CN107514267A CN201710822732.2A CN201710822732A CN107514267A CN 107514267 A CN107514267 A CN 107514267A CN 201710822732 A CN201710822732 A CN 201710822732A CN 107514267 A CN107514267 A CN 107514267A
Authority
CN
China
Prior art keywords
steelframe
pull bar
reinforces
fixing end
rotation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710822732.2A
Other languages
Chinese (zh)
Inventor
张稳军
张琪
宋传辉
焦亚磊
张高乐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin University
Original Assignee
Tianjin University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin University filed Critical Tianjin University
Priority to CN201710822732.2A priority Critical patent/CN107514267A/en
Publication of CN107514267A publication Critical patent/CN107514267A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/08Lining with building materials with preformed concrete slabs
    • E21D11/083Methods or devices for joining adjacent concrete segments

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The present invention relates to a kind of shield tunnel staggered joint erection liner structure rigidity stiffening device, including being bolted and being welded to connect the steelframe (2) being fixed on section of jurisdiction (1), fixture (6) and two kinds of reinforcing pull bars, connected between the steelframe of adjacent tubes interannular by reinforcing pull bar, position difference according to steelframe is overlapped on is divided into fastening end and reinforces pull bar (3) and fixing end reinforcing pull bar (4), fastening end reinforces the corresponding both ends that pull bar (3) is overlapped on longitudinally adjacent steelframe, fastening end reinforces pull bar through the bolt hole of adjacent steelframe and is tightened fixation with nut;Fixing end reinforces the both ends of pull bar (4), one end is fastening end (13), the other end is fixing end (14), fixing end (14) is provided with rhombus head and anti-rotation tenon, it is connected with steelframe point midway (11) by fixture (6), fastening end (13) are fixed through the respective end of longitudinally adjacent section of jurisdiction steelframe.

Description

Shield tunnel staggered joint erection liner structure rigidity stiffening device
Technical field
The invention belongs to Tunnel Engineering technical field, rigidity when being related to a kind of shield tunnel lining structure staggered joint erection adds Intensity device.
Background technology
Shield tunnel is once damaged as the urban track traffic underground structure of major motor vehicle engineering in a certain part, Corresponding influence can all be produced to the overall structure life-span according to different damaged conditions.Shield tunnel lining structure is spelled by section of jurisdiction Connecing to be formed, the seam after pipe sheet assembling is divided into longitudinal seam and ring seam, and edge joint position is the weak link of liner structure stress, So pipe sheet assembling can closely strengthen the strength and stiffness of liner structure to a certain extent.The adjacent tunnel segment structure of shield tunnel is whole Body relies primarily on track bolt to maintain, and all linear deformation can occurs due to a variety of causes in construction stage and operation stage, Such as different geological conditions, different buried depth, WATER LEVEL CHANGES, different forms of construction work, Different Ground load and different peripheries The various factors such as environmental change.Supporting construction of the section of jurisdiction as shield tunnel after assembly, once there is the underground of erosion carbon dioxide Water seepage, track bolt corrode and then section of jurisdiction is produced crack or make tunnel that longitudinal differential settlement etc. occur.With splitting The gradual development section of jurisdiction splicing seams joint open of seam is excessive and leak occurs, and section of jurisdiction concrete erosion causes section of jurisdiction self-strength to subtract Small, track bolt corrosion causes joint impermeability decrease etc., and then influences the usability and security of shield tunnel.
Shield tunnel largely all starts to use staggered joint erection liner structure at present, using the shield tunnel of staggered joint erection section of jurisdiction Road provides extensively development platform in the superiority of deformation, waterproof control aspect.The feelings that adjacent two interannulars longitudinal joint mutually staggers Condition is referred to as staggered joint erection, and the erection method of staggered joint erection can be uniformly distributed annulus seam rigidity, to reduce the deformation of structure. Compared with staggered joint erection is vertical, circumferential weld intersection is in the T-shaped cross with through seam assembling is vertical, circumferential weld is intersecting, the plane of weakness of seam Reduce, deformation it is smaller be advantageous to preventing water leakage, if while occur leak phenomenon it is also more disposable.Shield tunnel lining structure seam Place's rigidity relies primarily on track bolt to maintain, and being concentrated mainly on different loads for lining cutting pipe ring seam crossing rigidity both at home and abroad makees With, different high-strength bolt pretensions, different bolt radicals, varying strength bolt, different joint forms etc. studied, And for actively increasing the mode of internal force and then enhancing between adjacent section of jurisdiction after the completion of pipe sheet assembling simultaneously under staggered joint erection mode Liner structure rigidity, the deformation this respect research of reduction liner structure are less.
The content of the invention
It is an object of the invention to provide a kind of rigidity and its globality for strengthening liner structure, ensures that tunnel-liner does not invade The shield tunnel staggered joint erection liner structure rigidity stiffening device of tunnel structure building line, technical scheme are as follows:
A kind of shield tunnel staggered joint erection liner structure rigidity stiffening device, the shield tunnel fissure of displacement strengthened for active are spelled The rigidity pretended between adjacent pipe ring, including it is bolted and is welded to connect the steelframe 2 being fixed on section of jurisdiction 1, fixture 6 and two Kind reinforcing pull bar, wherein,
Connected between the steelframe of adjacent tubes interannular by reinforcing pull bar, it is equal in the point midway of every steelframe and both ends Bolt hole is offered, being divided into fastening end according to the position difference for being overlapped on steelframe reinforces pull bar 3 and fixing end reinforcing pull bar 4, tightly Fixed end reinforces the corresponding both ends that pull bar 3 is overlapped on longitudinally adjacent steelframe, and fastening end reinforces the spiral shell that pull bar passes through adjacent steelframe Keyhole is simultaneously tightened fixation with nut;Fixing end reinforces the both ends of pull bar 4, and one end is fastening end 13, and the other end is fixing end 14, fixing end 14 is provided with rhombus head and anti-rotation tenon, is connected with steelframe point midway 11 by fixture 6, fastening end 13 is worn Cross the bolt hole of the respective end of longitudinally adjacent section of jurisdiction steelframe and tightened fixation with nut;
Described fixture 6 includes rotation end stand 8 and the standing screw 9 being connected with each other with circular shear connector, rotates end stand 8 It can be rotated freely around the axle of standing screw 9, rotation end stand 8 is provided with reinforces in the fixing end 14 of pull bar 4 to interspersed fixing end Between hole, the anti-rotation tongue-and-groove for preventing fixing end from reinforcing pull bar rotation is provided with interstitial hole, fixing end reinforced pull bar by standing screw 9 Fixing end be fixed on rotation end stand at.
The present invention has advantages below:
1. the present apparatus can actively increase the reinforcing of shield tunnel fissure of displacement splicing tubes interannular internal force, effectively reduce due to various factors The changing of the relative positions between caused pipe ring so that annulus seam Stiffness Distribution is uniform, reduces the deformation of structure, be shield tunnel in severe class The globality of type area construction reinforced pipe ring structure provides method and measure;
2. staggered joint erection is vertical, circumferential weld intersection compared with the cross under through seam assembling is vertical, circumferential weld is intersecting, connects in T-shaped The plane of weakness of seam, which is reduced, deformation is smaller is advantageous to preventing water leakage, if while occur leak phenomenon it is also more disposable.
3. in the present apparatus, number of parts is few, compact-sized, it can relatively easily reach sufficiently large loading tensile, be Shield tunnel construction process and later stage use add safety guarantee;
4. the present apparatus is in terms of construction, install convenient is simple to operate, convenient disassembly;
5. unloading can realize stepless unloading initial stage, avoid and destroyed because of Condition of Sudden Unloading caused by liner structure;
6. because the research both at home and abroad for internal force active loading problem between adjacent section of jurisdiction is less, the present invention can be later should The research in field provides reference.
Brief description of the drawings
Fig. 1 is bicyclic overall stiffening device and part section of jurisdiction combination diagram
Fig. 2 is the bicyclic overall schematic of the present invention
Fig. 3 is bicyclic overall stiffening device schematic diagram
Fig. 4 is the multicyclic moeity section of jurisdiction schematic diagram of the present invention
Fig. 5 is fastening end partial sectional view
Fig. 6 is to maintain part partial sectional view
Fig. 7 is fixing end partial sectional view
Fig. 8 is fixture partial sectional view
Fig. 9 is fixing end cooperation figure
Figure 10 is steelframe schematic diagram
Figure 11 is that fastening end reinforces pull bar schematic diagram
Figure 12 is that fixing end reinforces pull bar schematic diagram
Include in Fig. 1~12:
1- sections of jurisdiction
2- steelframes
3- fastening ends reinforce pull bar
4- fixing ends reinforce pull bar
5- fasteners
6- fixtures
7- maintains part
8- rotates end stand
9- standing screws
10th, the lateral bolt hole of 12- steelframes
11- steelframe centre bolts hole
13- fastening ends
14- fixing ends
Embodiment
The present invention is described in detail with specific embodiment below in conjunction with the accompanying drawings.The present embodiment is with technical solution of the present invention Premised on implemented, give detailed embodiment and specific operating process, but protection scope of the present invention is not limited to Following embodiments.
In conjunction with above-mentioned each accompanying drawing, the case study on implementation of proposition shield tunnel staggered joint erection liner structure rigidity stiffening device.
As shown in figure 1, shield tunnel staggered joint erection liner structure rigidity stiffening device of the present invention, including steelframe 2, fastening end Reinforce pull bar 3, fixing end reinforcing pull bar 4, fastener 5, fixture 6, maintenance part 7.
Fig. 2 is the bicyclic overall schematic of the present invention, and the part for only rounding body stiffening device is i.e. as shown in Figure 3.This hair of Fig. 4 Selected by bright multicyclic moeity section of jurisdiction schematic diagram, polycyclic liner structure rigidity stiffening device and bicyclic liner structure rigidity stiffening device Device is identical, and simply arrangement mode is different.The connected mode of bicyclic liner structure rigidity stiffening device, which is that holes is corresponding, to be overlapped, such as Shown in Fig. 2, Fig. 3.Polycyclic liner structure rigidity stiffening device is cross-linked, and has not only been saved material but also has been reached the mesh of raising rigidity 's.
Fig. 5 is fastening end partial sectional view, after fastening end reinforcing pull bar is each passed through the bolt hole of adjacent steelframe end, then It is separately fixed at the hex nut being engaged with fastening end reinforcing pull bar end thread on the outside of two steelframes.
Fig. 6 is to maintain part partial sectional view, maintains the square nut above part to reinforce pull bar with fixing end and is connected, lower section Square nut be fixed on through on the double threaded screw in steelframe terminal stud hole.The screw thread of top square nut is reinforced with fixing end The screw thread of tie rod end 13 matches, and additional part is fixed with hex nut.
Fig. 7, Fig. 8 are fixing end partial sectional view and fixture partial sectional view respectively, and fixture 6 includes standing screw 9th, the two parts of end stand 8 are rotated.Standing screw 9 is through the reserved bolt hole in steelframe center and is deep into section of jurisdiction, the rotation of top End stand 8 is deep into sub-fraction in standing screw 9, the main function of standing screw 9 be by the hole for hoist on section of jurisdiction by steelframe and Rotation end stand is fixed on section of jurisdiction.When splicing liner structure rigidity stiffening device using the shield tunnel fissure of displacement of the present invention, first, After the completion for the treatment of shield tail pipe sheet assembling, take a ring steelframe 2 to be directed at the bolt hole 11 at its center with the hole for hoist of section of jurisdiction and use spanner Block at the hexagonal (hexagon)nut of standing screw 9, and screwed in tunnel segment hanging hole.Aforesaid operations are repeated, standing screw 9 are screwed in adjacent Tunnel segment hanging hole.The fastening end for being placed on two adjacent steelframe both ends is reinforced for pull bar 3, by fastening end reinforce pull bar 3 according to It is secondary to penetrate in the bolt hole 10 or 12 of adjacent steelframe side, and fixed with hex nut.To being placed on steelframe center Reinforced with the fixing end of adjacent steelframe both sides for pull bar 4, after double threaded screw first is penetrated into steelframe terminal stud hole, in steelframe two Side is fixed with hex nut, then maintains part close to the section of jurisdiction side installation of needs connection in double threaded screw, will be maintained under part The shallower bolt hole alignment double threaded screw of half part and fixation.Then installation, which is provided with, reinforces consolidating for pull bar rhombus head and anti-rotation tenon After fixed end reinforces pull bar 4, the other end 13 of fixing end reinforcing pull bar is aligned to the bolt hole for maintaining part, it is used hexagonal after penetrating Nut, which is fixed, to be tightened.
Fig. 9 show fixing end cooperation figure, and the rotation portion size of end stand 8 is 80mm × 80mm × 80mm, middle bore dia For 60mm.In order to allow fixing end to reinforce pull bar 4 smoothly through rotation end stand 8, rotate and leaned between end stand 8 and standing screw 9 " shear connector " formula joint connects, and rotation end stand 8 can rotate freely around the central shaft of standing screw 9.Reinforced in order that obtaining fixing end Pull bar 4 can pass through rotation end stand 8 and be connected with adjacent section of jurisdiction, therefore be preferably such that rotation end stand hole face and steelframe Side is parallel, and rotation end stand upper surface is contour with maintaining part upper surface.In addition it is to prevent fixing end reinforces pull bar 4 below from penetrating rotation The internal rotation of end stand 8 is being rotated after turning end stand 8, so being provided with anti-rotation tongue-and-groove on the rotation perforation of end stand 8 both sides.
Figure 10 is steelframe schematic diagram, and the cross section of steelframe is rectangle, the arc surface contacted with section of jurisdiction and section of jurisdiction concentric.Steel Frame is connected with section of jurisdiction by standing screw 9 through the bolt hole 11 at steelframe center and the hole for hoist of section of jurisdiction.Steelframe Both ends are designed with bolt hole, and one end is directly to reinforce pull bar with fastening end to be connected;The other end then needs access double threaded screw to be used in combination Two hex nuts are separately fixed at steelframe both sides, then again with maintaining part to be connected, finally access fixing end and reinforce pull bar.
Reinforce pull bar and be divided into two kinds, one of which fastening end as shown in figure 11 reinforces pull bar 3, i.e. a smooth round bar two End is designed with the screw thread to match with hex nut, and fastening end reinforcing pull bar 3 is passed through into steel by the effect of tightening of hex nut The both sides of steelframe are fixed on after the bolt hole of frame end again, have the function that to strengthen adjacent section of jurisdiction rigidity.
Another type for reinforcing pull bar is that fixing end as shown in figure 12 reinforces pull bar 4, and it includes the He of fixing end 14 Fastening end 13, fixing end reinforce pull bar 4 and are provided with reinforcing pull bar rhombus head and anti-rotation tenon, and tenon formula is together constituted with fixing end 14 Structure, middle major part is smooth round bar, and the other end has fixing end leading screw to be engaged with hex nut.

Claims (1)

1. a kind of shield tunnel staggered joint erection liner structure rigidity stiffening device, the shield tunnel staggered joint erection strengthened for active The rigidity of adjacent tubes interannular, including it is bolted and is welded to connect the steelframe (2) being fixed on section of jurisdiction (1), fixture (6) With two kinds of reinforcing pull bars, wherein,
Connected by reinforcing pull bar between the steelframe of adjacent tubes interannular, opened up in the point midway of every steelframe and both ends There is bolt hole, being divided into fastening end according to the position difference for being overlapped on steelframe reinforces pull bar (3) and fixing end reinforcing pull bar (4), tightly Fixed end reinforces the corresponding both ends that pull bar (3) is overlapped on longitudinally adjacent steelframe, and fastening end reinforces pull bar through adjacent steelframe Bolt hole is simultaneously tightened fixation with nut;Fixing end reinforces the both ends of pull bar (4), and one end is fastening end (13), and the other end is Fixing end (14), fixing end (14) are provided with rhombus head and anti-rotation tenon, are connected with steelframe point midway (11) by fixture (6) Connect, fastening end (13) pass through the bolt hole of the respective end of longitudinally adjacent section of jurisdiction steelframe and tightened fixation with nut.
Described fixture (6) includes rotation end stand (8) and the standing screw (9) being connected with each other with circular shear connector, round end Platform (8) can rotate freely around standing screw (9) axle, and rotation end stand (8) is provided with reinforces pull bar (4) admittedly to interspersed fixing end The interstitial hole of fixed end (14), is provided with the anti-rotation tongue-and-groove for preventing fixing end from reinforcing pull bar rotation at interstitial hole, and standing screw (9) will The fixing end that fixing end reinforces pull bar is fixed at rotation end stand.
CN201710822732.2A 2017-09-13 2017-09-13 Shield tunnel staggered joint erection liner structure rigidity stiffening device Pending CN107514267A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710822732.2A CN107514267A (en) 2017-09-13 2017-09-13 Shield tunnel staggered joint erection liner structure rigidity stiffening device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710822732.2A CN107514267A (en) 2017-09-13 2017-09-13 Shield tunnel staggered joint erection liner structure rigidity stiffening device

Publications (1)

Publication Number Publication Date
CN107514267A true CN107514267A (en) 2017-12-26

Family

ID=60725445

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710822732.2A Pending CN107514267A (en) 2017-09-13 2017-09-13 Shield tunnel staggered joint erection liner structure rigidity stiffening device

Country Status (1)

Country Link
CN (1) CN107514267A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109681232A (en) * 2018-11-26 2019-04-26 上海市基础工程集团有限公司 The assembling method of deep tunnel shield structure domain test section of jurisdiction
CN111502692A (en) * 2020-04-10 2020-08-07 中铁隧道集团二处有限公司 TBM (tunnel boring machine) first-ring segment lining split mounting type box locking device and application method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004150072A (en) * 2002-10-29 2004-05-27 Nippon Steel Corp Segment for protecting/reinforcing tunnel lining inner surface, and structure for protecting/reinforcing tunnel lining inner surface
CN201756968U (en) * 2010-06-18 2011-03-09 中铁第四勘察设计院集团有限公司 Lining ring of shield tunnel in manner of nine evenly divided blocks
DE102010003785A1 (en) * 2010-04-09 2011-10-13 Ed. Züblin Ag Concrete-formed component-connection has two connecting elements, which are arranged in two concrete-formed components with joint sides lying opposite to each other in joint
CN104632250A (en) * 2014-12-17 2015-05-20 北京工业大学 Prefabricated tunnel lining structure of inverted segments for round foundation pit and construction method of prefabricated tunnel lining structure
CN105781577A (en) * 2016-05-03 2016-07-20 西南交通大学 Dodecagonal segment for shield tunnel construction and segment lining structure
CN206071597U (en) * 2016-10-09 2017-04-05 中铁十八局集团有限公司 A kind of TBM receives section of jurisdiction take-up device
CN107143350A (en) * 2017-06-16 2017-09-08 天津大学 Shield tunnel straightway liner structure rigidity gear driven type stiffening device
CN207660617U (en) * 2017-09-13 2018-07-27 天津大学 Shield tunnel staggered joint erection liner structure rigidity stiffening device

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004150072A (en) * 2002-10-29 2004-05-27 Nippon Steel Corp Segment for protecting/reinforcing tunnel lining inner surface, and structure for protecting/reinforcing tunnel lining inner surface
DE102010003785A1 (en) * 2010-04-09 2011-10-13 Ed. Züblin Ag Concrete-formed component-connection has two connecting elements, which are arranged in two concrete-formed components with joint sides lying opposite to each other in joint
CN201756968U (en) * 2010-06-18 2011-03-09 中铁第四勘察设计院集团有限公司 Lining ring of shield tunnel in manner of nine evenly divided blocks
CN104632250A (en) * 2014-12-17 2015-05-20 北京工业大学 Prefabricated tunnel lining structure of inverted segments for round foundation pit and construction method of prefabricated tunnel lining structure
CN105781577A (en) * 2016-05-03 2016-07-20 西南交通大学 Dodecagonal segment for shield tunnel construction and segment lining structure
CN206071597U (en) * 2016-10-09 2017-04-05 中铁十八局集团有限公司 A kind of TBM receives section of jurisdiction take-up device
CN107143350A (en) * 2017-06-16 2017-09-08 天津大学 Shield tunnel straightway liner structure rigidity gear driven type stiffening device
CN207660617U (en) * 2017-09-13 2018-07-27 天津大学 Shield tunnel staggered joint erection liner structure rigidity stiffening device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109681232A (en) * 2018-11-26 2019-04-26 上海市基础工程集团有限公司 The assembling method of deep tunnel shield structure domain test section of jurisdiction
CN109681232B (en) * 2018-11-26 2020-06-02 上海市基础工程集团有限公司 Assembling method of deep tunnel shield whole-ring test duct pieces
CN111502692A (en) * 2020-04-10 2020-08-07 中铁隧道集团二处有限公司 TBM (tunnel boring machine) first-ring segment lining split mounting type box locking device and application method
CN111502692B (en) * 2020-04-10 2024-05-17 中铁隧道集团二处有限公司 TBM head ring pipe sheet lining assembled box type locking device and application method

Similar Documents

Publication Publication Date Title
CN107503766A (en) A kind of shield tunnel staggered joint erection method
US11078791B2 (en) Grouting bolt-cable composite beam and supporting method for advanced support of fractured surrounding rock in deep coal mines
CN105756685B (en) A kind of reinforced combined retaining structure of pipe-plate lining
CN111119073B (en) Road and bridge crack reinforcing apparatus
CN104790974A (en) City subway overlapped shield tunnel segment structure adopting special longitudinal connecting pieces
CN107514267A (en) Shield tunnel staggered joint erection liner structure rigidity stiffening device
CN206487496U (en) A kind of shield tunnel knocker anti-seep water structure
CN101625061A (en) Pipelining emergent repairing method of prestressing steel cylinder concrete pipe
CN106761847B (en) It is a kind of at the beginning of tunnel branch construct profile steel frame exempt from weld pin-connected panel supporting construction
CN106703835B (en) It is a kind of at the beginning of tunnel branch construct grid steel frame exempt from weld quick assembling supporting construction
CN103696429A (en) Concrete support and fish-belly sill combined supporting system of special-shaped foundation pit and construction method
CN201407054Y (en) Segment connecting structure of subway shield tunnel
CN108386213B (en) Variable-thickness steel ring of shield tunnel segment
CN207660617U (en) Shield tunnel staggered joint erection liner structure rigidity stiffening device
CN215804585U (en) Lining structure with local detachable repair function
CN205778932U (en) Ring beam pre support structure indulged by large cross-section tunnel
CN107178242A (en) A kind of bracing means for high voltage power transmission angle steel tower principal post angle steel
CN103967508A (en) Stretchable quick stress compensation type steel frame connection structure
CN106593485A (en) Sectional steel frame welding-free fast assembly support structure for tunnel primary support construction
CN103821234A (en) Joint construction for steel-reinforced concrete column and reinforced concrete beam
CN112459785A (en) Reinforcing method for ultra-shallow buried underground excavation tunnel to penetrate existing pipeline through municipal well
RU2433269C2 (en) Design of vertical shaft support with adjustable mode of operation
CN105697022A (en) Underground engineering squeezing-in device
CN203099080U (en) Protecting device of buried gas pipeline
CN206581159U (en) Hangar tunnel

Legal Events

Date Code Title Description
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20171226