CN107542425A - A kind of selective cementing unit - Google Patents

A kind of selective cementing unit Download PDF

Info

Publication number
CN107542425A
CN107542425A CN201610479182.4A CN201610479182A CN107542425A CN 107542425 A CN107542425 A CN 107542425A CN 201610479182 A CN201610479182 A CN 201610479182A CN 107542425 A CN107542425 A CN 107542425A
Authority
CN
China
Prior art keywords
sleeve pipe
payzone
well
inner tube
outer tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610479182.4A
Other languages
Chinese (zh)
Inventor
张喜庆
余金陵
王建松
宋国江
任淑琼
江建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shengli Oilfield Shengji Petroleum Equipment Co Ltd
Original Assignee
Shengli Oilfield Shengji Petroleum Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shengli Oilfield Shengji Petroleum Equipment Co Ltd filed Critical Shengli Oilfield Shengji Petroleum Equipment Co Ltd
Priority to CN201610479182.4A priority Critical patent/CN107542425A/en
Publication of CN107542425A publication Critical patent/CN107542425A/en
Pending legal-status Critical Current

Links

Landscapes

  • Curing Cements, Concrete, And Artificial Stone (AREA)

Abstract

The present invention discloses a kind of selective cementing unit, belongs to well cementation completion tool technical field in oil and gas wells in oil fields engineering.It includes sleeve pipe inner tube 3, sleeve pipe outer tube 4, and its sleeve pipe inner tube 3, the upper end of sleeve pipe outer tube 4 are equipped with upper slider 2 and upper diaphragm valve 1, lower slider 5 and lower diaphragm valve 6 are housed in sleeve pipe inner tube 3, the lower end of sleeve pipe outer tube 4.The present invention uses double-layer sleeve structure, cementing slurry can bypass payzone by sleeve pipe interlayer, realize the purpose for the selectivity well cementation that payzone is not cemented the well, payzone is cemented the well up and down, increase payzone drainage area, avoid injury of the cement mortar to payzone, be advantageous to improve oil gas well production, its technique is simple, workload is small, without construction risk, breaches the implementation bottleneck of existing selective cementing technology.

Description

A kind of selective cementing unit
Technical field
The present invention relates to a kind of selective cementing unit, belongs to well cementation completion tool technical field in oil and gas wells in oil fields engineering.
Background technology
Foreign countries just promote the use of inner tube method in the nineties in last century and realize selectivity well cementation, i.e. payzone section sieve tube completion, and payzone section uses well cementing of cement up and down, and compared with the well cementation of full well, payzone gun perforation process, sand production rate reduces, output increased.Although the technology realizes the technical goal selectively cemented the well, but enforcement difficulty is big, technique is cumbersome, each step is required for calculating precisely, it is more plus uncertain factor, than if desired for quantitative displacing, the underground folding of multiple valves, interior piping tool itself sequence reliability etc., construction risk is both increased, success rate and total completion time can not ensure.
The content of the invention
The present invention provides a kind of selective cementing unit, and technique is simple, and well cementation success rate is high, and well cementation section quality is good.
What the present invention was realized in:The present invention includes sleeve pipe inner tube, sleeve pipe outer tube, and its sleeve pipe inner tube, sleeve pipe outer tube upper end are equipped with upper slider and upper diaphragm valve, lower slider and lower diaphragm valve are housed in sleeve pipe inner tube, sleeve pipe outer tube lower end.The operation principle of the present invention:The present invention is serially connected on well cementing casing pipe post and arrives payzone position down, carry out building the pressure in sleeve pipe first, the upper slider of the present invention and lower isolation volume expansion, well above and below payzone is kept apart, during well cementation, interlayer that cement mortar is flowed between sleeve pipe inner tube, sleeve pipe outer tube from lower part borehole by lower diaphragm valve, around payzone, then top hole is flowed back to by upper diaphragm valve, has been achieved in that the purpose for the selectivity well cementation that payzone is not cemented the well, payzone is cemented the well up and down.The length of the present invention can adjust according to payzone segment length.
The present invention uses double-layer sleeve structure, cementing slurry can bypass payzone by internal and external casing interlayer, realize the purpose selectively cemented the well, increase payzone drainage area, avoid injury of the cement mortar to payzone, be advantageous to improve oil gas well production, its technique is simple, workload is small, without construction risk, breaches the implementation bottleneck of existing selective cementing technology.
Brief description of the drawings
Fig. 1 is structure principle chart of the present invention.
Embodiment
The present invention will be described in detail below in conjunction with the accompanying drawings:The present invention includes sleeve pipe inner tube 3, sleeve pipe outer tube 4, and its sleeve pipe inner tube 3, the upper end of sleeve pipe outer tube 4 are equipped with upper slider 2 and upper diaphragm valve 1, lower slider 5 and lower diaphragm valve 6 are housed in sleeve pipe inner tube 3, the lower end of sleeve pipe outer tube 4.The operation principle of the present invention:The present invention is serially connected on well cementing casing pipe post and arrives payzone position down, carry out building the pressure in sleeve pipe first, the upper slider 2 and lower slider 5 of the present invention expands, well above and below payzone is kept apart, during well cementation, interlayer that cement mortar is flowed between sleeve pipe inner tube 3, sleeve pipe outer tube 4 from lower part borehole by lower diaphragm valve 6, around payzone, top hole is flowed back to by upper diaphragm valve 1, has been achieved in that the purpose for the selectivity well cementation that payzone is not cemented the well, payzone is cemented the well up and down.The length of the present invention can adjust according to payzone segment length.
The present invention can increase payzone drainage area, avoid injury of the cement mortar to payzone, be advantageous to improve oil gas well production, while payzone still uses cement mortar sealing up and down, it is ensured that interlayer is not altered.The present invention is the development trend of well cementation completion mode, suitable for the well cementation of any oil reservoir, especially suitable for sensible reservoir, fractured reservoir.Present invention process is simple, workload is small, without construction risk, breaches the implementation bottleneck of existing selective cementing technology.

Claims (1)

  1. A kind of 1. selective cementing unit, including sleeve pipe inner tube (3), sleeve pipe outer tube (4), it is characterized in that being equipped with upper slider (2) and upper diaphragm valve (1) in sleeve pipe inner tube (3), sleeve pipe outer tube (4) upper end, lower slider (5) and lower diaphragm valve (6) are housed in sleeve pipe inner tube (3), sleeve pipe outer tube (4) lower end.
CN201610479182.4A 2016-06-28 2016-06-28 A kind of selective cementing unit Pending CN107542425A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610479182.4A CN107542425A (en) 2016-06-28 2016-06-28 A kind of selective cementing unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610479182.4A CN107542425A (en) 2016-06-28 2016-06-28 A kind of selective cementing unit

Publications (1)

Publication Number Publication Date
CN107542425A true CN107542425A (en) 2018-01-05

Family

ID=60961771

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610479182.4A Pending CN107542425A (en) 2016-06-28 2016-06-28 A kind of selective cementing unit

Country Status (1)

Country Link
CN (1) CN107542425A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108979591A (en) * 2018-09-14 2018-12-11 大港油田集团有限责任公司 A kind of two-tube overflow means
CN110439477A (en) * 2019-07-18 2019-11-12 中国石油天然气集团有限公司 A kind of double combination casing of plastic mismatch
CN112593894A (en) * 2020-12-24 2021-04-02 山西晋城无烟煤矿业集团有限责任公司 Multi-purpose multi-stage discontinuous well cementation method for preventing pollution of production layer

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU4499400A (en) * 1999-04-30 2000-11-17 Frank's International, Inc. Method and multi-purpose apparatus for control of fluid in wellbore casing
CN101307679A (en) * 2008-04-15 2008-11-19 中国石化集团胜利石油管理局石油开发中心 Thin interlayer steam injection thermal production well mixing-proof well completion process
CN201671591U (en) * 2009-12-18 2010-12-15 中国石油天然气集团公司 Concentric tube winding reservoir cementing tool
CN104343413A (en) * 2013-08-09 2015-02-11 胜利油田胜机石油装备有限公司 Top well cementation method and device for self-communicated double-process screen pipe
CN205858270U (en) * 2016-06-28 2017-01-04 胜利油田胜机石油装备有限公司 A kind of selectivity cementing unit

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU4499400A (en) * 1999-04-30 2000-11-17 Frank's International, Inc. Method and multi-purpose apparatus for control of fluid in wellbore casing
CN101307679A (en) * 2008-04-15 2008-11-19 中国石化集团胜利石油管理局石油开发中心 Thin interlayer steam injection thermal production well mixing-proof well completion process
CN201671591U (en) * 2009-12-18 2010-12-15 中国石油天然气集团公司 Concentric tube winding reservoir cementing tool
CN104343413A (en) * 2013-08-09 2015-02-11 胜利油田胜机石油装备有限公司 Top well cementation method and device for self-communicated double-process screen pipe
CN205858270U (en) * 2016-06-28 2017-01-04 胜利油田胜机石油装备有限公司 A kind of selectivity cementing unit

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王建华;刘杰;张进;: "页岩气开发钻完井技术探讨", 探矿工程(岩土钻掘工程), no. 10 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108979591A (en) * 2018-09-14 2018-12-11 大港油田集团有限责任公司 A kind of two-tube overflow means
CN110439477A (en) * 2019-07-18 2019-11-12 中国石油天然气集团有限公司 A kind of double combination casing of plastic mismatch
CN110439477B (en) * 2019-07-18 2021-09-28 中国石油天然气集团有限公司 Double-layer combined sleeve with mismatched strength
CN112593894A (en) * 2020-12-24 2021-04-02 山西晋城无烟煤矿业集团有限责任公司 Multi-purpose multi-stage discontinuous well cementation method for preventing pollution of production layer
CN112593894B (en) * 2020-12-24 2022-06-03 山西晋城无烟煤矿业集团有限责任公司 Multi-purpose multi-stage discontinuous well cementation method for preventing pollution of production layer

Similar Documents

Publication Publication Date Title
CN103195390B (en) The nearly horizontal mash gas pumping drilling encapsulating method in this coal seam a kind of
CN102979495A (en) Multi-cluster current limiting fracturing string of open hole horizontal well and fracturing method thereof
CN105952418A (en) Intelligent switching valve for reservoir reformation and production monitoring and control and construction method thereof
GB2435063A (en) Sand control completion having smart well capability and method for use of same
CN105822253A (en) Bushing sliding sleeve and hydraulic bridge plug combined type completion pipe string and rapid fracturing method
CN104141470A (en) Pore-forming and sealing method for hydraulic fracturing borehole casing section in underground coal mine
CN205063929U (en) Colliery is sealed in pit and is pressed integration segmentation hydraulic fracturing device
CN204532234U (en) Sliding sleeve of bushing and waterpower bridging plug combined type completion tubular column
AU2016423189A1 (en) Shunt system for downhole sand control completions
CN107542425A (en) A kind of selective cementing unit
CN102410009B (en) Controlled-valve placed well-cementing staged-fracturing well-completion string and hydraulically-controlled switch string
CN103912304A (en) Method for locally extracting gas of soft coal seams
CN103867177A (en) Horizontal well fracturing method
CN202900225U (en) A tubular column for a stage-unlimited intelligent well cementation sliding sleeve separate layer fracturing reconstruction technology
CN104594870A (en) Fracturing stimulation method
CN102434192A (en) Device and method for enhancing coal seam fracturing effect
CN104234682B (en) A kind ofly be applicable to separate stratum fracturing of continuous oil pipe method that is many, girdle
CN104879097A (en) Gas well production string provided with double parallel pipes
CN105507939B (en) A kind of slip casting displaced type drilling solidification sealing and method of the gas without pipe extraction
CN103089183A (en) Double bellmouth type expansion sleeve packing tool and operating method thereof
CN205858270U (en) A kind of selectivity cementing unit
CN204175251U (en) A kind of seam mining structure
CN103938613B (en) Freezing pipe slip casting check device
CN204002746U (en) Coiled tubing infinite stages fracturing sliding bush
CN203782681U (en) Grouting check device for freezing pipe

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180105