CN107503356A - One kind is applied to control foundation pit supporting construction forming method in soft soil horizon - Google Patents

One kind is applied to control foundation pit supporting construction forming method in soft soil horizon Download PDF

Info

Publication number
CN107503356A
CN107503356A CN201710710238.7A CN201710710238A CN107503356A CN 107503356 A CN107503356 A CN 107503356A CN 201710710238 A CN201710710238 A CN 201710710238A CN 107503356 A CN107503356 A CN 107503356A
Authority
CN
China
Prior art keywords
supporting construction
tri
construction
deep mixing
stake
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710710238.7A
Other languages
Chinese (zh)
Inventor
曹净
高越
杨泽帅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kunming University of Science and Technology
Original Assignee
Kunming University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kunming University of Science and Technology filed Critical Kunming University of Science and Technology
Priority to CN201710710238.7A priority Critical patent/CN107503356A/en
Publication of CN107503356A publication Critical patent/CN107503356A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The present invention relates to applied to controlling foundation pit supporting construction forming method in soft soil horizon, field of engineering technology under possession.Tri-axes deep mixing stake, the outer tri-axes deep mixing stake in hole, the vertical supporting construction of foundation ditch in present invention hole.Smooth location first, construction is mutually parallel and hole at regular intervals in tri-axes deep mixing stake and cheat outer tri-axes deep mixing stake.After the intensity of two row's tri-axes deep mixing stakes reaches to a certain degree, then the vertical supporting construction of construction foundation pit among two row's tri-axes deep mixing stakes.Then, after the vertical supporting construction of foundation ditch reaches design strength, along on the inside of the vertical supporting construction of foundation ditch, it then follows the principle excavation pit of " layering, be segmented, be symmetrical, balanced, in good time ", and Guan Liang, waist rail and branch anchor structure are constructed one by one, complete the excavation of foundation ditch.The present invention can not only ensure its Forming Quality in support construction, and play restriction effect to the crowded or undergauge that extends out of chutable concrete, effectively control the fullness coefficient of supporting construction, guarantee is provided for the construction quality of supporting construction.

Description

One kind is applied to control foundation pit supporting construction forming method in soft soil horizon
Technical field
It is applied to control foundation pit supporting construction forming method in soft soil horizon the present invention relates to one kind, belongs to underground engineering skill Art field.
Background technology
When city carries out foundation pit construction at present, often the construction work such as supporting, diaphram wall inner support is supportted using pile-anchor retaining, stake Skill is simple, is applicable the supporting construction that depth is extensive, maintenance effects are good.But in soft soil horizon, as muck soil, cumulosol, Above-mentioned supporting construction is performed in the soil layers such as loose flour sand, silt, compressibility is high, big, full water of void ratio etc. because figure layer has Feature, fullness coefficient is higher in support pile work progress, and pore-forming quality is difficult to ensure that barrier;And such regional underground water It is abundant, need to strengthen in terms of the water proof antiseepage of foundation ditch, therefore, it is necessary to design a kind of pattern foundation pit supporting structure knot suitable for soft soil horizon Structure forming method.
The content of the invention
The technical problem to be solved in the present invention is:The present invention proposes one kind and is applied to control pattern foundation pit supporting structure in soft soil horizon Structure forming method, it can ensure the Forming Quality of vertical supporting construction well, control fullness coefficient, and saving is constructed into This, and can plays a part of water-stop curtain.
The technical scheme is that:One kind is applied to control foundation pit supporting construction forming method, the side in soft soil horizon Method comprises the following steps that:
A, smooth location first, prepared for construction tri-axes deep mixing stake;
B, carry out having the construction of the outer tri-axes deep mixing stake 2 of tri-axes deep mixing stake 1 and hole in the hole of spacing;
C, after cheating the outer tri-axes deep mixing stake 2 of interior tri-axes deep mixing stake 1 and hole and reaching intensity requirement, among two row's tri-axes deep mixing stakes The vertical supporting construction 3 of construction foundation pit;
D, after the vertical supporting construction 3 of foundation ditch reaches design strength, along the vertical inner side of supporting construction 3 of foundation ditch, it then follows " layering, divide Section, it is symmetrical, balanced, in good time " principle excavation pit;
E, when being excavated to below the designed elevation of Guan Liang 4 50cm, Guan Liang 4 of constructing and first row branch anchor structure 6;
F, when being excavated to below the designed elevation of second row branch anchor structure 6 50cm, construct waist rail 5 and second row branch anchor structure 6;
G, construct successively each row's branch anchor structure 6, until being excavated to hole bottom designed elevation, complete the construction of whole supporting construction.
On the basis of above-mentioned technical proposal, the present invention also does described further below.
In the step B, in hole tri-axes deep mixing stake 1 be located at the inner side of the vertical supporting construction of foundation ditch 3, stake footpath 650mm ~ Between 850mm, to ensure that the purpose of water proof antiseepage is unlikely to waste again, lap width 150 ~ 250mm of every width is vertical with foundation ditch 100 ~ 200mm of lap width of supporting construction 3, length supporting construction 3 long 1m more vertical than foundation ditch are used to ensure the vertical supporting of foundation ditch The quality of structure 3.
In the step B, cheat outer tri-axes deep mixing stake 2 and be located on the outside of the vertical supporting construction 3 of foundation ditch, stake footpath 650mm ~ Between 850mm, to ensure that the purpose of water proof antiseepage is unlikely to waste again, lap width 250 ~ 350mm of every width is vertical with foundation ditch 100 ~ 200mm of lap width of supporting construction 3, length supporting construction 3 long 1m more vertical than foundation ditch are used to ensure the vertical supporting of foundation ditch The quality of structure 3.
In the step C, intensity requirement therein is that the outer tri-axes deep mixing stake 2 of tri-axes deep mixing stake 1 and hole reaches energy in finger pit Unlikely when the vertical pore-forming of supporting construction 3 of guarantee foundation ditch or grooving to cave in, it is outer that and can limits its chutable concrete extruding in perfusion Intensity when expansion or undergauge.
In the step C, the vertical supporting construction 3 of foundation ditch is diaphram wall, rotary digging drilling hole bored concrete pile or long auger The support piles such as bored concrete pile, its wall thickness, stake footpath or length are according to the requirement of foundation depth, geological conditions and foundation ditch surrounding enviroment condition It is determined that.
In described step E, F, G, branch anchor structure 6 is anchor cable, anchor pole, soil nailing, inner support diversified forms, is set by pattern foundation pit supporting structure Meter personnel select according to the concrete condition of foundation ditch.
The beneficial effects of the invention are as follows:The present invention is provided with hole in the vertical supporting construction both sides of foundation ditch, hole is outer two group three Axle stirs stake deeply, not only can be in the vertical supporting construction pore-forming of construction foundation pit(Groove)When play a part of retaining wall, can also irrigate During foundation ditch vertical structure, iris action is played, prevents that chutable concrete from spreading or undergauge into the soil body, makes supporting construction Quality be protected.Further, since soft soil horizon location underground water is relatively abundanter, two rows stir stake also deeply in hole, outside hole Water-stop curtain can be played a part of;
The effectively fullness coefficient of control supporting construction, guarantee is provided for the construction quality of supporting construction.It can be widely applied to pine Soft Soil Layer is enriched in the pattern foundation pit supporting structure in area.
Brief description of the drawings
Tri-axes deep mixing pile driving construction completes plan inside and outside hole in Fig. 1 present invention;
Tri-axes deep mixing pile driving construction completes profile inside and outside hole in Fig. 2 present invention;
Support construction completes profile in Fig. 3 present invention;
Fig. 4 present invention is applied to vertical support construction during pile-anchor retaining and completes profile;
Fig. 5 present invention is applied to vertical support construction during ground-connecting-wall inner support supporting and completes profile;
Fig. 6 present invention is applied to vertical support construction during pile-anchor retaining and completes plan;
Fig. 7 present invention is applied to vertical support construction during ground-connecting-wall inner support supporting and completes plan.
Each label in Fig. 1-7:Tri-axes deep mixing stake in 1- holes;2- cheats outer tri-axes deep mixing stake;The vertical supporting construction of 3- foundation ditches;4- Guan Liang;5- waist rails;6- branch anchor structures.
Embodiment
Below in conjunction with the accompanying drawings and specific embodiment, the invention will be further described.
Embodiment 1:As shown in figs. 1-7, it is a kind of to be applied to control foundation pit supporting construction forming method in soft soil horizon, it is described Method comprises the following steps that:
A, smooth location first, prepared for construction tri-axes deep mixing stake;
B, carry out having the construction of the outer tri-axes deep mixing stake 2 of tri-axes deep mixing stake 1 and hole in the hole of spacing;
C, after cheating the outer tri-axes deep mixing stake 2 of interior tri-axes deep mixing stake 1 and hole and reaching intensity requirement, among two row's tri-axes deep mixing stakes The vertical supporting construction 3 of construction foundation pit;
D, after the vertical supporting construction 3 of foundation ditch reaches design strength, along the vertical inner side of supporting construction 3 of foundation ditch, it then follows " layering, divide Section, it is symmetrical, balanced, in good time " principle excavation pit;
E, when being excavated to below the designed elevation of Guan Liang 4 50cm, Guan Liang 4 of constructing and first row branch anchor structure 6;
F, when being excavated to below the designed elevation of second row branch anchor structure 6 50cm, construct waist rail 5 and second row branch anchor structure 6;
G, construct successively each row's branch anchor structure 6, until being excavated to hole bottom designed elevation, complete the construction of whole supporting construction.
On the basis of above-mentioned technical proposal, the present invention can also do following improvement.
Further, in the step C, intensity requirement therein is the outer tri-axes deep mixing of tri-axes deep mixing stake 1 and hole in finger pit Stake 2 reaches unlikely when can guarantee that the vertical pore-forming of supporting construction 3 of foundation ditch or grooving and caved in, and and can limits its fluidised form coagulation in perfusion Soil extruding extends out or intensity during undergauge.
Further, in the step C, the vertical supporting construction 3 of foundation ditch is diaphram wall, rotary digging drilling hole bored concrete pile or length Auger boring pouring pile, its wall thickness, stake footpath or length are according to the requirement of foundation depth, geological conditions and foundation ditch surrounding enviroment condition It is determined that.
Further, in described step E, F, G, branch anchor structure 6 is anchor cable, anchor pole, soil nailing, inner support diversified forms, by Foundation Pit Support Design personnel select according to the concrete condition of foundation ditch.
Embodiment 2:As shown in Fig. 1-4 and Fig. 6, piled anchor is used in cumulosol, silt and silty clay alternating layers stratum When structure does foundation pit supporting system, excavation of foundation pit depth 8m.Support pile uses stake footpath as 800mm, and long 18m long auger fills Note stake.The outer tri-axes deep mixing stake of tri-axes deep mixing stake and hole uses stake footpath as 650mm in hole, long 19m tri-axes deep mixing stake.Three in hole The lap of splice that axle stirs the every width of stake deeply is 150mm, and the lap of splice for cheating the outer every width of tri-axes deep mixing stake is 250mm, and two rows are deep It is 100mm to stir stake and the lap width of the vertical support pile of foundation ditch.During construction, first outer three axles of tri-axes deep mixing stake and hole are deep in construction hole Stake is stirred, improves to chutable concrete extruding when can limit supporting construction perfusion and extends out or undergauge construction supporting again when its intensity Stake.When the intensity of support pile reaches its design load, it then follows the principle excavation pit of " layering, be segmented, be symmetrical, balanced, in good time ". When being excavated under Guan Liang designed elevation at 50cm, the construction of Guan Liang and first row anchor cable is carried out.Second row anchor cable hole is excavated to set When counting under absolute altitude at 50cm, the construction of waist rail and second row anchor cable is carried out, is constructed successively until excavating to hole bottom designed elevation.
Embodiment 3:As shown in Fig. 1-4 and Fig. 6, piled anchor is used in cumulosol, silt and silty clay alternating layers stratum When structure does foundation pit supporting system, excavation of foundation pit depth 8m.Support pile uses stake footpath as 900mm, and long 20m long auger fills Note stake.The outer tri-axes deep mixing stake of tri-axes deep mixing stake and hole uses stake footpath as 700mm in hole, long 21m tri-axes deep mixing stake, three in hole The lap of splice that axle stirs the every width of stake deeply is 200mm, and the lap of splice for cheating the outer every width of tri-axes deep mixing stake is 300mm, and two rows are deep It is 150mm to stir stake and the lap width of the vertical support pile of foundation ditch.During construction, first outer three axles of tri-axes deep mixing stake and hole are deep in construction hole Stake is stirred, improves to chutable concrete extruding when can limit supporting construction perfusion and extends out or undergauge construction supporting again when its intensity Stake.When the intensity of support pile reaches its design load, it then follows the principle excavation pit of " layering, be segmented, be symmetrical, balanced, in good time ". When being excavated under Guan Liang designed elevation at 50cm, the construction of Guan Liang and first row anchor cable is carried out.Second row anchor cable hole is excavated to set When counting under absolute altitude at 50cm, the construction of waist rail and second row anchor cable is carried out, is constructed successively until excavating to hole bottom designed elevation.
Embodiment 4:As shown in Fig. 1-3 and Fig. 5,7, adopted in muck soil, silt, flour sand and silty clay alternating layers stratum When doing foundation pit supporting system with diaphram wall inner support, excavation of foundation pit depth 16m.Diaphram wall thickness 1000mm, deep 30m. The outer tri-axes deep mixing stake of tri-axes deep mixing stake and hole uses stake footpath as 850mm in hole, long 31m tri-axes deep mixing stake.Three axles are deep in hole The lap of splice for stirring the every width of stake is 250mm, and the lap of splice for cheating the outer every width of tri-axes deep mixing stake is 350mm, and two rows stir stake deeply Lap width with the vertical support pile of foundation ditch is 300mm.During construction, the outer tri-axes deep mixing of tri-axes deep mixing stake and hole in hole of first constructing Stake, when its intensity improve to chutable concrete extruding when can limit supporting construction perfusion extend out or undergauge again under construction ground it is continuous Wall.When the intensity of diaphram wall reaches its design load, it then follows the principle of " layering, be segmented, be symmetrical, balanced, in good time " is excavated Foundation ditch.When being excavated under Guan Liang designed elevation at 50cm, the construction of Guan Liang and first row inner support is carried out.It is excavated in second row When under supported design absolute altitude at 50cm, the construction of waist rail and second row inner support is carried out, constructs set until excavating to hole bottom successively Count absolute altitude.
The specific embodiment of the present invention is explained in detail above in conjunction with accompanying drawing, but the present invention is not limited to above-mentioned reality Example is applied, can also be on the premise of present inventive concept not be departed from those of ordinary skill in the art's possessed knowledge Various changes can be made.

Claims (6)

1. one kind is applied to control foundation pit supporting construction forming method in soft soil horizon, it is characterised in that:Methods described it is specific Step is as follows:
A, smooth location first, prepared for construction tri-axes deep mixing stake;
B, carry out having tri-axes deep mixing stake in the hole of spacing(1)With the outer tri-axes deep mixing stake in hole(2)Construction;
C, wait to cheat interior tri-axes deep mixing stake(1)With the outer tri-axes deep mixing stake in hole(2)After reaching intensity requirement, in two row's tri-axes deep mixing stakes The middle vertical supporting construction of construction foundation pit(3);
D, the vertical supporting construction of foundation ditch is treated(3)After reaching design strength, along the vertical supporting construction of foundation ditch(3)Inner side, it then follows " point Layer, segmentation, it is symmetrical, balanced, in good time " principle excavation pit;
E, when being excavated to Guan Liang(4)Below designed elevation during 50cm, Guan Liang of constructing(4)With first row branch anchor structure(6);
F, when being excavated to second row branch anchor structure(6)Below designed elevation during 50cm, waist rail of constructing(5)With second row branch anchor structure (6);
G, construct successively each row's branch anchor structure(6), until being excavated to hole bottom designed elevation, complete the construction of whole supporting construction.
2. according to claim 1 be applied to control foundation pit supporting construction forming method in soft soil horizon, it is characterised in that: In the step B, tri-axes deep mixing stake in hole(1)Positioned at the vertical supporting construction of foundation ditch(3)Inner side, stake footpath 650mm ~ 850mm it Between, 150 ~ 250mm of lap width of every width, with the vertical supporting construction of foundation ditch(3)100 ~ 200mm of lap width, length compares base Cheat vertical supporting construction(3)Long 1m is used to ensure the vertical supporting construction of foundation ditch(3)Quality.
3. according to claim 1 be applied to control foundation pit supporting construction forming method in soft soil horizon, it is characterised in that: In the step B, outer tri-axes deep mixing stake is cheated(2)Positioned at the vertical supporting construction of foundation ditch(3)Outside, stake footpath 650mm ~ 850mm it Between, 250 ~ 350mm of lap width of every width, with the vertical supporting construction of foundation ditch(3)100 ~ 200mm of lap width, length compares base Cheat vertical supporting construction(3)Long 1m is used to ensure the vertical supporting construction of foundation ditch(3)Quality.
4. according to claim 1 be applied to control foundation pit supporting construction forming method in soft soil horizon, it is characterised in that: In the step C, intensity requirement therein is tri-axes deep mixing stake in finger pit(1)With the outer tri-axes deep mixing stake in hole(2)Reach and can guarantee that The vertical supporting construction of foundation ditch(3)Unlikely when pore-forming or grooving to cave in, and can limits its chutable concrete extruding in perfusion and extended out Or intensity during undergauge.
5. according to claim 1 be applied to control foundation pit supporting construction forming method in soft soil horizon, it is characterised in that: In the step C, the vertical supporting construction of foundation ditch(3)For diaphram wall, rotary digging drilling hole bored concrete pile or long screw auger drilling deposited pile, Its wall thickness, stake footpath or length determine according to the requirement of foundation depth, geological conditions and foundation ditch surrounding enviroment condition.
6. according to claim 1 be applied to control foundation pit supporting construction forming method in soft soil horizon, it is characterised in that: In described step E, F, G, branch anchor structure(6)For anchor cable, anchor pole, soil nailing, inner support diversified forms, by Foundation Pit Support Design personnel Selected according to the concrete condition of foundation ditch.
CN201710710238.7A 2017-08-18 2017-08-18 One kind is applied to control foundation pit supporting construction forming method in soft soil horizon Pending CN107503356A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710710238.7A CN107503356A (en) 2017-08-18 2017-08-18 One kind is applied to control foundation pit supporting construction forming method in soft soil horizon

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710710238.7A CN107503356A (en) 2017-08-18 2017-08-18 One kind is applied to control foundation pit supporting construction forming method in soft soil horizon

Publications (1)

Publication Number Publication Date
CN107503356A true CN107503356A (en) 2017-12-22

Family

ID=60691758

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710710238.7A Pending CN107503356A (en) 2017-08-18 2017-08-18 One kind is applied to control foundation pit supporting construction forming method in soft soil horizon

Country Status (1)

Country Link
CN (1) CN107503356A (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1418277A1 (en) * 2002-11-06 2004-05-12 Chiaverotti BVBA Method for constructing a retaining wall
CN102660955A (en) * 2012-05-17 2012-09-12 上海强劲地基工程股份有限公司 Quick construction method for foundation pit slope support
CN106120805A (en) * 2016-06-23 2016-11-16 程华清 The construction method of the ultra-deep foundation pit supporting under dilapidated house environment

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1418277A1 (en) * 2002-11-06 2004-05-12 Chiaverotti BVBA Method for constructing a retaining wall
CN102660955A (en) * 2012-05-17 2012-09-12 上海强劲地基工程股份有限公司 Quick construction method for foundation pit slope support
CN106120805A (en) * 2016-06-23 2016-11-16 程华清 The construction method of the ultra-deep foundation pit supporting under dilapidated house environment

Similar Documents

Publication Publication Date Title
CN104675403B (en) A kind of underground space construction method and supporting construction
CN104612160B (en) A kind of next-door neighbour's existing building pit maintenance soil structure and construction method
CN105464134B (en) Multi-layer underground space is along inverse combining construction method and supporting construction under existing facility
CN107201908B (en) Construction method for deep-buried central ditch of tunnel in severe cold region
JP7394252B1 (en) Protruding type wind duct structure perpendicular to the vertical direction and construction method at deep subway station
CN106703828A (en) The construction method of building subway station with fabricated lining combination PBA
CN103775110A (en) Underground excavation construction method for multilayer underground space of soft soil area
CN102296961A (en) Karst tunnel large-scale cavern processing method
CN105804119A (en) Underground corridor structure with dual-purpose pile foundations and construction method of underground corridor structure
CN105587320B (en) Rich water sand-pebble layer abnormal shape deep shaft structural system and its construction method
CN108316339A (en) A kind of construction method of water penetration geology large size arch bridge base
CN107503362A (en) A kind of compound antiskid piling wall retaining structure and construction method suitable for reservoir stability
CN108560536A (en) The continuous piling wall construction method of Soil-cement
CN110424434A (en) For filling out the stirring pile water stopping curtain and construction method in the deep area Kuai Shi in sea
CN110593308A (en) Open excavation back pressure construction method for foundation pit of overhead operation subway underground comprehensive pipe gallery
CN104480956B (en) A kind of minor diameter mold-bagged concrete pile composite foundation
CN108867673A (en) A kind of underwater prevention method in the foundation pit based on the curtain that draws water
CN104131566B (en) A kind of basement is without the construction method of horizontal support foundation ditch
CN108149696A (en) The composite supporting construction and construction method that a kind of gib soil nail wall is combined with permanent anti-float anchor rod
CN107489106A (en) A kind of rocky bed subaqueous bearing platform construction method
CN207176700U (en) A kind of solid matter perfusion inner support of pile foundation ditch permanent support structure under complex environment
CN102031742B (en) roadbed longitudinal crack treatment method based on convex tenon type cement grouting geomembrane belt
CN101886385B (en) Construction process of long-auger jet-grouting mixing curtain pile
CN204326080U (en) A kind of next-door neighbour's existing building pit maintenance soil structure
CN106381874A (en) Excavation construction technology for subway station foundation pit in upper-soft lower-hard ground

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20171222