CN107542486A - Drilling gas extraction laboratory analog system and method - Google Patents

Drilling gas extraction laboratory analog system and method Download PDF

Info

Publication number
CN107542486A
CN107542486A CN201710944003.4A CN201710944003A CN107542486A CN 107542486 A CN107542486 A CN 107542486A CN 201710944003 A CN201710944003 A CN 201710944003A CN 107542486 A CN107542486 A CN 107542486A
Authority
CN
China
Prior art keywords
pipe
gas
grouting
simulation
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710944003.4A
Other languages
Chinese (zh)
Other versions
CN107542486B (en
Inventor
张天军
蒋兴科
包若羽
张磊
宋爽
陈佳伟
葛迪
周敖
赵云红
范亚飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian University of Science and Technology
Original Assignee
Xian University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian University of Science and Technology filed Critical Xian University of Science and Technology
Priority to CN201710944003.4A priority Critical patent/CN107542486B/en
Publication of CN107542486A publication Critical patent/CN107542486A/en
Application granted granted Critical
Publication of CN107542486B publication Critical patent/CN107542486B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Examining Or Testing Airtightness (AREA)

Abstract

The invention discloses a kind of drilling gas extraction laboratory analog system, including borehole simulation pipe, hole-sealing grouting system, gas pressure simulated loading system, gas detector, acoustic emission system and computer;Two is provided with plug model configuration in borehole simulation pipe, and the tube wall of borehole simulation pipe is provided with multiple cracks simulation hole, simulation pipe in crack is connected with the simulation hole of crack, gas leakage detection switch is connected with crack simulation pipe;Hole-sealing grouting system includes Grouting Pipe, slurry recovering tube, grouting pump, slip casting handle and grouting pressure table;Gas pressure simulated loading system includes vavuum pump, methane gas tank, pressure vacuum gauge, vacuum switch, methane gas tank switch, gas pressure table and gas pumping switch;The invention also discloses a kind of drilling gas extraction laboratory simulation method and a kind of sealing material sealing property method of testing.The present invention can real simulation field condition, test that the manpower and materials of consuming are few, and experiment effect is good, experimental result accuracy is high, practical.

Description

Drilling gas extraction laboratory analog system and method
Technical field
The invention belongs to drilling gas extraction technical field, and in particular to a kind of drilling gas extraction laboratory analog system And method.
Background technology
Gas bearing capacity in China most area coal seam is high, pressure is big, gas permeability of coal seam is low, and geological tectonic conditions are multiple It is miscellaneous.And Gas Disaster is one of main disaster of China's coal-mine, the safety in production to mine has serious threat, and it is close to drill Envelope effect directly affects the extracting result of gas and effective extraction radius of drilling, and data shows:Into the sky of extraction system Gas 80% is above is by the suction that drills, if drilling air imbibed quantity reduces 1/2~1/3, drilling gas flow can increase 1.5~2 times.Therefore, the quality of sealing of hole effect directly affects the extracting result of gas.During mash gas pumping drilling sealing of hole, Due to just there is a large amount of cracks after itself pore-forming in drilling hole, while the hole of borehole circumference (splits) gap and further develops, expands, Outside air easily (is split) in gap access from this some holes in the presence of extraction negative pressure, so as to cause under gas extraction concentration Drop, directly result in the present situation that colliery sealing of hole difficulty is big, sealing of hole effect is poor.China's drainage from coal seam extraction gas concentration compared with Low, extraction negative pressure is also universal relatively low, and the gas density of the higher extraction of negative pressure is lower.It is possible thereby to infer:Existing sealing of hole skill Art is far from reaching sealing isolation effect.For high methane weak seam, this coal bed gas extraction drilling leakage problem is particularly It is prominent.In addition, the quality of sealing of hole effect affects the accuracy of determination of coal seam gas pressure again, if sealing of hole sections exist it is minimal amount of Gas leakage, it is all that the pressure value for making to obtain is relatively low, cause the judge to gas bearing and the larger error of prominent situation, or even make not When control prece and measure.According to preventing and treating coal and gas prominent regulation, the maximum coal-bed gas pressure of live practical measurement is One of four single indexs of Coal Seam Outburst Hazard identification, the size of coal-bed gas pressure reflects Coal Seam Outburst Hazard The order of severity, it is efficient sealed by being carried out to gas pressure measurement drilling, can be with the coal-bed gas pressure of Accurate Determining, this is just Mine targetedly formulates outburst prevention measures, establishment gas-geologic map etc. and provides important evidence.At present, it is such experiment be mostly Scene is carried out, and laboratory can carry out the relatively fewer of such experiment, and underground is limited by some conditions, various factors, Test effect is barely satisfactory, and the manpower and materials for operating consuming are also high.Therefore, it is badly in need of a kind of experimental system, to simulate drilling gas Extraction, the sealing property of influence and sealing material of the research the wall of a borehole crack gas leakage to drilling gas extraction.
The content of the invention
In view of the above-mentioned deficiencies in the prior art, the technical problem to be solved by the present invention is that provide a kind of drilling gas Extraction laboratory analog system, its is simple in construction, and novel in design rationally it is convenient to realize, can real simulation field condition, and will The experiment for needing to do at the scene is moved in laboratory, tests that the manpower and materials of consuming are few, and experiment effect is good, experimental result it is accurate Property it is high, it is practical, be easy to promote the use of.
In order to solve the above technical problems, the technical solution adopted by the present invention is:A kind of drilling gas extraction laboratory simulation System, it is characterised in that:Including borehole simulation pipe, hole-sealing grouting system, gas pressure simulated loading system and gas detector, And acoustic emission system and the computer that connects with acoustic emission system;Two is provided with plug simulation knot in the borehole simulation pipe Structure, multiple cracks simulation holes are provided with the tube wall of one section of borehole simulation pipe between two plug model configurations, it is described Simulation pipe in crack is connected with the simulation hole of crack, gas leakage detection switch is connected with the crack simulation pipe;
The hole-sealing grouting system includes the Grouting Pipe and slurry recovering tube stretched into borehole simulation pipe, and is connected with Grouting Pipe Grouting pump;Slip casting handle and grouting pressure table are provided with the grouting pump;
The gas pressure simulated loading system includes being connected to the true of gas pumping pipe one end by vavuum pump connecting tube Empty pump and the methane gas tank that the gas pumping pipe other end is connected to by methane gas tank connecting tube, the vavuum pump connecting tube On be connected with pressure vacuum gauge and vacuum switch, is provided with methane gas tank in the methane gas outlet of the methane gas tank Switch, gas pressure table and gas pumping switch are connected with the methane gas tank connecting tube;The Grouting Pipe is fixed on watt The downside of this drainage tube, the slurry recovering tube are fixed on the upside of gas pumping pipe, and the gas detector passes through gas detector Connecting tube is connected in vavuum pump connecting tube.
Above-mentioned drilling gas extraction laboratory analog system, it is characterised in that:The borehole simulation pipe is by a diameter of 135mm lucite tube is made, and the gas pumping pipe is made up of a diameter of 75mm lucite tube, the Grouting Pipe and Slurry recovering tube is made by PVC aluminium-plastic pipes.
Above-mentioned drilling gas extraction laboratory analog system, it is characterised in that:The plug model configuration is by being wrapped in Cotton gauze and the uniform liquid polyurethane foaming structure being applied on cotton gauze on gas pumping pipe, Grouting Pipe and slurry recovering tube Into the both sides of the plug model configuration are provided with the pad for preventing plug model configuration from spreading to the left and right.
Above-mentioned drilling gas extraction laboratory analog system, it is characterised in that:The gas detector is light interference type Gas detector.
Above-mentioned drilling gas extraction laboratory analog system, it is characterised in that:The acoustic emission system is SAEU2S sound Emission system, the SAEU2S acoustic emission systems are connected more including data acquisition cabinet and by cable with data acquisition cabinet Road preamplifier, the input of the preamplifier are connected with sensor by signal wire, and the data acquisition cabinet leads to USB connecting lines are crossed to be connected with computer.
Above-mentioned drilling gas extraction laboratory analog system, it is characterised in that:The quantity in the crack simulation hole is 6 It is individual, wherein the aperture in 2 cracks simulation hole is 2mm, wherein the aperture in 2 cracks simulation hole is 3mm, 2 crack simulations in addition The aperture in hole is 4mm;The external diameter of the crack simulation pipe is engaged with the aperture in crack simulation hole.
Present invention also offers a kind of method and step is simple, it is convenient to realize, can gather acoustic emission signal data and will adopt The signal collected is transferred to computer and recorded, when being solidified for use by acoustic emission signal data research cement grout inside should Power changes, and then studies the closure situation of borehole simulation pipe, judges whether there is crack use inside borehole simulation pipe;It can also detect Diverse location, different pore size crack simulation hole gas leakage when mash gas extraction concentration drilling gas extraction laboratory simulation side Method, it is characterised in that this method comprises the following steps:
Step 1: experiment early-stage preparations, detailed process are:
Step 101, one section of a diameter of 135mm lucite tube is taken to take one section of a diameter of 75mm as borehole simulation pipe Lucite tube as gas pumping pipe, take one section of PVC aluminium-plastic pipe as Grouting Pipe, take one section of PVC aluminium-plastic pipe as returning slurry Pipe;
Step 102, multiple crack simulation holes are outputed on the tube wall of borehole simulation pipe, and simulate to connect in hole in crack and split Gap simulation pipe, gas leakage detection switch is connected on crack simulation pipe;
Step 103, gas pumping pipe, Grouting Pipe and slurry recovering tube stopped up with iron wire, and Grouting Pipe is fixed on watt The downside of this drainage tube, slurry recovering tube is set to be fixed on the upside of gas pumping pipe;
Step 104, cotton gauze is cut into strip, is wrapped in two preparations on gas pumping pipe, Grouting Pipe and slurry recovering tube and sets The opening position of plug model configuration is put, and is respectively provided with what is spread to the left and right for preventing plug model configuration in the both sides of cotton gauze Pad;
Step 2: prefabricated plug model configuration and forming slip casting space, detailed process is:
Step 201, after liquid polyurethane is poured into beaker, liquid polyurethane is dipped using brush and is uniformly applied to cotton yarn On cloth, and liquid polyurethane is set to penetrate into completely in cotton gauze;
Step 202, the gas pumping pipe after liquid polyurethane will be smeared, the entirety of Grouting Pipe and slurry recovering tube puts drilling die into Intend in pipe, and fixed good position, make gas pumping pipe be located at gas pumping caliber to middle position;
Step 203, the borehole simulation pipe that will be fed into after gas pumping pipe, Grouting Pipe and slurry recovering tube are integrally placed to test On stand, and borehole simulation pipe is fixed, avoid borehole simulation pipe from sliding, stand two days afterwards, wait liquid polyurethane hair Holotype is finished into plug model configuration;
Step 3: toward slip casting in borehole simulation pipe, sealing of hole is simulated, and gather by acoustic emission system and sealed for studying crack The acoustic emission signal data of stifled situation, detailed process are:
Step 301, cleaning grouting pump, and check grouting pump, it is ensured that grouting pump is intact;
Step 302, after cement grout is poured into grouting pump, start grouting pump, first discharge the air in slip casting pump conduit, Grouting pump and Grouting Pipe are connected again;
Step 303, cement grout is passed through by Grouting Pipe injection hole by grouting pump simulate two plugs simulation knot in pipe In space between structure, grouting pump stopping slip casting being closed when having cement grout outflow in slurry recovering tube;
Step 304, borehole simulation pipe is gently tapped with hammer, make the cement grout between two plug model configurations close Contact and discharge bubble therein;
Step 305, grouting pump slip casting is again started up, grouting pump is closed when having cement grout outflow in slurry recovering tube and is stopped Slip casting;
Step 306, the connection for disconnecting grouting pump and Grouting Pipe, and the pulp returning port of the grouting port of Grouting Pipe and slurry recovering tube is blocked up Firmly, prevent cement grout from flowing out;
Step 307, with clear water clean grouting pump;
Step 308, multiple sensors in acoustic emission system are respectively installed to different numbers on the outer wall of borehole simulation pipe According to collection opening position, and the data acquisition cabinet in acoustic emission system is connected with computer;Borehole simulation pipe is stood one week, Cement grout is fully solidified, in cement grout process of setting, acoustic emission signal data are gathered by acoustic emission system and will be adopted The signal collected is transferred to computer and recorded, when being solidified for use by acoustic emission signal data research cement grout inside should Power changes, and then the closure situation for studying borehole simulation pipe uses;
Step 4: negative pressure ability is taken out in test, detailed process is:
Step 401, one end that vavuum pump is connected to gas pumping pipe by vavuum pump connecting tube;
Step 402, start vavuum pump, detection of negative pressure is carried out to borehole simulation pipe, observes the reading and note of pressure vacuum gauge Record is maximum up to negative pressure;When borehole simulation pipe reaches maximum reachable negative pressure, vavuum pump is closed, and closes and is arranged on vavuum pump company Vacuum switch in adapter;
Step 403, observe pressure vacuum gauge reading and record, when pressure vacuum gauge reading in 10~30 minutes nothing During change, it is judged as sealing of hole success, performs step 5;Otherwise, when pressure vacuum gauge reading in 10~30 minutes drastically under During drop, it is judged as that sealing of hole fails, repeat step one to step 3, simulates injection hole sealing again;
Step 5: influence of the detection borehole simulation pipe diverse location gas leakage to mash gas extraction concentration, detailed process are:
Step 501, gas detector is connected in vavuum pump connecting tube by gas detector connecting tube, and by gas Gas tank is connected to the other end of gas pumping pipe by methane gas tank connecting tube;
Step 502, methane gas tank switch and gas pumping switch are opened, by methane gas tank connecting tube by device in Gas Methane gas in body tank is introduced in borehole simulation pipe, there is provided the drilling gas of laboratory simulation;Observe the reading of gas pressure table Number, makes the gas pressure in borehole simulation pipe be in steady state value;
Step 503, start vavuum pump, gas pumping is carried out to borehole simulation pipe, open the gas leakage at diverse location successively Detection switch, and record the reading of gas detector when the gas leakage detection switch at diverse location is opened.
Above-mentioned method, it is characterised in that:Made in step 303 and step 305 by observing the registration of grouting pressure table Grouting pressure reaches more than 1.5MPa.
Present invention also offers a kind of method and step is simple, it is convenient to realize, sealing material sealing property testing efficiency is high Sealing material sealing property method of testing, it is characterised in that this method comprises the following steps:
Step 1: experiment early-stage preparations, detailed process are:
Step 101, one section of a diameter of 135mm lucite tube is taken to take one section of a diameter of 75mm as borehole simulation pipe Lucite tube as gas pumping pipe, take one section of PVC aluminium-plastic pipe as Grouting Pipe, take one section of PVC aluminium-plastic pipe as returning slurry Pipe;
Step 102,6 cracks simulation hole is outputed on the tube wall of borehole simulation pipe, wherein the aperture in 2 cracks simulation hole For 2mm, wherein the aperture in 2 cracks simulation hole is 3mm, the aperture in 2 cracks simulation hole is 4mm in addition;
Step 103, gas pumping pipe, Grouting Pipe and slurry recovering tube stopped up with iron wire, and Grouting Pipe is fixed on watt The downside of this drainage tube, slurry recovering tube is set to be fixed on the upside of gas pumping pipe;
Step 104, cotton gauze is cut into strip, is wrapped in two preparations on gas pumping pipe, Grouting Pipe and slurry recovering tube and sets The opening position of plug model configuration is put, and is respectively provided with what is spread to the left and right for preventing plug model configuration in the both sides of cotton gauze Pad;
Step 2: prefabricated plug model configuration and forming slip casting space, detailed process is:
Step 201, after liquid polyurethane is poured into beaker, liquid polyurethane is dipped using brush and is uniformly applied to cotton yarn On cloth, and liquid polyurethane is set to penetrate into completely in cotton gauze;
Step 202, the gas pumping pipe after liquid polyurethane will be smeared, the entirety of Grouting Pipe and slurry recovering tube puts drilling die into Intend in pipe, and fixed good position, make gas pumping pipe be located at gas pumping caliber to middle position;
Step 203, the borehole simulation pipe that will be fed into after gas pumping pipe, Grouting Pipe and slurry recovering tube are integrally placed to test On stand, and borehole simulation pipe is fixed, avoid borehole simulation pipe from sliding, stand two days afterwards, wait liquid polyurethane hair Holotype is finished into plug model configuration;
Step 3: toward injection sealing material in borehole simulation pipe, and eye slit closure situation, detailed process are:
Step 301, cleaning grouting pump, and check grouting pump, it is ensured that grouting pump is intact;
Step 302, after sealing material is poured into grouting pump, start grouting pump, first discharge the air in slip casting pump conduit, Grouting pump and Grouting Pipe are connected again;
Step 303, sealing material is passed through by Grouting Pipe injection hole by grouting pump simulate two plugs simulation knot in pipe In space between structure, the crack simulation hole that sealing material is 2mm to aperture, aperture is 3mm and aperture is 4mm is observed and recorded Closure situation;And by borehole simulation pipe level and be obliquely installed, inclined drill and horizontal drilling are simulated, observes and records borehole simulation When pipe is horizontal and tilts, the closure feelings in the crack simulation hole that sealing material is 2mm to aperture, aperture is 3mm and aperture is 4mm Condition;Blocking time since the registration of grouting pressure table reach specified grouting pressure and crack simulation hole lysimeter when, to crack It is that no leakage terminates that simulation hole is blocked completely, and the crack simulation hole blocking time in same aperture under experiment condition of the same race is made even Average value processing;
Step 304, with clear water clean grouting pump;
Step 4: negative pressure ability is taken out in test, detailed process is:
Step 401, one end that vavuum pump is connected to gas pumping pipe by vavuum pump connecting tube;
Step 402, start vavuum pump, detection of negative pressure is carried out to borehole simulation pipe, observes the reading and note of pressure vacuum gauge Record is maximum up to negative pressure;When borehole simulation pipe reaches maximum reachable negative pressure, vavuum pump is closed, and closes and is arranged on vavuum pump company Vacuum switch in adapter, observe the reading and record of pressure vacuum gauge.
Above-mentioned method, it is characterised in that:The sealing material is polyurethane, ordinary cement, expanding cement or PD materials.
The present invention has advantages below compared with prior art:
1st, the structure of drilling gas extraction laboratory analog system of the present invention is simple, novel in design reasonable, and it is convenient to realize.
2nd, the simple installation of drilling gas extraction laboratory analog system of the present invention, it is simple to operate, underground trials are changed to Laboratory, the drilling gas extraction of underground is directly substituted using simulation system, be equivalent in proportion contract the scene of underground As low as laboratory, reduce the underground trials time, reduce operation difficulty, save the manpower and materials expended needed for experiment, and Substantially increase test efficiency and the degree of accuracy, it is thus also avoided that experiment is directly carried out in underground to be needed to stop the loss that production is brought.
3rd, drilling gas extraction laboratory analog system of the present invention on the tube wall of borehole simulation pipe by opening up multiple split Gap simulates hole, and simulation pipe in crack is connected on the simulation hole of crack, and gas leakage detection switch, Neng Goumo are connected on crack simulation pipe Intend influence of the wall of a borehole diverse location gas leakage to gas pumping, can only be carried out in laboratory simulation before eliminating the wall of a borehole with The simulation of material gas leakage, the condition at scene is dramatically approached.
4th, the detection means of drilling gas extraction laboratory analog system of the present invention is rich and varied, including acoustic emission system and Gas detector etc., acoustic emission signal data are gathered by acoustic emission system and the signal collected is transferred to computer progress Record, when can solidify for use by acoustic emission signal data research cement grout inside stress variation, and then research drilling die Intend the closure situation of pipe, judge whether there is crack use inside borehole simulation pipe;Different positions can be detected by gas detector Put, the crack of different pore size simulation hole gas leakage when mash gas extraction concentration, for analyzing the crack pair of diverse location, different pore size The influence of drilling gas extraction.
5th, drilling gas extraction laboratory analog system of the present invention has multiple functions, can be used in detecting sealing material Sealing property, influence of the research the wall of a borehole diverse location gas leakage to gas pumping, carries out drilling gas extraction laboratory simulation etc.; It is not only able to simulate drilling gas extraction, additionally it is possible to when being directed to coal bed gas extraction, using acoustic emission system to borehole sealing The crack of section is sprouted and spread scenarios are monitored in real time, and the unstability of borehole sealing section is had great significance.
6th, can be in laboratory pair The present invention reduces influence of many uncertain factors to result of the test in underground trials The factor for influenceing experiment carries out Quantitative study, substantially increases the accuracy of experimental result.
7th, drilling gas extraction laboratory analog system of the present invention can provide one metastable watt for bore inner This pressure and concentration, reduce the error of experiment, simulate the situation at scene to greatest extent.
8th, the method and step of drilling gas extraction laboratory simulation method of the present invention is simple, and it is convenient to realize, can gather sound The signal collected is simultaneously transferred to computer and recorded by transmission signal data, for use by acoustic emission signal data research cement Stress variation inside during grout cures, and then study the closure situation of borehole simulation pipe, judge inside borehole simulation pipe whether There is crack use;The mash gas extraction concentration during crack simulation hole gas leakage of diverse location, different pore size can also be detected.
9th, the method and step of sealing material sealing property method of testing of the present invention is simple, and it is convenient to realize, sealing material sealing Performance test efficiency high.
10th, the present invention can real simulation field condition, and the experiment for needing to do at the scene is moved in laboratory, tested The manpower and materials of consuming are few, and experiment effect is good, practical, are easy to promote the use of.
In summary, the present invention is novel in design rationally, and it is convenient to realize, can real simulation field condition, and will need to exist The experiment that scene is done is moved in laboratory, tests that the manpower and materials of consuming are few, and experiment effect is good, and the accuracy of experimental result is high, It is practical, it is easy to promote the use of.
Below by drawings and examples, technical scheme is described in further detail.
Brief description of the drawings
Fig. 1 is the structural representation of drilling gas extraction laboratory analog system of the present invention.
When Fig. 2 is that drilling gas extraction laboratory analog system of the present invention is used to carry out drilling gas extraction laboratory simulation Use state figure.
Fig. 3 is the method flow block diagram of drilling gas extraction laboratory simulation method of the present invention.
Fig. 4 is that drilling gas extraction laboratory analog system of the present invention is used to carry out when sealing material sealing property is tested Use state figure.
Fig. 5 is the method flow block diagram of sealing material sealing property method of testing of the present invention.
Description of reference numerals:
Simulate hole in 1-crack;2-vavuum pump;3-pressure vacuum gauge;
4-vacuum switch;5-gas pumping pipe;6-slurry recovering tube;
7-borehole simulation pipe;8-plug model configuration;9-gas leakage detection switch;
10-cement grout;11-gas pumping switchs;12-methane gas tank connecting tube;
13-gas pressure table;14-methane gas tank switchs;15-methane gas tank;
16-1-data acquisition cabinet;16-2-preamplifier;16-3-sensor;
17-crack simulation pipe;18-pad;19-vavuum pump connecting tube;
20-Grouting Pipe;21-grouting pressure table;22-slip casting handle;
23-grouting pump;24-gas detector;25-gas detector connecting tube;
26-sealing material.
Embodiment
As shown in figure 1, the drilling gas extraction laboratory analog system of the present invention, including borehole simulation pipe 7, hole-sealing grouting System, gas pressure simulated loading system and gas detector 24, and acoustic emission system and the meter that connects with acoustic emission system Calculation machine 17;Two is provided with plug model configuration 8 in the borehole simulation pipe 7, and one between two plug model configurations 8 Multiple crack simulation holes 1 are provided with the tube wall of section borehole simulation pipe 7, simulation pipe in crack is connected with the crack simulation hole 1 17, the crack is simulated and is connected with gas leakage detection switch 9 on pipe 17;
The hole-sealing grouting system includes Grouting Pipe 20 and the slurry recovering tube 6 stretched into borehole simulation pipe 7, and and Grouting Pipe The grouting pump 23 of 20 connections;Slip casting handle 22 and grouting pressure table 21 are provided with the grouting pump 23;
The gas pressure simulated loading system includes being connected to the one end of gas pumping pipe 5 by vavuum pump connecting tube 19 Vavuum pump 2 and the methane gas tank 15 that the other end of gas pumping pipe 5 is connected to by methane gas tank connecting tube 12, the vacuum Pressure vacuum gauge 3 and vacuum switch 4 are connected with pump connecting tube 19, is set in the methane gas outlet of the methane gas tank 15 Methane gas tank switch 14 is equipped with, gas pressure table 13 and gas pumping switch are connected with the methane gas tank connecting tube 12 11;The Grouting Pipe 20 is fixed on the downside of gas pumping pipe 5, and the slurry recovering tube 6 is fixed on the upside of gas pumping pipe 5, institute Gas detector 24 is stated to be connected in vavuum pump connecting tube 19 by gas detector connecting tube 25.When it is implemented, described watt This gas tank connecting tube 12 is flexible pipe.The gas detector 24 is connected to positioned at vacuum pressure by gas detector connecting tube 25 In one section of vavuum pump connecting tube 19 between power table 3 and vacuum switch 4.
In the present embodiment, the borehole simulation pipe 7 is made up of a diameter of 135mm lucite tube, the gas pumping Pipe 5 is made up of a diameter of 75mm lucite tube, and the Grouting Pipe 20 and slurry recovering tube 6 are made by PVC aluminium-plastic pipes.
In the present embodiment, the plug model configuration 8 is by being wrapped on gas pumping pipe 5, Grouting Pipe 20 and slurry recovering tube 6 Cotton gauze and the liquid polyurethane foaming being uniformly applied on cotton gauze are formed, and the both sides of the plug model configuration 8 are all provided with It is equipped with the pad 18 for preventing plug model configuration 8 from spreading to the left and right.
In the present embodiment, the gas detector 24 is light interference type gas detector.
In the present embodiment, the acoustic emission system is SAEU2S acoustic emission systems, and the SAEU2S acoustic emission systems include The data acquisition cabinet 16-1 and multichannel preamplifier 16-2 being connected with data acquisition cabinet 16-1 by cable, it is described preposition Amplifier 16-2 input is connected with sensor 16-3 by signal wire, and the data acquisition cabinet 16-1 is connected by USB Line is connected with computer 17.
In the present embodiment, the quantity in the crack simulation hole 1 is 6, wherein the aperture in 2 cracks simulation hole 1 is 2mm, The aperture in wherein 2 cracks simulation hole 1 is 3mm, and the aperture in 2 cracks simulation hole 1 is 4mm in addition;Simulate pipe 17 in the crack The aperture in external diameter and crack simulation hole 1 be engaged.
As shown in Figures 2 and 3, drilling gas extraction laboratory simulation method of the invention, comprises the following steps:
Step 1: experiment early-stage preparations, detailed process are:
Step 101, one section of a diameter of 135mm lucite tube is taken to take one section of a diameter of 75mm as borehole simulation pipe 7 Lucite tube as gas pumping pipe 5, take one section of PVC aluminium-plastic pipe as Grouting Pipe 20, take one section of PVC aluminium-plastic pipe as returning Starch pipe 6;When it is implemented, the diameter as the Grouting Pipe 20 and the PVC aluminium-plastic pipes of slurry recovering tube 6 is 20mm;
Step 102, multiple crack simulation holes 1 are outputed on the tube wall of borehole simulation pipe 7, and connected in simulating hole 1 in crack Crack simulation pipe 17 is connect, gas leakage detection switch 9 is connected on crack simulation pipe 17;
Step 103, gas pumping pipe 5, Grouting Pipe 20 and slurry recovering tube 6 stopped up with iron wire, and make Grouting Pipe 20 solid The downside of gas pumping pipe 5 is scheduled on, slurry recovering tube 6 is fixed on the upside of gas pumping pipe 5;
Step 104, cotton gauze is cut into strip, is wrapped in two standards on gas pumping pipe 5, Grouting Pipe 20 and slurry recovering tube 6 The standby opening position that plug model configuration 8 is set, and be respectively provided with the both sides of cotton gauze for preventing plug model configuration 8 to the left and right The pad 18 of diffusion;When it is implemented, by cotton gauze be cut into width be 6cm~8cm strip, due to plug model configuration 8 by Polyurethane foam is formed, therefore by setting pad 18 in the both sides of cotton gauze, can prevent that polyurethane foam is uneven, causes Sealing effectiveness is poor or even sealing of hole fails;
Step 2: prefabricated plug model configuration 8 and forming slip casting space, detailed process is:
Step 201, after liquid polyurethane is poured into beaker, liquid polyurethane is dipped using brush and is uniformly applied to cotton yarn On cloth, and liquid polyurethane is set to penetrate into completely in cotton gauze;When it is implemented, because polyurethane is chemical material, and it is poisonous, When therefore carrying out step operation, it should put on one's gloves, prevent from splashing on hand;
Step 202, the gas pumping pipe 5 after liquid polyurethane will be smeared, the entirety of Grouting Pipe 20 and slurry recovering tube 6 puts brill into Casement is intended in pipe 7, and fixed good position, gas pumping pipe 5 is located at the middle position of the radial direction of gas pumping pipe 5;By gas Drainage tube 5 is located at the middle position of the radial direction of gas pumping pipe 5, is advantageous to liquid polyurethane and foams to form plug model configuration 8, Drilling can preferably be blocked.When it is implemented, because the time of liquid polyurethane foaming is shorter, therefore step 202 is whole Operating process should try one's best briefly, prevent liquid polyurethane foams before putting into borehole simulation pipe 7 from finishing;
The overall placement of step 203, the borehole simulation pipe 7 that will be fed into after gas pumping pipe 5, Grouting Pipe 20 and slurry recovering tube 6 Fixed on test-bed, and by borehole simulation pipe 7, avoid borehole simulation pipe 7 from sliding, stand two days afterwards, wait liquid Polyurethane foam forms plug model configuration 8 completely;
Step 3: toward slip casting in borehole simulation pipe 7, sealing of hole is simulated, and gather for studying crack by acoustic emission system The acoustic emission signal data of closure situation, detailed process are:
Step 301, cleaning grouting pump 23, and check grouting pump 23, it is ensured that grouting pump 23 is intact;
Step 302, after cement grout 10 is poured into grouting pump 23, start grouting pump 23, first discharge the pipeline of grouting pump 23 In air, then grouting pump 23 and Grouting Pipe 20 are connected;
Step 303, by grouting pump 23 by cement grout 10 pass through the injection hole of Grouting Pipe 20 simulate pipe 7 in two plugs In space between model configuration 8, the stopping slip casting of grouting pump 23 is closed when having the outflow of cement grout 10 in slurry recovering tube 6;
Step 304, borehole simulation pipe 7 is gently tapped with hammer, make the cement grout 10 between two plug model configurations 8 It is in close contact and discharges bubble therein;
Step 305, the slip casting of grouting pump 23 is again started up, slip casting is closed when having the outflow of cement grout 10 in slurry recovering tube 6 Pump 23 stops slip casting;
Step 306, the connection for disconnecting grouting pump 23 and Grouting Pipe 20, and by the grouting port of Grouting Pipe 20 and slurry recovering tube 6 Pulp returning port is blocked, and prevents cement grout 10 from flowing out;
Step 307, grouting pump 23 is cleaned with clear water;The cement grout 10 remained in the pipeline of grouting pump 23 can so be prevented The mouth of pipe is blocked after solidification, influences next use;
Step 308, multiple sensor 16-3 in acoustic emission system are respectively installed on the outer wall of borehole simulation pipe 7 not It is connected at data acquiring location, and by the data acquisition cabinet 16-1 in acoustic emission system with computer 17;By borehole simulation Pipe 7 stands one week, cement grout 10 is fully solidified, and in the process of setting of cement grout 10, is sent out by acoustic emission system collection sound Penetrate signal data and the signal collected is transferred to computer 17 and recorded, for use by acoustic emission signal data research cement Stress variation inside when slurries 10 solidify, and then the closure situation for studying borehole simulation pipe 7 uses;When it is implemented, due to The phenomenon of local source quick release of energy generation Elastic wave is referred to as sound emission (Acoustic Emission, abbreviation in material AE), otherwise referred to as stress wave is launched;Therefore, according to existing research in the prior art, by acoustic emission signal data with regard to energy The stress variation inside when cement grout 10 solidifies enough is studied, and then studies the closure situation of borehole simulation pipe 7, judges drilling die Intend whether having crack inside pipe 7;
Step 4: negative pressure ability is taken out in test, detailed process is:
Step 401, one end that vavuum pump 2 is connected to gas pumping pipe 5 by vavuum pump connecting tube 19;
Step 402, start vavuum pump 2, detection of negative pressure is carried out to borehole simulation pipe 7, observes the reading of pressure vacuum gauge 3 simultaneously Record is maximum up to negative pressure;When borehole simulation pipe 7 reaches maximum reachable negative pressure, vavuum pump 2 is closed, and close and be arranged on vacuum Vacuum switch 4 in pump connecting tube 19;It is to pass through sight when it is implemented, judging that borehole simulation pipe 7 reaches maximum up to negative pressure The reading realization of pressure vacuum gauge 3 is examined, when the reading of pressure vacuum gauge 3 reaches maximum and does not continue to rise in 1~5 minute Gao Shi, it is judged as that borehole simulation pipe 7 has reached maximum reachable negative pressure;
Step 403, the reading and record for observing pressure vacuum gauge 3, when the reading of pressure vacuum gauge 3 is in 10~30 minutes When unchanged, it is judged as sealing of hole success, performs step 5;Otherwise, when pressure vacuum gauge 3 reading in 10~30 minutes drastically During decline, it is judged as that sealing of hole fails, repeat step one to step 3, simulates injection hole sealing again;
When it is implemented, in order to avoid the internal crack of cement grout 10 influences to test the test effect for taking out negative pressure ability, Before step 4, first visually observe in borehole simulation pipe 7 at the closure of cement grout 10, if having larger crackle or larger Space;The acoustic emission signal data that acoustic emission system collects are observed on computer 17 again;And drilling is gently tapped with hammer Pipe 7 is simulated, the acoustic emission signal data situation that acoustic emission system collects is observed on computer 17, judges cement grout Whether larger crackle or larger space are had inside 10.
Step 5: influence of the diverse location gas leakage of detection borehole simulation pipe 7 to mash gas extraction concentration, detailed process are:
Step 501, gas detector 24 is connected in vavuum pump connecting tube 19 by gas detector connecting tube 25, and Methane gas tank 15 is connected to the other end of gas pumping pipe 5 by methane gas tank connecting tube 12;
Step 502, methane gas tank switch 14 and gas pumping switch 11 are opened, will by methane gas tank connecting tube 12 Methane gas in methane gas tank 15 is introduced in borehole simulation pipe 7, there is provided the drilling gas of laboratory simulation;Observe gas pressure The reading of power table 13, the gas pressure in borehole simulation pipe 7 is set to be in steady state value;
Step 503, start vavuum pump 2, gas pumping is carried out to borehole simulation pipe 7, open the leakage at diverse location successively Gas detection switch 9, and record the reading of gas detector 24 when the gas leakage detection switch 9 at diverse location is opened.Record Mash gas extraction concentration during the 7 diverse location gas leakage of borehole simulation pipe is descended.Because the quantity in crack simulation hole 1 is 6, its In the aperture in 2 cracks simulation hole 1 be 2mm, wherein the aperture in 2 cracks simulation hole 1 is 3mm, hole 1 is simulated in 2 cracks in addition Aperture be 4mm;The external diameter of the crack simulation pipe 17 is engaged with the aperture in crack simulation hole 1;Therefore, this makes it possible to examine The mash gas extraction concentration during crack simulation hole gas leakage of diverse location, different pore size is surveyed, for analyzing diverse location, different pore size Influence of the crack to drilling gas extraction.
In the present embodiment, make grouting pressure by observing the registration of grouting pressure table 21 in step 303 and step 305 Reach more than 1.5MPa.Cement grout 10 is injected by borehole simulation pipe under more than 1.5MPa with pressure situation by grouting pump 23 In space in 7 between two plug model configurations 8, it can ensure that cement grout 10 is more closely knit, fill cement grout 10 The crack of inside is reduced after fractional condensation is solid.
As shown in Figure 4 and Figure 5, sealing material sealing property method of testing of the invention, comprises the following steps:
Step 1: experiment early-stage preparations, detailed process are:
Step 101, one section of a diameter of 135mm lucite tube is taken to take one section of a diameter of 75mm as borehole simulation pipe 7 Lucite tube as gas pumping pipe 5, take one section of PVC aluminium-plastic pipe as Grouting Pipe 20, take one section of PVC aluminium-plastic pipe as returning Starch pipe 6;When it is implemented, the diameter as the Grouting Pipe 20 and the PVC aluminium-plastic pipes of slurry recovering tube 6 is 20mm;
Step 102,6 cracks simulation hole 1 is outputed on the tube wall of borehole simulation pipe 7, wherein 2 cracks simulation hole 1 Aperture is 2mm, wherein the aperture in 2 cracks simulation hole 1 is 3mm, the aperture in 2 cracks simulation hole 1 is 4mm in addition;
Step 103, gas pumping pipe 5, Grouting Pipe 20 and slurry recovering tube 6 stopped up with iron wire, and make Grouting Pipe 20 solid The downside of gas pumping pipe 5 is scheduled on, slurry recovering tube 6 is fixed on the upside of gas pumping pipe 5;
Step 104, cotton gauze is cut into strip, is wrapped in two standards on gas pumping pipe 5, Grouting Pipe 20 and slurry recovering tube 6 The standby opening position that plug model configuration 8 is set, and be respectively provided with the both sides of cotton gauze for preventing plug model configuration 8 to the left and right The pad 18 of diffusion;When it is implemented, by cotton gauze be cut into width be 6cm~8cm strip, due to plug model configuration 8 by Polyurethane foam is formed, therefore by setting pad 18 in the both sides of cotton gauze, can prevent that polyurethane foam is uneven, causes Sealing effectiveness is poor or even sealing of hole fails;
Step 2: prefabricated plug model configuration 8 and forming slip casting space, detailed process is:
Step 201, after liquid polyurethane is poured into beaker, liquid polyurethane is dipped using brush and is uniformly applied to cotton yarn On cloth, and liquid polyurethane is set to penetrate into completely in cotton gauze;When it is implemented, because polyurethane is chemical material, and it is poisonous, When therefore carrying out step operation, it should put on one's gloves, prevent from splashing on hand;
Step 202, the gas pumping pipe 5 after liquid polyurethane will be smeared, the entirety of Grouting Pipe 20 and slurry recovering tube 6 puts brill into Casement is intended in pipe 7, and fixed good position, gas pumping pipe 5 is located at the middle position of the radial direction of gas pumping pipe 5;By gas Drainage tube 5 is located at the middle position of the radial direction of gas pumping pipe 5, is advantageous to liquid polyurethane and foams to form plug model configuration 8, Drilling can preferably be blocked.When it is implemented, because the time of liquid polyurethane foaming is shorter, therefore step 202 is whole Operating process should try one's best briefly, prevent liquid polyurethane foams before putting into borehole simulation pipe 7 from finishing;
The overall placement of step 203, the borehole simulation pipe 7 that will be fed into after gas pumping pipe 5, Grouting Pipe 20 and slurry recovering tube 6 Fixed on test-bed, and by borehole simulation pipe 7, avoid borehole simulation pipe 7 from sliding, stand two days afterwards, wait liquid Polyurethane foam forms plug model configuration 8 completely;
Step 3: toward injection sealing material 26 in borehole simulation pipe 7, and eye slit closure situation, detailed process are:
Step 301, cleaning grouting pump 23, and check grouting pump 23, it is ensured that grouting pump 23 is intact;
Step 302, after sealing material 26 is poured into grouting pump 23, start grouting pump 23, first discharge the pipeline of grouting pump 23 In air, then grouting pump 23 and Grouting Pipe 20 are connected;
Step 303, by grouting pump 23 by sealing material 26 pass through the injection hole of Grouting Pipe 20 simulate pipe 7 in two plugs In space between model configuration 8, observe and record that sealing material 26 is 2mm to aperture, aperture is 3mm and aperture is that 4mm splits Gap simulates the closure situation in hole 1;And by the level of borehole simulation pipe 7 and be obliquely installed, simulate inclined drill and horizontal drilling, observation When recording horizontal borehole simulation pipe 7 and inclination, sealing material 26 is 2mm to aperture, the crack that aperture is 3mm and aperture is 4mm Simulate the closure situation in hole 1;The registration of blocking time from grouting pressure table 21 reaches specified grouting pressure and crack simulation hole 1 is opened During beginning lysimeter, simulate the completely blocked i.e. no leakage in hole 1 to crack and terminate, to the crack in same aperture under experiment condition of the same race The simulation blocking time of hole 1 is averaged processing;When it is implemented, it is more than 1.5MPa to specify grouting pressure;
Step 304, grouting pump 23 is cleaned with clear water;The sealing material 26 remained in the pipeline of grouting pump 23 can so be prevented The mouth of pipe is blocked after solidification, influences next use;
Step 4: negative pressure ability is taken out in test, detailed process is:
Step 401, one end that vavuum pump 2 is connected to gas pumping pipe 5 by vavuum pump connecting tube 19;
Step 402, start vavuum pump 2, detection of negative pressure is carried out to borehole simulation pipe 7, observes the reading of pressure vacuum gauge 3 simultaneously Record is maximum up to negative pressure;When borehole simulation pipe 7 reaches maximum reachable negative pressure, vavuum pump 2 is closed, and close and be arranged on vacuum Vacuum switch 4 in pump connecting tube 19, observe the reading and record of pressure vacuum gauge 3.When it is implemented, judge borehole simulation Pipe 7 reaches maximum up to negative pressure, is what is realized by observing the reading of pressure vacuum gauge 3, when the reading of pressure vacuum gauge 3 reaches It is maximum and when rise was not continued in 1~5 minute, it is judged as that borehole simulation pipe 7 has reached maximum reachable negative pressure.
When it is implemented, in order to carry out contrast experiment, two row's size and locations can also be outputed one by one in a step 102 Hole 1 is simulated in corresponding crack, is first blocked row crack simulation hole 1 with sealed solid glue when testing for the first time, it is next time right to do The row crack after Kaifeng is blocked up is disclosed during than experiment with pin again and simulates hole 1, while is simulated other row crack with sealed solid glue Hole 1 blocks, and rotary drilling simulation pipe 7, crack simulation hole 1 is located at the top of borehole simulation pipe 7.
In the present embodiment, the sealing material 26 is polyurethane, ordinary cement, expanding cement or PD materials.
It is described above, only it is presently preferred embodiments of the present invention, not the present invention is imposed any restrictions, it is every according to the present invention Any simple modification, change and the equivalent structure change that technical spirit is made to above example, still fall within skill of the present invention In the protection domain of art scheme.

Claims (10)

  1. A kind of 1. drilling gas extraction laboratory analog system, it is characterised in that:Including borehole simulation pipe (7), hole-sealing grouting system System, gas pressure simulated loading system and gas detector (24), and acoustic emission system and the meter to connect with acoustic emission system Calculation machine (17);The interior two of the borehole simulation pipe (7) is provided with plug model configuration (8), positioned at two plug model configurations (8) Between one section of borehole simulation pipe (7) tube wall on be provided with multiple cracks simulation hole (1), connects on crack simulation hole (1) Crack simulation pipe (17) is connected to, gas leakage detection switch (9) is connected with the crack simulation pipe (17);
    The hole-sealing grouting system includes Grouting Pipe (20) and the slurry recovering tube (6) stretched into borehole simulation pipe (7), and and slip casting Manage the grouting pump (23) of (20) connection;Slip casting handle (22) and grouting pressure table (21) are provided with the grouting pump (23);
    The gas pressure simulated loading system includes being connected to gas pumping pipe (5) one end by vavuum pump connecting tube (19) Vavuum pump (2) and the methane gas tank (15) that gas pumping pipe (5) other end is connected to by methane gas tank connecting tube (12), Pressure vacuum gauge (3) and vacuum switch (4) are connected with the vavuum pump connecting tube (19), the methane gas tank (15) Methane gas tank switch (14) is provided with methane gas outlet, gas pressure is connected with the methane gas tank connecting tube (12) Power table (13) and gas pumping switch (11);The Grouting Pipe (20) is fixed on the downside of gas pumping pipe (5), the slurry recovering tube (6) upside of gas pumping pipe (5) is fixed on, the gas detector (24) is connected to by gas detector connecting tube (25) In vavuum pump connecting tube (19).
  2. 2. according to the drilling gas extraction laboratory analog system described in claim 1, it is characterised in that:The borehole simulation pipe (7) be made up of a diameter of 135mm lucite tube, the gas pumping pipe (5) by a diameter of 75mm lucite control Into the Grouting Pipe (20) and slurry recovering tube (6) are made by PVC aluminium-plastic pipes.
  3. 3. according to the drilling gas extraction laboratory analog system described in claim 1, it is characterised in that:The plug simulation knot Structure (8) is by the cotton gauze that is wrapped on gas pumping pipe (5), Grouting Pipe (20) and slurry recovering tube (6) and is uniformly applied to cotton yarn Liquid polyurethane foaming on cloth is formed, and the both sides of the plug model configuration (8) are provided with for preventing plug simulation knot The pad (18) that structure (8) spreads to the left and right.
  4. 4. according to the drilling gas extraction laboratory analog system described in claim 1, it is characterised in that:The gas detector (24) it is light interference type gas detector.
  5. 5. according to the drilling gas extraction laboratory analog system described in claim 1, it is characterised in that:The acoustic emission system For SAEU2S acoustic emission systems, the SAEU2S acoustic emission systems include data acquisition cabinet (16-1) and pass through cable and data The multichannel preamplifier (16-2) of cabinet (16-1) connection is gathered, the input of the preamplifier (16-2) passes through signal Line is connected with sensor (16-3), and the data acquisition cabinet (16-1) is connected by USB connecting lines with computer (17).
  6. 6. according to the drilling gas extraction laboratory analog system described in claim 1, it is characterised in that:Simulate hole in the crack (1) quantity is 6, wherein the aperture of 2 crack simulations hole (1) is 2mm, wherein the aperture of 2 crack simulations hole (1) is 3mm, the aperture of 2 crack simulations hole (1) is 4mm in addition;The external diameter of the crack simulation pipe (17) and crack simulation hole (1) Aperture is engaged.
  7. A kind of 7. method that drilling gas extraction laboratory simulation is carried out using system as claimed in claim 1, it is characterised in that This method comprises the following steps:
    Step 1: experiment early-stage preparations, detailed process are:
    Step 101, one section of a diameter of 135mm lucite tube is taken as borehole simulation pipe (7), take one section of a diameter of 75mm's Lucite tube takes one section of PVC aluminium-plastic pipe to take one section of PVC aluminium-plastic pipe conduct as Grouting Pipe (20) as gas pumping pipe (5) Slurry recovering tube (6);
    Step 102, multiple crack simulations hole (1) are outputed on the tube wall of borehole simulation pipe (7), and simulated in crack in hole (1) Crack simulation pipe (17) is connected, is simulated in crack and gas leakage detection switch (9) is connected on pipe (17);
    Step 103, gas pumping pipe (5), Grouting Pipe (20) and slurry recovering tube (6) stopped up with iron wire, and make Grouting Pipe (20) downside of gas pumping pipe (5) is fixed on, slurry recovering tube (6) is fixed on the upside of gas pumping pipe (5);
    Step 104, cotton gauze is cut into strip, is wrapped in gas pumping pipe (5), Grouting Pipe (20) and upper two of slurry recovering tube (6) Prepare the opening position of setting plug model configuration (8), and be respectively provided with the both sides of cotton gauze for preventing plug model configuration (8) The pad (18) spread to the left and right;
    Step 2: prefabricated plug model configuration (8) and forming slip casting space, detailed process is:
    Step 201, after liquid polyurethane is poured into beaker, liquid polyurethane is dipped using brush and is uniformly applied to cotton gauze On, and liquid polyurethane is penetrated into completely in cotton gauze;
    Step 202, the gas pumping pipe (5) after liquid polyurethane will be smeared, the entirety of Grouting Pipe (20) and slurry recovering tube (6) is put into In borehole simulation pipe (7), and fixed good position, gas pumping pipe (5) is located at the centre position of gas pumping pipe (5) radial direction Place;
    The entirety of step 203, the borehole simulation pipe (7) that will be fed into after gas pumping pipe (5), Grouting Pipe (20) and slurry recovering tube (6) It is placed on test-bed, and borehole simulation pipe (7) is fixed, avoid borehole simulation pipe (7) from sliding, stands two days afterwards, Liquid polyurethane foaming is waited to form plug model configuration (8) completely;
    Step 3: toward borehole simulation pipe (7) interior slip casting, sealing of hole is simulated, and gather by acoustic emission system and sealed for studying crack The acoustic emission signal data of stifled situation, detailed process are:
    Step 301, cleaning grouting pump (23), and check grouting pump (23), it is ensured that grouting pump (23) is intact;
    Step 302, after cement grout (10) is poured into grouting pump (23), start grouting pump (23), first discharge grouting pump (23) Air in pipeline, then grouting pump (23) and Grouting Pipe (20) are connected;
    Step 303, cement grout (10) is simulated by Grouting Pipe (20) injection hole by grouting pump (23) and manages in (7) two In space between plug model configuration (8), grouting pump (23) is closed when having cement grout (10) outflow in slurry recovering tube (6) Stop slip casting;
    Step 304, borehole simulation pipe (7) is gently tapped with hammer, make the cement grout between two plug model configurations (8) (10) it is in close contact and discharges bubble therein;
    Step 305, grouting pump (23) slip casting is again started up, note is closed when having cement grout (10) outflow in slurry recovering tube (6) Stock pump (23) stops slip casting;
    Step 306, disconnect grouting pump (23) and the connection of Grouting Pipe (20), and by the grouting port and slurry recovering tube of Grouting Pipe (20) (6) pulp returning port is blocked, and prevents cement grout (10) from flowing out;
    Step 307, grouting pump (23) is cleaned with clear water;
    Step 308, multiple sensors (16-3) in acoustic emission system are respectively installed on the outer wall of borehole simulation pipe (7) not It is connected at data acquiring location, and by the data acquisition cabinet (16-1) in acoustic emission system with computer (17);Will drilling Simulation pipe (7) stands one week, cement grout (10) is fully solidified, and in cement grout (10) process of setting, passes through sound emission system System gathers acoustic emission signal data and the signal collected is transferred into computer (17) and recorded, for use by acoustic emission signal Stress variation inside when data research cement grout (10) solidifies, and then the closure situation for studying borehole simulation pipe (7) uses;
    Step 4: negative pressure ability is taken out in test, detailed process is:
    Step 401, one end that vavuum pump (2) is connected to gas pumping pipe (5) by vavuum pump connecting tube (19);
    Step 402, start vavuum pump (2), detection of negative pressure, the reading of observation pressure vacuum gauge (3) are carried out to borehole simulation pipe (7) And record maximum up to negative pressure;When borehole simulation pipe (7) reaches maximum reachable negative pressure, vavuum pump (2) is closed, and close setting Vacuum switch (4) in vavuum pump connecting tube (19);
    The reading and record of step 403, observation pressure vacuum gauge (3), when the reading of pressure vacuum gauge (3) is in 10~30 minutes When unchanged, it is judged as sealing of hole success, performs step 5;Otherwise, when the reading of pressure vacuum gauge (3) was had to go to the toilet at 10~30 minutes When play declines, it is judged as that sealing of hole fails, repeat step one to step 3, simulates injection hole sealing again;
    Step 5: influence of detection borehole simulation pipe (7) the diverse location gas leakage to mash gas extraction concentration, detailed process are:
    Step 501, gas detector (24) is connected in vavuum pump connecting tube (19) by gas detector connecting tube (25), And methane gas tank (15) is connected to the other end of gas pumping pipe (5) by methane gas tank connecting tube (12);
    Step 502, methane gas tank switch (14) and gas pumping switch (11) are opened, pass through methane gas tank connecting tube (12) Methane gas in methane gas tank (15) is introduced in borehole simulation pipe (7), there is provided the drilling gas of laboratory simulation;Observation The reading of gas pressure table (13), the gas pressure in borehole simulation pipe (7) is set to be in steady state value;
    Step 503, start vavuum pump (2), gas pumping is carried out to borehole simulation pipe (7), open the leakage at diverse location successively Gas detection switch (9), and record the reading of gas detector (24) when the gas leakage detection switch (9) at diverse location is opened.
  8. 8. in accordance with the method for claim 1, it is characterised in that:By observing grouting pressure in step 303 and step 305 The registration of table (21), makes grouting pressure reach more than 1.5MPa.
  9. A kind of 9. method that sealing material sealing property test is carried out using system as claimed in claim 6, it is characterised in that should Method comprises the following steps:
    Step 1: experiment early-stage preparations, detailed process are:
    Step 101, one section of a diameter of 135mm lucite tube is taken as borehole simulation pipe (7), take one section of a diameter of 75mm's Lucite tube takes one section of PVC aluminium-plastic pipe to take one section of PVC aluminium-plastic pipe conduct as Grouting Pipe (20) as gas pumping pipe (5) Slurry recovering tube (6);
    Step 102,6 crack simulations hole (1) are outputed on the tube wall of borehole simulation pipe (7), wherein 2 crack simulations hole (1) Aperture be 2mm, wherein the aperture of 2 cracks simulation hole (1) be 3mm, the aperture that hole (1) is simulated in 2 cracks in addition is 4mm;
    Step 103, gas pumping pipe (5), Grouting Pipe (20) and slurry recovering tube (6) stopped up with iron wire, and make Grouting Pipe (20) downside of gas pumping pipe (5) is fixed on, slurry recovering tube (6) is fixed on the upside of gas pumping pipe (5);
    Step 104, cotton gauze is cut into strip, is wrapped in gas pumping pipe (5), Grouting Pipe (20) and upper two of slurry recovering tube (6) Prepare the opening position of setting plug model configuration (8), and be respectively provided with the both sides of cotton gauze for preventing plug model configuration (8) The pad (18) spread to the left and right;
    Step 2: prefabricated plug model configuration (8) and forming slip casting space, detailed process is:
    Step 201, after liquid polyurethane is poured into beaker, liquid polyurethane is dipped using brush and is uniformly applied to cotton gauze On, and liquid polyurethane is penetrated into completely in cotton gauze;
    Step 202, the gas pumping pipe (5) after liquid polyurethane will be smeared, the entirety of Grouting Pipe (20) and slurry recovering tube (6) is put into In borehole simulation pipe (7), and fixed good position, gas pumping pipe (5) is located at the centre position of gas pumping pipe (5) radial direction Place;
    The entirety of step 203, the borehole simulation pipe (7) that will be fed into after gas pumping pipe (5), Grouting Pipe (20) and slurry recovering tube (6) It is placed on test-bed, and borehole simulation pipe (7) is fixed, avoid borehole simulation pipe (7) from sliding, stands two days afterwards, Liquid polyurethane foaming is waited to form plug model configuration (8) completely;
    Step 3: toward injection sealing material (26) in borehole simulation pipe (7), and eye slit closure situation, detailed process are:
    Step 301, cleaning grouting pump (23), and check grouting pump (23), it is ensured that grouting pump (23) is intact;
    Step 302, after sealing material (26) is poured into grouting pump (23), start grouting pump (23), first discharge grouting pump (23) Air in pipeline, then grouting pump (23) and Grouting Pipe (20) are connected;
    Step 303, sealing material (26) is simulated by Grouting Pipe (20) injection hole by grouting pump (23) and manages in (7) two In space between plug model configuration (8), observe and record that sealing material (26) is 2mm to aperture, aperture is 3mm and aperture is The closure situation of 4mm crack simulation hole (1);And by borehole simulation pipe (7) level and be obliquely installed, simulate inclined drill and water Flat drill hole, observe and record borehole simulation pipe (7) is horizontal and when tilting, and sealing material (26) is 2mm to aperture, aperture be 3mm and Aperture is that the closure situation of hole (1) is simulated in 4mm crack;The registration of blocking time from grouting pressure table (21) reaches specified slip casting When pressure and crack simulation hole (1) beginning lysimeter, simulate the completely blocked i.e. no leakage in hole (1) to crack and terminate, to of the same race Crack simulation hole (1) blocking time in same aperture is averaged processing under experiment condition;
    Step 304, grouting pump (23) is cleaned with clear water;
    Step 4: negative pressure ability is taken out in test, detailed process is:
    Step 401, one end that vavuum pump (2) is connected to gas pumping pipe (5) by vavuum pump connecting tube (19);
    Step 402, start vavuum pump (2), detection of negative pressure, the reading of observation pressure vacuum gauge (3) are carried out to borehole simulation pipe (7) And record maximum up to negative pressure;When borehole simulation pipe (7) reaches maximum reachable negative pressure, vavuum pump (2) is closed, and close setting Vacuum switch (4) in vavuum pump connecting tube (19), the reading and record of observation pressure vacuum gauge (3).
  10. 10. in accordance with the method for claim 9, it is characterised in that:The sealing material (26) be polyurethane, ordinary cement, Expanding cement or PD materials.
CN201710944003.4A 2017-09-30 2017-09-30 Drilling gas extraction laboratory simulation method and sealing material method for testing tightness Active CN107542486B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710944003.4A CN107542486B (en) 2017-09-30 2017-09-30 Drilling gas extraction laboratory simulation method and sealing material method for testing tightness

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710944003.4A CN107542486B (en) 2017-09-30 2017-09-30 Drilling gas extraction laboratory simulation method and sealing material method for testing tightness

Publications (2)

Publication Number Publication Date
CN107542486A true CN107542486A (en) 2018-01-05
CN107542486B CN107542486B (en) 2018-07-03

Family

ID=60967383

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710944003.4A Active CN107542486B (en) 2017-09-30 2017-09-30 Drilling gas extraction laboratory simulation method and sealing material method for testing tightness

Country Status (1)

Country Link
CN (1) CN107542486B (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108894779A (en) * 2018-09-14 2018-11-27 西安科技大学 A kind of coal gas extraction borehole unstability differentiates experimental rig and method
CN109441441A (en) * 2018-11-15 2019-03-08 华北科技学院 Seat earth multi-angle oblique bored grouting Analog Experiment for Discharges device and method under a kind of pressure-bearing influence of dynamic water
CN110107279A (en) * 2019-04-29 2019-08-09 淮阴工学院 A kind of gas sealing of hole ground simulating device
CN110219699A (en) * 2019-04-24 2019-09-10 中国矿业大学 A kind of measurement device and measuring method of the effective radius of influence of mash gas pumping drilling
CN110410137A (en) * 2019-08-30 2019-11-05 华北科技学院 A kind of coal bed gas extraction intersects the experimental simulation device and experiment analogy method in string hole
CN111271051A (en) * 2020-02-14 2020-06-12 辽宁工程技术大学 Three-way loading mine drilling and hole sealing effect simulation test device and method
CN112228036A (en) * 2020-06-04 2021-01-15 精英数智科技股份有限公司 Gas extraction monitoring method, system and equipment and readable storage medium
CN112727444A (en) * 2021-01-05 2021-04-30 湖南科技大学 Visual hole sealing material crack sealing performance testing device and method
CN112983536A (en) * 2021-03-29 2021-06-18 贵州盘江煤电集团技术研究院有限公司 Method for determining optimal grouting pressure for grouting and sealing coal mine gas extraction drill hole
CN114215507A (en) * 2021-05-21 2022-03-22 华北科技学院(中国煤矿安全技术培训中心) Gas pressure measuring device and method based on directional drilling machine
CN114263444A (en) * 2021-12-10 2022-04-01 贵州盘江精煤股份有限公司 Simple processing method for preventing air leakage of drill hole
NL2031041B1 (en) * 2022-02-22 2023-09-06 Univ Anhui Sci & Technology Device for testing airtightness of hole sealing material and use method
CN117703299A (en) * 2024-02-06 2024-03-15 山东科技大学 Visual sealing device and sealing method for gas extraction drilling

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4687060A (en) * 1986-06-13 1987-08-18 Methane Drainage Ventures Production and grout liner for methane drainage in subterranean boreholes and method
CN201381872Y (en) * 2009-03-13 2010-01-13 淮南矿业(集团)有限责任公司 Hole-sealing pressure measuring device
CN101824999A (en) * 2009-03-04 2010-09-08 中矿龙科能源科技(北京)有限公司 Technology for measuring gas pressure of coal bed by utilizing through beds hole
CN102889958A (en) * 2012-10-30 2013-01-23 山西潞安矿业(集团)有限责任公司 Coal bed gas pressure direct measurement device and pressure measurement method thereof
CN104897872A (en) * 2015-05-16 2015-09-09 中国矿业大学 Closed goaf mashgas three-dimensional seepage simulation device and simulation method thereof
CN205154099U (en) * 2015-11-20 2016-04-13 河南理工大学 Experimental device for simulation gas hole sealing

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4687060A (en) * 1986-06-13 1987-08-18 Methane Drainage Ventures Production and grout liner for methane drainage in subterranean boreholes and method
CN101824999A (en) * 2009-03-04 2010-09-08 中矿龙科能源科技(北京)有限公司 Technology for measuring gas pressure of coal bed by utilizing through beds hole
CN201381872Y (en) * 2009-03-13 2010-01-13 淮南矿业(集团)有限责任公司 Hole-sealing pressure measuring device
CN102889958A (en) * 2012-10-30 2013-01-23 山西潞安矿业(集团)有限责任公司 Coal bed gas pressure direct measurement device and pressure measurement method thereof
CN104897872A (en) * 2015-05-16 2015-09-09 中国矿业大学 Closed goaf mashgas three-dimensional seepage simulation device and simulation method thereof
CN205154099U (en) * 2015-11-20 2016-04-13 河南理工大学 Experimental device for simulation gas hole sealing

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108894779A (en) * 2018-09-14 2018-11-27 西安科技大学 A kind of coal gas extraction borehole unstability differentiates experimental rig and method
CN108894779B (en) * 2018-09-14 2024-03-01 西安科技大学 Coal gas extraction borehole instability discrimination test device and method
CN109441441A (en) * 2018-11-15 2019-03-08 华北科技学院 Seat earth multi-angle oblique bored grouting Analog Experiment for Discharges device and method under a kind of pressure-bearing influence of dynamic water
CN110219699A (en) * 2019-04-24 2019-09-10 中国矿业大学 A kind of measurement device and measuring method of the effective radius of influence of mash gas pumping drilling
CN110107279B (en) * 2019-04-29 2022-05-17 淮阴工学院 Gas hole sealing ground simulation experiment device
CN110107279A (en) * 2019-04-29 2019-08-09 淮阴工学院 A kind of gas sealing of hole ground simulating device
CN110410137A (en) * 2019-08-30 2019-11-05 华北科技学院 A kind of coal bed gas extraction intersects the experimental simulation device and experiment analogy method in string hole
CN111271051A (en) * 2020-02-14 2020-06-12 辽宁工程技术大学 Three-way loading mine drilling and hole sealing effect simulation test device and method
CN112228036A (en) * 2020-06-04 2021-01-15 精英数智科技股份有限公司 Gas extraction monitoring method, system and equipment and readable storage medium
CN112727444A (en) * 2021-01-05 2021-04-30 湖南科技大学 Visual hole sealing material crack sealing performance testing device and method
CN112983536A (en) * 2021-03-29 2021-06-18 贵州盘江煤电集团技术研究院有限公司 Method for determining optimal grouting pressure for grouting and sealing coal mine gas extraction drill hole
CN112983536B (en) * 2021-03-29 2023-04-28 贵州盘江煤电集团技术研究院有限公司 Method for determining optimal grouting pressure of grouting seal of coal mine gas extraction drill hole
CN114215507B (en) * 2021-05-21 2023-11-17 华北科技学院(中国煤矿安全技术培训中心) Gas pressure measuring device and method based on directional drilling machine
CN114215507A (en) * 2021-05-21 2022-03-22 华北科技学院(中国煤矿安全技术培训中心) Gas pressure measuring device and method based on directional drilling machine
CN114263444A (en) * 2021-12-10 2022-04-01 贵州盘江精煤股份有限公司 Simple processing method for preventing air leakage of drill hole
NL2031041B1 (en) * 2022-02-22 2023-09-06 Univ Anhui Sci & Technology Device for testing airtightness of hole sealing material and use method
CN117703299A (en) * 2024-02-06 2024-03-15 山东科技大学 Visual sealing device and sealing method for gas extraction drilling
CN117703299B (en) * 2024-02-06 2024-05-14 山东科技大学 Visual sealing device and sealing method for gas extraction drilling

Also Published As

Publication number Publication date
CN107542486B (en) 2018-07-03

Similar Documents

Publication Publication Date Title
CN107542486B (en) Drilling gas extraction laboratory simulation method and sealing material method for testing tightness
CN207194943U (en) A kind of Drillhole gas pumping laboratory analog system
CN105756674B (en) Fracture-matrix coupling flow damage evaluation device and method for simulating formation conditions
CN107515185A (en) A kind of coal body permeability test device and its application method
CN202975005U (en) Rock core holder
CN106771615B (en) A kind of soil body electrical conductance and permeability multipurpose test system and test method
CN103398933A (en) Constant-pressure concrete permeability testing device
CN107505448A (en) Seepage inflow erosion model equipment, system and test method caused by underground utilities breakage
CN205477605U (en) Crack - matrix coupling of simulated formation condition is flowed and is harmd evaluation device
CN107870144A (en) A kind of test device and method of coal petrography body strain crack permeability
CN104713950B (en) Sonic test coupling device and method of testing
CN206459937U (en) A kind of packer permeability test device of engineering geological investigation
CN102183447B (en) Test system and test method for permeability coefficients of aquifer
CN204255812U (en) The device for testing permeability coefficient of original state coarse-grained soil
CN109959775A (en) A kind of pressure stabilizing simulation grouting test device and its application method
CN113063701A (en) Visual grouting simulation device and method for saturated sandy soil stratum
CN203822282U (en) Confining pressure hydrofracture experimental facility
CN108533210A (en) Gel leak-proof leak-stopping property detecting device and its application process under a kind of bad ground
CN106644822A (en) Concrete permeability coefficient testing method and concrete permeability coefficient testing device
CN210005075U (en) Water leakage monitoring device for plug and working pipe in drilling water-pressing test
CN106645432B (en) A kind of automatic coupling sonic test system and sonic test method
CN109187926A (en) Three axis seepage flow test device of fractured coal and rock and desorption-diffusion-seepage tests system
WO2021013186A1 (en) Test device and test method for simulating earth-filling and grouting
CN108760599A (en) A kind of simulating measuring device
CN206300876U (en) A kind of concrete air transmission coefficient test device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant