CN107520210A CN201710740713.5A CN201710740713A CN107520210A CN 107520210 A CN107520210 A CN 107520210A CN 201710740713 A CN201710740713 A CN 201710740713A CN 107520210 A CN107520210 A CN 107520210A
Authority
CN
China
Prior art keywords
feedback
electromagnetic force
control unit
inner chamber
scale
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710740713.5A
Other languages
Chinese (zh)
Inventor
钱国东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuxi Thick Hair Automation Equipment Co Ltd
Original Assignee
Wuxi Thick Hair Automation Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuxi Thick Hair Automation Equipment Co Ltd filed Critical Wuxi Thick Hair Automation Equipment Co Ltd
Priority to CN201710740713.5A priority Critical patent/CN107520210A/en
Publication of CN107520210A publication Critical patent/CN107520210A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B9/00Cleaning hollow articles by methods or apparatus specially adapted thereto 
    • B08B9/08Cleaning containers, e.g. tanks
    • B08B9/093Cleaning containers, e.g. tanks by the force of jets or sprays
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B9/00Cleaning hollow articles by methods or apparatus specially adapted thereto 
    • B08B9/08Cleaning containers, e.g. tanks

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Cleaning In General (AREA)

Abstract

The invention discloses a kind of large tank inner chamber incrustation scale to remove construction method, completes incrustation scale based on injection apparatus for eliminating sludge and removes work;According to the metallic conduit with scale crust for the metallic conduit of no scale crust, its absorption affinity to calutron can change, the detection of feedback of electromagnetic force value is carried out to the side side wall of band large-scale metal pipeline by EM induction system, so as to determine whether incrustation scale and then scale crust is removed by spraying the injection of spraying system on apparatus for eliminating sludge.

Description

A kind of large tank inner chamber incrustation scale removes construction method
Technical field
The present invention relates to a kind of large tank inner chamber incrustation scale to remove construction method and device.
Background technology
In the industrial production, having many equipment is cooled down with industry water, has been crossed after 1 year, and be cooled equipment Inner chamber can deposit the thick incrustation scales of one layer of 3~5mm, seriously undermine cooling performance, so the incrustation scale for removing equipment inner chamber is one Key subjects, removing the method for incrustation scale at present substantially has mechanical removal method, water under high pressure to remove method and chemical agent three kinds of method of removing, shows So, it is helpless that mechanical removal method and water under high pressure, which remove removing of the method to the remote position incrustation scale in equipment inner chamber, is only used Chemical agent removes method, but first has to convey the incrustation scale removing machine of chemical agent with chemical agent removing incrustation scale, to realize dynamic circulation Cleaning, next to that to have a kind of chemical agent and cleaning that can remove scale removal rapidly, but these two aspects is at present all without real Realize.Mainly still manually enter in large tank to enter the scale crust in large tank by way of spraying chemical reagent Row sprinkling, and the chemical reagent for being used to clean incrustation scale typically all can be very big to Health Impact.
The content of the invention
For above-mentioned technical problem, the present invention proposes that a kind of large tank inner chamber incrustation scale removes construction method, solves big Incrustation scale removes difficult and incrustation scale and removes the not high technical problem of automation degree of equipment in type tank body.
In order to realize above-mentioned technical purpose, the present invention uses following concrete technical scheme:
A kind of large tank inner chamber incrustation scale removes construction method, completes incrustation scale based on injection apparatus for eliminating sludge and removes work;
The first step, whole injection apparatus for eliminating sludge is driven into axial location in tank body to be onstructed;
Second step, starting EM induction system, pulling force sensor detects a feedback of electromagnetic force value, and by the feedback of electromagnetic force Value is sent to control unit;Feedback of electromagnetic force threshold value when being preset with Non-scale layer in a control unit, control unit will detect Feedback of electromagnetic force value compared with feedback of electromagnetic force threshold value, if feedback of electromagnetic force value is less than feedback of electromagnetic force threshold value, open Dynamic spraying system carries out scale removal work to tank inner chamber cavity wall;
3rd step, the positioner are used for the position for monitoring the whole injection apparatus for eliminating sludge of measurement in real time, determine itself and active line Error, when error exceedes permissible value, error is fed back into control unit, drive device is controlled by control unit, with adjustment The position of whole injection apparatus for eliminating sludge, is located on active line, and meet the requirement of control errors;Meanwhile the Laser Measuring Monitor the relative position relation between measurement injection target point and tank body axis in real time away from device;
4th step, the feedback of electromagnetic force value that control unit is fed back to when the pulling force sensor detection in EM induction system are equal to institute When stating feedback of electromagnetic force threshold value in control unit, then control unit control drive device sends the driving instruction of advance;
5th step, after whole device enters new position, circulation performs the step of the first step~the 4th, until injection scale removal operation complete it is whole Individual tank body;
6th step, implement prune job of the scale removal with injection liquid.
The scale removal is acidic cleaning solution with injection liquid.
The composition percentage by weight of the acid wash liquid is as follows:Hydrochloric acid 5-8 ﹪, clear water 92-95 ﹪, then stirring is equal It is even, it is heated up to 50-60 DEG C.
6th step includes injection alkaline rinse and the injection sub-steps of clear water two.
The drive device includes track and sets motor-driven carrier in orbit.
Beneficial effect:
The present invention and prior art project, have advantages below:
1st, intelligent sprayed construction is realized.Metal of the present invention according to the metallic conduit with scale crust relative to no scale crust For pipeline, its absorption affinity to calutron can change, the side side by EM induction system to band large-scale metal pipeline Wall carries out the detection of feedback of electromagnetic force value, so as to determine whether incrustation scale and then by spraying spraying system on apparatus for eliminating sludge Injection is removed to scale crust;
Secondly, the present invention position of the whole injection apparatus for eliminating sludge of monitoring measurement in real time, determines itself and work also by positioner The error of line, when error exceedes permissible value, error is fed back into control unit, drive device is controlled by control unit, to adjust The position of whole injection apparatus for eliminating sludge, is located on active line, and meet the requirement of control errors;And, pass through laser Range unit monitors the relative position relation between measurement injection target point and tank body axis in real time, and then judges spraying system Nozzle position, to adjust in real time.
2nd, efficiency high.The present invention is realized the intelligentized control method of sprayed construction, is reduced sprayed construction using monitoring feedback technique Operating personnel's quantity, improve sprayed construction efficiency.
Brief description of the drawings
Fig. 1 is that large tank inner chamber of the present invention incrustation scale removes construction method functional block diagram.
Fig. 2 is laser locating apparatus schematic diagram of the present invention.
Wherein, 1 is laser ranging system;2 be the shower nozzle of spraying system;3 be default clean tank inner surface;4 be real-time Incrustation scale layer surface in tank body.
Embodiment
Embodiment is provided below in conjunction with the accompanying drawings and the present invention is specifically described.It is necessarily pointed out that below Embodiment is served only for that the invention will be further described, it is impossible to be interpreted as limiting the scope of the invention, the field it is special Some nonessential modifications and adaptations that industry technical staff makes according to the content of the invention described above, still fall within the protection of the present invention Scope.
Incrustation scale removing constructing device in large tank inner chamber of the present invention is driven into axial location in tank body to be onstructed, Set inertial coordinate device.
As shown in figure 1, a kind of large tank inner chamber incrustation scale removes construction method, it is clear to complete incrustation scale based on injection apparatus for eliminating sludge Except work;
The first step, whole injection apparatus for eliminating sludge is driven into axial location in tank body to be onstructed;
Second step, starting EM induction system, pulling force sensor detects a feedback of electromagnetic force value, and by the feedback of electromagnetic force Value is sent to control unit;Feedback of electromagnetic force threshold value when being preset with Non-scale layer in a control unit, control unit will detect Feedback of electromagnetic force value compared with feedback of electromagnetic force threshold value, if feedback of electromagnetic force value is less than feedback of electromagnetic force threshold value, open Dynamic spraying system carries out scale removal work to tank inner chamber cavity wall;
3rd step, the positioner are used for the position for monitoring the whole injection apparatus for eliminating sludge of measurement in real time, determine itself and active line Error, when error exceedes permissible value, error is fed back into control unit, drive device is controlled by control unit, with adjustment The position of whole injection apparatus for eliminating sludge, is located on active line, and meet the requirement of control errors;Meanwhile the Laser Measuring Monitor the relative position relation between measurement injection target point and tank body axis in real time away from device;
4th step, the feedback of electromagnetic force value that control unit is fed back to when the pulling force sensor detection in EM induction system are equal to institute When stating feedback of electromagnetic force threshold value in control unit, then control unit control drive device sends the driving instruction of advance;
5th step, after whole device enters new position, circulation performs the step of the first step~the 4th, until injection scale removal operation complete it is whole Individual tank body;
6th step, implement prune job of the scale removal with injection liquid.
The scale removal is acidic cleaning solution with injection liquid.
The composition percentage by weight of the acid wash liquid is as follows:Hydrochloric acid 5-8 ﹪, clear water 92-95 ﹪, then stirring is equal It is even, it is heated up to 50-60 DEG C.
6th step includes injection alkaline rinse and the injection sub-steps of clear water two.
The drive device includes track and sets motor-driven carrier in orbit.
The invention also discloses a kind of band large-scale metal tank inner chamber water scale removing device, including:
Control unit, magnetic force induction system, spraying system, positioner, laser ranging system, liquid-supplying system and driving dress Put, wherein, the magnetic force induction system includes pulling force sensor and electromagnet, and the electromagnet is fixedly installed on whole injection In the frame of apparatus for eliminating sludge, for producing electromagnetic attraction to band large-scale metal tank body;The pulling force sensor is connected on electromagnet, Control unit is fed back to for detecting the size of the electromagnetic attraction, and by the electromagnetic attraction value detected;
Described control unit is received and worked according to the size that electromagnetic attraction is detected from pulling force sensor, control spraying system, Realize the removal to metal can inner chamber scale crust;
The positioner is used for the position for monitoring the whole injection apparatus for eliminating sludge of measurement in real time, determines its error with active line, When error exceedes permissible value, error is fed back into control unit, drive device is controlled by control unit, to adjust whole injection The position of apparatus for eliminating sludge, is located on active line, and meets the requirement of control errors;
The laser ranging system is fixed on spraying system, for monitoring in real time between measurement injection target point and tank body axis Relative position relation.

Claims (5)

1. a kind of large tank inner chamber incrustation scale removes construction method, it is characterised in that it is clear to complete incrustation scale based on injection apparatus for eliminating sludge Except work;
The first step, whole injection apparatus for eliminating sludge is driven into axial location in tank body to be onstructed;
Second step, starting EM induction system, pulling force sensor detects a feedback of electromagnetic force value, and by the feedback of electromagnetic force Value is sent to control unit;Feedback of electromagnetic force threshold value when being preset with Non-scale layer in a control unit, control unit will detect Feedback of electromagnetic force value compared with feedback of electromagnetic force threshold value, if feedback of electromagnetic force value is less than feedback of electromagnetic force threshold value, open Dynamic spraying system carries out scale removal work to tank inner chamber cavity wall;
3rd step, positioner are used for the position for monitoring the whole injection apparatus for eliminating sludge of measurement in real time, determine its mistake with active line Difference, when error exceedes permissible value, error is fed back into control unit, drive device is controlled by control unit, it is whole to adjust The position of apparatus for eliminating sludge is sprayed, is located on active line, and meet the requirement of control errors;Meanwhile laser ranging system is real When monitoring measurement injection target point and tank body axis between relative position relation;
4th step, the feedback of electromagnetic force value that control unit is fed back to when the pulling force sensor detection in EM induction system are equal to institute When stating feedback of electromagnetic force threshold value in control unit, then control unit control drive device sends the driving instruction of advance;
5th step, after whole device enters new position, circulation performs the step of the first step~the 4th, until injection scale removal operation complete it is whole Individual tank body;
6th step, implement prune job of the scale removal with injection liquid.
2. large tank inner chamber according to claim 1 incrustation scale removes construction method, it is characterised in that the scale removal spray It is acidic cleaning solution to penetrate liquid.
3. large tank inner chamber according to claim 2 incrustation scale removes construction method, it is characterised in that the acid wash liquid Composition percentage by weight it is as follows:Hydrochloric acid 5-8 ﹪, clear water 92-95 ﹪, then stir, are heated up to 50-60 DEG C.
4. large tank inner chamber according to claim 1 incrustation scale removes construction method, it is characterised in that the 6th step bag Include injection alkaline rinse and the injection sub-steps of clear water two.
5. large tank inner chamber according to claim 1 incrustation scale removes construction method, it is characterised in that the drive device Including track and motor-driven carrier in orbit is set.
CN201710740713.5A 2017-08-25 2017-08-25 A kind of large tank inner chamber incrustation scale removes construction method Pending CN107520210A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710740713.5A CN107520210A (en) 2017-08-25 2017-08-25 A kind of large tank inner chamber incrustation scale removes construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710740713.5A CN107520210A (en) 2017-08-25 2017-08-25 A kind of large tank inner chamber incrustation scale removes construction method

Publications (1)

Publication Number Publication Date
CN107520210A true CN107520210A (en) 2017-12-29

Family

ID=60682170

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710740713.5A Pending CN107520210A (en) 2017-08-25 2017-08-25 A kind of large tank inner chamber incrustation scale removes construction method

Country Status (1)

Country Link
CN (1) CN107520210A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114433580A (en) * 2020-10-20 2022-05-06 中国石油化工股份有限公司 Online oil sludge flushing device and method for storage tank bottom plate

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1048416A (en) * 1990-07-18 1991-01-09 湖北省荆门市第一化肥厂 High-efficiency hydrochloric restrainer industrialized producing technology and device thereof
EP1882914A2 (en) * 2006-07-25 2008-01-30 Sontec Sensorbau GmbH Method and assembly for determining the presence or status of a medium or a mixture
CN101398286A (en) * 2008-11-10 2009-04-01 王洋 Instrument for measuring thickness of non-ferromagnetic material and surface coating of ironwork
CN101610853A (en) * 2006-12-19 2009-12-23 喷洒***公司 Automatically jar cleans and monitoring device
CN101780656A (en) * 2009-01-08 2010-07-21 通用电气公司 Method for detecting and removing a nitride layer formed on the surface of a steel alloy
CN101974971A (en) * 2010-11-01 2011-02-16 河海大学 Full automatic wall facing concrete injection system
EP2626148A1 (en) * 2012-02-13 2013-08-14 Alfa Laval Corporate AB Monitoring of systems for internal cleaning of containers
CN104998848A (en) * 2014-09-10 2015-10-28 国家电网公司 Electrification water washing robot of rail type transformer substation
CN105170589A (en) * 2015-10-19 2015-12-23 安徽理工大学 Vertical storage tank shell cleaning equipment
CN205110292U (en) * 2015-10-10 2016-03-30 杭州博发机械设备有限公司 Portable fermentation cylinder cleaning machine of rotatory spray lance in area

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1048416A (en) * 1990-07-18 1991-01-09 湖北省荆门市第一化肥厂 High-efficiency hydrochloric restrainer industrialized producing technology and device thereof
EP1882914A2 (en) * 2006-07-25 2008-01-30 Sontec Sensorbau GmbH Method and assembly for determining the presence or status of a medium or a mixture
CN101610853A (en) * 2006-12-19 2009-12-23 喷洒***公司 Automatically jar cleans and monitoring device
CN101398286A (en) * 2008-11-10 2009-04-01 王洋 Instrument for measuring thickness of non-ferromagnetic material and surface coating of ironwork
CN101780656A (en) * 2009-01-08 2010-07-21 通用电气公司 Method for detecting and removing a nitride layer formed on the surface of a steel alloy
CN101974971A (en) * 2010-11-01 2011-02-16 河海大学 Full automatic wall facing concrete injection system
EP2626148A1 (en) * 2012-02-13 2013-08-14 Alfa Laval Corporate AB Monitoring of systems for internal cleaning of containers
CN104998848A (en) * 2014-09-10 2015-10-28 国家电网公司 Electrification water washing robot of rail type transformer substation
CN205110292U (en) * 2015-10-10 2016-03-30 杭州博发机械设备有限公司 Portable fermentation cylinder cleaning machine of rotatory spray lance in area
CN105170589A (en) * 2015-10-19 2015-12-23 安徽理工大学 Vertical storage tank shell cleaning equipment

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
丁光宇: "《铁路机车用水处理》", 31 December 1987, 中国铁道出版社 *
傅玉华: "《石油化工设备腐蚀与防治》", 30 September 1997, 机械工业出版社 *
夏纪真: "《无损检测导论》", 31 August 2016, 中山大学出版社 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114433580A (en) * 2020-10-20 2022-05-06 中国石油化工股份有限公司 Online oil sludge flushing device and method for storage tank bottom plate

Similar Documents

Publication Publication Date Title
CN103736693B (en) A kind of laser cleaning system for nuclear power station radioactive pollution decontamination
CN101430176A (en) Intelligent movable cleaning robot for condenser
CN105347400A (en) Device and method for producing high-purity nano molybdenum trioxide
CN106498136A (en) A kind of high-pressure liquid or the device of above-critical state quenching
CN107520210A (en) A kind of large tank inner chamber incrustation scale removes construction method
CN207238702U (en) A kind of band large-scale metal tank inner chamber water scale removing device based on monitoring feedback technique
CN205912345U (en) PCB board automatic processing equipment
CN203635552U (en) Laser cleaning system for removing radioactive pollution of nuclear power stations
CN105021085A (en) Online ultrasonic wave scale prevention and removing device for plate heat exchanger
CN105274549B (en) Flowacid- cleaning infusion device and acid washing method in a kind of tubing
CN207171186U (en) A kind of suspension type plasma robot removes the device of hot rolling base slag
CN206109210U (en) Fountain etching machine
CN204301593U (en) The online ultrasonic for scale prevention and removal device of a kind of plate type heat exchanger
CN206345881U (en) A kind of device of high-pressure liquid or above-critical state quenching
CN203916420U (en) A kind of acid mist purifying device
CN206430632U (en) Tubular heat exchanger cleaning device
CN204338809U (en) The automatic specking device of a kind of strand
CN208695767U (en) A kind of high-pressure cleaning system
CN106191885B (en) The processing method of vanadium production equipment surface scale
CN115762840B (en) Electrochemical decontamination device and decontamination method for pipeline
CN206689123U (en) Polished and cleaned device
CN219059131U (en) Rust removal device is used in processing of high accuracy metal product
CN106705746B (en) Multiple gun tubular heat exchanger intelligence cleaning robot
CN206082116U (en) Lithium battery formation waste gas is collected and processing apparatus
CN104109867A (en) Preparing method of stainless steel welding wire cleaning working fluid

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20171229