CN107558612A CN201710583761.8A CN201710583761A CN107558612A CN 107558612 A CN107558612 A CN 107558612A CN 201710583761 A CN201710583761 A CN 201710583761A CN 107558612 A CN107558612 A CN 107558612A
Authority
CN
China
Prior art keywords
truss
installation
sections
lifting
checked
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710583761.8A
Other languages
Chinese (zh)
Inventor
姚晓阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Green Brilliant Energy Saving Technology Co Ltd
Original Assignee
Jiangsu Green Brilliant Energy Saving Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Green Brilliant Energy Saving Technology Co Ltd filed Critical Jiangsu Green Brilliant Energy Saving Technology Co Ltd
Priority to CN201710583761.8A priority Critical patent/CN107558612A/en
Publication of CN107558612A publication Critical patent/CN107558612A/en
Pending legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a kind of curved space pipe truss installation method, comprise the following steps:Preparative work before construction, including:Prepare field operation condition;Basis is checked and accepted;Drawing prepares, and component is checked and checked;Lifting includes:Determine lifting sequence;50 tons of cranes are provided from suspender;The installation of rectangle A section roofing truss;The installation of fan-shaped B sections roofing truss;The installation of C sections roofing truss before sector.The curved space pipe truss installation method of the present invention has ground assembling roofing truss, the method for whole section of lifting, have construction it is succinct, conveniently, short time limit and construction quality easily ensure, save the advantages of heavy mechanical equipment, reduction operating expenses.

Description

A kind of curved space pipe truss installation method
Technical field
The present invention relates to a kind of truss installation method, and in particular to a kind of curved space pipe truss installation method.
Background technology
In recent years, space truss architecture because of it from heavy and light, span is big, short construction period, variation in moulding complexity U.S.A are refuted The features such as bank, is rapidly developed, and is used widely in the Big Space Public Architectures such as gymnasium, exhibition pipe, airport.
Run in early stage International airport administration building main-inlet employs curved space truss structure, by outer layer batter post, column And roofing truss collectively constitutes fan truss structure, single Pin roofing truss most weight is 2.8 tons, main-inlet truss overall length 60m, beam overall 57m, always weigh about 137 tons.Main-inlet truss Steel Structure makes at home, and each part is through preassembling passed examination Afterwards, transported by sea by container to erecting bed, building site assembling and lifting are carried out by an Indian Company, production unit provides installation Scheme is to instruct site operation.Each transport section of truss Steel Structure need to meet the built-in size sea-freight of container and require, but can not be complete Portion splits into single part delivery, to reduce steel construction Assembling workload.
Both ends hold-down support installation method known to roofing truss use can day and night difference variation be produced greatly because of Middle East Raw stress causes truss structure modification to destroy, and after the batter post lifting in truss Steel Structure and before roofing truss installation, batter post Stability be also a construction Difficulties.
The content of the invention
Goal of the invention:The present invention is directed to deficiency of the prior art, proposes a kind of curved space pipe truss installation method, has Have ground assembling roofing truss, the method for whole section of lifting, have construction it is succinct, conveniently, short time limit and construction quality easily ensure, save About heavy mechanical equipment, reduce operating expenses the advantages of.
Technical scheme:A kind of curved space pipe truss installation method of the present invention, comprises the following steps:
A, preparative work before construction, comprise the following steps:
(1)Prepare field operation condition
Job site possesses " three supplies and one leveling ";Relevant basic terrace project is basically completed, and its concrete strength is not lower than 75% ;The coordinate and absolute altitude at each measurement control point are accurately clear, and each basic center line and level measurement finish;Each passage, building Ladder, railing possess execution conditions, each hole, and hole and Buddhist monk in progress have open position to have the reliable precautionary measures;It is furnished with The fire-fighting equipment of enough acceptance(check)s;Each professional teams and groups possess work box, and have the special shelf for stacking parts;
(2)Basis is checked and accepted
Basis concrete cast before civil engineering unit should together with installation unit by net of control points total powerstation to all kinds of lower margins Bolt, the coordinate of built-in fitting, absolute altitude are checked, are just in the milk after meeting code requirement, should be checked after grouting;Fill Check need to be done easy to remember after checking and be in the milk before slurry;Surface of base should be marked and clearly indulged, horizontal center line, elevation line;
(3)Drawing prepares, and component is checked and checked
Whether the packing list of inspection steel construction delivery, installation diagram, component diagram are correct;Component inspection checks work by management list Position is taken the lead, represented with manufactory based on, kind, can be advised with total Bao Fang, unit in charge of construction the number of components as packing slip listed by jointly Lattice, inspection is checked, should made a record, check whether component apparent size is consistent with drawing according to component diagram, if problematic, through each Fang, which is represented, confirms visa, and is negotiated by Zong Bao directions manufactory, and solves in time;The parts checked through unpacking, Ying Youshi It is responsible for keeping in work order position;
B, lift, comprise the following steps:
(1)Determine lifting sequence
Rectangle A section roofing truss, fan-shaped B sections roofing truss and C before sector are included according to curved space tube truss structure Section roofing truss, is lifted since A sections, after with B sections, is finally terminated to the lifting of C sections;Each truss is often across by outer framework Formed with inner frame, often across outer framework maximum weight is 28 tons, and lifting sequence is first integral hoisting outer framework, then again with list Part installs inner frame;One end hold-down support is used in the jointing of each truss, the other end uses slotted eye type of attachment Sliding support, so that day and night difference variation is big adjusting Middle East produces stress, a small amount of installation deviation by sliding, and During across the civil engineering expansion joint of large-scale truss, the stress concentration that the later stage causes malformation to bring because of foundation of civil work sedimentation, increase are reduced The security of structure;
(2)50 tons of cranes are provided from suspender;
(3)The installation of rectangle A section roofing truss
1)The lifting for being arranged on A sections and carrying out column of A section columns, is carried out windproof before not installing truss and forming stable frame Measure, prevent column from toppling over;
2)First on ground by installation diagram assembling truss before the installation lifting of A section truss, truss bolt of lower base hole horizontal and right is measured Linea angulata distance meets design requirement, prevents from doing over again because pitch-row deviation is big in lifting;
Truss base is fixed with column top using high-strength bolt, and verticality of stand column, horizontal range, truss top should be checked after lifting Hold levelness deviation otherwise should adjust to meeting the requirements whether in regulating scope, continue to construct, until two crosses of A sections Type truss installa-tion is completed;
(4)The installation of fan-shaped B sections roofing truss
1)The lifting for being arranged on B sections and carrying out column of B section columns, is carried out windproof before not installing truss and forming stable frame Measure, prevent column from toppling over;
2)First on ground by installation diagram assembling truss before the installation lifting of B section truss, truss bolt of lower base hole horizontal and right is measured Linea angulata distance meets design requirement, prevents from doing over again because pitch-row deviation is big in lifting;Truss base uses with column top Whether high-strength bolt is fixed, should check verticality of stand column, horizontal range, truss upper horizontal degree deviation in regulating scope after lifting It is interior, it otherwise should adjust to meeting the requirements, continue to construct, until B sections truss installa-tion is completed;
(5)The installation of C sections roofing truss before sector
1)The lifting for being arranged on C sections and carrying out column of c section columns, is carried out windproof before not installing truss and forming stable frame Measure, prevent column from toppling over;Batter post is held in the very useful chain block of lifting rear pillar, by pulling chain block chain conveniently to adjust Horizontal level at the top of whole batter post, after batter post top horizontal distance reaches requirement, tighten the nut of batter post foundation bolt;
2)The installation of C section truss among the C sections truss is installed, after truss element forms rock-steady structure, start to adjust Whether the locus of truss meets drawing requirement, otherwise should adjust in time;Continue that truss is installed to both sides, in all truss After installation, check whether the integral installation size of truss meets the requirements, fasten all bolts and related welding, polishing, Application subsequent job, complete whole curved space tube truss structure installation.
Further, the gradient on the batter post of the C sections truss and ground is 65 degree.
Further, batter post capital absolute altitude >=14m of the C sections truss, batter post suspension column absolute altitude are zero m.
Further, the batter post of the C sections truss is Φ 406*25mm steel pipes.
Further, the column in A sections truss and B the section truss is H350*350*14*22mm shaped steel.
Beneficial effect:The curved space pipe truss installation method of the present invention, there is ground assembling roofing truss, whole section of lifting Method, have construction it is succinct, conveniently, short time limit and construction quality easily ensure, save heavy mechanical equipment, reduction operating expenses The advantages of.
Embodiment
With reference to specific embodiment, the invention will be further described:
Embodiment 1
A kind of curved space pipe truss installation method, comprises the following steps:
A, preparative work before construction, comprise the following steps:
(1)Prepare field operation condition
Job site possesses " three supplies and one leveling ";Relevant basic terrace project is basically completed, and its concrete strength is not lower than 75% ;The coordinate and absolute altitude at each measurement control point are accurately clear, and each basic center line and level measurement finish;Each passage, building Ladder, railing possess execution conditions, each hole, and hole and Buddhist monk in progress have open position to have the reliable precautionary measures;It is furnished with The fire-fighting equipment of enough acceptance(check)s;Each professional teams and groups possess work box, and have the special shelf for stacking parts;
(2)Basis is checked and accepted
Basis concrete cast before civil engineering unit should together with installation unit by net of control points total powerstation to all kinds of lower margins Bolt, the coordinate of built-in fitting, absolute altitude are checked, are just in the milk after meeting code requirement, should be checked after grouting;Fill Check need to be done easy to remember after checking and be in the milk before slurry;Surface of base should be marked and clearly indulged, horizontal center line, elevation line;
(3)Drawing prepares, and component is checked and checked
Whether the packing list of inspection steel construction delivery, installation diagram, component diagram are correct;Component inspection checks work by management list Position is taken the lead, represented with manufactory based on, kind, can be advised with total Bao Fang, unit in charge of construction the number of components as packing slip listed by jointly Lattice, inspection is checked, should made a record, check whether component apparent size is consistent with drawing according to component diagram, if problematic, through each Fang, which is represented, confirms visa, and is negotiated by Zong Bao directions manufactory, and solves in time;The parts checked through unpacking, Ying Youshi It is responsible for keeping in work order position;
B, lift, comprise the following steps:
(1)Determine lifting sequence
Rectangle A section roofing truss, fan-shaped B sections roofing truss and C before sector are included according to curved space tube truss structure Section roofing truss, is lifted since A sections, after with B sections, is finally terminated to the lifting of C sections;Each truss is often across by outer framework Formed with inner frame, often across outer framework maximum weight is 28 tons, and lifting sequence is first integral hoisting outer framework, then again with list Part installs inner frame;One end hold-down support is used in the jointing of each truss, the other end uses slotted eye type of attachment Sliding support, so that day and night difference variation is big adjusting Middle East produces stress, a small amount of installation deviation by sliding, and During across the civil engineering expansion joint of large-scale truss, the stress concentration that the later stage causes malformation to bring because of foundation of civil work sedimentation, increase are reduced The security of structure;
(2)50 tons of cranes are provided from suspender;
(3)The installation of rectangle A section roofing truss
1)The lifting for being arranged on A sections and carrying out column of A section columns, is carried out windproof before not installing truss and forming stable frame Measure, prevent column from toppling over;
2)First on ground by installation diagram assembling truss before the installation lifting of A section truss, truss bolt of lower base hole horizontal and right is measured Linea angulata distance meets design requirement, prevents from doing over again because pitch-row deviation is big in lifting;
Truss base is fixed with column top using high-strength bolt, and verticality of stand column, horizontal range, truss top should be checked after lifting Hold levelness deviation otherwise should adjust to meeting the requirements whether in regulating scope, continue to construct, until two crosses of A sections Type truss installa-tion is completed;
(4)The installation of fan-shaped B sections roofing truss
1)The lifting for being arranged on B sections and carrying out column of B section columns, is carried out windproof before not installing truss and forming stable frame Measure, prevent column from toppling over;
2)First on ground by installation diagram assembling truss before the installation lifting of B section truss, truss bolt of lower base hole horizontal and right is measured Linea angulata distance meets design requirement, prevents from doing over again because pitch-row deviation is big in lifting;Truss base uses with column top Whether high-strength bolt is fixed, should check verticality of stand column, horizontal range, truss upper horizontal degree deviation in regulating scope after lifting It is interior, it otherwise should adjust to meeting the requirements, continue to construct, until B sections truss installa-tion is completed;
(5)The installation of C sections roofing truss before sector
1)The lifting for being arranged on C sections and carrying out column of c section columns, is carried out windproof before not installing truss and forming stable frame Measure, prevent column from toppling over;Batter post is held in the very useful chain block of lifting rear pillar, by pulling chain block chain conveniently to adjust Horizontal level at the top of whole batter post, after batter post top horizontal distance reaches requirement, tighten the nut of batter post foundation bolt;
2)The installation of C section truss among the C sections truss is installed, after truss element forms rock-steady structure, start to adjust Whether the locus of truss meets drawing requirement, otherwise should adjust in time;Continue that truss is installed to both sides, in all truss After installation, check whether the integral installation size of truss meets the requirements, fasten all bolts and related welding, polishing, Application subsequent job, complete whole curved space tube truss structure installation.
The batter post of the C sections truss and the gradient on ground are 65 degree.The batter post capital absolute altitude of the C sections truss >= 14m, batter post suspension column absolute altitude are zero m.The batter post of the C sections truss is Φ 406*25mm steel pipes.The A sections truss and B sections purlin Column in frame is H350*350*14*22mm shaped steel.
The curved space pipe truss installation method of the present invention, there is ground assembling roofing truss, the whole section of method lifted, tool Have construction it is succinct, conveniently, short time limit and construction quality easily ensure, save the advantages of heavy mechanical equipment, reduction operating expenses.
The above described is only a preferred embodiment of the present invention, any formal limitation not is made to the present invention, though So the present invention is disclosed above with preferred embodiment, but is not limited to the present invention, any to be familiar with this professional technology people Member, without departing from the scope of the present invention, when the technology contents using the disclosure above make a little change or modification For the equivalent embodiment of equivalent variations, as long as being the content without departing from technical solution of the present invention, the technical spirit according to the present invention Any simple modification, equivalent change and modification made to above example, in the range of still falling within technical solution of the present invention.

Claims (5)

  1. A kind of 1. curved space pipe truss installation method, it is characterised in that:Comprise the following steps:
    A, preparative work before construction, comprise the following steps:
    (1)Prepare field operation condition
    Job site possesses " three supplies and one leveling ";Relevant basic terrace project is basically completed, and its concrete strength is not lower than 75% ;The coordinate and absolute altitude at each measurement control point are accurately clear, and each basic center line and level measurement finish;Each passage, building Ladder, railing possess execution conditions, each hole, and hole and Buddhist monk in progress have open position to have the reliable precautionary measures;It is furnished with The fire-fighting equipment of enough acceptance(check)s;Each professional teams and groups possess work box, and have the special shelf for stacking parts;
    (2)Basis is checked and accepted
    Basis concrete cast before civil engineering unit should together with installation unit by net of control points total powerstation to all kinds of lower margins Bolt, the coordinate of built-in fitting, absolute altitude are checked, are just in the milk after meeting code requirement, should be checked after grouting;Fill Check need to be done easy to remember after checking and be in the milk before slurry;Surface of base should be marked and clearly indulged, horizontal center line, elevation line;
    (3)Drawing prepares, and component is checked and checked
    Whether the packing list of inspection steel construction delivery, installation diagram, component diagram are correct;Component inspection checks work by management list Position is taken the lead, represented with manufactory based on, kind, can be advised with total Bao Fang, unit in charge of construction the number of components as packing slip listed by jointly Lattice, inspection is checked, should made a record, check whether component apparent size is consistent with drawing according to component diagram, if problematic, through each Fang, which is represented, confirms visa, and is negotiated by Zong Bao directions manufactory, and solves in time;The parts checked through unpacking, Ying Youshi It is responsible for keeping in work order position;
    B, lift, comprise the following steps:
    (1)Determine lifting sequence
    Rectangle A section roofing truss, fan-shaped B sections roofing truss and C before sector are included according to curved space tube truss structure Section roofing truss, is lifted since A sections, after with B sections, is finally terminated to the lifting of C sections;Each truss is often across by outer framework Formed with inner frame, often across outer framework maximum weight is 28 tons, and lifting sequence is first integral hoisting outer framework, then again with list Part installs inner frame;One end hold-down support is used in the jointing of each truss, the other end uses slotted eye type of attachment Sliding support, so that day and night difference variation is big adjusting Middle East produces stress, a small amount of installation deviation by sliding, and During across the civil engineering expansion joint of large-scale truss, the stress concentration that the later stage causes malformation to bring because of foundation of civil work sedimentation, increase are reduced The security of structure;
    (2)50 tons of cranes are provided from suspender;
    (3)The installation of rectangle A section roofing truss
    1)The lifting for being arranged on A sections and carrying out column of A section columns, is carried out windproof before not installing truss and forming stable frame Measure, prevent column from toppling over;
    2)First on ground by installation diagram assembling truss before the installation lifting of A section truss, truss bolt of lower base hole horizontal and right is measured Linea angulata distance meets design requirement, prevents from doing over again because pitch-row deviation is big in lifting;
    Truss base is fixed with column top using high-strength bolt, and verticality of stand column, horizontal range, truss top should be checked after lifting Hold levelness deviation otherwise should adjust to meeting the requirements whether in regulating scope, continue to construct, until two crosses of A sections Type truss installa-tion is completed;
    (4)The installation of fan-shaped B sections roofing truss
    1)The lifting for being arranged on B sections and carrying out column of B section columns, is carried out windproof before not installing truss and forming stable frame Measure, prevent column from toppling over;
    2)First on ground by installation diagram assembling truss before the installation lifting of B section truss, truss bolt of lower base hole horizontal and right is measured Linea angulata distance meets design requirement, prevents from doing over again because pitch-row deviation is big in lifting;Truss base uses with column top Whether high-strength bolt is fixed, should check verticality of stand column, horizontal range, truss upper horizontal degree deviation in regulating scope after lifting It is interior, it otherwise should adjust to meeting the requirements, continue to construct, until B sections truss installa-tion is completed;
    (5)The installation of C sections roofing truss before sector
    1)The lifting for being arranged on C sections and carrying out column of c section columns, is carried out windproof before not installing truss and forming stable frame Measure, prevent column from toppling over;Batter post is held in the very useful chain block of lifting rear pillar, by pulling chain block chain conveniently to adjust Horizontal level at the top of whole batter post, after batter post top horizontal distance reaches requirement, tighten the nut of batter post foundation bolt;
    2)The installation of C section truss among the C sections truss is installed, after truss element forms rock-steady structure, start to adjust Whether the locus of truss meets drawing requirement, otherwise should adjust in time;Continue that truss is installed to both sides, in all truss After installation, check whether the integral installation size of truss meets the requirements, fasten all bolts and related welding, polishing, Application subsequent job, complete whole curved space tube truss structure installation.
  2. A kind of 2. curved space pipe truss installation method according to claim 1, it is characterised in that:The C sections truss The gradient on batter post and ground is 65 degree.
  3. A kind of 3. curved space pipe truss installation method according to claim 1, it is characterised in that:The C sections truss Batter post capital absolute altitude >=14m, batter post suspension column absolute altitude are zero m.
  4. A kind of 4. curved space pipe truss installation method according to claim 1, it is characterised in that:The C sections truss Batter post is Φ 406*25mm steel pipes.
  5. A kind of 5. curved space pipe truss installation method according to claim 1, it is characterised in that:The A sections truss and B Column in section truss is H350*350*14*22mm shaped steel.
CN201710583761.8A 2017-07-18 2017-07-18 A kind of curved space pipe truss installation method Pending CN107558612A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710583761.8A CN107558612A (en) 2017-07-18 2017-07-18 A kind of curved space pipe truss installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710583761.8A CN107558612A (en) 2017-07-18 2017-07-18 A kind of curved space pipe truss installation method

Publications (1)

Publication Number Publication Date
CN107558612A true CN107558612A (en) 2018-01-09

Family

ID=60973567

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710583761.8A Pending CN107558612A (en) 2017-07-18 2017-07-18 A kind of curved space pipe truss installation method

Country Status (1)

Country Link
CN (1) CN107558612A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108644469A (en) * 2018-05-22 2018-10-12 山西省工业设备安装集团有限公司 The construction technology of main steam system pipeline in a kind of Steam Turbine

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102777047A (en) * 2012-08-22 2012-11-14 河北二十冶工程技术有限公司 Assembling and splicing installation method of large-span tube-truss roof beam
CN104727564A (en) * 2015-04-17 2015-06-24 中亿丰建设集团股份有限公司 Method for installation construction of roof free-form surface single-layer latticed shell structure of super high-rise building
CN105133841A (en) * 2015-07-29 2015-12-09 五洋建设集团股份有限公司 Spatial curved surface steel structure pipe truss roof installation construction method
CN105780995A (en) * 2014-12-22 2016-07-20 五冶集团上海有限公司 Curved surface space pipe truss structure and mounting method thereof
CN106703419A (en) * 2017-01-22 2017-05-24 中国十七冶集团有限公司 Large-span roof truss high-altitude assembly sliding control method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102777047A (en) * 2012-08-22 2012-11-14 河北二十冶工程技术有限公司 Assembling and splicing installation method of large-span tube-truss roof beam
CN105780995A (en) * 2014-12-22 2016-07-20 五冶集团上海有限公司 Curved surface space pipe truss structure and mounting method thereof
CN104727564A (en) * 2015-04-17 2015-06-24 中亿丰建设集团股份有限公司 Method for installation construction of roof free-form surface single-layer latticed shell structure of super high-rise building
CN105133841A (en) * 2015-07-29 2015-12-09 五洋建设集团股份有限公司 Spatial curved surface steel structure pipe truss roof installation construction method
CN106703419A (en) * 2017-01-22 2017-05-24 中国十七冶集团有限公司 Large-span roof truss high-altitude assembly sliding control method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108644469A (en) * 2018-05-22 2018-10-12 山西省工业设备安装集团有限公司 The construction technology of main steam system pipeline in a kind of Steam Turbine

Similar Documents

Publication Publication Date Title
CN105780995B (en) A kind of curved space tube truss structure and its installation method
CN110886423B (en) BIM technology-based steel structure tension beam roof construction method
CN107012949B (en) A kind of method for improving of large-span steel vestibule
CN104141383B (en) A kind of Bailey beam pendent form support system and construction thereof
CN1978801B (en) Super-span steel skew arch construction method
CN103774854A (en) Construction method for hoisting heavy type ultrahigh steel member
CN101538936B (en) Hydraulic slip-and-lift construction method for water tower
CN203947771U (en) A kind of Bailey beam pendent form support system
CN102535845A (en) Construction method of bearing frame of corridor structure
CN109853394A (en) Arch bridge cable hoisting tower button integrated construction engineering method
CN102787560B (en) Integrated construction method of support of large cantilevered capping beam and vertical column
CN105586833B (en) Stiff skeleton steel reinforcement cage global formation large-scale cast-in-place tall pier and thin wall construction method
CN104674665B (en) Large-spatial structures vestibule bridge installation method
CN106192758A (en) A kind of construction method utilizing the cantilever form large-scale high pier stud of construction
CN114232805B (en) Construction method of ultrahigh-height large-span steel concrete beam hanging structure
CN115419277B (en) Construction method of heavy steel box type diagonal column
CN103216103A (en) Pre-deformation construction method for mounting oblique-arc-shaped combined steel-structured column of annular roof
CN108411790A (en) A kind of adjustable installing bracket of prefabricated assembled segmentation bent cap
CN104929047B (en) A kind of V-type pier outer support construction method
CN115467421A (en) Hoisting construction method for complex large-span steel roof
CN106639147B (en) Super high-rise building enhancement layer steel construction semi-girder truss construction method
CN102777044B (en) Hoisting method of steel-structured spraying layer of urea prilling tower
CN109457814B (en) Construction method for top cover of high-rise and large-diameter building based on Bailey truss structure
CN107558612A (en) A kind of curved space pipe truss installation method
CN102635061B (en) Mountain stream river-crossing cable-stayed chain trestle and hoisting method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180109

WD01 Invention patent application deemed withdrawn after publication