CN107542151A - Piping lane and its construction method under sponge urban land - Google Patents
Piping lane and its construction method under sponge urban land Download PDFInfo
- Publication number
- CN107542151A CN107542151A CN201710936383.7A CN201710936383A CN107542151A CN 107542151 A CN107542151 A CN 107542151A CN 201710936383 A CN201710936383 A CN 201710936383A CN 107542151 A CN107542151 A CN 107542151A
- Authority
- CN
- China
- Prior art keywords
- piping lane
- water
- conduit
- pipe
- straight sections
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Sewage (AREA)
Abstract
The present invention relates to piping lane and its construction method under a kind of sponge urban land, the underground pipe gallery includes multiple piping lane units being sequentially connected, wherein, piping lane unit includes a piping lane main body, a three-way pipe is connected with the lower end of piping lane main body, three-way pipe is respectively arranged on the left side and the right side the first connection end and second connection end, the middle part of three-way pipe is provided with the 3rd connection end, first connection end is connected with the first conduit, second connection end is connected with the second conduit, 3rd connection end is connected with the 3rd conduit, first conduit, a mozzle and a water-storing device are respectively provided with second conduit and the 3rd conduit, water-storing device is located at the lower section of the mozzle, a breather pipe is also associated with the side of piping lane main body, one end of breather pipe communicates with air.Piping lane not only can be by rain penetration to underground under sponge urban land proposed by the present invention, it may have certain water storage function, meets practical application request.
Description
Technical field
The present invention relates to urban construction equipment technical field, piping lane and its construction party under more particularly to a kind of sponge urban land
Method.
Background technology
Sponge city, it is new generation of city storm water man- agement concept, refers to that city is adapting to environmental change and reply rainwater band
Natural calamity come etc. has good " elasticity ", also referred to as " water elasticity city ".International term is " low shadow
Ring exploitation storm-water system structure ".Refer specifically to rain when water suction, water storage, infiltration, water purification, it is necessary to when the water stored " is released
Put " and be used.
Traditional urban construction pattern, all it is hard surface everywhere.Whenever heavy rain, then pipe duct, pumping plant etc. can only be relied on to set
Carry out draining is applied, for the purpose of " quick to exclude " and " end concentration ", rainwater is drained as much as possible.
However, existing drainage pattern, can not can not also realize certain water storage function, no by rain penetration to underground
Meet the construction requirements in sponge city.
The content of the invention
Based on this, the invention aims to solve existing drainage pattern can not by rain penetration to underground, also without
Method realizes the problem of certain water storage function, to meet practical application request.
The present invention proposes piping lane under a kind of sponge urban land, including multiple piping lane units being sequentially connected, wherein, it is described
Piping lane unit includes a piping lane main body, and a three-way pipe, the left and right two of the three-way pipe are connected with the lower end of the piping lane main body
Side is respectively equipped with the first connection end and second connection end, and the middle part of the three-way pipe is provided with the 3rd connection end, and described first connects
End is connect to be connected with the first conduit, the second connection end is connected with the second conduit, and the 3rd connection end is connected with the 3rd conduit,
A mozzle and a water-storing device are respectively provided with first conduit, second conduit and the 3rd conduit,
The water-storing device is located at the lower section of the mozzle, and a breather pipe is also associated with the side of the piping lane main body, described logical
One end of tracheae communicates with air.
Piping lane under sponge urban land proposed by the present invention, it is sequentially connected and is assembled by multiple piping lane units, wherein, often
Individual piping lane unit includes a piping lane main body, wherein each piping lane main body is connected by a three-way pipe with three conduits, each conduit
On be equipped with a mozzle and a water-storing device, its due to water-storing device be located at mozzle lower section, in actual applications, should
Rainwater can be drained into underground by mozzle, and the water-storing device can be stored unnecessary rainwater, so as to arid when
Wait and use.Piping lane not only can be by rain penetration to underground under sponge urban land proposed by the present invention, it may have certain storage
Water function, meets practical application request.
Piping lane under the sponge urban land, wherein, first conduit includes the first kink and located at described the
First straight sections of one kink bottom, the first sealing is provided with the bottom of first straight sections, in first straight sections
Side be provided with the first mozzle, opposite side is provided with the first water-storing device, and first water-storing device is located at first water conservancy diversion
The lower section of pipe, first water-storing device include the first water pipe, and the first storage box is provided with the top of first water pipe,
First switch valve is provided with the bottom of first water pipe.
Piping lane under the sponge urban land, wherein, second conduit includes the second kink and located at described the
Second straight sections of two kink bottoms, the second sealing is provided with the bottom of second straight sections, in second straight sections
Side be provided with the second mozzle, opposite side is provided with the second water-storing device, and second water-storing device is located at second water conservancy diversion
The lower section of pipe, second water-storing device include the second water pipe, and the second storage box is provided with the top of second water pipe,
Second switch valve is provided with the bottom of second water pipe.
Piping lane under the sponge urban land, wherein, the 3rd conduit includes the 3rd straight sections, in the 3rd straight tube
The side in portion is provided with the 3rd mozzle, and opposite side is provided with the 3rd water-storing device, and the 3rd water-storing device is led located at the described 3rd
The lower section of flow tube, the 3rd water-storing device include the 3rd water pipe, and the 3rd water storage is provided with the top of the 3rd water pipe
Box, the 3rd switch valve is provided with the bottom of the 3rd water pipe.
Piping lane under the sponge urban land, wherein, it is provided with a draining hole, the drainage at the top of the piping lane main body
The opening shape of mouth is turbination, and a screen pack is provided with the top of the draining hole.
Piping lane under the sponge urban land, wherein, the caliber of the piping lane main body is more than first straight sections, described
The caliber of second straight sections and the 3rd straight sections, the caliber scope of the piping lane main body are 10~15cm, described first
The caliber scope of straight sections, second straight sections and the 3rd straight sections is 5~8cm.
Piping lane under the sponge urban land, wherein, the quantity of the piping lane unit is 4, and four piping lane units enclose
Into a square, the breather pipe of the two adjacent piping lane units is connected with a blow vent.
Piping lane under the sponge urban land, wherein, the quantity of the piping lane unit is 4, and four piping lane units enclose
Into a square, the breather pipe of the two adjacent piping lane units is connected with a connecting hole, is arranged in a mutually vertical manner
Two connecting holes communicate with the blow vent.
The present invention also proposes a kind of construction method, wherein, for being applied to sponge Urban Underground piping lane as described above
Work, methods described comprise the following steps:
Multiple piping lane units are carried out being sequentially connected assembling to obtain underground pipe gallery;
After carrying out smooth processing to ground, natural soft-clay bed course is laid, the underground pipe gallery is placed on the natural soft-clay pad
The upper surface of layer;
On the natural soft-clay bed course, a fluffy soil layer is laid to the underground pipe gallery, the fluffy soil layer is at least high
In the mozzle of each piping lane unit;
After the fluffy soil layer is laid, continue to pour mixed mud layer on the fluffy soil layer, wherein described mixed
The upper surface of dirt bed is not higher than the blow vent being connected with the breather pipe of each piping lane unit;
Sealing compound is sprayed, completes laying operation.
The additional aspect and advantage of the present invention will be set forth in part in the description, and will partly become from the following description
Obtain substantially, or recognized by the practice of the present invention.
Brief description of the drawings
Fig. 1 is the overall structure diagram for the piping lane unit that first embodiment of the invention proposes;
Fig. 2 be Fig. 1 shown in piping lane unit in three-way pipe schematic enlarged-scale view;
Fig. 3 be Fig. 1 shown in piping lane unit in the first conduit schematic enlarged-scale view;
Fig. 4 be Fig. 1 shown in piping lane unit in the second conduit schematic enlarged-scale view;
Fig. 5 be Fig. 1 shown in piping lane unit in the 3rd conduit schematic enlarged-scale view;
Fig. 6 is the overall structure diagram for the underground pipe gallery that second embodiment of the invention proposes;
Fig. 7 is the overall structure diagram for the underground pipe gallery that third embodiment of the invention proposes.
Primary symbols explanation:
Piping lane main body | 10 | 3rd straight sections | 141 |
Three-way pipe | 11 | 3rd water-storing device | 142 |
First conduit | 12 | Screen pack | 1011 |
Second conduit | 13 | First mozzle | 1221 |
3rd conduit | 14 | First sealing | 1222 |
Breather pipe | 15 | First water pipe | 1230 |
Blow vent | 16、16a | First storage box | 1231 |
Connecting hole | 17 | First switch valve | 1232 |
Piping lane unit | 100 | Second mozzle | 1321 |
Draining hole | 101 | Second sealing | 1322 |
First connection end | 111 | Second water pipe | 1330 |
Second connection end | 112 | Second storage box | 1331 |
3rd connection end | 113 | Second switch valve | 1332 |
First kink | 121 | 3rd mozzle | 1411 |
First straight sections | 122 | 3rd sealing | 1412 |
First water-storing device | 123 | 3rd water pipe | 1420 |
Second kink | 131 | 3rd storage box | 1421 |
Second straight sections | 132 | 3rd switch valve | 1422 |
Second water-storing device | 133 |
Embodiment
For the ease of understanding the present invention, the present invention is described more fully below with reference to relevant drawings.In accompanying drawing
Give the preferred embodiment of the present invention.But the present invention can realize in many different forms, however it is not limited to this paper institutes
The embodiment of description.On the contrary, the purpose for providing these embodiments is made to the disclosure more thorough and comprehensive.
Unless otherwise defined, all of technologies and scientific terms used here by the article is with belonging to technical field of the invention
The implication that technical staff is generally understood that is identical.Term used in the description of the invention herein is intended merely to description tool
The purpose of the embodiment of body, it is not intended that in the limitation present invention.Term as used herein " and/or " include one or more phases
The arbitrary and all combination of the Listed Items of pass.
Fig. 1 to Fig. 5 is referred to, for the piping lane unit 100 in first embodiment of the invention, the piping lane unit 100 wraps
A piping lane main body 10 is included, a three-way pipe 11, the left and right sides of the three-way pipe 11 are connected with the lower end of the piping lane main body 10
The first connection end 111 and second connection end 112 are respectively equipped with, the middle part of the three-way pipe 11 is provided with the 3rd connection end 113, institute
State the first connection end 111 to be connected with the first conduit 12, the second connection end 112 is connected with the second conduit 13, and the described 3rd connects
Connect end 113 to be connected with the 3rd conduit 14, divide equally on first conduit 12, second conduit 13 and the 3rd conduit 14
Not She You a mozzle and a water-storing device, the water-storing device be located at the mozzle lower section, in the piping lane main body
10 side is also associated with a breather pipe 15, and one end of the breather pipe 15 communicates with air.
For first conduit 12, first conduit 12 includes the first kink 121 and located at described first
First straight sections 122 of the bottom of kink 121, the first sealing 1222 is provided with the bottom of first straight sections 122, described
The side of first straight sections 122 is provided with the first mozzle 1221, and opposite side is provided with the first water-storing device 123, first water storage
Device 123 is located at the lower section of first mozzle 1221, and first water-storing device 123 includes the first water pipe 1230,
The top of first water pipe 1230 is provided with the first storage box 1231, and first is provided with the bottom of first water pipe 1230
Switch valve 1232.
Specifically, in actual use, rainwater can flow into soil layer from the first mozzle 1221, and unnecessary rainwater can pass through
First straight sections 122 are flowed into first water-storing device 123, wherein the first storage box in the first water-storing device 123
1231 can store a certain amount of rainwater., can be by located at the bottom of first water pipe 1230 when in arid season
First switch valve 1232, now the rainwater in first storage box 1231 soil layer will be flowed into by the first switch valve 1232
It is interior, it is achieved thereby that the effect of Adjusting rainwater.
For second conduit 13, second conduit 13 includes the second kink 131 and located at described second
Second straight sections 132 of the bottom of kink 131, the second sealing 1322 is provided with the bottom of second straight sections 132, described
The side of second straight sections 132 is provided with the second mozzle 1321, and opposite side is provided with the second water-storing device 133, second water storage
Device 133 is located at the lower section of second mozzle 1321, and second water-storing device 133 includes the second water pipe 1330,
The top of second water pipe 1330 is provided with the second storage box 1331, and second is provided with the bottom of second water pipe 1330
Switch valve 1332.It should be understood that the operation principle of second conduit 13 is identical with the operation principle of the first above-mentioned conduit 12,
The function of rainwater diversion and water storage can equally be realized.
For the 3rd conduit 14, the 3rd conduit 14 includes the 3rd straight sections 141, in the 3rd straight sections
141 side is provided with the 3rd mozzle 1411, and opposite side is provided with the 3rd water-storing device 142, at the bottom of the 3rd straight sections 141
Portion is provided with the 3rd sealing 1412, and the 3rd water-storing device 142 is located at the lower section of the 3rd mozzle 1411, and the described 3rd stores
Water installations 142 include the 3rd water pipe 1420, the 3rd storage box 1421 are provided with the top of the 3rd water pipe 1420, in institute
The bottom for stating the 3rd water pipe 1420 is provided with the 3rd switch valve 1422.It should be understood that the operation principle of the 3rd conduit 14 with
The first above-mentioned conduit 12 and the operation principle of the second conduit 13 are identical, can equally realize rainwater diversion and the work(of water storage
Energy.
Further, a draining hole 101, the opening shape of the draining hole 101 are provided with the top of the piping lane main body 10
Shape is turbination, and the setting is primarily to store more rainwater, in order to which rainwater more easily enters piping lane master
In body 10.In addition, it is provided with a screen pack 1011 at the top of the draining hole 101.The screen pack 1011 is mainly used in preventing rain
Impurity in water is entered in piping lane main body 10, and the problem of cause line clogging.
At the same time, in the present embodiment, the caliber of the piping lane main body 10 is more than first straight sections 122, described
The caliber of second straight sections 132 and the 3rd straight sections 141.The caliber scope of wherein described piping lane main body 10 be 10~
15cm, the caliber scopes of first straight sections 122, second straight sections 132 and the 3rd straight sections 141 for 5~
8cm.Specifically, in the present embodiment, the caliber of the piping lane main body 10 is 12cm, first straight sections 122, described second
The caliber of straight sections 132 and the 3rd straight sections 141 is 5cm.Tested through actual use, the pipeline of the caliber have compared with
For good draining and water storage effect, practical application request can be met.
Piping lane under sponge urban land proposed by the present invention, it is sequentially connected and is assembled by multiple piping lane units, wherein, often
Individual piping lane unit includes a piping lane main body, wherein each piping lane main body is connected by a three-way pipe with three conduits, each conduit
On be equipped with a mozzle and a water-storing device, its due to water-storing device be located at mozzle lower section, in actual applications, should
Rainwater can be drained into underground by mozzle, and the water-storing device can be stored unnecessary rainwater, so as to arid when
Wait and use.Piping lane not only can be by rain penetration to underground under sponge urban land proposed by the present invention, it may have certain storage
Water function, meets practical application request.
Referring to Fig. 6, the underground pipe gallery proposed for second embodiment, the underground pipe gallery in the present embodiment by four as above
Described piping lane unit 100 forms.Wherein, four piping lane units 100 surround a square, and are attached successively, phase
The breather pipe 15 of the two adjacent piping lane units 100 is connected with a blow vent 16., it is necessary to protect in actual installation application
Demonstrate,prove the blow vent 16 to communicate with air, on the one hand the setting can adjust the water level value in water-storing device, on the other hand can protect
The permeability of the underground pipe gallery is demonstrate,proved, to extend actual life.
Referring to Fig. 7, the underground pipe gallery proposed for 3rd embodiment, the underground pipe gallery in the present embodiment is equally by four
Piping lane unit 100 as described above forms.Likewise, four piping lane units 100 surround a square, wherein adjacent two
The breather pipe 15 of individual piping lane unit 100 is connected with a connecting hole 17, two connecting holes 17 being arranged in a mutually vertical manner with it is described
Blow vent 16a is communicated.Compared with above-mentioned second embodiment, the setting undoubtedly reduces blow vent 16a setting, therefore more favourable
Set in actual installation, meet practical application.
In addition, the present invention also proposes a kind of construction method, wherein, for sponge Urban Underground pipe as described above
Corridor is constructed, and methods described comprises the following steps:
Multiple piping lane units 100 are carried out being sequentially connected assembling to obtain underground pipe gallery;
After carrying out smooth processing to ground, natural soft-clay bed course is laid, the underground pipe gallery is placed on the natural soft-clay pad
The upper surface of layer;
On the natural soft-clay bed course, a fluffy soil layer is laid to the underground pipe gallery, the fluffy soil layer is at least high
In the mozzle of each piping lane unit;
After the fluffy soil layer is laid, continue to pour mixed mud layer on the fluffy soil layer, wherein described mixed
The upper surface of dirt bed is not higher than the blow vent being connected with the breather pipe of each piping lane unit;
Sealing compound is sprayed, completes laying operation.
Embodiment described above only expresses the several embodiments of the present invention, and its description is more specific and detailed, but simultaneously
Therefore the limitation to the scope of the claims of the present invention can not be interpreted as.It should be pointed out that for one of ordinary skill in the art
For, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to the guarantor of the present invention
Protect scope.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.
Claims (9)
1. piping lane under a kind of sponge urban land, including multiple piping lane units being sequentially connected, it is characterised in that the piping lane list
Member includes a piping lane main body, and a three-way pipe, the left and right sides difference of the three-way pipe are connected with the lower end of the piping lane main body
Provided with the first connection end and second connection end, the middle part of the three-way pipe is provided with the 3rd connection end, first connection end with
First conduit is connected, and the second connection end is connected with the second conduit, and the 3rd connection end is connected with the 3rd conduit, and described the
A mozzle and a water-storing device, the storage are respectively provided with one conduit, second conduit and the 3rd conduit
Water installations are located at the lower section of the mozzle, and a breather pipe is also associated with the side of the piping lane main body, the breather pipe
One end communicates with air.
2. piping lane under sponge urban land according to claim 1, it is characterised in that it is curved that first conduit includes first
Folding part and the first straight sections located at the first kink bottom, the first envelope is provided with the bottom of first straight sections
Mouthful, the first mozzle is provided with the side of first straight sections, opposite side is provided with the first water-storing device, the first water storage dress
The lower section of first mozzle is arranged in, first water-storing device includes the first water pipe, in first water pipe
Top is provided with the first storage box, and first switch valve is provided with the bottom of first water pipe.
3. piping lane under sponge urban land according to claim 2, it is characterised in that it is curved that second conduit includes second
Folding part and the second straight sections located at the second kink bottom, the second envelope is provided with the bottom of second straight sections
Mouthful, the second mozzle is provided with the side of second straight sections, opposite side is provided with the second water-storing device, the second water storage dress
The lower section of second mozzle is arranged in, second water-storing device includes the second water pipe, in second water pipe
Top is provided with the second storage box, and second switch valve is provided with the bottom of second water pipe.
4. piping lane under sponge urban land according to claim 3, it is characterised in that it is straight that the 3rd conduit includes the 3rd
Pipe portion, the 3rd mozzle is provided with the side of the 3rd straight sections, and opposite side is provided with the 3rd water-storing device, the 3rd water storage
Device is located at the lower section of the 3rd mozzle, and the 3rd water-storing device includes the 3rd water pipe, in the 3rd water pipe
Top be provided with the 3rd storage box, be provided with the 3rd switch valve in the bottom of the 3rd water pipe.
5. piping lane under sponge urban land according to claim 1, it is characterised in that set at the top of the piping lane main body
There is a draining hole, the opening shape of the draining hole is turbination, and a screen pack is provided with the top of the draining hole.
6. piping lane under sponge urban land according to claim 4, it is characterised in that the caliber of the piping lane main body is more than
The caliber of first straight sections, second straight sections and the 3rd straight sections, the caliber scope of the piping lane main body
For 10~15cm, the caliber scope of first straight sections, second straight sections and the 3rd straight sections is 5~8cm.
7. piping lane under sponge urban land according to claim 6, it is characterised in that the quantity of the piping lane unit is 4,
Four piping lane units surround a square, and the breather pipe of the two adjacent piping lane units connects with a blow vent
Connect.
8. piping lane under sponge urban land according to claim 6, it is characterised in that the quantity of the piping lane unit is 4,
Four piping lane units surround a square, and the breather pipe of the two adjacent piping lane units connects with a connecting hole
Connect, two connecting holes being arranged in a mutually vertical manner communicate with the blow vent.
9. a kind of construction method, it is characterised in that for the sponge city as described in any one of above-mentioned claim 1 to 8
Underground pipe gallery is constructed, and methods described comprises the following steps:
Multiple piping lane units are carried out being sequentially connected assembling to obtain underground pipe gallery;
After carrying out smooth processing to ground, natural soft-clay bed course is laid, the underground pipe gallery is placed on the natural soft-clay bed course
Upper surface;
On the natural soft-clay bed course, a fluffy soil layer is laid to the underground pipe gallery, the fluffy soil layer is at least above every
The mozzle of individual piping lane unit;
After the fluffy soil layer is laid, continue to pour mixed mud layer on the fluffy soil layer, wherein the mixed mud
The upper surface of layer is not higher than the blow vent being connected with the breather pipe of each piping lane unit;
Sealing compound is sprayed, completes laying operation.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710936383.7A CN107542151A (en) | 2017-10-10 | 2017-10-10 | Piping lane and its construction method under sponge urban land |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710936383.7A CN107542151A (en) | 2017-10-10 | 2017-10-10 | Piping lane and its construction method under sponge urban land |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107542151A true CN107542151A (en) | 2018-01-05 |
Family
ID=60966986
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710936383.7A Pending CN107542151A (en) | 2017-10-10 | 2017-10-10 | Piping lane and its construction method under sponge urban land |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107542151A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111155623A (en) * | 2019-12-10 | 2020-05-15 | 宣城市政建设集团有限公司 | Construction and installation method for outdoor square stainless steel and plastic finished product combined drainage ditch |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105484340A (en) * | 2016-01-18 | 2016-04-13 | 济南黄河路桥工程公司 | Rainstorm overflow well with rainwater seepage function |
CN105714911A (en) * | 2016-02-03 | 2016-06-29 | 济南轨道交通集团有限公司 | Low-influence region rainwater treatment and utilization system and region rainwater treatment method |
CN106638886A (en) * | 2016-12-22 | 2017-05-10 | 盐城工学院 | Sponge city rainwater treatment system |
-
2017
- 2017-10-10 CN CN201710936383.7A patent/CN107542151A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105484340A (en) * | 2016-01-18 | 2016-04-13 | 济南黄河路桥工程公司 | Rainstorm overflow well with rainwater seepage function |
CN105714911A (en) * | 2016-02-03 | 2016-06-29 | 济南轨道交通集团有限公司 | Low-influence region rainwater treatment and utilization system and region rainwater treatment method |
CN106638886A (en) * | 2016-12-22 | 2017-05-10 | 盐城工学院 | Sponge city rainwater treatment system |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111155623A (en) * | 2019-12-10 | 2020-05-15 | 宣城市政建设集团有限公司 | Construction and installation method for outdoor square stainless steel and plastic finished product combined drainage ditch |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103739167B (en) | Rain and sewage dual-purpose landscape type ecological purification system | |
US9596812B2 (en) | Multi-filtration auto-drainage/irrigation pipe and planting device | |
CN103088896B (en) | Ecological road shock resistance rainwater utilization system | |
CN209212297U (en) | A kind of guarded drainage and decompression system for rich water section tunnel | |
CN205688460U (en) | Pipe gallery system with sponge city function | |
CN106400926B (en) | Infiltration drainage ditch system and its construction method for large area sunk type greenery patches | |
CN203938558U (en) | Rain, dirty dual-purpose landscape type ecological purification system | |
CN107542151A (en) | Piping lane and its construction method under sponge urban land | |
CN206971036U (en) | Lawn watering system for sponge city | |
CN204023475U (en) | For the building operations cleaning dust remover of Sloping field in mountain area | |
CN206368389U (en) | One kind backwash and sewage sucking system | |
CN205296347U (en) | Arrangement structure that utility tunnel internal drain pipe said | |
CN208266612U (en) | A kind of town road structure | |
CN208009528U (en) | A kind of building Rainwater collection system | |
CN108781577B (en) | Nano capillary-concealed pipe combined soil salt elimination method | |
CN206396789U (en) | A kind of comprehensive pipe gallery structure for being easy to sewage collecting to discharge | |
CN109440573A (en) | A kind of system for reclaiming rainwater suitable for road construction | |
CN206418520U (en) | A kind of comprehensive pipe gallery structure for accessing storm sewer | |
CN206233332U (en) | A kind of drought and waterlogging racing equipment based on sponge city | |
CN207362974U (en) | A kind of urban road rain water collecting system | |
CN102535579A (en) | Ecological storing system for road rainwater | |
CN208668577U (en) | A kind of sponge urban road drainage structure | |
CN207974030U (en) | A kind of sponge urban construction pervious bed rainwater collection collector | |
CN206070571U (en) | It is applied to the miniature prefabricated piping lane of sponge city river construction | |
CN206052491U (en) | Ground water permeable device based on sponge urban construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180105 |