CN107506881A - A kind of transformer movement method for inspecting and system - Google Patents
A kind of transformer movement method for inspecting and system Download PDFInfo
- Publication number
- CN107506881A CN107506881A CN201610416405.2A CN201610416405A CN107506881A CN 107506881 A CN107506881 A CN 107506881A CN 201610416405 A CN201610416405 A CN 201610416405A CN 107506881 A CN107506881 A CN 107506881A
- Authority
- CN
- China
- Prior art keywords
- inspection
- transformer
- patrol task
- task
- patrol
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 25
- 238000007689 inspection Methods 0.000 claims abstract description 260
- 238000012937 correction Methods 0.000 claims abstract description 7
- 238000011156 evaluation Methods 0.000 claims abstract description 7
- 238000012856 packing Methods 0.000 claims abstract description 7
- 230000002265 prevention Effects 0.000 claims abstract description 7
- 238000007726 management method Methods 0.000 claims description 38
- 238000012795 verification Methods 0.000 claims description 8
- 238000012544 monitoring process Methods 0.000 claims description 7
- 230000009466 transformation Effects 0.000 claims description 5
- 238000012550 audit Methods 0.000 claims description 3
- 238000004891 communication Methods 0.000 description 12
- 238000010586 diagram Methods 0.000 description 9
- 238000013461 design Methods 0.000 description 5
- 238000004458 analytical method Methods 0.000 description 4
- 238000001514 detection method Methods 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 4
- 230000007547 defect Effects 0.000 description 3
- 230000002452 interceptive effect Effects 0.000 description 3
- 238000002360 preparation method Methods 0.000 description 3
- 238000007619 statistical method Methods 0.000 description 3
- 238000012360 testing method Methods 0.000 description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical group [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 230000015572 biosynthetic process Effects 0.000 description 2
- 230000015556 catabolic process Effects 0.000 description 2
- 238000013070 change management Methods 0.000 description 2
- 238000004587 chromatography analysis Methods 0.000 description 2
- 238000012790 confirmation Methods 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 230000006872 improvement Effects 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 238000005259 measurement Methods 0.000 description 2
- 238000003860 storage Methods 0.000 description 2
- 238000003786 synthesis reaction Methods 0.000 description 2
- 241001269238 Data Species 0.000 description 1
- 230000002159 abnormal effect Effects 0.000 description 1
- 230000032683 aging Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 150000001875 compounds Chemical class 0.000 description 1
- 238000013499 data model Methods 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
- 238000009472 formulation Methods 0.000 description 1
- 230000003862 health status Effects 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000010295 mobile communication Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000010606 normalization Methods 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
- 230000000737 periodic effect Effects 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 238000012797 qualification Methods 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
- 238000012502 risk assessment Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 230000001131 transforming effect Effects 0.000 description 1
- 238000002604 ultrasonography Methods 0.000 description 1
- 230000000007 visual effect Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
- G06Q10/06398—Performance of employee with respect to a job function
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Marketing (AREA)
- Educational Administration (AREA)
- Development Economics (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Game Theory and Decision Science (AREA)
- Health & Medical Sciences (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- Primary Health Care (AREA)
- General Health & Medical Sciences (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of transformer movement method for inspecting and system, wherein, this method includes:The transformer patrol plan that comprehensive application system inputs according to staff, generate patrol task information;Comprehensive application system assigns patrol task information, and patrol task information is sent into corresponding transformer inspection terminal;Transformer inspection terminal receives the patrol task information, and is shown to operating personnel;Transformer inspection terminal is according to patrol task information, and the inspection data of Collecting operation personnel, after the completion of patrol task, packing generates inspection result data bag;Comprehensive application system is monitored in real time to patrol task, receives inspection result data bag;After the completion of patrol task, comprehensive application system closes patrol task;Comprehensive application system parses inspection result data bag, shows staff, and writing task personnel are to the evaluation of inspection operation, management, correction and prevention information.
Description
Technical field
The present invention relates to transformer specialty inspection integrated application field, further relates to transformer specialty inspection standardized work pipe
Reason field, espespecially a kind of transformer movement method for inspecting and system, to meet inspection job information management requirement.
Background technology
Transformer specialty inspection has strict code requirement and the substantial amounts of scope of examination, and traditional way is live use
Paper list record check result, carry out data preparation again afterwards and work write in report, exist data it is lack of standardization, it is error-prone,
The present situations such as efficiency is low.There is a situation where not require to carry out inspection operation according to standard during other field operation, can be to inspection result
Accuracy impact, there is an urgent need to provide collection, transmission, processing, storage, tissue, the exhibition of a set of transformer inspection data
The total solution now applied with analysis, so as to realize the storage of transformer inspection data structured and inspection standardized management,
Data acquisition efficiency, accuracy rate and qualification rate are lifted, data base is established for transformer specialty inspection job management and advanced application
Plinth.
Current national power industry is there has been no transformer specialty inspection comprehensive data application platform, auxiliary by technological meanses
User's Design of Transformer inspection standardized work flows and management regulation are helped, transformer detection data integration is realized, shares and divide
Analysis, the fine-grained management for lifting transformer tank specialty inspection business are horizontal.
The content of the invention
To achieve the above object, the present invention proposes a kind of transformer movement method for inspecting and system, to meet transformer
The basis of inspection job information management requirement, science and technology support can also be provided for operating personnel's field operation.The present invention includes
Two partial contents:Transformer specialty inspection comprehensive data application subsystem (that is, comprehensive application system) and transformer specialty are patrolled
Inspection standardization transformer inspection terminal (that is, transformer inspection terminal).
Transformer movement method for inspecting proposed by the present invention includes:Step S1, comprehensive application system are defeated according to staff
The transformer patrol plan entered, generate patrol task information;Step S2, comprehensive application system are assigned patrol task information, will patrolled
Inspection mission bit stream is sent to corresponding transformer inspection terminal;Step S3, transformer inspection terminal receive the patrol task letter
Breath, and it is shown to operating personnel;Step S4, transformer inspection terminal is according to patrol task information, the inspection of Collecting operation personnel
Data, after the completion of patrol task, packing generation inspection result data bag;Step S5, comprehensive application system are entered to patrol task
Row monitoring in real time, receives inspection result data bag;Step S6, after the completion of patrol task, comprehensive application system is closed inspection and appointed
Business;Step S7, comprehensive application system parsing inspection result data bag, shows staff, and writing task personnel are to inspection
Evaluation, management, correction and the prevention information of operation.
Transformer movement cruising inspection system proposed by the present invention includes:Comprehensive application system, transformer inspection terminal;It is comprehensive to answer
Included with system:Mould is summarized in patrol task generation module, task assignment module, inspection monitoring module, task closedown module, inspection
Block;Transformer inspection terminal includes:Task receiving module, inspection data acquisition module;Wherein, patrol task generation module, use
In the transformer patrol plan inputted according to staff, patrol task information is generated;Task assignment module, for assigning inspection
Mission bit stream, patrol task information is sent to corresponding transformer inspection terminal;Task receiving module, for receiving described patrol
Mission bit stream is examined, and is shown to operating personnel;Inspection data acquisition module, for according to patrol task information, Collecting operation people
The inspection data of member, after the completion of patrol task, packing generation inspection result data bag;Inspection monitoring module, for inspection
Task is monitored in real time, receives inspection result data bag;Task closedown module, for after the completion of patrol task, closing to be patrolled
Inspection task;Trailer record module, for parsing inspection result data bag, staff is showed, and writing task personnel are to patrolling
Examine evaluation, management, correction and the prevention information of operation.
A kind of transformer movement method for inspecting proposed by the present invention and system, use the design using transformer as kernel object
Theory, carries out data tissue and information shows, and realizes the interactive experience centered on inspection business;Realize transformer inspection flow
Change management, lift the standardization of service management and the degree that becomes more meticulous.
Brief description of the drawings
Accompanying drawing described herein is used for providing a further understanding of the present invention, forms the part of the application, not
Form limitation of the invention.In the accompanying drawings:
Fig. 1 is the transformer inspection work flow schematic diagram of one embodiment of the invention.
Fig. 2 is that the transformer of one embodiment of the invention moves method for inspecting flow chart.
Fig. 3 is that the transformer of one embodiment of the invention moves cruising inspection system schematic diagram.
Fig. 4 is the transformer specialty inspection comprehensive data application platform framework schematic diagram of a specific embodiment of the invention.
Fig. 5 is the transformer specialty inspection work flow schematic diagram under the WEB terminal of a specific embodiment of the invention.
Fig. 6 is the transformer specialty inspection work flow schematic diagram under the mobile terminal of a specific embodiment of the invention.
Fig. 7 is the inspection work breakdown structure schematic diagram of a specific embodiment of the invention.
Fig. 8 is the operation item structural representation of a specific embodiment of the invention.
Embodiment
Coordinate diagram and presently preferred embodiments of the present invention below, the present invention is expanded on further to reach predetermined goal of the invention institute
The technological means taken.
As shown in figure 1, transformer specialty inspection work flow includes eight key links, wherein formulation patrol task S11,
Assign patrol task S12, supervision patrol task S15, close patrol task S16, inspection operation summary S17, inspection operation examination & verification
Six links of S18 are realized by comprehensive application system, receive patrol task S13, two links of inspection operation S14 pass through transformer
Inspection terminal is realized.
Specifically, the transformer that Fig. 2 is one embodiment of the invention moves method for inspecting flow chart.As shown in Fig. 2 this method
Including:
Step S1, the transformer patrol plan that comprehensive application system inputs according to staff, generate patrol task information;
Specifically, patrol task information includes:Patrol task includes:Task names, job content (are defaulted as transformer to patrol
Inspection), operating location, the time started, the end time, operation team, operation director, operating personnel, weather, temperature, humidity, when
Preceding inspection state (do not start, have started to, being turned off, having summarized, having audited).
Step S2, comprehensive application system assign patrol task information, patrol task information are sent into corresponding transformer
Inspection terminal;
Specifically, creating inspection project Shi Hui assignments teams and groups, the operation team of patrol task is defaulted as the work of project
Industry teams and groups, the group leader of operation team are the operation director of task.Operation team to scene carry out inspection operation when can be by operation
Task is dispatched to specific operating personnel, and operating personnel logs in transformer inspection terminal and operated accordingly.
Step S3, transformer inspection terminal receives the patrol task information, and is shown to operating personnel;
Specifically, operating personnel reaches transformer station checks the responsible inspection project of this group in transformer inspection terminal, become
The patrol task of depressor, and receive patrol task.
Step S4, transformer inspection terminal the inspection data of Collecting operation personnel, are appointed according to patrol task information in inspection
After the completion of business, packing generation inspection result data bag;
Specifically, after patrol task receives, operating personnel carries out operation according to transformer inspection job specification, and records inspection
Look into inspection result.It is real in transformer inspection terminal according to work flow, operation item, scope of examination design project data collecting card
Existing live inspection data acquisition.
Step S5, comprehensive application system are monitored in real time to patrol task, receive inspection result data bag;
Specifically, staff can check the essential information, current of inspection project and task in comprehensive application system
State and the inspection data of collection, comprehensive application system need to provide the information retrieval means of various dimensions.
Step S6, after the completion of patrol task, comprehensive application system closes patrol task;
Specifically, operation group completes the field operation of transformer and typing test data (oil chromatogram analysis result etc.) successor
Business director can close the task.
Step S7, comprehensive application system parsing inspection result data bag, shows staff, and writing task personnel couple
Evaluation, management, correction and the prevention information of inspection operation.
Further, this method also includes:
Step S8, comprehensive application system show inspection result data to center leader or technical support personnel, and in record
Understand tacitly lead or technical support personnel input inspection msu message, complete inspection operation examination & verification.
Based on same inventive concept, a kind of transformer movement cruising inspection system is provided in the embodiment of the present invention, as following
Described in embodiment.It is similar to said system to solve the principle of problem due to this method, therefore the implementation of this method may refer to
The implementation of system is stated, part is repeated and repeats no more.Used below, term " unit " or " module " can realize predetermined work(
The combination of the software and/or hardware of energy.Although device described by following examples is preferably realized with software, firmly
Part, or the realization of the combination of software and hardware is also what may and be contemplated.
Fig. 3 is that the transformer of one embodiment of the invention moves cruising inspection system schematic diagram.As shown in figure 3, the system includes:It is comprehensive
Close application system 100, transformer inspection terminal 200;
Comprehensive application system 100 includes:Patrol task generation module 101, task assignment module 102, inspection monitoring module
103rd, module 105 is summarized in task closedown module 104, inspection;
Transformer inspection terminal 200 includes:Task receiving module 201, inspection data acquisition module 202;
Wherein,
Patrol task generation module 101, for the transformer patrol plan inputted according to staff, generate patrol task
Information;Patrol task information includes:Patrol task includes:Task names, job content (being defaulted as transformer inspection), operation
Point, time started, end time, operation team, operation director, operating personnel, weather, temperature, humidity, current inspection state
(do not start, have started to, being turned off, having summarized, having audited).
Task assignment module 102, for assigning patrol task information, patrol task information is sent to corresponding transformer
Inspection terminal 200.
Task receiving module 201, for receiving the patrol task information, and it is shown to operating personnel.
Inspection data acquisition module 202, for according to patrol task information, the inspection data of Collecting operation personnel, patrolling
After the completion of inspection task, packing generation inspection result data bag.
Inspection monitoring module 103, for being monitored in real time to patrol task, receive inspection result data bag.
Task closedown module 104, for after the completion of patrol task, closing patrol task.
Trailer record module 105, for parsing inspection result data bag, show staff, and writing task personnel
To the evaluation of inspection operation, management, correction and prevention information.
In the present embodiment, comprehensive application system 100 also includes:
Audit logging module 106, for showing inspection result data to center leader or technical support personnel, and in record
Understand tacitly lead or technical support personnel input inspection msu message, complete inspection operation examination & verification.
In order to carry out apparent explanation to above-mentioned transformer movement cruising inspection system, with reference to a specific implementation
Example illustrates, however, it should be noted that the embodiment merely to the present invention is better described, is not formed to this hair
It is bright improperly to limit.
The present invention proposes that transformer movement method for inspecting and system can apply to a transformer specialty inspection integrated data
Application platform scheme, it can be expanded to such as Fig. 4 according to platform construction thinking and service design requirement, the platform construction pattern of use
It is shown, specifically include:Transformer specialty inspection comprehensive data application system (that is, comprehensive application system), transformer specialty inspection
Standardize transformer inspection terminal (that is, transformer inspection terminal).Wherein,
Comprehensive application system is the kernel subsystems of platform, and information-based support is provided for transformer inspection service management, auxiliary
Help the fine-grained management of lifting transformer specialty inspection business horizontal.Comprehensive application system includes metadata management, mark is turned into
Industry management, patrol task lifecycle management, transformer synthesis inspection data display, inspection Reports Administration, statistical analysis, achievement
Imitate nine examination, communication exchange, support and management main functional modules.It is described in detail below:
1st, metadata management:Patrolled according to transformer specialty inspection charge book list, transformer specialty inspection report, transformer
The management of inspection business requires and the technical specification of correlation, the transformer specialty inspection data model of standard is established, to transformer
The related data and caused inspection data that inspection operation needs effectively are managed.Metadata management includes patrol task, patrolled
Examine the management of the related datas such as object, the scope of examination, detection type, check criteria, inspection result.Transformer specialty inspection includes
Outward appearance inspection, iron core, clamp earthing current test, infrared measurement of temperature, ultrasonic wave, high frequency positioning, Chromatographic Analysis of Transformer oil and state
18, net is anti-to perform totally six big content.
2nd, standardized management:Transformer specialty inspection has strict code requirement and the substantial amounts of scope of examination, traditional
Way is that scene uses paper list record check result, carries out data preparation again afterwards and work is write in report, data be present
Lack of standardization, the error-prone, present situation such as efficiency is low.In the presence of the feelings that progress inspection operation is not required according to standard during other field operation
Condition, the accuracy of inspection result can be impacted.Therefore terminal need to realize the data acquisition function of standardization, and can enter line number
Compared according to verification and history.Terminal uses the operator scheme of guiding, and guiding operating personnel is carried out according to the inspection step of standard
Normative operation.
3rd, patrol task lifecycle management:According to the job requirements of transformer specialty inspection, system need to provide transformation
Device patrol task lifecycle management function, realize the transformer inspection work flow of standardization.Including patrol task
Foundation, task assignment, task supervision, task termination, task audit this five steps.
4th, transformer synthesis inspection data display:System need to provide the overview display function of transformer specialty inspection data,
System provides the data display mode at two kinds of visual angles.1) data display centered on transformer patrol task, it is mainly true to become
The information such as the implementation status of depressor patrol task, job schedule, inspection charge book;2) using transformer as core business object,
In the way of the full lifeline of transformer, overview display transformer account, patrol record, advanced application result, O&M maintenance note
The information such as record, defect, transformer health status is shown comprehensively.
5th, inspection Reports Administration:Inspection report is the important achievement of transformer specialty inspection operation, is that analysis judges transformation
Device state, the important evidence for formulating Repair of Transformer plan.The data and inspection that system need to gather according to substation inspection operation
Report template, the standard report for meeting code requirement is automatically generated, and it can be managed, system should support inspection to report
Template Manager, it is conveniently adjusted the content and pattern of inspection report.
6th, statistical analysis:Multi-angle, various dimensions are carried out to transformer specialty inspection data according to different business needs
Statistical analysis, the handling situations of macroscopic view reflection transformer specialty inspection, found for problem, service optimization and fine-grained management provide
Data supporting.As the ageing statistics of patrol task, inspection data integrity statistics, inspection data standard statistics, inspection are abnormal
Defect trend statistics, inspection exception defect distribution statistics, monthly inspection work collect statistics, monthly inspection job performance collect system
Meter.
7th, performance appraisal:Performance appraisal is an important step of transformer specialty inspection management, is slapped by quantifying performance
The inspection operational performance of Wo Ge team, help to find problem and improvement method present in work.
8th, communication exchange:Various problems can be faced during transformer specialty inspection, it is sometimes desirable to which other team are special
Family gives assistance.System need to provide the real-time communication channel of communication between team, can be directed in inspection operation particular problem or
Topic is discussed, solved, and realizes the new business pattern of cooperative team and transformer inspection scene real-time interactive.
9th, support and management:System provides the pipe that information is supported to staff, operating personnel, authority, data bank, daily record etc.
Manage function.
Transformer inspection terminal, it is the transformer specialty inspection standardization transformer inspection terminal based on mobile communication technology
It is the important tool of operating personnel's field operation, for aiding in the workflow and work product of specification transformer specialty inspection,
Work on the spot efficiency is improved, promotes the collection of inspection data normalization, improves data accuracy.Management terminal major function includes number
According to communication, patrol task management, standardized work management, inspection data bank, communication exchange.
1st, data and communication management:Data communication is the base that transformer specialty inspection standardization transformer inspection terminal need to possess
This function, it is field operation, data acquisition, the data supporting of information inquiry.Need to realize both sides data communication facility:The
One, realize that the data of transformer detection device automatically access, including infrared detection equipment, high frequency partial discharge examination equipment sum
Code-phase machine;Secondth, the data syn-chronization of live inspection data and transformer specialty inspection comprehensive data application system, including reality are realized
When inspection data, history inspection report, data bank and communication exchange data etc..
2nd, patrol task management:In complete transformer inspection work flow, portion link is that operating personnel is complete at the scene
Into, therefore transformer specialty inspection standardization transformer inspection terminal needs to have the inspection function of field operation part, from
And transformer patrol task lifecycle management is completed, lift the degree that becomes more meticulous of inspection job management.
3rd, standardized work instructs:Transformer specialty inspection has strict code requirement and the substantial amounts of scope of examination, passes
The way of system is that scene uses paper list record check result, carries out data preparation again afterwards and work is write in report, exist
The present situations such as data are lack of standardization, error-prone, efficiency is low.In the presence of not according to standard requirement progress inspection operation during other field operation
Situation, the accuracy of inspection result can be impacted.Therefore terminal need to realize the data acquisition function of standardization, and can carry out
Data check and history compare.Terminal uses the operator scheme of guiding, and guiding operating personnel enters according to the inspection step of standard
Row normative operation.
4th, inspection data bank:Transformer specialty inspection standardization transformer inspection terminal being capable of periodic synchronization inspection data
Storehouse, the related technical data of transformer specialty inspection can be checked in terminal, aids in field operation.Technical data includes management
Specification, fire protection technology, job instruction, transforming plant primary wiring diagram, transformer equipment structure chart etc..Support WORD, PDF,
The data consultation of the file formats such as IMAGE.
5th, communication exchange:Transformer specialty inspection standardization transformer inspection terminal need to possess the work(of real-time communication exchange
Can, the operating personnel of field operation can pass through terminal and cooperative team or expert this friendship of being discussed to particular problem or theme
Stream, work compound.
In order to carry out apparent explanation to above-mentioned transformer movement method for inspecting, with reference to multiple specific implementations
Example illustrates, however, it should be noted that the embodiment merely to the present invention is better described, is not formed to this hair
It is bright improperly to limit.
The transformer specialty inspection that transformer inspection Job Operations flow scheme proposed by the present invention can be divided under WEB terminal is made
Transformer specialty inspection work flow (Fig. 6) under industry flow (Fig. 5) and mobile terminal.
With reference to shown in Fig. 5, the transformer specialty inspection work flow under WEB terminal is as follows:
Transformer specialty inspection operation is first had to create an inspection project for some transformer station, and inspection project is divided
Task specific inspection responsibility group.A patrol task is created for some transformer in power station again, gives tacit consent to the institute of the transformer station
There is transformer patrol task all by program accountability group inspection, group leader is exactly the director of task.Scene starts meeting during inspection operation
Job content is dispatched to specific group member and carries out operation.After completing a patrol task (inspection of a transformer), close
Patrol task, task leader can do inspection operation summary according to inspection charge book, finally by center leader or technical support
Personnel carry out inspection operation examination & verification.After whole inspection project (the inspection operation of a transformer station) terminates, test center can be provided
The complete inspection report of transformer station.Inspection project information includes:Project name, affiliated unit of transformer station, planned start time, meter
Draw end time, actual time started, physical end time, operation team, current state (plan, perform, terminate).
With reference to shown in Fig. 6, the transformer specialty inspection work flow under mobile terminal is as follows:
Operating personnel reaches transformer station and the responsible inspection project of this group is checked in transformer inspection terminal, and transformer patrols
Inspection task, and receive patrol task.Operating personnel firstly the need of carry out inspection job safety notice confirm, including:Check risk
Assessment and Pre-control measures, check that safety is told somebody what one's real intentions are, carry out safety verification, unconfirmed to start this task, safety instruction confirms
Need to record following information:Acknowledging time, confirmation personnel (owner for participating in operation), (registration terminal does what is operated to scrutineer
People).Safety instruction does not complete explanation task and not started, and after completing safety instruction confirmation, operating personnel can be used this subjob
Instrument, material confirmed that instrument, material information are maintained in comprehensive application system, and scene is selected.Power tool is true
After recognizing, the situation of field operation, including operation time started, weather condition, temperature, transformer information etc., most of number are recorded
It is what is safeguarded before operation according to item, reduces terminal input item as far as possible.Operating personnel is recovered and confirmed to scene, until scene
The end of job.
Inspection work breakdown structure proposed by the present invention is as shown in Figure 7.Transformer specialty inspection is to be directed to some power transformation
Stand and create corresponding inspection project, inspection project includes the patrol task of multiple transformers, and each patrol task includes
Six sport job contents, each single item job content include multiple operation items, and each operation item is itemized comprising multiple operations, often
One subitem comprises at least a scope of examination and check criteria, and operating personnel carries out site inspection according to the scope of examination and recorded
Inspection result.
Specific operation item is as shown in figure 8, including outward appearance inspection, iron core, clamp earthing current test, infrared measurement of temperature, ultrasound
Ripple, high frequency positioning, Chromatographic Analysis of Transformer oil and 18, state's net instead perform totally six big content.
Six your writings, which hold in the industry, specifically includes following operation item and operation subitem, as shown in table 1:
The big job content detail list of table 1 six
A kind of transformer movement method for inspecting proposed by the present invention and system, use the design using transformer as kernel object
Theory, carries out data tissue and information shows, and realizes the interactive experience centered on inspection business;Realize transformer inspection flow
Change management, lift the standardization of service management and the degree that becomes more meticulous.
Particular embodiments described above, the purpose of the present invention, technical scheme and beneficial effect are carried out further in detail
Describe in detail it is bright, should be understood that the foregoing is only the present invention specific embodiment, the guarantor being not intended to limit the present invention
Scope is protected, within the spirit and principles of the invention, any modification, equivalent substitution and improvements done etc., should be included in this
Within the protection domain of invention.
Claims (10)
1. a kind of transformer moves method for inspecting, it is characterised in that this method includes:
Step S1, the transformer patrol plan that comprehensive application system inputs according to staff, generate patrol task information;
Step S2, comprehensive application system assign patrol task information, patrol task information are sent into corresponding transformer inspection
Terminal;
Step S3, transformer inspection terminal receives the patrol task information, and is shown to operating personnel;
Step S4, transformer inspection terminal are complete in patrol task according to patrol task information, the inspection data of Collecting operation personnel
Cheng Hou, packing generation inspection result data bag;
Step S5, comprehensive application system are monitored in real time to patrol task, receive inspection result data bag;
Step S6, after the completion of patrol task, comprehensive application system closes patrol task;
Step S7, comprehensive application system parsing inspection result data bag, shows staff, and writing task personnel are to inspection
Evaluation, management, correction and the prevention information of operation.
2. transformer according to claim 1 moves method for inspecting, it is characterised in that this method includes:
Step S8, comprehensive application system shows inspection result data to center leader or technical support personnel, and records center is led
Lead or technical support personnel input inspection msu message, complete inspection operation examination & verification.
3. transformer according to claim 1 moves method for inspecting, it is characterised in that patrol task information includes:Inspection
Task includes:Task names, job content, operating location, time started, end time, operation team, operation director, work
Industry personnel, weather, temperature, humidity, current inspection state.
4. transformer according to claim 3 moves method for inspecting, it is characterised in that the job content is defaulted as transformation
Device inspection.
5. transformer according to claim 3 moves method for inspecting, it is characterised in that the current inspection includes:Do not open
Begin, have started to, be turned off, summarized, audited.
6. a kind of transformer moves cruising inspection system, it is characterised in that the system includes:Comprehensive application system, transformer inspection are whole
End;
Comprehensive application system includes:Patrol task generation module, task assignment module, inspection monitoring module, task closedown module,
Module is summarized in inspection;
Transformer inspection terminal includes:Task receiving module, inspection data acquisition module;
Wherein,
Patrol task generation module, for the transformer patrol plan inputted according to staff, generate patrol task information;
Task assignment module, for assigning patrol task information, it is whole that patrol task information is sent to corresponding transformer inspection
End;
Task receiving module, for receiving the patrol task information, and it is shown to operating personnel;
Inspection data acquisition module, for complete in patrol task according to patrol task information, the inspection data of Collecting operation personnel
Cheng Hou, packing generation inspection result data bag;
Inspection monitoring module, for being monitored in real time to patrol task, receive inspection result data bag;
Task closedown module, for after the completion of patrol task, closing patrol task;
Trailer record module, for parsing inspection result data bag, staff is showed, and writing task personnel make to inspection
Evaluation, management, correction and the prevention information of industry.
7. transformer according to claim 6 moves cruising inspection system, it is characterised in that comprehensive application system also includes:
Audit logging module, for showing inspection result data to center leader or technical support personnel, and records center is led
Or the inspection msu message of technical support personnel's input, complete the examination & verification of inspection operation.
8. transformer according to claim 6 moves cruising inspection system, it is characterised in that patrol task information includes:Inspection
Task includes:Task names, job content, operating location, time started, end time, operation team, operation director, work
Industry personnel, weather, temperature, humidity, current inspection state.
9. transformer according to claim 8 moves cruising inspection system, it is characterised in that the job content is defaulted as transformation
Device inspection.
10. transformer according to claim 8 moves cruising inspection system, it is characterised in that the current inspection includes:Do not open
Begin, have started to, be turned off, summarized, audited.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610416405.2A CN107506881A (en) | 2016-06-14 | 2016-06-14 | A kind of transformer movement method for inspecting and system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610416405.2A CN107506881A (en) | 2016-06-14 | 2016-06-14 | A kind of transformer movement method for inspecting and system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107506881A true CN107506881A (en) | 2017-12-22 |
Family
ID=60678626
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610416405.2A Pending CN107506881A (en) | 2016-06-14 | 2016-06-14 | A kind of transformer movement method for inspecting and system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107506881A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110335368A (en) * | 2019-04-03 | 2019-10-15 | 中国联合网络通信集团有限公司 | Computer room method for inspecting and device |
CN110443383A (en) * | 2019-07-18 | 2019-11-12 | 西安工程大学 | Transformer electrification method for inspecting and cruising inspection system based on Business Stream |
CN110705861A (en) * | 2019-09-26 | 2020-01-17 | 山东鲁能软件技术有限公司 | Management method and system based on mobile internet |
CN111507635A (en) * | 2020-04-22 | 2020-08-07 | 国网天津市电力公司 | Power transformation operation and inspection intelligent mobile operation system and method based on power internet of things |
CN112381523A (en) * | 2020-11-25 | 2021-02-19 | 国网北京市电力公司 | Task processing method and device, processor and electronic device |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102456239A (en) * | 2010-10-27 | 2012-05-16 | 镇江华扬信息科技有限公司 | Intelligent Beidou inspection system |
JP2013140418A (en) * | 2011-12-28 | 2013-07-18 | Toshiba Syst Technol Corp | Patrol inspection system and management server for power facility apparatus |
CN103325153A (en) * | 2013-06-17 | 2013-09-25 | 深圳市共济科技有限公司 | Inspection method and inspection system |
WO2015131462A1 (en) * | 2014-03-07 | 2015-09-11 | 国家电网公司 | Centralized monitoring system and monitoring method for unmanned aerial vehicle to patrol power transmission line |
CN104978775A (en) * | 2014-04-04 | 2015-10-14 | 江苏中科泛联物联网科技股份有限公司 | Inspection method and inspection system based on multi-sensor intelligent terminal |
-
2016
- 2016-06-14 CN CN201610416405.2A patent/CN107506881A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102456239A (en) * | 2010-10-27 | 2012-05-16 | 镇江华扬信息科技有限公司 | Intelligent Beidou inspection system |
JP2013140418A (en) * | 2011-12-28 | 2013-07-18 | Toshiba Syst Technol Corp | Patrol inspection system and management server for power facility apparatus |
CN103325153A (en) * | 2013-06-17 | 2013-09-25 | 深圳市共济科技有限公司 | Inspection method and inspection system |
WO2015131462A1 (en) * | 2014-03-07 | 2015-09-11 | 国家电网公司 | Centralized monitoring system and monitoring method for unmanned aerial vehicle to patrol power transmission line |
CN104978775A (en) * | 2014-04-04 | 2015-10-14 | 江苏中科泛联物联网科技股份有限公司 | Inspection method and inspection system based on multi-sensor intelligent terminal |
Non-Patent Citations (2)
Title |
---|
瞿微等: "输变电线路巡检***的设计与实现", 《现代机械》 * |
魏峰: "超高压输电线路巡检***的研究", 《中国优秀硕士学位论文全文数据库(电子期刊)》 * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110335368A (en) * | 2019-04-03 | 2019-10-15 | 中国联合网络通信集团有限公司 | Computer room method for inspecting and device |
CN110443383A (en) * | 2019-07-18 | 2019-11-12 | 西安工程大学 | Transformer electrification method for inspecting and cruising inspection system based on Business Stream |
CN110705861A (en) * | 2019-09-26 | 2020-01-17 | 山东鲁能软件技术有限公司 | Management method and system based on mobile internet |
CN111507635A (en) * | 2020-04-22 | 2020-08-07 | 国网天津市电力公司 | Power transformation operation and inspection intelligent mobile operation system and method based on power internet of things |
CN112381523A (en) * | 2020-11-25 | 2021-02-19 | 国网北京市电力公司 | Task processing method and device, processor and electronic device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107193375B (en) | Electric power safety production scene interaction system based on virtual reality | |
CN107506881A (en) | A kind of transformer movement method for inspecting and system | |
CN206921161U (en) | It is a kind of to include inspection management and defect processing and the intelligent inspection system of examination | |
Liu et al. | Automatically updating maintenance information from a BIM database | |
CN107222523B (en) | Terminal data processing method, device and system | |
CN111598411A (en) | Intelligent safety control system for operation site of transformer substation | |
CN106297461B (en) | A kind of large-scale maintenance machinery emergency preplan simulative training system | |
CN206728059U (en) | A kind of electric communication operation and maintenance mobile job-oriented terminal | |
CN111612646A (en) | Networked intelligent secondary operation and maintenance system | |
CN107680193A (en) | A kind of mobile patrolling and checking management system and its application method | |
CN112749877A (en) | Intelligent community daily patrol management system and method | |
CN107895233A (en) | Towards the operation management system and rich media interactive system, method of power communication | |
CN109450699A (en) | Integration firm IT operation management system and method | |
CN109410679A (en) | Ultra-high voltage main device three-dimensional artificial training system | |
CN112256872B (en) | Intelligent billing method for overhaul work ticket of transformer substation | |
CN105184519A (en) | Standardized safety operation tracing management system | |
CN106780153A (en) | It is a kind of in real time multi-functional back brake, patrol and examine operation note system | |
CN107977718A (en) | Substation equipment maintaining method and system based on BIM models | |
CN113554319A (en) | Comprehensive safety risk evaluation system and method | |
CN113095633A (en) | Engineering project construction site potential safety hazard investigation system based on componentization | |
CN104504768A (en) | Real-time monitoring system for mobile operation of high-voltage transmission line and monitoring method of real-time monitoring system | |
CN106781792A (en) | A kind of power information emergency drilling training system | |
CN117933914A (en) | Production operation risk supervision method and system based on Internet of things | |
CN111062680A (en) | Safe bottom-crossing method and system | |
CN206726273U (en) | A kind of mobile operation and DSS |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171222 |