CN107503285B CN201710601718.XA CN201710601718A CN107503285B CN 107503285 B CN107503285 B CN 107503285B CN 201710601718 A CN201710601718 A CN 201710601718A CN 107503285 B CN107503285 B CN 107503285B
Authority
CN
China
Prior art keywords
cross beam
module
middle cross
walking
main couple
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710601718.XA
Other languages
Chinese (zh)
Other versions
CN107503285A (en
Inventor
王祥国
郑祥峰
魏宏亮
修佳岳
李爽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaoning Road & Bridge Construction Group Co ltd
China State Railway Investment Construction Group Co Ltd
Original Assignee
Luqiao Liaoning Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Luqiao Liaoning Construction Group Co Ltd filed Critical Luqiao Liaoning Construction Group Co Ltd
Priority to CN201710601718.XA priority Critical patent/CN107503285B/en
Publication of CN107503285A publication Critical patent/CN107503285A/en
Application granted granted Critical
Publication of CN107503285B publication Critical patent/CN107503285B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F11/00Lifting devices specially adapted for particular uses not otherwise provided for

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mechanical Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of cast-in-place across navigation channel bowstring arch bridge middle cross beam self-propelled adjustable lifting mould equipment, belong to bridge construction technical field of auxiliary equipment, when being constructed to solve existing bowstring arch bridge using first beam rear arch construction, the problem of being influenced by river flood season and having an adverse effect to channel safe, the equipment include main hanging module, being arranged in and main hang walking module, the multiple groups in module main hang in module for pulling up the dead man module of walking sunpender, supporting module and pouring built module is arranged in.It is simple with using, it can reuse, the beneficial effect not influenced by river discharge size, and the length for pouring built module can be adjusted, so that the both ends for pouring built module are more bonded the binder at both ends, reduce leaking for concrete.

Description

Cast-in-place across navigation channel bowstring arch bridge middle cross beam self-propelled adjustable lifting mould equipment
Technical field
The invention belongs to bridge construction technical field of auxiliary equipment, hang mould equipment more particularly to one kind, and in particular to one Cast-in-place across the navigation channel bowstring arch bridge middle cross beam self-propelled adjustable lifting mould equipment of kind.
Background technique
Because bowstring arch bridge has many advantages, such as handsome in appearance, construction is succinct, on both sides of the Changjiang River built extensively in China It uses, middle cross beam construction is the critical process that bowstring arch bridge is built.The construction of bowstring arch bridge at present mostly uses first beam rear arch to construct Form, first beam rear arch construction, which mostly uses, sets up the construction method that full framing pours, due to needing to set up full hall under bridge Bracket thus will receive the influence of water flow size, be influenced that whole year will be led to because of the relationship in flood season by water flow size Construction time be very limited;When in navigation channel of opening the navigation or air flight in this way, structure sheet can be only reached to navigation channel passing ship Body all causes king-sized security risk;And full framing steel material is big, and the strutting system precompressed period is long, completes pouring It, can be because the obstruction of top bridge causes just to complete to extract work after cut portion bracket when extracting full framing afterwards Make, resulting in can not continue to use after a large amount of bracket is cut in follow-up work.
As human cost is higher and higher, the ratio that human cost occupies enterprise's totle drilling cost is increasing, reduce manpower at This is more and more important for the cost for reducing enterprise, and modern comfort the degree of automation is higher, more can be reduced the human cost used, So increasing the degree of automation seems extremely important.
Summary of the invention
According to the above-mentioned deficiencies of the prior art, the technical problem to be solved by the present invention is to propose a kind of cast-in-place across navigation channel system Bar arch bridge middle cross beam self-propelled adjustable lifting mould equipment is constructed for solving existing bowstring arch bridge using first beam rear arch construction When, the problem of influenced by river flood season and have an adverse effect to channel safe, has using simply, can repeat to make With, the beneficial effect not influenced by river discharge size, and the length for pouring built module can be adjusted, so that pouring built module Both ends are more bonded the binder at both ends, reduce leaking for concrete.
The technical solution adopted by the present invention are as follows:
A kind of cast-in-place across navigation channel bowstring arch bridge middle cross beam self-propelled adjustable lifting mould equipment, the equipment include it is main hang module, It is arranged in and main hang walking module, the multiple groups in module main hang in module for pulling up dead man module, the branch of walking sunpender is set Hold mode block and pour built module.
It includes a main couple, four hydraulic pressure supports being arranged on main couple, more settings in master that the master, which hangs module, Middle cross beam bed die sunpender on truss, the walking sunpender being arranged on main couple.The upper end of the hydraulic pressure support and main couple are solid Fixed connection, the axis and horizontal plane of hydraulic pressure support, hydraulic pressure support include hydraulic telescopic rod and are arranged under hydraulic telescopic rod The upper end of the contact chip at end, hydraulic telescopic rod is fixedly connected with main couple, is set in the middle part of contact chip there are two lug, is set on lug There is connecting hole, the lower end of hydraulic telescopic rod is equipped with the second connecting hole, and connecting shaft is additionally provided on contact chip, and connecting shaft passes through connecting hole With the second connecting hole so that contact chip is movably connect with hydraulic telescopic rod.The dead man module includes being arranged on main couple Mounting rack, two telescopic rods being arranged on mounting rack, the rotating wheel being arranged on telescopic rod and setting are used on mounting rack Drive the driving motor of rotating wheel rotation.The supporting module includes traveling wheel hanger, is arranged on walking parsing davit Walking beam and the lower beam being arranged on walking beam.The walking module include two rail being arranged on binder, four set Set the voluntarily steel wheel below main couple and two voluntarily motors being arranged in below main couple, two voluntarily motor driven is voluntarily Steel wheel rotation.The built module that pours includes a set of middle cross beam side form and a set of middle cross beam bed die.It wears on the top of the walking sunpender Main couple is crossed, one end that walking sunpender passes through main couple is equipped with sunpender nut and top cross-arm beam, the lower part for sunpender of walking are worn Middle cross beam is crossed, one end that walking sunpender passes through middle cross beam is equipped with traveling wheel hanger, is equipped with walking beam in traveling wheel hanger, Walking beam is connect close to one end of the middle cross beam poured with middle cross beam bed die boom foot, and walking beam is arranged in lower beam Top.Every set middle cross beam side form includes two groups of middle cross beam side form units being parallel to each other, and each middle cross beam side form unit includes more The bottom of a middle cross beam side form module, middle cross beam side form is connect by hinge with middle cross beam bed die, is set at the top of middle cross beam side form There is the second mounting hole, the second mounting hole is equipped with pull rod.The main couple is equipped with control module and signal receiving module, control Module is connect with voluntarily motor by conducting wire, and signal receiving module is connect with control module by conducting wire.
The medicine have the advantages that having using simply, it can reuse, not had by what river discharge size was influenced Beneficial effect, and the length for pouring built module can be adjusted, so that the both ends for pouring built module are more bonded the binder at both ends, reduce mixed Solidifying soil leaks.
Detailed description of the invention
Content expressed by this specification attached drawing and the label in figure are briefly described below:
Fig. 1 is cast-in-place across the navigation channel bowstring arch bridge middle cross beam self-propelled adjustable lifting mould equipment of the specific embodiment of the invention Cross-sectional view;
Fig. 2 is cast-in-place across the navigation channel bowstring arch bridge middle cross beam self-propelled adjustable lifting mould equipment of the specific embodiment of the invention Partial enlarged view;
Fig. 3 is cast-in-place across the navigation channel bowstring arch bridge middle cross beam self-propelled adjustable lifting mould equipment of the specific embodiment of the invention Structure chart;
Fig. 4 is that cast-in-place across the navigation channel bowstring arch bridge middle cross beam of the specific embodiment of the invention is poured with self-propelled adjustable lifting mould equipment The structure chart of the mobile bed die of built module.
Specific embodiment
Below by the description to embodiment, the shape of for example related each component of a specific embodiment of the invention, structure It makes, the mutual alignment between each section and connection relationship, the effect of each section and working principle, manufacturing process and the side of operating with Method etc., is described in further detail, completeer to help those skilled in the art to have inventive concept of the invention, technical solution Whole, accurate and deep understanding.
Using the bowstring arch bridge of first beam rear arch construction construction when proceeding to middle cross beam and pouring, two binder is Completion of processing, so when work in-process crossbeam middle cross beam can be poured using binder auxiliary.A kind of cast-in-place across navigation channel tied arch Bridge middle cross beam self-propelled adjustable lifting mould equipment, the equipment include a main couple, two rail being arranged on binder, four Voluntarily steel wheel below main couple, two voluntarily motors being arranged in below main couple, four hydraulic pressure supports, Duo Genzhong are set Crossbeam bed die sunpender, eight walking sunpenders, four steel bearing beams, multiple groups are arranged on main couple for pulling up the dead man of walking sunpender Module, more top cross-arm beams, multiple sunpender nuts, multiple hydraulic tops, a set of middle cross beam side form, a set of middle cross beam bed die, two The anti-fall anti-throwing platform of root lower beam, two walking beams, four traveling wheel hangers, a set of full protection, two staircases and a remote control Device.
Voluntarily steel wheel is divided into two groups described in four, and every group includes two voluntarily steel wheels, and two groups are separately positioned on main couple Both ends.Two rail are separately positioned on the top of two binders, and two rail are parallel to each other.Main couple both ends are set voluntarily Steel wheel is arranged on rail, and two both ends that voluntarily motor is separately positioned on main couple are used to drive the voluntarily steel at main couple both ends Wheel.By voluntarily motor driven voluntarily steel wheel, main couple is moved on rail.For Auxiliary support, the main truss The both ends of frame are respectively provided with two hydraulic pressure supports, and the both ends of hydraulic pressure support are separately connected main couple and binder, the upper end of hydraulic pressure support It is fixedly connected with main couple, the axis and horizontal plane of hydraulic pressure support, hydraulic pressure support includes hydraulic telescopic rod and is arranged in liquid Press the contact chip of telescopic rod lower end, the upper end of hydraulic telescopic rod is fixedly connected with main couple, set in the middle part of contact chip there are two it is convex Ear, lug are equipped with connecting hole, and the lower end of hydraulic telescopic rod is equipped with the second connecting hole, the diameter of the second connecting hole and connecting hole Diameter is equal, is additionally provided with connecting shaft on contact chip, and the diameter of connecting shaft is equal to the diameter of connecting hole, connecting shaft pass through connecting hole and Second connecting hole, so that contact chip is movably connect with hydraulic telescopic rod, contact chip can be rotated around the axis of connecting shaft.In this way, i.e. Keep the upper surface of binder uneven, contact chip also can keep well contacting with the upper surface of binder, reduce pressure.On main couple also Equipped with more middle cross beam bed die sunpenders, main couple is equipped with multiple vertical mounting holes, and middle cross beam bed die sunpender is inserted into mounting hole, The upper end of middle cross beam bed die sunpender is equipped with sunpender nut and top cross-arm beam, and middle cross beam bed die sunpender passes through sunpender nut and top Cross-arm beam is hung on main couple, and the lower part of middle cross beam bed die sunpender is equipped with lower beam, and lower beam is equipped with a set of middle cross beam bed die, Middle cross beam bed die is equipped with a set of middle cross beam side form, the wherein the middle cross beam just space between middle cross beam side form and middle cross beam bed die It pours.The dead man module include the mounting rack being arranged on main couple, two be arranged on mounting rack telescopic rods, setting exist Rotating wheel on telescopic rod and the driving motor on mounting rack for driving rotating wheel to rotate is set.
In order to further support middle cross beam bed die when pouring, with pouring or preparing to pour adjacent It is all reserved with vertical duct on two middle cross beams for having poured completion, and is pouring or is preparing to have poured adjacent two It is poured and is equipped with walking sunpender in the duct on the middle cross beam of completion, the walking sunpender of the upper end in duct is equipped with steel bearing beam, row The top for walking sunpender passes through main couple, and one end that walking sunpender passes through main couple is equipped with sunpender nut and top cross-arm beam.Row The lower part for walking sunpender passes through middle cross beam, and one end that walking sunpender passes through middle cross beam is equipped with traveling wheel hanger, and traveling wheel is hung Walking beam is equipped in frame, walking beam is connect close to one end of the middle cross beam poured with middle cross beam bed die boom foot, lower cross The top of walking beam is arranged in beam.
Every set middle cross beam side form includes two groups of middle cross beam side form units being parallel to each other, and each middle cross beam side form unit includes Multiple middle cross beam side form modules.The bottom of middle cross beam side form is connect by hinge with middle cross beam bed die, the top of middle cross beam side form Equipped with the second mounting hole, the second mounting hole is equipped with pull rod, by the fixed middle cross beam side form of pull rod, so that in middle cross beam side The angle between middle cross beam side form and middle cross beam bed die is kept when pouring in mould.
Since the levelness of the side of binder is poor, and the straightness of binder can not be completely secured well, in order to make The both ends for obtaining middle cross beam side form and middle cross beam bed die can contact well with binder, so that the both ends for pouring built module are more bonded two The binder at end reduces leaking for concrete.The both ends of middle cross beam bed die are respectively provided with a mobile bed die, the both ends of middle cross beam bed die It is respectively provided with a driving telescopic rod, one end of telescopic rod is driven to be fixedly connected with middle cross beam bed die, drives telescopic rod far from middle cross One end of beam bottom board is fixedly connected with mobile bed die, by driving the mobile bed die of flexible driving of telescopic rod mobile.In order to seal The gap of mobile bed die and binder contact position, mobile bed die are equipped with sheet rubber far from one end of middle cross beam bed die, when mobile bottom Sheet rubber is squeezed after mould is contacted with binder, and then seals the gap of mobile bed die and binder contact position.
The main couple is equipped with control module and signal receiving module, and control module is connected with voluntarily motor by conducting wire It connects, signal receiving module is connect with control module by conducting wire, and the remote control device sends signal, and signal receiving module receives letter Control module is passed to after number, control module controls the rotation and rotation direction of voluntarily motor.
In order to facilitate main couple above and below worker, the both ends of the main couple are respectively provided with a staircase.
In order to protect the worker operated on main couple, the top two sides of the main couple are equipped with the anti-fall anti-throwing of full protection Platform, the anti-fall anti-throwing platform of full protection can facilitate worker to walk, moreover it is possible to prevent article from falling in river.
The present invention is exemplarily described above in conjunction with attached drawing, it is clear that the present invention implements not by aforesaid way Limitation, as long as the improvement for the various unsubstantialities that the inventive concept and technical scheme of the present invention carry out is used, or without changing It is within the scope of the present invention into the conception and technical scheme of the invention are directly applied to other occasions.This hair Bright protection scope should be determined by the scope of protection defined in the claims.

Claims (5)

1. a kind of cast-in-place across navigation channel bowstring arch bridge middle cross beam self-propelled adjustable lifting mould equipment, it is characterised in that: the equipment includes It is main to hang module, be arranged in and main hang walking module, the multiple groups in module main hang in module for pulling up pulling out for walking sunpender is set Bar module, the supporting module being arranged in walking module and it is arranged in supporting module and pours built module;The master hangs module packet Include a main couple, four hydraulic pressure supports being arranged on main couple, the more middle cross beam bed die sunpenders being arranged on main couple, Walking sunpender on main couple is set;The upper end of the hydraulic pressure support is fixedly connected with main couple, the axis of hydraulic pressure support with Horizontal plane, hydraulic pressure support include hydraulic telescopic rod and the contact chip that hydraulic telescopic rod lower end is arranged in, hydraulic telescopic rod Upper end is fixedly connected with main couple, is set in the middle part of contact chip there are two lug, and lug is equipped with connecting hole, under hydraulic telescopic rod End is equipped with the second connecting hole, connecting shaft is additionally provided on contact chip, connecting shaft passes through connecting hole and the second connecting hole, so that contact chip It is movably connect with hydraulic telescopic rod;The supporting module includes traveling wheel hanger, the walking walked on parsing davit is arranged in Beam and the lower beam being arranged on walking beam;The top of the walking sunpender passes through main couple, and walking sunpender passes through main couple One end is equipped with sunpender nut and top cross-arm beam, and the lower part for sunpender of walking passes through middle cross beam, and walking sunpender passes through middle cross beam One end is equipped with traveling wheel hanger, walking beam is equipped in traveling wheel hanger, walking beam is close to the middle cross beam poured One end is connect with middle cross beam bed die boom foot, and the top of walking beam is arranged in lower beam.
2. cast-in-place across navigation channel bowstring arch bridge middle cross beam self-propelled adjustable lifting mould equipment according to claim 1, feature Be: the walking module include two rail being arranged on binder, four voluntarily steel wheels being arranged in below main couple and Two voluntarily motors being arranged in below main couple, two voluntarily voluntarily steel wheel rotates motor driven.
3. cast-in-place across navigation channel bowstring arch bridge middle cross beam self-propelled adjustable lifting mould equipment according to claim 1, feature Be: the built module that pours includes a set of middle cross beam side form and a set of middle cross beam bed die.
4. cast-in-place across navigation channel bowstring arch bridge middle cross beam self-propelled adjustable lifting mould equipment according to claim 3, feature Be: every set middle cross beam side form includes two groups of middle cross beam side form units being parallel to each other, and each middle cross beam side form unit includes more The bottom of a middle cross beam side form module, middle cross beam side form is connect by hinge with middle cross beam bed die, is set at the top of middle cross beam side form There is the second mounting hole, the second mounting hole is equipped with pull rod.
5. cast-in-place across navigation channel bowstring arch bridge middle cross beam self-propelled adjustable lifting mould equipment according to claim 2, feature Be: the main couple is equipped with control module and signal receiving module, and control module is connect with voluntarily motor by conducting wire, believes Number receiving module is connect with control module by conducting wire.
CN201710601718.XA 2017-07-21 2017-07-21 Cast-in-place across navigation channel bowstring arch bridge middle cross beam self-propelled adjustable lifting mould equipment Active CN107503285B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710601718.XA CN107503285B (en) 2017-07-21 2017-07-21 Cast-in-place across navigation channel bowstring arch bridge middle cross beam self-propelled adjustable lifting mould equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710601718.XA CN107503285B (en) 2017-07-21 2017-07-21 Cast-in-place across navigation channel bowstring arch bridge middle cross beam self-propelled adjustable lifting mould equipment

Publications (2)

Publication Number Publication Date
CN107503285A CN107503285A (en) 2017-12-22
CN107503285B true CN107503285B (en) 2019-08-27

Family

ID=60689295

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710601718.XA Active CN107503285B (en) 2017-07-21 2017-07-21 Cast-in-place across navigation channel bowstring arch bridge middle cross beam self-propelled adjustable lifting mould equipment

Country Status (1)

Country Link
CN (1) CN107503285B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110792038B (en) * 2019-11-11 2021-06-25 山东交通学院 Self-propelled mold hanging tool and method for high-altitude cast-in-place of tie rod arch bridge beam

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008214940A (en) * 2007-03-02 2008-09-18 Sumitomo Mitsui Construction Co Ltd Movable suspension timbering
CN203188121U (en) * 2013-03-01 2013-09-11 浙江省交通工程建设集团有限公司 Cast-in-place bridge floor suspending mold of half-through or through arch bridge
CN203947771U (en) * 2014-07-16 2014-11-19 北京万兴建筑集团有限公司 A kind of Bailey beam pendent form support system
CN205557336U (en) * 2015-11-26 2016-09-07 柳州欧维姆机械股份有限公司 Construct high mound from promoting walking template device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008214940A (en) * 2007-03-02 2008-09-18 Sumitomo Mitsui Construction Co Ltd Movable suspension timbering
CN203188121U (en) * 2013-03-01 2013-09-11 浙江省交通工程建设集团有限公司 Cast-in-place bridge floor suspending mold of half-through or through arch bridge
CN203947771U (en) * 2014-07-16 2014-11-19 北京万兴建筑集团有限公司 A kind of Bailey beam pendent form support system
CN205557336U (en) * 2015-11-26 2016-09-07 柳州欧维姆机械股份有限公司 Construct high mound from promoting walking template device

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
五尺沟大跨度钢管混凝土简支系杆拱桥施工方法研究;殷奇等;《第十七届全国桥梁学术会议》;20160831;第491页 *
贝雷桁架式挂篮的设计和施工;徐凯峰;《中国西部科技》;20080515;第26-27页 *

Also Published As

Publication number Publication date
CN107503285A (en) 2017-12-22

Similar Documents

Publication Publication Date Title
CN105365042B (en) A kind of preparation method of prefabricated small box girder
CN102071798B (en) Hydraulic climbing system for wall-attached support frame
CN207811202U (en) A kind of self-propelled aloft working platform
CN102242602A (en) Spiral pile drilling machine
CN207392708U (en) A kind of Fast Installation scaffold for building
CN107503285B (en) Cast-in-place across navigation channel bowstring arch bridge middle cross beam self-propelled adjustable lifting mould equipment
CN107829368B (en) Cast-in-place across navigation channel bowstring arch bridge middle cross beam hangs mould equipment with self-propelled
CN205954489U (en) Stride cast -in -place space of business line steel structure construction protection on bridge and move movable support
CN102561193A (en) Construction technology of closure section for rotary continuous beam for overpass electrified railway and hanging basket thereof
CN2838516Y (en) Outdoor body surfaces cleaning device
CN206571448U (en) Bridge-type tube drawbench
CN109356618A (en) A kind of simple integral movable type square type tunnel frame and its construction method
CN203129025U (en) Suspension fixing device for hanging basket
CN104179338B (en) Plaster a wall smooth all-in-one at a high speed
CN205531309U (en) Concave shape floor forming device's glue covers formula structure of zooming
CN104313984A (en) Kerbstone mechanical-hoisting and seam-spacing method-based construction method, hoisting tool and seam-spacing tool
CN103556603B (en) Rock plastic sealing construction trolley and construction method
CN201865053U (en) Continuous steel beam template
CN2286769Y (en) Cement concrete road roughening and maintaining machine
CN203583439U (en) Concrete faced rockfill dam plastic water stop construction trolley
CN207484941U (en) A kind of closed cover of the outer builder's jack of architectural engineering
CN206205905U (en) A kind of chassis suitable for City Subway Station abnormity big cross section lining cutting one-piece casting
CN209469456U (en) A kind of tunnel ditch template
CN204803771U (en) High pier bridge disease of highway inspection punishment facility
CN208310158U (en) Construction protection crosshead

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20201210

Address after: No.34, Lanjun Road, Tiexi District, Shenyang, Liaoning Province, 110000

Patentee after: LIAONING TRAFFIC ENGINEERING Co.,Ltd.

Patentee after: CHINA STATE RAILWAY INVESTMENT CONSTRUCTION GROUP Co.,Ltd.

Address before: 110000 No. 7 glide Road, Tiexi District, Shenyang, Liaoning

Patentee before: LIAONING ROAD & BRIDGE CONSTRUCTION GROUP Co.,Ltd.

TR01 Transfer of patent right
CP03 Change of name, title or address

Address after: 110000 No. 7 glide Road, Tiexi District, Shenyang, Liaoning

Patentee after: LIAONING ROAD & BRIDGE CONSTRUCTION GROUP CO.,LTD.

Patentee after: CHINA STATE RAILWAY INVESTMENT CONSTRUCTION GROUP Co.,Ltd.

Address before: No.34, Lanjun Road, Tiexi District, Shenyang, Liaoning Province, 110000

Patentee before: LIAONING TRAFFIC ENGINEERING Co.,Ltd.

Patentee before: CHINA STATE RAILWAY INVESTMENT CONSTRUCTION GROUP Co.,Ltd.

CP03 Change of name, title or address