CN107539921A - A kind of dismountable building site temporary up-down mechanism - Google Patents

A kind of dismountable building site temporary up-down mechanism Download PDF

Info

Publication number
CN107539921A
CN107539921A CN201710728176.2A CN201710728176A CN107539921A CN 107539921 A CN107539921 A CN 107539921A CN 201710728176 A CN201710728176 A CN 201710728176A CN 107539921 A CN107539921 A CN 107539921A
Authority
CN
China
Prior art keywords
chassis
track elements
lifting platform
building site
down mechanism
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201710728176.2A
Other languages
Chinese (zh)
Inventor
王志国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Sen Yu Hong Green Engineering Co Ltd
Original Assignee
Chengdu Sen Yu Hong Green Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Sen Yu Hong Green Engineering Co Ltd filed Critical Chengdu Sen Yu Hong Green Engineering Co Ltd
Priority to CN201710728176.2A priority Critical patent/CN107539921A/en
Publication of CN107539921A publication Critical patent/CN107539921A/en
Withdrawn legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a kind of dismountable building site temporary up-down mechanism, including chassis and the apparatus for automatically lifting being vertically arranged on chassis, the apparatus for automatically lifting includes two symmetrical cylindrical rails and lifting platform being vertically arranged on chassis, and the lifting platform both sides are equipped with the linear bearing being socketed in the cylindrical rails of corresponding side;Two combined orbits being vertically arranged on chassis are symmetrically arranged with the outside of two cylindrical rails;Any linear bearing is stretching out away from lifting platform side and is provided with chain fixture in end, is provided with motor at the top of combined orbit, and power transmission shaft one end of the motor is provided with fluted disc, the fluted disc by provided with chain and chain fixture drive connection.Present invention floor space simple in construction is smaller, and the lift work of different height can be realized by combined orbit, chain is synchronously pulled by both sides motor so as to drive lifting platform at the uniform velocity to lift, more stable and safety.

Description

A kind of dismountable building site temporary up-down mechanism
Technical field
The present invention relates to construction equipment field, in particular to a kind of dismountable building site temporary up-down mechanism.
Background technology
When modern architecture is constructed, it can usually use and arrive tower wagon or lowering or hoisting gear, staff or material transportation are arrived Higher position, so as to save manpower.Such as need to use tower wagon progress work high above the ground when setting up cable in building site, or it is right Some interior of building top surfaces spray emulsion paint, or need to use in tower wagon progress reinforcing bar when bridge construction processes box beam Stress test, therefore be frequently necessary to use with certain altitude and moveable equipment on building site.
But the tower wagon constant height usually used in the prior art cannot be adjusted, cause its usage scenario less, fit Answering property is poor.And the liftable mobile platform of in general mostly uses hydraulic shear cutter frame structure.Described hydraulic shear cutter frame structure Although the regulation of certain altitude can be carried out, it is easily swung because of its architectural characteristic in rise, and height is higher Amplitude of fluctuation is bigger, once later maintenance maintenance effect is poor, can also there is certain potential safety hazard;And use hydraulic pressure scissors When frame structure is lifted, the thrust of hydraulic jack is not steady state value, and hydraulic jack load is larger when first section raises, once lifting When article on platform is heavier, certain damage can be caused to hydraulic jack.
The content of the invention
For above-mentioned unstable in the prior art and lifting load it is larger the problem of, the present invention provide one kind is dragged by motor The mode draged provides dismountable building site temporary up-down mechanism of the lifting process of stable safety.
The present invention is achieved through the following technical solutions:A kind of dismountable building site temporary up-down mechanism, including chassis and perpendicular The straight apparatus for automatically lifting being arranged on chassis, the chassis bottom are provided with the universal wheel on chassis easy to remove, the automatic liter Falling unit includes two symmetrical cylindrical rails and lifting platform being vertically arranged on chassis, and the lifting platform both sides are equipped with socket Linear bearing in the cylindrical rails of corresponding side, lifting platform is made along above and below cylindrical rails direction by the linear bearing of both sides Slide;Two combined orbits being vertically arranged on chassis, two combinations are symmetrically arranged with the outside of two cylindrical rails At formula track line and two cylindrical rails lines on the same line;Any linear bearing is away from the epitaxial lateral overgrowth of lifting platform one To stretch and be provided with chain fixture in end, motor is provided with the top of combined orbit, power transmission shaft one end of the motor is provided with fluted disc, The fluted disc by provided with chain and chain fixture be connected.
Combined orbit in the present invention from both sides Synchronous lifting or discharges lifting platform, and two described cylindrical rails Then ensure that lifting platform can remain that horizontality lifts.
What deserves to be explained is whole device is demountable structure, i.e., assembled by multiple parts.Such as combined type Track is connected by bolt with chassis, it is necessary to directly back out bolt when dismantling i.e. detachable.And described linear bearing It is to be bolted on lifting platform both sides.During installation, universal wheel is first arranged on tray bottom, then again by linear axis bearing sleeve It is connected in cylindrical rails, cylindrical rails and combined orbit is arranged on chassis, then by lifting platform and the linear bearing of both sides Connection, motor and fluted disc are finally installed, and chain is wound on fluted disc, and chain one end is fixed in chain fixture, pass through The motor of both sides synchronously carries out lift work.
To better implement the present invention, further, the combined orbit includes more than two sections or two sections mutually fastening A track elements, often save A track elements be i-beam structure, A track elements one end end face is provided with counterbore, other end end face It is provided with the latch coordinated with counterbore;The side wall of two adjacent sections A track elements, which is provided with, is used for the company that docking two saves A track elements The adjacent A track elements of two sections are fixedly connected by fishplate bar, the connecting plate by bolt.Combined orbit is carried out now thin Change, can be combined by more piece A track elements, finally motor is fixed on the A track elements of the top.Two adjacent sections A Track element is coordinated so as to play spacing effect by A latches and counterbore gap, then passes through the symmetrically arranged connection in both sides Two adjacent sections A track elements are fixedly connected by plate.
Further, the cylindrical rails include the B track elements more than two sections or two sections being mutually socketed, the B tracks Unit one end end face is provided with cylindrical recesses, and the other end is provided with the inner tube coordinated with cylindrical recesses.The chassis is provided with two The cushion cap coordinated with inner tube.Two adjacent sections B track elements by will inner tube insert cylindrical recesses in carry out it is spacing, so as to The quantity of A track elements is adjusted, and the top of final combined orbit and cylindrical rails is in same level.
Further, the often section A track elements are additionally provided with two or more on provided with the side end face of counterbore one Screw, the motor bottom are provided with fixed plate, and the fixed plate is provided with A through holes corresponding with screw, and fixed plate passes through bolt It is fixed on the top of combined orbit;Two B through holes passed through for chain are additionally provided with fixed plate;The lateral cylindrical rail of fixed plate one Road extends to form protuberance, and the protuberance bottom is provided with the projection coordinated with cylindrical recesses, and the B of topmost is inserted by projection Whole cylindrical rails are fixed on chassis by track element.The fixed plate is bolted on the A track elements of topmost On the end face of top, and described protuberance thickness is identical with fixed plate, and parallel with fixed plate, that is, will circle by fixed plate The upper end of post track is fixed, and cylindrical rails lower end is fixed on chassis.In actual use, can be individually by two B rails The cushion cap that road unit is placed on bottommost and chassis, which coordinates, to be fixed, and the heavy platform can be socketed on the outside of inner tube, and by holding Platform upper shed edge contacts with B track elements provides support force.Then one B track elements are installed successively successively, eventually form circle Post track, and the cylindrical recesses progress for passing through the B track elements of the projection insertion top of fixed disk bottom is spacing, and fixed disk Lower surface contacts the lower pressure of offer with the B track elements of top.More piece B track elements are clamped by shape by fixed disk and cushion cap The cylindrical rails that Cheng Yigen is smoothly connected.
Further, the chain fixture is arranged on combined orbit in the groove of lifting platform side, and another Counterweight module is provided with the groove of side, the counterweight module top is connected with chain.Because combined orbit is a kind of I-steel knot Structure, the i.e. groove in the presence of two identical sizes, and described counterweight module can slide up and down in corresponding groove, to molality Block has the counter weight groups of multiple interconnections into whole counterweight module deadweight being adjusted according to the actual requirements, so as to adapt to difference Load.
Further, the tray bottom is provided with dovetail groove close to corner location, and each dovetail groove is combined with one and stretched Connecting rod, the universal wheel are arranged on shrinking connecting-rod outboard end.All shrinking connecting-rod physical dimensions are identical, shrinking connecting-rod and bottom Disk linkage section is provided with L-type angle iron connecting piece, and the upper horizontal surface of the L-type angle iron connecting piece is provided with the bar coordinated with dovetail groove Shape projection, and the vertical plane of L-type angle iron connecting piece is provided with D through holes, and L-type angle iron connecting piece is fixed on into chassis by bolt On.When in use, the length of adjustable and retractable connecting rod, so as to provide preferable support effect to whole chassis.
Further, the universal wheel includes the ear mount being flexibly connected with shrinking connecting-rod and the roller being arranged in ear mount, On the wheel hub of the roller two or more C through holes are provided with around central angles such as axle center;Side is provided with and led to C in ear mount The C latches that hole coordinates.The C latches are used for locking universal wheel, after whole device is moved to specified location, will pass through C latches All universal wheel activities are limited, to provide preferable stability, prevent its movement.
Further, the chassis, combined orbit and lifting platform surface are equipped with corrosion-inhibiting coating.
The present invention compared with prior art, has advantages below and beneficial effect:
Present invention floor space simple in construction is smaller, can realize the lift work of different height by combined orbit, and institute The cylindrical tracks stated can be adjusted according to combined orbit, and so as to reach identical combined effect, but and can is protected all the time Hold that its surface is smooth, smooth lifting process is provided to linear bearing;And chain is synchronously pulled by both sides motor so as to band Dynamic lifting platform at the uniform velocity lifts, more stable and safety, and being supported in lifting process for motor changes less so that motor energy Enough long-time Effec-tive Functions.
Brief description of the drawings
The detailed description made by reading with reference to the following drawings to non-limiting example, other features of the invention, Objects and advantages will become apparent:
Fig. 1 is the positive structure schematic of the present invention;
Fig. 2 is the side structure schematic diagram of the present invention;
Fig. 3 is the sectional perspective structural representation of the apparatus for automatically lifting of the present invention;
Fig. 4 is Fig. 3 of present invention partial enlarged drawing;
Fig. 5 is the structural representation of the shrinking connecting-rod of the present invention;
Fig. 6 is the structural representation of the B track elements of the present invention.
Wherein:1-chassis, 2-universal wheel, 201-ear mount, 202-roller, 3-cylindrical rails, 301-B track lists Member, 302-cylindrical recesses, 4-lifting platform, 5-linear bearing, 6-combined orbit, 601-A track elements, 602-heavy Hole, 603-A latches, 604-connecting plate, 605-screw, 7-chain fixture, 8-motor, 9-fluted disc, 10-chain, 11- Fixed plate, 12-A through holes, 13-B through holes, 14-counterweight module, 15-dovetail groove, 16-shrinking connecting-rod, 17-cushion cap.
Embodiment
Embodiments of the invention are described below in detail, the example of the embodiment is shown in the drawings, wherein from beginning to end Same or similar label represents same or similar element or the element with same or like function.Below with reference to attached The embodiment of figure description is exemplary, is only used for explaining the present invention, and is not considered as limiting the invention.
In the description of the invention, it is necessary to illustrate, unless otherwise clearly defined and limited, term " installation ", " phase Even ", " connection " should be interpreted broadly, for example, it may be being fixedly connected or being detachably connected, or be integrally connected;Can To be mechanical connection or electrical connection;Can also be joined directly together or be indirectly connected by intermediary, can To be the connection of two element internals.For the ordinary skill in the art, above-mentioned term can be understood with concrete condition Concrete meaning in the present invention.
Embodiment 1:
A kind of dismountable building site temporary up-down mechanism of the present embodiment, as shown in Figure 1, Figure 2, shown in Fig. 3, Fig. 4, Fig. 5 and Fig. 6, is wrapped Include chassis 1 and be vertically arranged in the One On The Chassis apparatus for automatically lifting, the bottom of chassis 1 is provided with the universal of chassis 1 easy to remove Wheel 2, it is characterised in that:The apparatus for automatically lifting is symmetrically vertically arranged in the One On The Chassis cylindrical rails 3 and lifting including two Platform 4, the both sides of lifting platform 4 are equipped with the linear bearing 5 being socketed in the cylindrical rails 3 of corresponding side, pass through the straight of both sides Bobbin, which holds 5, makes lifting platform 4 be slided up and down along the direction of cylindrical rails 3;Two outsides of cylindrical rails 3 are symmetrically arranged with two and set vertically Put and be in the One On The Chassis combined orbit 6, two lines of combined orbit 6 and two lines of cylindrical rails 3 with always On line;Any linear bearing 5 is stretching out away from the side of lifting platform 4 and is being provided with the fixture 7 of chain 10 in end, in combined rail The top of road 6 is provided with motor 8, and power transmission shaft one end of the motor 8 is provided with fluted disc 9, the fluted disc 9 by provided with chain 10 and chain The fixture 7 of bar 10 is connected.Combined orbit 6 in the present invention from both sides Synchronous lifting or discharges lifting platform 4, and described Two cylindrical rails 3 then ensure that lifting platform 4 can remain that horizontality lifts.
The principle of the present embodiment is:Whole device is demountable structure, i.e., is assembled by multiple parts.Such as group Box-like track 6 is connected by bolt with chassis 1, it is necessary to directly back out bolt when dismantling i.e. detachable.And described straight line Bearing 5 is also to be bolted on the both sides of lifting platform 4.During installation, universal wheel 2 is first arranged on the bottom of chassis 1, then again will Linear bearing 5 is socketed in cylindrical rails 3, and cylindrical rails 3 and combined orbit 6 are arranged on chassis 1, then by lifting platform 4 It is connected with the linear bearing 5 of both sides, motor 8 and fluted disc 9 is finally installed, and chain 10 is wound on fluted disc 9, and by chain 10 1 End is fixed in the fixture 7 of chain 10, and lift work is carried out by the way that the motor 8 of both sides is synchronous.
Embodiment 2:
The present embodiment is on the basis of above-described embodiment 1, is further limited, and the combined orbit 6 includes two sections or two The more than section A track elements 601 that mutually fasten, it is i-beam structure often to save A track elements 601, one end end of A track elements 601 Face is provided with counterbore 602, and other end end face is provided with the A latches 603 coordinated with counterbore 602;Two adjacent sections A track elements 601 Side wall be provided with and be used for the connecting plate 604 that docking two saves A track elements 601, the connecting plate 604 saves phases by bolt by two Adjacent A track elements 601 are fixedly connected.
The principle of the present embodiment is:It can be combined, be finally fixed on motor 8 most upper by more piece A track elements 601 On the A track elements 601 at end.Two adjacent sections A track elements 601 are coordinated so as to play by A latches 603 with the gap of counterbore 602 Spacing effect, then two adjacent sections A track elements 601 are fixedly connected by the symmetrically arranged connecting plate 604 in both sides.This reality It is same as the previously described embodiments to apply the other parts of example, repeats no more.
Embodiment 3:
The present embodiment is on the basis of above-described embodiment 2, is further limited, and the cylindrical rails 3 include two sections or two sections The B track elements 301 being mutually socketed above, one end end face of B track elements 301 are provided with cylindrical recesses 302, and the other end is set There is the inner tube 303 coordinated with cylindrical recesses 302.The chassis 1 is provided with two cushion caps 17 coordinated with inner tube 303.Adjacent two Section B track elements 301 by inner tube 303 is inserted in cylindrical recesses 302 carry out it is spacing, so as to A track elements 601 Quantity is adjusted, and final combined orbit 6 and the top of cylindrical rails 3 are in same level.The present embodiment its His part is same as the previously described embodiments, repeats no more.
Embodiment 4:
The present embodiment is on the basis of above-described embodiment 3, is further limited, and the A track elements 601 that often save are provided with heavy Two or more screws 605 are additionally provided with the side end face of hole 602 1, the bottom of motor 8 is provided with fixed plate 11, described solid Fixed board 11 is provided with A through holes 12 corresponding with screw 605, and fixed plate 11 is bolted on the top of combined orbit 6;Gu Two B through holes 13 passed through for chain 10 are additionally provided with fixed board 11;The lateral extension of cylindrical rails 3 of fixed plate 11 1 forms protrusion Portion, the protuberance bottom are provided with the projection coordinated with cylindrical recesses 302, and the B track elements 301 of topmost are inserted by projection Whole cylindrical rails 3 are fixed on chassis 1.
The present invention principle be:The fixed plate 11 is bolted on the top end face of A track elements 601 of topmost On, and described protuberance thickness is identical with fixed plate 11, and parallel with fixed plate 11, that is, by fixed plate 11 by cylinder The upper end of track 3 is fixed, and the lower end of cylindrical rails 3 is fixed on chassis 1.In actual use, can be individually by two B rails Road unit 301 is placed on bottommost and the One On The Chassis cushion cap 17 coordinates fixation, and the heavy platform can be socketed in the outside of inner tube 303, And contacted by the upper shed edge of cushion cap 17 with B track elements 301 and support force is provided.Then one B track lists are installed successively successively Member 301, eventually form cylindrical rails 3, and the column of the B track elements 301 for the projection insertion top for passing through fixed disk bottom Groove 302 carries out spacing, and fixed disk lower surface contacts the lower pressure of offer with the B track elements 301 of top.Pass through fixed disk More piece B track elements 301 are clamped to form the cylindrical rails being smoothly connected 3 with cushion cap 17.The other parts of the present embodiment It is same as the previously described embodiments, repeat no more.
Embodiment 5:
The present embodiment is on the basis of above-described embodiment 4, is further limited, and the fixture 7 of chain 10 is arranged on combined type Track 6 is provided with counterweight module 14 in the groove of the side of lifting platform 4 in opposite side groove, and the counterweight module 14 is pushed up Portion is connected with chain 10.Because combined orbit 6 is a kind of i-beam structure, i.e. the groove in the presence of two identical sizes, and institute The counterweight module 14 stated can slide up and down in corresponding groove, and counterweight module 14 has the counter weight group of multiple interconnections Into can adjust whole counterweight module 14 according to the actual requirements and conduct oneself with dignity, so as to adapt to different load.
Embodiment 6:
The present embodiment is on the basis of above-described embodiment 5, is further limited, and the bottom of chassis 1 is set close to corner location There is dovetail groove 15, each dovetail groove 15 is combined with a shrinking connecting-rod 16, and the universal wheel 2 is arranged on the outboard end of shrinking connecting-rod 16 Portion.All physical dimensions of shrinking connecting-rod 16 are identical, and shrinking connecting-rod 16 is provided with L-type angle iron connecting piece with the linkage section of chassis 1, described The upper horizontal surface of L-type angle iron connecting piece is provided with the bar shaped projection coordinated with dovetail groove 15, and L-type angle iron connecting piece is vertical Face is provided with D through holes, and L-type angle iron connecting piece is fixed on chassis 1 by bolt.When in use, adjustable and retractable connecting rod 16 Length, so as to whole chassis 1 provide preferable support effect.The other parts of the present embodiment are same as the previously described embodiments, Repeat no more.
Embodiment 7:
The present embodiment is on the basis of above-described embodiment 6, is further limited, and the universal wheel 2 includes and shrinking connecting-rod 16 The ear mount 201 of flexible connection and the roller 202 being arranged in ear mount 201, around central angles such as axle center on the wheel hub of the roller 202 Provided with two or more C through holes;Side is provided with the C latches coordinated with C through holes in ear mount 201.The C latches are used for Locking universal wheel 2, after whole device is moved to specified location, it will pass through C latches and limit all activities of universal wheel 2, to provide Preferable stability, prevent its movement.And the chassis 1, combined orbit 6 and the surface of lifting platform 4 are equipped with corrosion-inhibiting coating.This The other parts of embodiment are same as the previously described embodiments, repeat no more.
Although an embodiment of the present invention has been shown and described, it will be understood by those skilled in the art that:Not A variety of change, modification, replacement and modification can be carried out to these embodiments by departing under the principle and objective of the present invention, of the invention Scope is limited by claim and its equivalent.

Claims (8)

1. a kind of dismountable building site temporary up-down mechanism, including chassis(1)Be vertically arranged in chassis(1)On automatic lifting Device, the chassis(1)Bottom is provided with chassis easy to remove(1)Universal wheel(2), it is characterised in that:The automatic lifting dress Put and be symmetrically vertically arranged in chassis including two(1)On cylindrical rails(3)And lifting platform(4), the lifting platform(4)Both sides are equal Provided with the cylindrical rails for being socketed in corresponding side(3)On linear bearing(5), pass through the linear bearing of both sides(5)Make lifting platform (4)Along cylindrical rails(3)Direction slides up and down;Two cylindrical rails(3)Outside is symmetrically arranged with two and is vertically arranged in chassis (1)On combined orbit(6), two combined orbits(6)Line and two cylindrical rails(3)Line is in always On line;Any linear bearing(5)Away from lifting platform(4)Side stretches out and is provided with chain fixture in end(7), combining Formula track(6)Top is provided with motor(8), the motor(8)Power transmission shaft one end be provided with fluted disc(9), the fluted disc(9)By setting Some chains(10)With chain fixture(7)Drive connection.
A kind of 2. dismountable building site temporary up-down mechanism according to claim 1, it is characterised in that:The combined rail Road(6)Including the A track elements more than two sections or two sections mutually fastened(601), often save A track elements(601)For I-steel knot Structure, A track elements(601)One end end face is provided with counterbore(602), other end end face is provided with and counterbore(602)The A of cooperation is inserted Pin(603);Two adjacent sections A track elements(601)Side wall be provided be used for docking two save A track elements connecting plate(604), The connecting plate(604)Adjacent A track elements are saved by two by bolt(601)It is fixedly connected.
A kind of 3. dismountable building site temporary up-down mechanism according to claim 2, it is characterised in that:The cylindrical rails (3)Including the B track elements more than two sections or two sections being mutually socketed(301), the B track elements(301)One end is set on end face There are cylindrical recesses(302), the other end is provided with and cylindrical recesses(302)The inner tube of cooperation(303);The chassis(1)It is provided with two Individual and inner tube(303)The cushion cap of cooperation(17).
A kind of 4. dismountable building site temporary up-down mechanism according to claim 2, it is characterised in that:It is described often to save A rails Road unit(601)Provided with counterbore(602)Two or more screws are additionally provided with one side end face(605), the motor (8)Bottom is provided with fixed plate(11), the fixed plate(11)It is provided with and screw(605)Corresponding A through holes(12), fixed plate (11)It is bolted on combined orbit(6)Top;Fixed plate(11)On be additionally provided with two and supply chain(10)The B passed through Through hole(13);Fixed plate(11)One lateral cylindrical rails(3)Extension forms protuberance, and the protuberance bottom is provided with recessed with column Groove(302)The projection of cooperation, the B track elements of topmost are inserted by projection(301)By whole cylindrical rails(3)It is fixed on bottom Disk(1)On.
A kind of 5. dismountable building site temporary up-down mechanism according to claim any one of 2-4, it is characterised in that:It is described Chain fixture(7)It is arranged on combined orbit(6)Close to lifting platform(4)In the groove of side, and it is provided with opposite side groove Counterweight module(14), the counterweight module(14)Top and chain(10)Connection.
A kind of 6. dismountable building site temporary up-down mechanism according to claim any one of 2-4, it is characterised in that:It is described Chassis(1)Bottom is provided with dovetail groove close to corner location(15), each dovetail groove(15)It is combined with a shrinking connecting-rod(16), institute State universal wheel(2)It is arranged on shrinking connecting-rod(16)Outboard end.
A kind of 7. dismountable building site temporary up-down mechanism according to claim any one of 2-4, it is characterised in that:It is described Universal wheel(2)Including with shrinking connecting-rod(16)The ear mount of flexible connection(201)Be arranged on ear mount(201)Interior roller(202), The roller(202)Wheel hub on around central angles such as axle center be provided with two or more C through holes;In ear mount(201)Upper one Side is provided with the C latches coordinated with C through holes.
A kind of 8. dismountable building site temporary up-down mechanism according to claim any one of 2-4, it is characterised in that:It is described Chassis(1), combined orbit(6)And lifting platform(4)Surface is equipped with corrosion-inhibiting coating.
CN201710728176.2A 2017-08-23 2017-08-23 A kind of dismountable building site temporary up-down mechanism Withdrawn CN107539921A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710728176.2A CN107539921A (en) 2017-08-23 2017-08-23 A kind of dismountable building site temporary up-down mechanism

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710728176.2A CN107539921A (en) 2017-08-23 2017-08-23 A kind of dismountable building site temporary up-down mechanism

Publications (1)

Publication Number Publication Date
CN107539921A true CN107539921A (en) 2018-01-05

Family

ID=60958945

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710728176.2A Withdrawn CN107539921A (en) 2017-08-23 2017-08-23 A kind of dismountable building site temporary up-down mechanism

Country Status (1)

Country Link
CN (1) CN107539921A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110713140A (en) * 2019-09-25 2020-01-21 沛县宝业建筑工业化有限公司 Building materials conveyer for construction
CN112174016A (en) * 2020-08-07 2021-01-05 盐城工学院 Machine of lifting that work synchronism is high
CN112962218A (en) * 2021-02-01 2021-06-15 福建省明辉机械制造有限公司 Spunbonded composite surface layer mechanism

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110713140A (en) * 2019-09-25 2020-01-21 沛县宝业建筑工业化有限公司 Building materials conveyer for construction
CN112174016A (en) * 2020-08-07 2021-01-05 盐城工学院 Machine of lifting that work synchronism is high
CN112962218A (en) * 2021-02-01 2021-06-15 福建省明辉机械制造有限公司 Spunbonded composite surface layer mechanism
CN112962218B (en) * 2021-02-01 2022-02-25 福建省明辉机械制造有限公司 Spunbonded composite surface layer mechanism

Similar Documents

Publication Publication Date Title
CN107539921A (en) A kind of dismountable building site temporary up-down mechanism
US9834411B2 (en) Apparatus, system, and method for pipe modular lift system
US8578680B2 (en) Tower construction method and apparatus
CN110004834A (en) A kind of automatic climbing platform for hanging cable construction
CN109573851B (en) Arc-shaped roof internode steel truss hanging and installing integrated device and butt-joint hanging method
US20180044146A1 (en) Cantilevered crane system for a factory work station
CN103803422B (en) A kind of hoisting device for nuclear station and installation method thereof
CN208267346U (en) Can lateral displacement driven hanging basket
CN106121347B (en) A kind of electric force pole tower
CN209038990U (en) A kind of spliced EMU wiper upkeep operation platform
JP4067096B2 (en) Electric balance arm device for outdoor wall work
US7367461B2 (en) Movable girder mounted jib
CN212532065U (en) Gantry crane capable of being used in different height difference places
CN108100867B (en) Crane travelling mechanism carrying tool
US3908792A (en) Passenger carrying assembly
CN108680377B (en) Electric hoist energy efficiency test stand without installation
CN113955644A (en) Gantry hammock for large-scale special equipment
CN206223459U (en) Rolling stock rolling rig
CN112343320A (en) Combined working support
CN107932465A (en) Bearing placing device and bearing storing method
CN218404875U (en) Contact rail installation moving platform
CN220117694U (en) Photovoltaic construction platform
CN114803818B (en) Converter valve power module replacement device
CN210029713U (en) Overhead traveling crane hoisting support with adjustable
DE202017005815U1 (en) crane system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20180105