CN107557522A - Method for removing dust on roof of steel plant - Google Patents

Method for removing dust on roof of steel plant Download PDF

Info

Publication number
CN107557522A
CN107557522A CN201710556589.7A CN201710556589A CN107557522A CN 107557522 A CN107557522 A CN 107557522A CN 201710556589 A CN201710556589 A CN 201710556589A CN 107557522 A CN107557522 A CN 107557522A
Authority
CN
China
Prior art keywords
dust
roof
converter
roof dust
valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710556589.7A
Other languages
Chinese (zh)
Inventor
徐磊
***
陈浩
曾卫民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shougang Jingtang United Iron and Steel Co Ltd
Original Assignee
Shougang Jingtang United Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shougang Jingtang United Iron and Steel Co Ltd filed Critical Shougang Jingtang United Iron and Steel Co Ltd
Priority to CN201710556589.7A priority Critical patent/CN107557522A/en
Publication of CN107557522A publication Critical patent/CN107557522A/en
Pending legal-status Critical Current

Links

Landscapes

  • Carbon Steel Or Casting Steel Manufacturing (AREA)

Abstract

The invention discloses a method for removing dust on a roof of a steel plant, which comprises the following steps: a partition plate is used for separating an iron adding span and an oxygen lance blowing span of the converter; directly connecting a roof dust removal pipeline with the iron adding cross dust collection hood; compiling a special roof dust removal valve control program; starting an accident button such as splashing on a picture of a main control room of the converter, opening all roof dust removal valves of the splashing converter, and closing the roof dust removal valves of other converters; and after a period of time, the roof dedusting valves of all the converters are recovered to be normal. The method aims to provide a novel steel plant roof dedusting method, and the converter accident state is intensively controlled through a roof dedusting system of the steel plant, if: a large amount of smoke dust generated during splashing, slag overflowing, iron spraying and the like is treated in a centralized way through the roof dust removal system, the problem that the use of the dust removal air quantity is uneven is solved, the working efficiency of the roof dust removal system is improved, and the atmospheric quality in a steel-making factory is obviously improved.

Description

The method of steel mill removing roof dust
Technical field
The present invention relates to metallurgy industry to make steel field of Environment Protection, more particularly in converter generation splash, the slag that overflows, spills the accidents such as iron When how to reduce atmosphere pollution in factory building, the method for improving steel mill removing roof dust system effectiveness.
Background technology
Steel mill can produce substantial amounts of smoke-dust in converter smelting, although there is secondary dedusting system to reduce dust pollution, But still some smoke-dust is discharged into air from steel mill roof, especially when converter occurs splash, the slag that overflows, spills the accidents such as iron, A large amount of smoke-dusts are blown out from steel-making factory building, and traditional removing roof dust system can not purify a large amount of smoke-dusts, and dust pollution is serious.
The removing roof dust system of steel mill, smoke-dust four dissipates elegant caused by converter, it is impossible to centralized collection processing, moreover, In general removing roof dust systematic air flow disperses, when volume of smoke produces, it is impossible in time siphons away a large amount of ash-laden gas, causes serious Factory building in atmosphere pollution.
The content of the invention
The technical problem to be solved in the present invention is to provide a kind of method of novel steelmaking factory removing roof dust, pass through centralized Control Steel mill removing roof dust system, concentrate under converter accidents state, such as:Splash, the slag that overflows, a large amount of smoke-dusts caused by when spilling iron etc. Focused on by removing roof dust system, it is uneven to solve the problems, such as that dedusting air quantity uses, improves the work of removing roof dust system Make efficiency, hence it is evident that improve the air quality in steel-making factory building.
The method of steel mill removing roof dust of the present invention, comprises the following steps:
Converter iron making across and oxygen rifle blowing across being separated with dividing plate;
Removing roof dust pipeline is directly connected with iron making across dust gathering arrester;
Write machine type roof special for power station dust removing valve control program;
Start " emergency button such as splash " on converter master control room picture, open all removing roof dust valves of splash converter, Close the removing roof dust valve of other converters;
The removing roof dust valve of all converters is recovered normal after a period of time.
The method of steel mill removing roof dust of the present invention, wherein described a period of time refer to 3 minutes.
The method of steel mill removing roof dust of the present invention, wherein the control program is set as inciting somebody to action farthest during daily converter smelting The converter oxygen gun at end across removing roof dust valve open, when operating personnel click on " emergency button such as splash " when, control program start, The removing roof dust valve of other converters is closed, the dust removing valve for only retaining the converter that splash occurs is opened, and the time continues 3 minutes, 3 points Recover daily smelting state after clock.
The method of steel mill removing roof dust of the present invention, it is to break through conventional thought first, by the air quantity collection of removing roof dust system Middle use, when generation volume of smoke is excessive, removing roof dust systematic air flow focuses on the converter that splash occurs, and improves removing roof dust system The efficiency of system;Second, converter iron making is separated across being blown with oxygen rifle across with dividing plate, volume of smoke caused by converter splash obtains Shunting, can be collected by dust excluding hood respectively, and no longer four dissipate and elegant cause to pollute in factory building;Third, in master control room operation screen Upper increase " emergency button such as splash ", works out dedicated program, is uniformly coordinated the removing roof dust valve of 15 converters, is easy to post personnel Operation.
The invention will be further described below in conjunction with the accompanying drawings.
Brief description of the drawings
Fig. 1 is the flow chart of the method for steel mill removing roof dust of the present invention.
Embodiment
As shown in figure 1, the method for steel mill removing roof dust of the present invention, comprises the following steps:
Converter iron making across and oxygen rifle blowing across being separated with dividing plate;
Removing roof dust pipeline is directly connected with iron making across dust gathering arrester;
Write machine type roof special for power station dust removing valve control program;
Start " emergency button such as splash " on converter master control room picture, open all removing roof dust valves of splash converter, Close the removing roof dust valve of other converters;
The removing roof dust valve of all converters is recovered normal after a period of time.
The method of steel mill removing roof dust of the present invention, wherein described a period of time refer to 3 minutes.
The method of steel mill removing roof dust of the present invention, wherein the control program is set as inciting somebody to action farthest during daily converter smelting The converter oxygen gun at end across removing roof dust valve open, when operating personnel click on " emergency button such as splash " when, control program start, The removing roof dust valve of other converters is closed, the dust removing valve for only retaining the converter that splash occurs is opened, and the time continues 3 minutes, 3 points Recover daily smelting state after clock.
The present invention is uniformly coordinated 15 converter roofs of control using the program of a set of special control removing roof dust system valve Dust removing valve, increase special " emergency button such as splash " in the terminal of every converter, division board is installed between converter bay, by converter Iron making across with oxygen rifle blowing across separate, by removing roof dust pipeline directly with converter iron making across dust gathering arrester link together, compile Write machine type roof special for power station dust removing valve control program, when program setting is daily converter smelting by the converter oxygen gun of distalmost end across roof remove Dirt valve is opened, and when operating personnel click on " emergency button such as splash ", control program starts, by the removing roof dust valve of other converters Close, the dust removing valve for only retaining the converter that splash occurs is opened, and the time continues 3 minutes, daily smelting state is replied after 3 minutes.
The method of steel mill removing roof dust of the present invention, it is to break through conventional thought first, by the air quantity collection of removing roof dust system Middle use, when generation volume of smoke is excessive, removing roof dust systematic air flow focuses on the converter that splash occurs, and improves removing roof dust system The efficiency of system;Second, converter iron making is separated across being blown with oxygen rifle across with dividing plate, volume of smoke caused by converter splash obtains Shunting, can be collected by dust excluding hood respectively, and no longer four dissipate and elegant cause to pollute in factory building;Third, in master control room operation screen Upper increase " emergency button such as splash ", works out dedicated program, is uniformly coordinated the removing roof dust valve of 15 converters, is easy to post personnel Operation, dust caused by suction ash are directly discharged in secondary dedusting system, do not produce dust pollution.
By using the method for steel mill removing roof dust of the present invention, acquired has the beneficial effect that:
(1) air quantity of removing roof dust system is concentrated use in, when generation volume of smoke is excessive, removing roof dust systematic air flow collection In to occur splash converter, improve removing roof dust system efficiency;
(2) converter iron making is separated across being blown with oxygen rifle across with dividing plate, volume of smoke caused by converter splash is divided Stream, can be collected by dust excluding hood respectively, and no longer four dissipate and elegant cause to pollute in factory building;
(3) increase " emergency button such as splash " on master control room operation screen, work out dedicated program, be uniformly coordinated 15 and turn The removing roof dust valve of stove, is easy to post human users;
(4) automatically controlling for removing roof dust systematic air flow is realized, removing roof dust allocation of the amount of air can be turned to what is needed Stove;
(5) removing roof dust system effectiveness is improved, change the scattered present situation of removing roof dust air quantity;
(6) special control program is write, optimizes the operation of dust removing valve, during a removing roof dust air quantity is concentrated, its When its converter again taps on button, removing roof dust system postponed according to 3 minutes principles.
Embodiment described above is only that the preferred embodiment of the present invention is described, not to the model of the present invention Enclose and be defined, on the premise of design spirit of the present invention is not departed from, technical side of the those of ordinary skill in the art to the present invention The various modifications and improvement that case is made, it all should fall into the protection domain of claims of the present invention determination.

Claims (3)

  1. A kind of 1. method of steel mill removing roof dust, it is characterised in that comprise the following steps:
    Converter iron making across and oxygen rifle blowing across being separated with dividing plate;
    Removing roof dust pipeline is directly connected with iron making across dust gathering arrester;
    Write machine type roof special for power station dust removing valve control program;
    Start " emergency button such as splash " on converter master control room picture, open all removing roof dust valves of splash converter, close The removing roof dust valve of other converters;
    The removing roof dust valve of all converters is recovered normal after a period of time.
  2. 2. the method for steel mill removing roof dust according to claim 1, it is characterised in that:Described a period of time refers to 3 Minute.
  3. 3. the method for steel mill removing roof dust according to claim 2, it is characterised in that:The control program is set as day During normal converter smelting by the converter oxygen gun of distalmost end across removing roof dust valve open, when operating personnel click on " accident such as splash is pressed During button ", control program starts, and the removing roof dust valve of other converters is closed, and the dust removing valve for only retaining the converter that splash occurs is beaten Open, the time continues 3 minutes, recovers daily smelting state after 3 minutes.
CN201710556589.7A 2017-07-10 2017-07-10 Method for removing dust on roof of steel plant Pending CN107557522A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710556589.7A CN107557522A (en) 2017-07-10 2017-07-10 Method for removing dust on roof of steel plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710556589.7A CN107557522A (en) 2017-07-10 2017-07-10 Method for removing dust on roof of steel plant

Publications (1)

Publication Number Publication Date
CN107557522A true CN107557522A (en) 2018-01-09

Family

ID=60973029

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710556589.7A Pending CN107557522A (en) 2017-07-10 2017-07-10 Method for removing dust on roof of steel plant

Country Status (1)

Country Link
CN (1) CN107557522A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111589241A (en) * 2020-04-16 2020-08-28 包头钢铁(集团)有限责任公司 Converter triple dust removal clerestory and roof clerestory optimization transformation control method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1888087A (en) * 2006-08-03 2007-01-03 上海宝钢工程技术有限公司 Converter shop dust collecting cover device
CN202208731U (en) * 2011-09-01 2012-05-02 南京钢铁股份有限公司 Dust removal air distribution device of blast furnace casting house
CN202380017U (en) * 2011-12-22 2012-08-15 中冶赛迪工程技术股份有限公司 Secondary dust removal system for converters

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1888087A (en) * 2006-08-03 2007-01-03 上海宝钢工程技术有限公司 Converter shop dust collecting cover device
CN202208731U (en) * 2011-09-01 2012-05-02 南京钢铁股份有限公司 Dust removal air distribution device of blast furnace casting house
CN202380017U (en) * 2011-12-22 2012-08-15 中冶赛迪工程技术股份有限公司 Secondary dust removal system for converters

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111589241A (en) * 2020-04-16 2020-08-28 包头钢铁(集团)有限责任公司 Converter triple dust removal clerestory and roof clerestory optimization transformation control method

Similar Documents

Publication Publication Date Title
CN106382825A (en) Environment-friendly steelmaking furnace
CN107557522A (en) Method for removing dust on roof of steel plant
CN201969720U (en) Smoke gathering device for ladle refining furnace
CN206872864U (en) Mobile enclosed cover
CN100460095C (en) Converter shop dust collecting cover device
CN204665948U (en) Nonferrous metal smelting furnace flue gas waste heat recovery and dust pelletizing system
CN206269606U (en) A kind of environmentally friendly converter
CN109702160B (en) Cutting smoke exhaust system of side suction type continuous casting machine and control method thereof
CN204265787U (en) A kind of converter mouth secondary flue gas seals catching apparatus
CN110923384A (en) Plugging device for preventing dust overflow of blast furnace taphole
CN202380017U (en) Secondary dust removal system for converters
CN202164318U (en) Environmental smoke-collecting device for converter blowing factory buildings
CN212018882U (en) Casting shop cigarette ash recovery unit
CN202208731U (en) Dust removal air distribution device of blast furnace casting house
CN211814541U (en) Plugging device for preventing dust overflow of blast furnace taphole
CN2853806Y (en) Adding, iron tapping smoke collecting dust removing device of metal mixer
CN209501339U (en) A kind of dry coke quenching flue-gas dust-removing and desulfurization purification device
CN2581913Y (en) Volume semi-closed smoke collecting hood for refining furnace
CN208042418U (en) Roofing purifies natural exhaust device
CN111575436B (en) Dust removal method
CN103537150A (en) Environment-friendly dust removal method for molten iron tank
CN201885585U (en) Guiding type desulfurizer for smoke of sintering machine
CN205062113U (en) LF refining furnace dust collector
CN2295178Y (en) Electric-oven smoke collecting hood
CN207904302U (en) Energy-saving secondary BOF dedusting system device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180109