CN107545399A - Bulleted list based on item taxonomy tree - Google Patents
Bulleted list based on item taxonomy tree Download PDFInfo
- Publication number
- CN107545399A CN107545399A CN201610486878.XA CN201610486878A CN107545399A CN 107545399 A CN107545399 A CN 107545399A CN 201610486878 A CN201610486878 A CN 201610486878A CN 107545399 A CN107545399 A CN 107545399A
- Authority
- CN
- China
- Prior art keywords
- project
- item
- user
- bulleted list
- interest
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Information Retrieval, Db Structures And Fs Structures Therefor (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Bulleted list based on item taxonomy tree, automatically generate a pattern:Bulleted list carries out planning classification by item taxonomy tree:Prescribed time-limit, allocated items weight.Multiple prime items selections can be carried out to project, only just start this project after the completion of prime project inside project planning.Embodiments of the invention provide a kind of bulleted list based on item taxonomy tree, solve because the reasons such as turn of the market, customer demand and technology alteration call some resources to suspend execution due to a lack of resource come the task in being carrying out caused by the meeting that carries out an urgent task from being carrying out for task;Maximize the use value of valuable source (such as some visual plants or human resources), realize that the performance of enterprises maximizes, the bulleted list based on item taxonomy tree, resource allocation has more flexibility during the project implementation, resource is effectively used, and project can be completed in time.
Description
Technical field
The present invention relates to the project management development technique field of classification of the items, more particularly on item taxonomy tree and project
The project management mechanism of list.
Background technology
Project management is the method for managing system using project as object, it by a provisional special flexible tissue,
Expeditiously plan, tissue, guidance and control are carried out to project, to realize the dynamic management of project overall process and the synthesis of target
Coordinate and optimize.Project is prevalent in the items of our human societies as a kind of disposable and unique social activities
Among activity, it might even be possible to say it is that the existing various material and culture achievements of the mankind are realized by way of project,
Because the relied on facility of existing various operations and condition are all initially to lean on project activity construction or exploitation.The mesh of project management
Property to go to ensure to meet or surmount by carrying out project management activity project objective that project each side concerned face clearly proposes or
Index and meet project each side concerned be not known as defined in potential demand and pursuit.The uniqueness of project management be project management not
The production and operation management of in general enterprise is same as, government and unique management content also different from routine, is a kind of entirely different
Management activity.The integration of project management be project management in must according to each key element of detailed programs or it is each specialty between
Configuration relation carries out the management of integration, and can not carry out in isolation project it is each specialty or specialty manage independently.Project pipe
The novelty of reason includes two layers of meaning:One refers to that project management is the pipe for innovating (innovation that project is included)
Reason, secondly the management for referring to any one project is required for going by management innovation all without unalterable pattern and method
Realize effective management for detailed programs.
The most important work of project management is the plan of project, scheduling is split and control, and wherein project scheduling splits conduct
An important step in project management, reasonably dispatches and wherein critical effect is played to the quality of project management.At present
The detachable property of task is effectively used in many project managements.On the one hand, because turn of the market, customer demand and technology become
Some hot jobs of reason such as more have pending, it is necessary to call some resources urgent to perform these from being carrying out for task
Task, the task in being currently executing can be so caused to suspend execution due to a lack of resource, until after hot job has performed
It is further continued for performing current task;On the other hand, in order to maximize some valuable sources (such as some visual plants or human resources)
Use value, realize the performance of enterprises maximize, it may be necessary to allocated in multiple projects, if task is detachable,
Resource allocation has more flexibility during the project implementation, and resource is effectively used, and project can be completed in time.
System is implemented based on benefit caused by the bulleted list of item taxonomy tree:On the one hand it is to possess Project Manager's body
Part people provide flexible, convenient operation interface, have the advantages that security it is good, it is easy to operate, realize it is easy;On the other hand
The mechanism of item taxonomy tree and bulleted list is made full use of to improve production efficiency, quality and the continuity of work again, and can
More flexible distribution task.
The content of the invention
In order to overcome the shortcomings of existing bulleted list, the present invention provides a kind of bulleted list based on item taxonomy tree,
Automatically generate a pattern:Bulleted list carries out planning classification by item taxonomy tree:Prescribed time-limit, allocated items weight;All
Sub-project is 2 layers of special construction, and classified catalogue+project data form is present;It can carry out automatically creating for 2 times in bulleted list specified
Personnel and a large amount of sub-projects;Preview planning is carried out to project;Lateral comparison is carried out according to time shaft according to all participants, and
And any increase and decrease can be carried out to personnel;Inside project planning multiple prime items selections, only prime item can be carried out to project
Just start this project after the completion of mesh.It on the one hand can so reduce the integrated project program safety control of more sub-project compositions
Complexity and difficulty, the mechanism on the other hand can be made full use of to be split after project receives again and send and wait all tear open
Molecule project is completed after checking and accepting, then applies checking and accepting from fractionation person to the total publisher of project.
The technical solution adopted for the present invention to solve the technical problems is:The interest of user is different, its interest arest neighbors
Answer what different thought proposed, therefore introduce item classification information, different interest arest neighbors is obtained for the different interest of user
Recommended, so as to improve the recommendation quality of system.Algorithm enters scoring of the user to project first with item classification information
Row classification, i.e., it is different for different interest, user group.Secondly under same project classification, calculate item similarity and obtain
Project similar neighborhood, predict that it does not score using the scoring with the non-scoring item similarity highest project similar neighborhood of user
The scoring of project.Then different interest is directed to, calculates the similar neighborhood of user in each class respectively, will be with target base phase
Targeted customer is recommended like the interest of degree highest neighbor user.
The invention has the advantages that solve because the reasons such as turn of the market, customer demand and technology alteration are from
It is due to a lack of resource and temporary come the task in being carrying out caused by the meeting that carries out an urgent task that some resources are called in the task of execution
Stop performing;The use value of valuable source (such as some visual plants or human resources) is maximized, realizes that the performance of enterprises maximizes,
Bulleted list based on item taxonomy tree, resource allocation has more flexibility during the project implementation, and resource is effectively made
With project can be completed in time.
Brief description of the drawings
The present invention is further described with reference to the accompanying drawings and examples.
Fig. 1 is present example classification of the items algorithm flow chart.
Fig. 2 is present example new projects project overview list figure.
Fig. 3 is present example user items list figure.
Fig. 4 is that present example PPSP-CTWM problem Rollout algorithms substep solves figure.
Fig. 5 is present example coordination model flow chart.
Embodiment
In Fig. 1, present example classification of the items algorithm flow chart is illustrated.User's scoring record Data processing is used
Family-project rating matrix mxn, while project category matrix is utilized, user-project rating matrix mxn is divided into k classification.
That is knm, wherein j are the rating matrix of jth class.Fill each classification matrix J.Matrix element R, it is scoring of the user to project J,
It is divided into two kinds of situations:When user explicitly scores project J, its value is taken to set L;And when user does not score project J, it scores
Then obtained by algorithm 1, i.e., to arbitrary project, scoring of the user to project J.
To k classification matrix, the similarity between any user in class is calculated, and form user's similarity matrix in class.
In the class where destination item, find targeted customer UID user's neighborhood, be set to C and user cl, c2 ... with
Family UID similarity is arranged in order from high to low.All neighbours' number m in user's neighborhood Curb are calculated, user UID is set
Arest neighbors number be M, work as M>During m, then user UID arest neighbors collection is combined into C;Work as M<M, then preceding M items are taken in C as user
UID arest neighbors collection is combined into C.When destination item belongs to multiple classifications simultaneously, respectively in affiliated classification matrix, class is calculated
Prediction scoring purD, rrDs of the interior user UID to project IID, then average as user UID to the final pre- of project IID
Survey appraisal result.Using strategy (whole classification matrixes as belonging to selection target project or the class closest to average value specified
Other matrix etc.), the neighbor user in user's UID arest neighbors set C is selected, their hobby is recommended into targeted customer, is mesh
Mark user and find potential new interest.
Claims (3)
1. the bulleted list based on item taxonomy tree, it is characterized in that:Automatically generate a pattern:Bulleted list is by item taxonomy tree
Carry out planning classification:Prescribed time-limit, allocated items weight;Multiple prime projects can be carried out inside project planning to project to select
Select, only just start this project after the completion of prime project.
2. according to claim 1 automatically generate a pattern:Bulleted list carries out planning classification by item taxonomy tree:Regulation
Time limit, allocated items weight, it is characterized in that:The interest of user is different, and its interest arest neighbors also answers what different thought proposed, therefore
Item classification information is introduced, is recommended for the different interest arest neighbors of the different interest acquisition of user, so as to improve system
Recommendation quality;Algorithm classifies scoring of the user to project first with item classification information, i.e., for different emerging
Interest, user group are different.
3. multiple prime items selections, only prime can be carried out to project inside project planning according to claim 1
Just start this project after the completion of project, it is characterized in that:Under same project classification, it is similar to calculate item similarity acquisition project
Neighbours, commenting for its non-scoring item is predicted using the scoring with the non-scoring item similarity highest project similar neighborhood of user
Point;Then different interest is directed to, calculates the similar neighborhood of user in each class respectively, will be with target base similarity highest
The interest of neighbor user recommend targeted customer.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610486878.XA CN107545399A (en) | 2016-06-28 | 2016-06-28 | Bulleted list based on item taxonomy tree |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610486878.XA CN107545399A (en) | 2016-06-28 | 2016-06-28 | Bulleted list based on item taxonomy tree |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107545399A true CN107545399A (en) | 2018-01-05 |
Family
ID=60962676
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610486878.XA Pending CN107545399A (en) | 2016-06-28 | 2016-06-28 | Bulleted list based on item taxonomy tree |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107545399A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111324258A (en) * | 2020-02-04 | 2020-06-23 | 北京字节跳动网络技术有限公司 | Method, device, equipment and medium for generating contents of configuration items of multilevel pull-down menu |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101271559A (en) * | 2008-05-16 | 2008-09-24 | 华东师范大学 | Cooperation recommending system based on user partial interest digging |
CN103886401A (en) * | 2013-09-25 | 2014-06-25 | 西安云澜信息科技有限公司 | Project management system based on cloud computation |
-
2016
- 2016-06-28 CN CN201610486878.XA patent/CN107545399A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101271559A (en) * | 2008-05-16 | 2008-09-24 | 华东师范大学 | Cooperation recommending system based on user partial interest digging |
CN103886401A (en) * | 2013-09-25 | 2014-06-25 | 西安云澜信息科技有限公司 | Project management system based on cloud computation |
Non-Patent Citations (1)
Title |
---|
欧立奇等: "协同过滤算法中新项目推荐方法的研究", 《微计算机信息(管控一体化)》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111324258A (en) * | 2020-02-04 | 2020-06-23 | 北京字节跳动网络技术有限公司 | Method, device, equipment and medium for generating contents of configuration items of multilevel pull-down menu |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Lee et al. | A RFID-based resource allocation system for garment manufacturing | |
Iyer et al. | Measuring and benchmarking managerial efficiency of project execution schedule performance | |
Lansley | Analysing construction organizations | |
Merk | Production beyond the horizon of consumption: spatial fixes and anti-sweatshop struggles in the global athletic footwear industry | |
Vinodh et al. | Development of computerized decision support system for leanness assessment using multi grade fuzzy approach | |
Tu et al. | Applying an AHP-QFD conceptual model and zero-one goal programming to requirement-based site selection for an airport cargo logistics center | |
CN107545399A (en) | Bulleted list based on item taxonomy tree | |
Mateen | Measuring Project Management Maturity-A framework for better and efficient Projects delivery | |
Asadi | Intellectual capital knowledge management: organizational value creation | |
Bazrkar et al. | IDENTIFYING AND SELECTING THE STRATEGIC PROCESS USING THE CROSS-EFFICIENCY APPROACH BASED ON SATISFACTION LEVEL AND EXTENDDED BALANCED SCORECARD. | |
Gooneratne et al. | Appearance, disappearance and reappearance of activity based costing: a case study from a Sri Lankan manufacturing firm | |
CN107545344A (en) | The integrated project mechanism being made up of more sub-projects | |
CN107545345A (en) | Two layers of sub-project structure of application class catalogue and project data | |
CN107545400A (en) | Project structure based on more loose-leaves | |
Zhai et al. | Research on Application of Meticulous Nursing Scheduling Management Based on Data‐Driven Intelligent Optimization Technology | |
Kwong et al. | Determination of fault-tolerant fabric-cutting schedules in a just-in-time apparel manufacturing environment | |
Hong et al. | Economic Restructuring and HRM in Hong Kong | |
Mirahmadi et al. | Determination of the optimal number of suppliers considering the risk: Emersun Company as a case study | |
CN107545343A (en) | Entry addressing mechanism based on prime project | |
CN107545402A (en) | Realize the secondary project mechanism for automatically creating sub-project | |
Gu et al. | Task allocation for product development projects based on the knowledge interest | |
Dwikardana et al. | Crisis-based transition and family-business organization’s growth in 5 Indonesian middle-large family-business organizations | |
Ebrahimi et al. | Developing an integrated marketing strategy decision making framework based on corporate-specific criteria | |
Kaihara et al. | Auction-based production planning considering operators' skill criterion | |
Azmeh | Global value chains, production regimes and the governance of migrant workers |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20180105 |
|
WD01 | Invention patent application deemed withdrawn after publication |