site, is then barricaded as barricade by one piece of block splicing of construction personnel, this Sample, which is built, needs a large amount of manpowers, and the speed built and removed is very slow, and construction efficiency is low, and speed is slow, long in time limit.
Summary of the invention
In view of the above deficiencies, this reality invention provides a kind of municipal road construction enclosing board mounting structure and its construction party Method, by the present invention in that constructed with semi-automated mechanism, it is easy to operate, manpower and material resources have been saved, the construction time is saved.
The specific technical solution that the present invention mentions is as follows:
Municipal road construction enclosing board mounting structure, including anchoring, engineering truck, barrier, it is characterised in that: the work Journey vehicle is connect by traction device with anchoring;Barrier is whole one block of plate, and top is equipped with the hook for catching on wirerope;
The leading portion of the engineering truck is equipped with push arm, and the push arm connects with the hydraulic push rod being fixed on above engineering truck It connects, baffle is installed at the hydraulic push rod and push arm contact, conveyer belt is installed in the middle section of the engineering truck, and rear end is equipped with The side of frame body, frame body is equipped with doorframe;It is equipped on frame body through motor-driven driving wheel, the driving wheel is laid in transmission The top of the discharge end of band, the driving wheel drive auxiliary wheel rotation, and the auxiliary wheel is equipped with barrier conveyer belt one up and down;Institute The turntable for being also equipped in frame body and driving by bottom motors two is stated, four faces of the turntable are equipped with armlet, the armlet Bottom be that plate is carried on a shoulder pole in transition, the triangular rack being fixed on above frame body, the connection installation of hydraulic cylinder two are installed above the armlet Push rod two is installed on the lower section of triangular rack, the hydraulic cylinder two and is directed at doorframe, the two sides of the doorframe are also equipped with logical Cross the barrier conveyer belt two that motor three drives rotation material transfer;
The anchoring includes pedestal, and the pedestal is mounted below universal wheel, and electric reel and mechanical arm are mounted on bottom Above, face interval is equipped with pulley to seat on the tool arm, cable wire fixator on the doorframe, and it is solid that wirerope one end is fixed on cable wire Determine on device, be then passed through after the pulley above anchoring, the other end is wound on electric reel.
Preferentially, be also equipped on the inside of the armlet gear buckle, it is described gear button one end be hinged on pin, the other end and The spring connection being fixed on armlet.
Based on above-mentioned apparatus, the present invention also provides a kind of municipal road construction surrounding baffle construction method of installation, feature exists In including the following steps:
1) engineering truck being connect by traction device with anchoring, engineering truck drives anchoring to reach construction site, Scene is reached using charge of trucks barrier simultaneously;
2) both anchoring and engineering truck are separated according to site operation situation, and anchoring is transferred to specific bit After setting, wirerope one end is fixed on cable wire fixator, is then passed through after the pulley above anchoring, the other end is wound on On electric reel, starts electric reel and tense wirerope;
3) charge of trucks barrier is directly unloaded on conveyer belt, barrier is advanced slowly under the drive of hydraulic stem;
4) push arm advances under the drive of hydraulic push rod entangles barrier and is pushed into the barrier conveyer belt one being symmetrically installed Interior, barrier conveyer belt one advances under the indirect drive of motor is sent into barrier on the armlet on turntable, and gear button clasps barrier;
5) turntable, which constantly rotates, send barrier into frame side, when barrier reaches doorframe face, band of the push rod two in hydraulic cylinder two Barrier is pushed open under dynamic and is sent into barrier conveyer belt two, during this process: spring is elongated, and gear button is rotated along pin, in this way Barrier is just detached from the constraint of gear button, while keeping off button and also springing back to original position;
6) when barrier is transmitted to doorframe by barrier conveyer belt two, the hook above barrier catches on wirerope automatically On;
7) step 3) -6 is constantly repeated), such barrier is just constantly admitted to arrangement on wirerope and forms surrounding baffle, constructs Terminate.
The invention has the advantages that the present invention is by designing automanual machine application in surrounding baffle Fast Installation, Mechanization is built and removed the arrangement achieves surrounding baffle, and speed is fast, high degree of automation, reduces manual operation and saves people Power cost, and it is highly-safe, it is suitble to promote the use of.
Detailed description of the invention
Present invention will be further explained below with reference to the attached drawings and examples.
Schematic diagram when Fig. 1 is municipal road construction enclosing board mounting structure of the present invention construction;
Fig. 2 another view direction schematic diagram when being municipal road construction enclosing board mounting structure of the present invention construction;
Fig. 3 is the structure chart of barrier of the present invention;
Fig. 4 is the side view of barrier of the present invention;
Fig. 5 is the structure chart of gear button;
Fig. 6 is the structural schematic diagram of engineering truck second half section of the present invention;
Fig. 7 is anchoring structure chart of the present invention;
Fig. 8 is the structure chart of another view direction of engineering truck second half section of the present invention.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to embodiments, to the present invention It is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, it is not used to Limit the present invention.
Embodiment 1
Municipal road construction enclosing board mounting structure, including anchoring 1, engineering truck 4, barrier 2, the engineering truck 4 are logical Traction device is crossed to connect with anchoring 1;In the present embodiment, barrier 2 is whole one block of plate, and top is equipped with and catches on wirerope 3 Hook.
The leading portion of engineering truck 4 is equipped with push arm 8, the push arm 8 and the hydraulic push rod 22 being fixed on above engineering truck 4 Connection, the hydraulic push rod 22 are equipped with baffle 23 with push 8 contact position of arm, and barrier 2 falls down baffle 23 in order to prevent.The work Conveyer belt 10 is installed in the middle section of journey vehicle 4, and conveyer belt 10 in the construction process, can be moved, can not also be moved, meanwhile, transmission Speed is also adjustable, and in the present embodiment, conveyer belt 10 is slowly moved.
The rear end of engineering truck 4 is equipped with frame body 24, and the side of frame body 24 is equipped with doorframe 26;It is equipped on frame body 24 and passes through electricity The driving wheel 14 that machine drives, the driving wheel 14 are laid in the top of the discharge end of conveyer belt 10, and the driving wheel 14 drives auxiliary 16 rotation of wheel is helped, about 16 auxiliary wheel is equipped with barrier conveyer belt 1;It is also equipped in the frame body 24 and passes through bottom The turntable 25 that motor two drives, four faces of the turntable 25 are equipped with armlet 12, and the bottom of the armlet 12 is that plate is carried on a shoulder pole in transition 11, the top of the armlet 12 is equipped with the triangular rack 17 being fixed on above frame body 24, and the connection of hydraulic cylinder 2 18 is mounted on three The lower section of angle hanger 17 is equipped with push rod 2 19 on the hydraulic cylinder 2 18 and is directed at doorframe 26, and the two sides of the doorframe 26 are also pacified Equipped with the barrier conveyer belt 2 20 for driving rotation material transfer by motor three;
Anchoring 1 includes pedestal 107, and the pedestal 107 is mounted below universal wheel 108, electric reel 106 and mechanical arm 103 are mounted on above pedestal 107, and face interval is equipped with pulley 101, cable wire fixator on the doorframe 26 on the tool arm 103 9,3 one end of wirerope is fixed on cable wire fixator 9, is then passed through after the pulley 101 above anchoring 1, the other end is wound on On electric reel 106.
The inside of armlet 12 is also equipped with gear and buckle 13, and one end of the gear button 13 is hinged on pin 31, the other end with admittedly The spring 32 being scheduled on armlet 12 connects.
Based on above-mentioned apparatus, the present invention also proposes a kind of municipal road construction surrounding baffle construction method of installation, including as follows Step:
1) engineering truck 4 is connect by traction device with anchoring 1, it is existing that engineering truck 4 drives anchoring 1 to reach construction , while scene is reached using charge of trucks barrier 2;
2) anchoring 1 is separated according to site operation situation with 4 the two of engineering truck, and anchoring 1 is transferred to finger After positioning is set, 3 one end of wirerope is fixed on cable wire fixator 9, is then passed through after the pulley 101 above anchoring 1, The other end is wound on electric reel 106.Start electric reel 106 to tense wirerope 3;
3) charge of trucks barrier 2 is directly unloaded on conveyer belt 10, barrier 2 is advanced slowly under the drive of hydraulic stem;
4) push arm 8 advances under the drive of hydraulic push rod 22 entangles barrier 2 and is pushed into the barrier transmission being symmetrically installed In band 1, barrier conveyer belt 1 advances under the indirect drive of motor is sent into barrier 2 on the armlet 12 on turntable 25, Gear button 13 clasps barrier 2;
5) barrier 2 is sent into 26 side of doorframe by the constantly rotation of turntable 25, and when barrier 2 reaches 26 face of doorframe, push rod 2 19 is in liquid Barrier 2 is pushed open under the drive of cylinder pressure 2 18 and is sent into barrier conveyer belt 2 20, during this process: spring 32 is elongated, gear button 13 rotate along pin 31, and such barrier 2 is just detached from the constraint of gear button 13, while keeping off button 13 and also springing back to original position;
6) when barrier 2 is transmitted to doorframe 26 by barrier conveyer belt 2 20, the hook above barrier 2 catches on steel automatically In cord 3;
7) step 3) -6 is constantly repeated), such barrier 2 is just constantly admitted to arrangement on wirerope 3 and forms surrounding baffle, applies Work terminates.
Embodiment 2
Municipal road construction enclosing board mounting structure, including anchoring 1, engineering truck 4, barrier 2, the engineering truck 4 are logical Traction device is crossed to connect with anchoring 1;In the construction process, sufficiently bulky due to barrier 2, what such lorry transported every time Limited amount saves the volume of barrier to solve the problems, such as this, increases freight volume, and in the present embodiment, barrier barrier 2 includes upper Barrier 210 and lower barrier 211, the two sides of the upper barrier 210 are equipped with side chute 202 and slide into upper barrier 210 for lower barrier 211 Inside;The upper barrier 210, top hanging groove 203 is installed, cable wire lock 204 is mounted on barrier 210, thereon Face is locked with from the back side and passes through the cable wire 201 of coming, and the cable wire 201 is connect with lower barrier 211 simultaneously, while folding also can be used Folded barrier.
The leading portion of engineering truck 4 is equipped with push arm 8, the push arm 8 and the hydraulic push rod 22 being fixed on above engineering truck 4 Connection, the hydraulic push rod 22 are equipped with baffle 23 with push 8 contact position of arm, and barrier 2 falls down baffle 23 in order to prevent.The work Conveyer belt 10 is installed in the middle section of journey vehicle 4, and conveyer belt 10 in the construction process, can be moved, can not also be moved, meanwhile, transmission Speed is also adjustable, and in the present embodiment, conveyer belt 10 is slowly moved.
The rear end of engineering truck 4 is equipped with frame body 24, and the side of frame body 24 is equipped with doorframe 26;It is equipped on frame body 24 and passes through electricity The driving wheel 14 that machine drives, the driving wheel 14 are laid in the top of the discharge end of conveyer belt 10, and the driving wheel 14 drives auxiliary 16 rotation of wheel is helped, about 16 auxiliary wheel is equipped with barrier conveyer belt 1;It is also equipped in the frame body 24 and passes through bottom The turntable 25 that motor two drives, four faces of the turntable 25 are equipped with armlet 12, and the bottom of the armlet 12 is that plate is carried on a shoulder pole in transition 11, the top of the armlet 12 is equipped with the triangular rack 17 being fixed on above frame body 24, and the connection of hydraulic cylinder 2 18 is mounted on three The lower section of angle hanger 17 is equipped with push rod 2 19 on the hydraulic cylinder 2 18 and is directed at doorframe 26, and the two sides of the doorframe 26 are also pacified Equipped with the barrier conveyer belt 2 20 for driving rotation material transfer by motor three;
Anchoring 1 includes pedestal 107, and the pedestal 107 is mounted below universal wheel 108, electric reel 106 and mechanical arm 103 are mounted on above pedestal 107, and face interval is equipped with pulley 101, cable wire fixator on the doorframe 26 on the tool arm 103 9,3 one end of wirerope is fixed on cable wire fixator 9, is then passed through after the pulley 101 above anchoring 1, the other end is wound on On electric reel 106.
The inside of armlet 12 is also equipped with gear and buckle 13, and one end of the gear button 13 is hinged on pin 31, the other end with admittedly The spring 32 being scheduled on armlet 12 connects.
Based on above-mentioned apparatus, the present invention also proposes a kind of municipal road construction surrounding baffle construction method of installation, including as follows Step:
1) engineering truck 4 is connect by traction device with anchoring 1, it is existing that engineering truck 4 drives anchoring 1 to reach construction , while scene is reached using charge of trucks barrier 2;
2) anchoring 1 is separated according to site operation situation with 4 the two of engineering truck, and anchoring 1 is transferred to finger After positioning is set, 3 one end of wirerope is fixed on cable wire fixator 9, is then passed through after the pulley 101 above anchoring 1, The other end is wound on electric reel 106.Start electric reel 106 to tense wirerope 3;
3) charge of trucks barrier 2 is directly unloaded on conveyer belt 10, barrier 2 is advanced slowly under the drive of hydraulic stem;
4) push arm 8 advances under the drive of hydraulic push rod 22 entangles barrier 2 and is pushed into the barrier transmission being symmetrically installed In band 1, barrier conveyer belt 1 advances under the indirect drive of motor is sent into barrier 2 on the armlet 12 on turntable 25, Gear button 13 clasps barrier 2;
5) barrier 2 is sent into 26 side of doorframe by the constantly rotation of turntable 25, and when barrier 2 reaches 26 face of doorframe, push rod 2 19 is in liquid Barrier 2 is pushed open under the drive of cylinder pressure 2 18 and is sent into barrier conveyer belt 2 20, during this process: spring 32 is elongated, gear button 13 rotate along pin 31, and such barrier 2 is just detached from the constraint of gear button 13, while keeping off button 13 and also springing back to original position;
6) when barrier 2 is transmitted to doorframe 26 by barrier conveyer belt 2 20, hanging groove 203 above upper barrier 210 from It is dynamic to catch on wirerope 3;
7) step 3) -6 is constantly repeated), such barrier 2 is just constantly admitted to arrangement on wirerope 3 and forms surrounding baffle;Row After the completion of column, construction personnel releases cable wire 201, extracts lower barrier 211 inside upper barrier 210 out, arrives logical when certain position It crosses cable wire lock 204 to lock cable wire 201, construction terminates.
Embodiment 3
Municipal road construction enclosing board mounting structure, including anchoring 1, engineering truck 4, barrier 2, the engineering truck 4 are logical Traction device is crossed to connect with anchoring 1;In the construction process, sufficiently bulky due to barrier 2, what such lorry transported every time Limited amount saves the volume of barrier to solve the problems, such as this, increases freight volume, and in the present embodiment, barrier barrier 2 includes upper Barrier 210 and lower barrier 211, the two sides of the upper barrier 210 are equipped with side chute 202 and slide into upper barrier 210 for lower barrier 211 Inside;The upper barrier 210, top hanging groove 203 is installed, cable wire lock 204 is mounted on barrier 210, thereon Face is locked with from the back side and passes through the cable wire 201 of coming, and the cable wire 201 is connect with lower barrier 211 simultaneously, while folding also can be used Folded barrier.In addition, the bottom of lower barrier 211 is equipped with 208 He of upper pin in order to solve the problems, such as that barrier is easy to be waved by wind Lower bearing pin 205 is hinged with interior plate 206 on the upper pin 208, outer panel 207, interior plate 206 is hinged on lower bearing pin 205 Triangle branch frame is hingedly formed again with outer panel 207, is propped up on the ground by the triangle branch frame of lower section, the stability of barrier mentions significantly It is high.
The leading portion of engineering truck 4 is equipped with push arm 8, the push arm 8 and the hydraulic push rod 22 being fixed on above engineering truck 4 Connection, the hydraulic push rod 22 are equipped with baffle 23 with push 8 contact position of arm, and barrier 2 falls down baffle 23 in order to prevent.The work Conveyer belt 10 is installed in the middle section of journey vehicle 4, and conveyer belt 10 in the construction process, can be moved, can not also be moved, meanwhile, transmission Speed is also adjustable, and in the present embodiment, conveyer belt 10 is not moved.
The rear end of engineering truck 4 is equipped with frame body 24, and the side of frame body 24 is equipped with doorframe 26;It is equipped on frame body 24 and passes through electricity The driving wheel 14 that machine drives, the driving wheel 14 are laid in the top of the discharge end of conveyer belt 10, and the driving wheel 14 drives auxiliary 16 rotation of wheel is helped, about 16 auxiliary wheel is equipped with barrier conveyer belt 1;It is also equipped in the frame body 24 and passes through bottom The turntable 25 that motor two drives, four faces of the turntable 25 are equipped with armlet 12, and the bottom of the armlet 12 is that plate is carried on a shoulder pole in transition 11, the top of the armlet 12 is equipped with the triangular rack 17 being fixed on above frame body 24, and the connection of hydraulic cylinder 2 18 is mounted on three The lower section of angle hanger 17 is equipped with push rod 2 19 on the hydraulic cylinder 2 18 and is directed at doorframe 26, and the two sides of the doorframe 26 are also pacified Equipped with the barrier conveyer belt 2 20 for driving rotation material transfer by motor three;
Anchoring 1 includes pedestal 107, and the pedestal 107 is mounted below universal wheel 108, electric reel 106 and mechanical arm 103 are mounted on above pedestal 107, and face interval is equipped with pulley 101, cable wire fixator on the doorframe 26 on the tool arm 103 9,3 one end of wirerope is fixed on cable wire fixator 9, is then passed through after the pulley 101 above anchoring 1, the other end is wound on On electric reel 106.
The inside of armlet 12 is also equipped with gear and buckle 13, and one end of the gear button 13 is hinged on pin 31, the other end with admittedly The spring 32 being scheduled on armlet 12 connects.
In order to save the labour for manually unloading barrier, the side of engineering truck 4 is also movably installed with movable plate 7, the activity Hydraulic cylinder 46 is installed, the hydraulic cylinder 46 is connected with lifter plate 5, barrier 2 can directly be unloaded and be attached to lifter plate 5 on plate 7 On.
Based on above-mentioned apparatus, the present invention also proposes a kind of municipal road construction surrounding baffle construction method of installation, including as follows Step:
1) engineering truck 4 is connect by traction device with anchoring 1, it is existing that engineering truck 4 drives anchoring 1 to reach construction , while scene is reached using charge of trucks barrier 2;
2) anchoring 1 is separated according to site operation situation with 4 the two of engineering truck, and anchoring 1 is transferred to finger After positioning is set, 3 one end of wirerope is fixed on cable wire fixator 9, is then passed through after the pulley 101 above anchoring 1, The other end is wound on electric reel 106.Start electric reel 106 to tense wirerope 3;
3) charge of trucks barrier 2 is directly discharged on lifter plate 5 from lorry, hydraulic cylinder 46 is by the barrier on lifter plate 5 (2) it rises with conveyer belt 10 side by side, barrier 2 is pushed on conveyer belt 10 by construction personnel;
4) push arm 8 advances under the drive of hydraulic push rod 22 entangles barrier 2 and is pushed into the barrier transmission being symmetrically installed In band 1, barrier conveyer belt 1 advances under the indirect drive of motor is sent into barrier 2 on the armlet 12 on turntable 25, Gear button 13 clasps barrier 2;
5) barrier 2 is sent into 26 side of doorframe by the constantly rotation of turntable 25, and when barrier 2 reaches 26 face of doorframe, push rod 2 19 is in liquid Barrier 2 is pushed open under the drive of cylinder pressure 2 18 and is sent into barrier conveyer belt 2 20, during this process: spring 32 is elongated, gear button 13 rotate along pin 31, and such barrier 2 is just detached from the constraint of gear button 13, while keeping off button 13 and also springing back to original position;
6) when barrier 2 is transmitted to doorframe 26 by barrier conveyer belt 2 20, hanging groove 203 above upper barrier 210 from It is dynamic to catch on wirerope 3;
7) step 3) -6 is constantly repeated), such barrier 2 is just constantly admitted on wirerope 3 and arranges;After the completion of arrangement, Construction personnel releases cable wire 201, extracts lower barrier 211 inside upper barrier 210 out, is locked when arriving certain position by cable wire Device 204 locks cable wire 201, and construction terminates.
Although the illustrative specific embodiment of the present invention is described above, in order to the technology of the art Personnel are it will be appreciated that the present invention, but the present invention is not limited only to the range of specific embodiment, to the common skill of the art For art personnel, as long as long as various change the attached claims limit and determine spirit and scope of the invention in, one The innovation and creation using present inventive concept are cut in the column of protection.

Claims (3)

1. municipal road construction enclosing board mounting structure, including anchoring (1), engineering truck (4), barrier (2), feature exists In: the engineering truck (4) is connect by traction device with anchoring (1);Barrier (2) is whole one block of plate, and top is equipped with Catch on the hook of wirerope (3);
The leading portion of the engineering truck (4) be equipped with push arm (8), push arm (8) be fixed on the liquid of engineering truck (4) above Push rod (22) connection is pressed, the hydraulic push rod (22) and push arm (8) contact position are equipped with baffle (23), the engineering truck (4) Middle section conveyer belt (10) are installed, rear end is equipped with frame body (24), and the side of frame body (24) is equipped with doorframe (26);On frame body (24) It being equipped with through motor-driven driving wheel (14), the driving wheel (14) is laid in the top of the discharge end of conveyer belt (10), The driving wheel (14) drives auxiliary wheel (16) rotation, and the auxiliary wheel (16) is equipped with barrier conveyer belt one (15) up and down;Institute It states in frame body (24) and is also equipped with the turntable (25) driven by bottom motors two, four faces of the turntable (25) are equipped with shield Arm (12), the bottom of the armlet (12) are that plate (11) are carried on a shoulder pole in transition, are equipped with above the armlet (12) and are fixed on frame body (24) above triangular rack (17), hydraulic cylinder two (18) connect the lower section for being mounted on triangular rack (17), the hydraulic cylinder two (18) push rod two (19) alignment doorframe (26) is installed, the two sides of the doorframe (26), which are also equipped with to drive by motor three, revolves on Turn the barrier conveyer belt two (20) of material transfer;
The anchoring (1) includes pedestal (107), and the pedestal (107) is mounted below universal wheel (108), electric reel (106) and mechanical arm (103) is mounted on pedestal (107) above, and face interval is equipped with pulley (101), institute on the tool arm (103) Cable wire fixator (9) on doorframe (26) is stated, wirerope (3) one end is fixed on cable wire fixator (9), is then passed through anchoring (1) above after pulley (101), the other end is wound on electric reel (106).
2. municipal road construction enclosing board mounting structure according to claim 1, it is characterised in that: the armlet (12) Inside is also equipped with gear button (13), and one end of the gear button (13) is hinged on pin (31), the other end and is fixed on armlet (12) spring (32) connection on.
3. the construction method of municipal road construction enclosing board mounting structure according to claim 1, which is characterized in that including Following steps:
1) engineering truck (4) are connect by traction device with anchoring (1), engineering truck (4) drives anchoring (1) to reach and applies Work scene, while scene is reached using charge of trucks barrier (2);
2) anchoring (1) is separated according to site operation situation with engineering truck (4) the two, and anchoring (1) is transferred to After designated position, wirerope (3) one end is fixed on cable wire fixator (9), is then passed through the pulley of anchoring (1) above (101) after, the other end is wound on electric reel (106), is started electric reel (106) and is tensed wirerope (3);
3) charge of trucks barrier (2) is directly unloaded on conveyer belt (10), before barrier (2) is slow under the drive of hydraulic stem Into;
4) push arm (8) is advanced under the drive of hydraulic push rod (22) entangles barrier (2) and is pushed into the barrier biography being symmetrically installed It send in band one (15), barrier conveyer belt one (15) advances under the indirect drive of motor is sent into barrier (2) on turntable (25) On armlet (12), gear button (13) clasps barrier (2);
5) barrier (2) are sent into doorframe (26) side by turntable (25) constantly rotation, when barrier (2) reaches doorframe (26) face, push rod two (19) barrier (2) is pushed open under the drive of hydraulic cylinder two (18) and is sent into barrier conveyer belt two (20), during this process: spring (32) it is elongated, gear button (13) is rotated along pin (31), and such barrier (2) is just detached from the constraint of gear button (13), while keeping off button (13) original position is also sprung back to;
6) when barrier (2) is transmitted to doorframe (26) by barrier conveyer belt two (20), the hook of barrier (2) above hooks automatically Firmly on wirerope (3);
7) step 3) -6 is constantly repeated), such barrier (2) is just constantly admitted to arrangement on wirerope (3) and forms surrounding baffle, applies Work terminates.
CN201710478538.7A 2017-06-21 2017-06-21 Municipal road construction enclosing board mounting structure and its construction method Active CN107558805B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201910097175.1A CN109812129B (en) 2017-06-21 2017-06-21 Municipal road construction baffle mounting structure and construction method thereof
CN201710478538.7A CN107558805B (en) 2017-06-21 2017-06-21 Municipal road construction enclosing board mounting structure and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710478538.7A CN107558805B (en) 2017-06-21 2017-06-21 Municipal road construction enclosing board mounting structure and its construction method

Related Child Applications (1)

Application Number Title Priority Date Filing Date
CN201910097175.1A Division CN109812129B (en) 2017-06-21 2017-06-21 Municipal road construction baffle mounting structure and construction method thereof

Publications (2)

Publication Number Publication Date
CN107558805A CN107558805A (en) 2018-01-09
CN107558805B true CN107558805B (en) 2019-06-04

Family

ID=60973454

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201910097175.1A Active CN109812129B (en) 2017-06-21 2017-06-21 Municipal road construction baffle mounting structure and construction method thereof
CN201710478538.7A Active CN107558805B (en) 2017-06-21 2017-06-21 Municipal road construction enclosing board mounting structure and its construction method

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201910097175.1A Active CN109812129B (en) 2017-06-21 2017-06-21 Municipal road construction baffle mounting structure and construction method thereof

Country Status (1)

Country Link
CN (2) CN109812129B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110748230B (en) * 2019-09-23 2020-11-27 深圳市市政工程总公司 Intelligent backplate base installation device for construction
CN110748235B (en) * 2019-09-23 2020-12-01 江西省连城建筑工程有限公司 Building workpiece installation construction method
CN111661594B (en) * 2020-06-01 2021-03-30 广东联创建筑工程有限公司 Construction is with enclosing fender installation device
CN113047688B (en) * 2021-03-31 2022-07-22 九江职业技术学院 Automatic laying device of fender is enclosed in construction

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1888318A (en) * 2006-07-14 2007-01-03 常熟华东汽车有限公司 Road barricade vehicle
CN201901854U (en) * 2010-12-25 2011-07-20 常熟华东汽车有限公司 Vehicle and barrier separating mechanism for combined type net barrier
CN103015790A (en) * 2013-01-16 2013-04-03 明光市浩淼消防科技发展有限公司 Mesh laying and collecting device of barbed wire mesh
CN103306227A (en) * 2013-07-08 2013-09-18 中铁第四勘察设计院集团有限公司 Light reflecting fence capable of being folded movably
CN103470097A (en) * 2013-09-25 2013-12-25 北京安龙特种车辆有限公司 Isolating net piece and carrier vehicle for loading isolating net pieces
CN204511024U (en) * 2015-02-04 2015-07-29 台州市泰辉市政工程有限公司 Municipal construction fence
CN104831651A (en) * 2014-02-11 2015-08-12 罗德里戈和西奎拉联营-城市设计有限公司 Demountable modular safety panel and a respective assembly process
CN105421854A (en) * 2015-12-23 2016-03-23 杨光明 Liftable guardrail applicable to stereo garage
AU2015249062A1 (en) * 2014-11-10 2016-05-26 Malcolm Robertson Rail vehicle for constructing safety barrier fences
CN205330278U (en) * 2016-01-26 2016-06-22 国网安徽省电力公司检修公司 Electronic car of arranging of primary equipment safety measure
CN206205477U (en) * 2016-11-25 2017-05-31 南通华达重工科技有限公司 A kind of safety barrier support for constructions work

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1711671B1 (en) * 2004-01-13 2011-04-20 Quickfencer Limited Apparatus for dispensing and tensioning wire
US20110121125A1 (en) * 2009-07-15 2011-05-26 E-Z Stretcher Llc Roll Fencing Unfurling and Stretching Apparatus

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1888318A (en) * 2006-07-14 2007-01-03 常熟华东汽车有限公司 Road barricade vehicle
CN201901854U (en) * 2010-12-25 2011-07-20 常熟华东汽车有限公司 Vehicle and barrier separating mechanism for combined type net barrier
CN103015790A (en) * 2013-01-16 2013-04-03 明光市浩淼消防科技发展有限公司 Mesh laying and collecting device of barbed wire mesh
CN103306227A (en) * 2013-07-08 2013-09-18 中铁第四勘察设计院集团有限公司 Light reflecting fence capable of being folded movably
CN103470097A (en) * 2013-09-25 2013-12-25 北京安龙特种车辆有限公司 Isolating net piece and carrier vehicle for loading isolating net pieces
CN104831651A (en) * 2014-02-11 2015-08-12 罗德里戈和西奎拉联营-城市设计有限公司 Demountable modular safety panel and a respective assembly process
AU2015249062A1 (en) * 2014-11-10 2016-05-26 Malcolm Robertson Rail vehicle for constructing safety barrier fences
CN204511024U (en) * 2015-02-04 2015-07-29 台州市泰辉市政工程有限公司 Municipal construction fence
CN105421854A (en) * 2015-12-23 2016-03-23 杨光明 Liftable guardrail applicable to stereo garage
CN205330278U (en) * 2016-01-26 2016-06-22 国网安徽省电力公司检修公司 Electronic car of arranging of primary equipment safety measure
CN206205477U (en) * 2016-11-25 2017-05-31 南通华达重工科技有限公司 A kind of safety barrier support for constructions work

Also Published As

Publication number Publication date
CN109812129B (en) 2020-03-27
CN109812129A (en) 2019-05-28
CN107558805A (en) 2018-01-09

Similar Documents

Publication Publication Date Title
CN107558805B (en) Municipal road construction enclosing board mounting structure and its construction method
CN105236277B (en) Full-automatic powered block car and its block method
CN103195460B (en) Hydraulic support steering platform
CN206844730U (en) A kind of multifunctional motor-driven vehicle charging station
CN202001026U (en) Workpiece clamping device of tunnel construction arch centre mounting device
CN109252736A (en) Road safety job execution barrier structure
CN209710794U (en) A kind of sanitation cart automatic pruning machine structure
CN103541557A (en) Simple device for vertical steel pipe
CN203515607U (en) Adjustable steel mould trolley of tunnel widening section
CN203583900U (en) Simple device for erecting steel pipe
CN211102389U (en) Welding tool for automobile trunk decorative plate
CN202007671U (en) Lagging jack installation equipment for tunnel construction
CN211973253U (en) Wisdom garage is with dredging device
CN207986409U (en) A kind of cable reel installation
CN206394064U (en) The automatic band end socket mechanism of double
CN112275881A (en) A aluminum alloy plate draws exhibition device for auto-parts production
CN208516316U (en) A kind of roof panel horizontal conveyer
CN203095192U (en) Ground anchor type spreading machine
CN207699084U (en) A kind of sylvester for coal mine equipment recycling
CN206169141U (en) Screw rolling machine
CN204311797U (en) A kind of membrane structure bicycle shed of building
CN221418230U (en) Wire rope anticreep device
CN117509421B (en) Lifting device for installation of lighting engineering
CN106032178A (en) A product box sealing turning device
CN220277415U (en) Tree whitewashing device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Zheng Daming

Inventor after: Qu Chengming

Inventor before: Qu Chengming

CB03 Change of inventor or designer information
TA01 Transfer of patent application right

Effective date of registration: 20190509

Address after: 510000 self-designed 9 rooms (for office use only) on the 1st floor of 101 Dongyan Street, Dongguanzhuang Road, Tianhe District, Guangzhou City, Guangdong Province (not for factory use)

Applicant after: Guangdong Haoyuan Construction Co., Ltd.

Address before: 277524 No. 174, Bashangcun, Guanqiao Town, Tengzhou City, Zaozhuang City, Shandong Province

Applicant before: Qu Chengming

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant