CN107486547A - exhaust block and die assembly - Google Patents

exhaust block and die assembly Download PDF

Info

Publication number
CN107486547A
CN107486547A CN201710927001.4A CN201710927001A CN107486547A CN 107486547 A CN107486547 A CN 107486547A CN 201710927001 A CN201710927001 A CN 201710927001A CN 107486547 A CN107486547 A CN 107486547A
Authority
CN
China
Prior art keywords
briquetting
demoulding
groove
projected parts
strip projected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710927001.4A
Other languages
Chinese (zh)
Other versions
CN107486547B (en
Inventor
郭增未
王树建
王洪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Fali Automobile Die Casting Co ltd
Original Assignee
TIANJIN FALI AUTOMOBILE DIE CASTING FACTORY
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN FALI AUTOMOBILE DIE CASTING FACTORY filed Critical TIANJIN FALI AUTOMOBILE DIE CASTING FACTORY
Priority to CN201710927001.4A priority Critical patent/CN107486547B/en
Publication of CN107486547A publication Critical patent/CN107486547A/en
Application granted granted Critical
Publication of CN107486547B publication Critical patent/CN107486547B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D17/00Pressure die casting or injection die casting, i.e. casting in which the metal is forced into a mould under high pressure
    • B22D17/20Accessories: Details
    • B22D17/22Dies; Die plates; Die supports; Cooling equipment for dies; Accessories for loosening and ejecting castings from dies
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D17/00Pressure die casting or injection die casting, i.e. casting in which the metal is forced into a mould under high pressure
    • B22D17/20Accessories: Details
    • B22D17/22Dies; Die plates; Die supports; Cooling equipment for dies; Accessories for loosening and ejecting castings from dies
    • B22D17/2236Equipment for loosening or ejecting castings from dies

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Exhaust Silencers (AREA)

Abstract

The invention provides a kind of exhaust block and die assembly, it is related to the technical field of die casting, the exhaust block includes the first briquetting and the second briquetting, along the length direction of the first briquetting, the upper surface of first briquetting is provided with strip projected parts, groove corresponding with strip projected parts is provided with the second briquetting, after the first briquetting and the second briquetting fasten, gap between strip projected parts and groove be present, gap forms exhaust passage;Along the width of the strip projected parts, the upper surface of the strip projected parts is provided with curved portions, and the bending direction of curved portions deviates from the upper surface of the first briquetting, can increase the leaving area of mold cavity, improve exhaust efficiency;Along the length direction of strip projected parts, multiple flow-disturbing grooves are arranged at intervals with strip projected parts, it is raised that multiple flow-disturbings corresponding with flow-disturbing groove are arranged at intervals with groove, flow-disturbing groove is raised for increasing stroke of the aluminium alloy on briquetting with flow-disturbing, prevents from occurring in injection process aluminium-plated phenomenon at exhaust block.

Description

Exhaust block and die assembly
Technical field
The present invention relates to the technical field of die casting, more particularly, to a kind of exhaust block and die assembly.
Background technology
Usually, when carrying out Die Casting, if the air or caused due to mould release etc. of mould inside remaining Gas is rolled into molten metal, then the defects of cast-internal produces stomata will occur.When the exhaust structure of mould does not conform to When managing and being machined this casting piece, easily occur gas hole defect on cutting face, influence the quality of casting, even have sealing will Therefore the result of poor sealing can occur for the region asked.In order to reduce because stomata causes scrapping for casting, the exhaust knot of mould Structure just seems critically important.The exhaust passage of exhaust block connects with the die cavity of mould, and the gas in shaping in die cavity passes through row The exhaust passage of air parcel is discharged to the outside of mould, and the molten metals such as the aluminium of inflow exhaust block is flowed out it to mold exterior Before, the cooled and solidified at exhaust block.The castings product effectively discharged thereby, it is possible to obtain the type intracavity gas.
In industrial production, the exhaust apparatus of washboard-type is relatively conventional, can typically meet mold use requirement, produces conjunction The product of lattice.But the capacity size of this exhaust apparatus depends on the size of exhaustion plate, only sufficiently large exhaustion plate is Sufficiently large capacity can be produced.This just proposes higher requirement to the casting die of entirety, on the one hand, is arranged using large area The mould of gas plate, it is framed to need to increase;On the other hand, the casting pressure of press casting procedure rises mould power caused by the exhaustion plate The clamp force, it is necessary to bigger can be increased, when the mould power that rises is less than clamp force, mould in process of production just will not be in point of mould The splashing of aluminium liquid is caused on type face, the quality of casting is influenceed and causes danger to operating personnel.
The content of the invention
It is an object of the invention to provide a kind of exhaust block and die assembly, to alleviate existing exhaust apparatus capacity The low technical problem of efficiency.
Exhaust block provided by the invention, including the first briquetting and the second briquetting, along the length direction of first briquetting, institute The upper surface for stating the first briquetting is provided with strip projected parts, is provided with second briquetting corresponding with the strip projected parts recessed Groove, after first briquetting and the second briquetting fasten, gap between the strip projected parts and groove be present, the gap is described Exhaust block length direction forms exhaust passage;
Along the width of the strip projected parts, the upper surface of the strip projected parts is provided with curved portions, the curved portions Bending direction deviate from the upper surface of first briquetting, for increasing the leaving area of the exhaust passage, improve exhaust effect Rate;
Along the length direction of the strip projected parts, multiple flow-disturbing grooves, the groove are arranged at intervals with the strip projected parts On to be arranged at intervals with multiple corresponding with flow-disturbing groove flow-disturbings raised, the flow-disturbing groove with flow-disturbing is raised is used to increase aluminium alloy Stroke in exhaust passage.
Further, first briquetting includes demoulding hole, and demoulding bar is provided with the demoulding hole, and the demoulding bar is used Jacked up in by the casting feedstock of solidification.
Further, first briquetting includes ejecting mechanism, for the demoulding bar to be released into the demoulding hole, and For accommodating the accommodating chamber of the ejecting mechanism, the accommodating chamber connects with the demoulding hole;
The ejecting mechanism includes release link, push pedal, spring and center-pole, and the release link and demoulding bar are fixed on described The front of push pedal, the both ends of the spring are connected to the back side of the push pedal and the bottom surface of the accommodating chamber, and the spring is used In promoting the push pedal, so that the demoulding bar stretches out the demoulding hole;The center-pole is fixed in the accommodating chamber, and is hung down Directly run through the push pedal, so that the push pedal is slided along the center-pole;
First briquetting includes reset hole, and the reset hole is located at the both sides of the exhaust passage, and the release link is used When first briquetting and the second briquetting compression, the push pedal is promoted inwardly to move, so that described in demoulding bar retraction In demoulding hole.
Further, the first jet channel is provided with the demoulding bar, for being connected with source of the gas;First jet is led to First gas outlet in road is located at the side wall of the demoulding bar, and the opening of first gas outlet is inclined to direction where the push pedal Tiltedly;
The groove that keeps out the wind corresponding with first gas outlet, the opening of the groove that keeps out the wind are provided with the inwall in the demoulding hole Direction towards first gas outlet so that the gas sprayed in first gas outlet enter it is described keep out the wind in groove, for will The demoulding bar ejects the demoulding hole.
Further, the demoulding bar includes bar portion and cap body, the bar portion towards one end of cap body be to the cap body The first raised circular conical surface of side, cap body are that court deviates from the second raised circular cone of the bar portion direction towards one end of the bar portion Face, and gap be present between the bar portion and cap body;Be provided with air guide port on first circular conical surface of the bar portion so that gas from Gap between first circular conical surface and the second circular conical surface is blown out to surrounding.
Further, the end set of the release link has stop configurations, throwing of the release link to the stop configurations Shadow falls in the stop configurations;The aperture position of the reset hole is provided with backstop groove corresponding with the stop configurations, uses In preventing described in the end retraction of the release link below the opening of reset hole.
Further, the second jet channel is provided with the release link, second jet channel includes the second outlet Mouthful, second gas outlet is located at the stop configurations towards the side of the push pedal, and the outlet side of second gas outlet To vertically outward-dipping.
Further, cooling duct is provided with first briquetting, the cooling duct is used to conduct coolant, so that The casting feedstock entered between first briquetting and the second briquetting faster dissipated heat and cooled and solidified.
Further, the cooling duct includes the feed pathway set along the first briquetting length direction and goes out liquid and lead to Road, and multiple bending channels corresponding with the curved portions, the bending channel be arranged at the feed pathway with it is described go out Between liquid passage, and connected respectively with the feed pathway and liquid outlet channel, the bending channel is used to increase and the exhaust The heat exchange area of passage.
Die assembly provided by the invention, including above-mentioned exhaust block.
Exhaust block provided by the invention, including the first briquetting and the second briquetting, along the length direction of first briquetting, institute The upper surface for stating the first briquetting is provided with strip projected parts, is provided with second briquetting corresponding with the strip projected parts recessed Groove, after first briquetting and the second briquetting fasten, gap between the strip projected parts and groove be present, the gap is described Exhaust block length direction forms exhaust passage.Along the width of strip projected parts, the upper surface of the strip projected parts is provided with arc Shape portion, the bending direction of the curved portions deviates from the upper surface of first briquetting, compared to the row of washboard-type in the prior art Air parcel, because the strip projected parts in the application include curved portions, the effective width of exhaust passage adds, so as to not change In the case of becoming exhaust block width, the area of exhaust is added, so as to increase the efficiency of exhaust, while will not be produced excessive Rise mould power, and the hardly installation to mould and use has any impact.Along the length direction of the strip projected parts, the bar Multiple flow-disturbing grooves are arranged at intervals with shape projection, it is convex that multiple flow-disturbings corresponding with the flow-disturbing groove are arranged at intervals with the groove Rise, when aluminium alloy is by flow-disturbing groove and flow-disturbing projection position, the setback structure of flow-disturbing groove can make aluminium alloy in advance side To overturning repeatedly, stroke of the aluminium alloy on briquetting can be increased, aluminium alloy is had the time dissipated heat and cooled and solidified of abundance, Prevent from occurring in injection process aluminium-plated phenomenon at exhaust block.
Die assembly provided by the invention, including above-mentioned exhaust block, exhaust block include the first briquetting and the second briquetting, edge The length direction of first briquetting, the upper surface of first briquetting are provided with strip projected parts, set on second briquetting Have a groove corresponding with the strip projected parts, after first briquetting and the second briquetting fasten, the strip projected parts and groove it Between gap be present, the gap forms exhaust passage in the exhaust block length direction.It is described along the width of strip projected parts The upper surface of strip projected parts is provided with curved portions, and the bending direction of the curved portions deviates from the upper surface of first briquetting, phase Than in the exhaust block of washboard-type in the prior art because the projection in the application includes curved portions, exhaust passage it is effective Width adds, so that in the case where not changing exhaust block width, the area of exhaust is added, so as to increase the effect of exhaust Rate, while the excessive mould power that rises will not be produced, the hardly installation to mould and use has any impact.Along the strip Raised length direction, be arranged at intervals with multiple flow-disturbing grooves on the strip projected parts, be arranged at intervals with the groove it is multiple with Flow-disturbing corresponding to the flow-disturbing groove is raised, when aluminium alloy is by flow-disturbing groove and flow-disturbing projection position, the setback of flow-disturbing groove Structure can be such that aluminium alloy is overturn repeatedly in direction of advance, can increase stroke of the aluminium alloy on briquetting, aluminium alloy is had abundance Time dissipated heat and cooled and solidified, prevent from occurring in injection process aluminium-plated phenomenon at exhaust block.
Brief description of the drawings
, below will be to specific in order to illustrate more clearly of the specific embodiment of the invention or technical scheme of the prior art The required accompanying drawing used is briefly described in embodiment or description of the prior art, it should be apparent that, in describing below Accompanying drawing is some embodiments of the present invention, for those of ordinary skill in the art, before creative work is not paid Put, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is the schematic diagram for the exhaust block that the embodiment of the present invention 1 provides;
Fig. 2 is the partial enlarged drawing at location A in Fig. 1;
Fig. 3 is the demoulding hole location sectional view for the exhaust block that the embodiment of the present invention 1 provides;
Fig. 4 is the sectional view of the cooling duct overlook direction for the exhaust block that the embodiment of the present invention 1 provides;
Fig. 5 is the top view of the first briquetting of the exhaust block that the embodiment of the present invention 1 provides;
Fig. 6 is a kind of a kind of cross-sectional view in state left view direction of first briquetting for the exhaust block that the embodiment of the present invention 1 provides;
Fig. 7 is the partial enlarged drawing at B location in Fig. 6;
Fig. 8 is a kind of the transversal of the first briquetting another kind state left view direction for the exhaust block that the embodiment of the present invention 1 provides Figure;
Fig. 9 is the cross-sectional view in another kind the first briquetting left view direction for the exhaust block that the embodiment of the present invention 1 provides;
Figure 10 is the partial enlarged drawing of location of C in Fig. 9;
Figure 11 is the sectional view in the first briquetting left view direction of the exhaust block that the embodiment of the present invention 2 provides;
Figure 12 is the sectional view of the cooling duct overlook direction for the exhaust block that the embodiment of the present invention 2 provides;
Figure 13 is the sectional view of the cooling duct overlook direction for the exhaust block that the embodiment of the present invention 3 provides.
Icon:The briquettings of 100- first;110- strip projected parts;120- flow-disturbing grooves;130- curved portions;The briquettings of 200- second; 210- grooves;300- cooling ducts;310- bending channels;410- demoulding bars;411- cap bodies;412- air guide ports;420- demouldings hole; 421- keeps out the wind groove;510- release links;511- stop configurations;512- backstop grooves;The jet channels of 513- second;520- push pedals;530- Spring;The gas outlets of 540- first.
Embodiment
Technical scheme is clearly and completely described below in conjunction with accompanying drawing, it is clear that described implementation Example is part of the embodiment of the present invention, rather than whole embodiments.Based on the embodiment in the present invention, ordinary skill The every other embodiment that personnel are obtained under the premise of creative work is not made, belongs to the scope of protection of the invention.
In the description of the invention, it is necessary to explanation, such as occur term " " center ", " on ", " under ", "left", "right", " vertical ", " level ", " interior ", " outer " etc., its orientation indicated or position relationship are to be closed based on orientation shown in the drawings or position System, it is for only for ease of and describes the present invention and simplify description, rather than indicates or imply that signified device or element must have Specific orientation, with specific azimuth configuration and operation, therefore be not considered as limiting the invention.In addition, such as there is art Language " first ", " second ", " the 3rd " are only used for describing purpose, and it is not intended that instruction or hint relative importance.
The invention provides a kind of exhaust block, multiple embodiments is given below the structure of exhaust block provided by the invention is entered Row is described in detail.
Embodiment 1
As shown in Figure 1-Figure 3, exhaust block provided by the invention, including the first briquetting 100 and the second briquetting 200, along described The length direction of first briquetting 100, the upper surface of first briquetting 100 are provided with strip projected parts 110, second briquetting Groove 210 corresponding with the strip projected parts 110 is provided with 200, after the briquetting 200 of the first briquetting 100 and second fastens, Gap between the strip projected parts 110 and groove 210 be present, the gap forms exhaust in the exhaust block length direction and led to Road.Along the width of strip projected parts 110, the upper surface of the strip projected parts 110 is provided with curved portions 130, the curved portions 130 bending direction deviates from the upper surface of first briquetting 100, compared to the exhaust block of washboard-type in the prior art, because Strip projected parts 110 in the application include curved portions 130, so the effective width of exhaust passage adds, so as to not change In the case of exhaust block width, the area of exhaust is added, so as to increase the efficiency of exhaust, while excessive rise will not be produced Mould power, the hardly installation to mould and use have any impact.It is described along the length direction of the strip projected parts 110 Multiple flow-disturbing grooves 120 are arranged at intervals with strip projected parts 110, the multiple and flow-disturbing groove is arranged at intervals with the groove 210 Flow-disturbing corresponding to 120 is raised, when aluminium alloy is by flow-disturbing groove 120 and flow-disturbing projection position, the setback knot of flow-disturbing groove 120 Structure can be such that aluminium alloy is overturn repeatedly in direction of advance, can increase stroke of the aluminium alloy on briquetting, make aluminium alloy have abundance when Between dissipated heat and cooled and solidified, prevent from occurring in injection process aluminium-plated phenomenon at exhaust block.
Curved portions 130 can be multiple, and multiple reclinate curved portions 130 can make the surface shape of strip projected parts 110 Drape, so as to add the top surface area of strip projected parts 110, it is logical that exhaust can be increased in the case where the width of briquetting is certain The effective width in road, so as to add the leaving area of exhaust block die cavity, improve exhaust efficiency.
As shown in figure 4, in order to accelerate the setting rate of casting feedstock, casting feedstock can be aluminium liquid, first briquetting Cooling duct 300 is provided with 100, the cooling duct 300 is used to conduct coolant, and coolant can be water, and water is continuous Flow through cooling duct 300 to cool to the first briquetting 100, so as to absorb aluminium liquid heat, further ensure that aluminium liquid will not splash Go out outside mould.
In order to be misplaced when preventing the first briquetting 100 and the second briquetting 200 from combining, cause strip projected parts 110 and groove 210 parts stick together, and other part gap is larger.Influence exhaust.The upper surface of first briquetting 100 is provided with fixed Position block, is provided with locating slot corresponding with the locating piece on second briquetting 200., can after locating slot is combined with locating piece The combination so that the first briquetting 100 and the second briquetting 200 just align, so as to so that strip projected parts 110 are just matched somebody with somebody with groove 210 Conjunction forms uniform exhaust passage.
Further, be provided with fixing groove on the bottom surface of the briquetting 200 of the first briquetting 100 and second, its be used for The dynamic model and cover half of mould position fixation respectively, prevent that block structure is vented during Die Casting to be moved on mould.
As shown in Figure 5, it is preferred that, it is necessary to clear up the aluminium flake being set on the first briquetting 100, still after die sinking Because aluminium flake is close on the first briquetting 100, it is not easy to is peeled off.First briquetting 100 includes demoulding hole 420, the demoulding Demoulding bar 410 is provided with hole 420, the demoulding bar 410 is used to jack up the casting feedstock of solidification.
Demoulding hole 420 can be through hole, through the aluminium that will can be covered on the first briquetting 100 of demoulding bar 410 of through hole Film ejects.
As Figure 6-Figure 8, it is preferable that first briquetting 100 can include ejecting mechanism, for by the demoulding bar 410 release the demoulding hole 420, and for accommodating the accommodating chamber of the ejecting mechanism, the accommodating chamber and the demoulding hole 420 connections.The ejecting mechanism can include release link 510, push pedal 520, spring 530 and center-pole, release link 510 and demoulding The quantity of bar 410 is multiple, and the release link 510 and demoulding bar 410 are fixed on the front of the push pedal 520, and demoulding bar 410 can To be predominantly located at the front end of the first briquetting 100, the back side and the appearance of the both ends of spring 530 respectively against the push pedal 520 Receive the bottom surface of chamber, spring 530 is in compressive state, and the spring 530 of compression is used to promote the push pedal 520, can make described de- Film bar 410 stretches out the demoulding hole 420, so as to which aluminium flake be boosted.The center-pole is fixed in the accommodating chamber, and is vertically passed through The push pedal 520 is worn, the push pedal 520 can be made to be slided along the center-pole, the anti-run-off the straight of thrust plate 520.Described first Briquetting 100 includes reset hole, and the reset hole is located at the left and right sides of the exhaust passage, when first briquetting 100 and When two briquettings 200 compress, release link 510 is pressed into reset hole, so as to promote the push pedal 520 inwardly to move, so as to compress Spring 530, the demoulding bar 410 can be made to retract in the demoulding hole 420, be ready to complete demoulding next time, demoulding bar 410 Stretching and retract all be completely automatic.
Need what is illustrated, in order to clearly check the structure of demoulding bar 410 and demoulding hole 420, in Fig. 6-Fig. 8, demoulding Certain gap between bar 410 and demoulding hole 420 be present, and the two is close in practice.
Further, can be provided with the first jet channel in the demoulding bar 410, the air inlet of the first jet channel with Source of the gas connects, and the first gas outlet 540 of first jet channel is located in the side wall on the top of the demoulding bar 410, when de- When film bar 410 needs to eject demoulding hole 420, jet can be carried out with the sideways groove 421 that keeps out the wind, because interaction force can incite somebody to action Demoulding bar 410 ejects demoulding hole 420.The opening of first gas outlet 540 tilts to the place direction of push pedal 520, works as aluminium It is simple to be not enough to release aluminium flake by the elastic force of spring 530 when the adhesion of piece and the first briquetting 100 is too big, because Gas jet into the groove 421 that keeps out the wind, demoulding bar 410 can be ejected demoulding hole 420, further promote aluminium flake.Go out when first After gas port 540 is departing from demoulding hole 420, jet can be carried out to the surface of the first briquetting 100, by the surface of the first briquetting 100 Sludge blows winged, prevents disintegrating slag accumulated plugging exhaust passage, so the structure can not only clear up aluminium slag, can also be lifted and pushed away Power, aluminium film is departed from the surface of the first briquetting 100, kill two birds with one stone.
As shown in Fig. 9-Figure 10, the demoulding bar 410 can include bar portion and cap body 411, and the bar portion is towards cap body 411 One end be to deviate from institute towards one end of the bar portion for court to the first raised circular conical surface of the side of cap body 411, cap body 411 The second raised circular conical surface of bar portion direction is stated, and gap between the bar portion and cap body 411 be present, company can be passed through therebetween Extension bar is fixedly connected, and air guide port 412 is provided with the first circular conical surface of the bar portion, and gas enters after the ejection of air guide port 412 In the annular air structure formed to the first circular conical surface and the second circular conical surface, gas can be made from first circular conical surface and second Gap between circular conical surface is blown out to surrounding, and at this moment, gas is blown away towards surrounding, can increase the area of the covering of blowout, so as to Increase the effect of cleaning.
The end of the release link 510 can be provided with stop configurations 511, and the release link 510 is to the stop configurations 511 projection falls in the stop configurations 511, that is to say, that when stop configurations 511 are cylindrical, stop configurations 511 Diameter is more than the diameter of release link 510.The aperture position of the reset hole is provided with and the 511 corresponding backstop of stop configurations Groove 512, for preventing described in the end retraction of the release link 510 below the opening of reset hole, by limiting release link 510 Motion, can be prevented in excessive the first briquetting of retraction 100 of release link 510.Because release link 510, push pedal 520 and demoulding bar 410 Three has identical motion state, once so the end of release link 510 is stained with some sludges, when the second briquetting 200 Cause when pushing, release link 510 will cause the also excessive retraction demoulding hole 420 of demoulding bar 410 indirectly by excessive retraction reset hole In, such aluminium liquid will be flowed into demoulding hole 420, and the inwall after aluminium liquid solidification with demoulding hole 420 produces larger adhesion, Demoulding bar 410 will be blocked, the smooth ejection of demoulding bar 410 is influenceed, so the position by limiting release link 510, can make to take off The upper surface of film bar 410 and the flush of the first briquetting 100.
The second jet channel 513 can be provided with the release link 510, second jet channel 513 includes second Gas outlet, second gas outlet is located at the stop configurations 511 towards the side of the push pedal 520, and second outlet The outgassing direction of mouth is vertically outward-dipping.On the one hand, the second gas outlet sprays gas, can also increase demoulding bar 410 To the thrust of aluminium film, on the other hand, when cleaning the surface of the first briquetting 100, metal fragment may be blown into only In retaining groove 512, when stop configurations 511 enter backstop groove 512, the two surface will be unable to be bonded completely, so needing to only Retaining groove 512 is cleared up, and the effect of the second puff prot is exactly that the impurity in backstop groove 512 blows off.Meanwhile second puff prot The face combined on first briquetting 100 with the second briquetting 200 can also be cleaned out, prevent the composition surface of the two from can not paste completely Close, become big thickening " overlap " so as to avoid causing engendering in press casting procedure, exhaust block structure is not pasted Close.
Embodiment 2
As shown in Figure 11-Figure 12, difference from Example 1 is, increases the arrangement areas of cooling duct 300, can be with Accelerate the transmission of heat.The cooling duct 300 can include the feed pathway set along the length direction of the first briquetting 100 And liquid outlet channel, and multiple bending channels 310 corresponding with the curved portions 130, the bending channel 310 are located in described Between feed pathway and the liquid outlet channel, and connected respectively with the feed pathway and liquid outlet channel.Include in feed pathway Multiple liquid outlets connected with bending channel 310, so as to so that the coolant for entering feed pathway quickly enter it is curved In triton road 310, each bending channel 310 is corresponding with strip projected parts 110, so as to so that aluminium liquid quickly solidifies.
Embodiment 3
As shown in figure 13, it is with Examples 1 and 2 difference, the cooling duct 300 is included along first briquetting The feed pathway and liquid outlet channel that 100 length directions are set, and multiple bending channels 310 corresponding with the curved portions 130, In order to increase the service efficiency of coolant, the multiple bending channel 310 is sequentially communicated, and forms center-aisle, the centre leads to The water inlet in road connects with feed pathway, and the delivery port of center-aisle connects with the liquid outlet channel, it is different from said structure it It is in the structure does not have branch road, only a passage, the flow path of coolant is added, so as to fully absorb aluminium The heat of liquid.
Die assembly provided by the invention, including above-mentioned exhaust block, exhaust block include the first briquetting 100 and the second briquetting 200, along the length direction of first briquetting 100, the upper surface of first briquetting 100 is provided with strip projected parts 110, described Groove 210 corresponding with the strip projected parts 110, the briquetting of the first briquetting 100 and second are provided with second briquetting 200 After 200 fasten, gap between the strip projected parts 110 and groove 210 be present, the gap is in the exhaust block length direction shape Into exhaust passage.Along the width of strip projected parts 110, the upper surface of the strip projected parts 110 is provided with curved portions 130, institute The bending direction for stating curved portions 130 deviates from the upper surface of first briquetting 100, compared to the exhaust of washboard-type in the prior art Block, because the projection in the application includes curved portions 130, the effective width of exhaust passage adds, so as to not change In the case of exhaust block width, the area of exhaust is added, so as to increase the efficiency of exhaust, while excessive rise will not be produced Mould power, the hardly installation to mould and use have any impact.It is described along the length direction of the strip projected parts 110 Multiple flow-disturbing grooves 120 are arranged at intervals with strip projected parts 110, the multiple and flow-disturbing groove is arranged at intervals with the groove 210 Flow-disturbing corresponding to 120 is raised, when aluminium alloy is by flow-disturbing groove 120 and flow-disturbing projection position, the setback knot of flow-disturbing groove 120 Structure can be such that aluminium alloy is overturn repeatedly in direction of advance, can increase stroke of the aluminium alloy on briquetting, make aluminium alloy have abundance when Between dissipated heat and cooled and solidified, prevent from occurring in injection process aluminium-plated phenomenon at exhaust block.
Finally it should be noted that:Various embodiments above is merely illustrative of the technical solution of the present invention, rather than its limitations;To the greatest extent The present invention is described in detail with reference to foregoing embodiments for pipe, it will be understood by those within the art that:Its according to The technical scheme described in foregoing embodiments can so be modified, either which part or all technical characteristic are entered Row equivalent substitution;And these modifications or replacement, the essence of appropriate technical solution is departed from various embodiments of the present invention technology The scope of scheme.

Claims (10)

  1. A kind of 1. exhaust block, it is characterised in that including the first briquetting and the second briquetting, along the length direction of first briquetting, The upper surface of first briquetting is provided with strip projected parts, is provided with second briquetting corresponding with the strip projected parts recessed Groove, after first briquetting and the second briquetting fasten, gap between the strip projected parts and groove be present, the gap is described Exhaust block length direction forms exhaust passage;
    Along the width of the strip projected parts, the upper surfaces of the strip projected parts is provided with curved portions, the curved portions it is curved Qu Fangxiang deviates from the upper surface of first briquetting, for increasing the leaving area of the exhaust passage, improves exhaust efficiency;
    Along the length direction of the strip projected parts, be arranged at intervals with multiple flow-disturbing grooves on the strip projected parts, on the groove between Every being provided with, multiple flow-disturbings corresponding with the flow-disturbing groove are raised, and the flow-disturbing groove is being arranged with flow-disturbing projection for increasing aluminium alloy Stroke in gas passage.
  2. 2. exhaust block according to claim 1, it is characterised in that first briquetting includes demoulding hole, the demoulding hole Demoulding bar is inside provided with, the demoulding bar is used to jack up the casting feedstock of solidification.
  3. 3. exhaust block according to claim 2, it is characterised in that first briquetting includes ejecting mechanism, for by institute State demoulding bar and release the demoulding hole, and for accommodating the accommodating chamber of the ejecting mechanism, the accommodating chamber and the demoulding Hole connects;
    The ejecting mechanism includes release link, push pedal, spring and center-pole, and the release link and demoulding bar are fixed on the push pedal Front, the both ends of the spring is connected to the back side of the push pedal and the bottom surface of the accommodating chamber, and the spring is used to push away The push pedal is moved, so that the demoulding bar stretches out the demoulding hole;The center-pole is fixed in the accommodating chamber, and is vertically passed through The push pedal is worn, so that the push pedal is slided along the center-pole;
    First briquetting includes reset hole, and the reset hole is located at the both sides of the exhaust passage, and the release link is used to work as When first briquetting and the second briquetting compress, the push pedal is promoted inwardly to move, the demoulding so that the demoulding bar is retracted In hole.
  4. 4. exhaust block according to claim 3, it is characterised in that the first jet channel is provided with the demoulding bar, is used Connected in source of the gas;First gas outlet of first jet channel is located at the side wall of the demoulding bar, and first outlet The opening of mouth tilts to direction where the push pedal;
    The groove that keeps out the wind corresponding with first gas outlet, the opening direction of the groove that keeps out the wind are provided with the inwall in the demoulding hole Towards first gas outlet so that the gas sprayed in first gas outlet enter it is described keep out the wind in groove, for will described in Demoulding bar ejects the demoulding hole.
  5. 5. exhaust block according to claim 4, it is characterised in that the demoulding bar includes bar portion and cap body, the bar portion It is to the first raised circular conical surface of the cap body side towards one end of cap body, cap body is that court deviates from towards one end of the bar portion The second raised circular conical surface of the bar portion direction, and gap be present between the bar portion and cap body;First circular cone of the bar portion Air guide port is provided with face, so that gas is blown out from the gap between first circular conical surface and the second circular conical surface to surrounding.
  6. 6. the exhaust block according to claim 4 or 5, it is characterised in that the end set of the release link has stop configurations, Projection of the release link to the stop configurations falls in the stop configurations;The aperture position of the reset hole be provided with Backstop groove corresponding to the stop configurations, for preventing described in the end retraction of the release link below the opening of reset hole.
  7. 7. exhaust block according to claim 6, it is characterised in that the second jet channel, institute are provided with the release link Stating the second jet channel includes the second gas outlet, and second gas outlet is located at the stop configurations towards the one of the push pedal Side, and the outgassing direction of second gas outlet is vertically outward-dipping.
  8. 8. exhaust block according to claim 1, it is characterised in that cooling duct is provided with first briquetting, it is described Cooling duct is used to conduct coolant, so that the casting feedstock entered between first briquetting and the second briquetting is faster Dissipated heat and cooled and solidified.
  9. 9. exhaust block according to claim 8, it is characterised in that the cooling duct is included along the first briquetting length The feed pathway and liquid outlet channel that direction is set, and multiple bending channels corresponding with the curved portions, the bending channel It is arranged between the feed pathway and the liquid outlet channel, and is connected respectively with the feed pathway and liquid outlet channel, it is described Bending channel is used to increase the heat exchange area with the exhaust passage.
  10. 10. a kind of die assembly, it is characterised in that including the exhaust block described in claim 1-9 any one.
CN201710927001.4A 2017-09-30 2017-09-30 Exhaust block and die assembly Active CN107486547B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710927001.4A CN107486547B (en) 2017-09-30 2017-09-30 Exhaust block and die assembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710927001.4A CN107486547B (en) 2017-09-30 2017-09-30 Exhaust block and die assembly

Publications (2)

Publication Number Publication Date
CN107486547A true CN107486547A (en) 2017-12-19
CN107486547B CN107486547B (en) 2019-11-29

Family

ID=60653336

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710927001.4A Active CN107486547B (en) 2017-09-30 2017-09-30 Exhaust block and die assembly

Country Status (1)

Country Link
CN (1) CN107486547B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110625086A (en) * 2019-09-26 2019-12-31 浙江华朔科技股份有限公司 Die casting die mold core structure with front blocking insert
CN114799122A (en) * 2022-06-27 2022-07-29 宁波市北仑欣玉模具制造有限公司 Time delay drawing of patterns sliding block set spare and die casting die of die casting die

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5897478A (en) * 1981-12-02 1983-06-09 有限会社 山崎工作所 Venting device for die
CN203649361U (en) * 2013-11-13 2014-06-18 广东鸿泰科技股份有限公司 Air exhaust block
CN104690246A (en) * 2015-02-12 2015-06-10 宁波君灵模具技术有限公司 Exhaust system
CN105195708A (en) * 2015-10-30 2015-12-30 江苏博众汽车部件有限公司 Anti-carry-over die-casting die assembly exhausting block
CN205128888U (en) * 2015-10-30 2016-04-06 江苏博众汽车部件有限公司 Prevent die casting die combination exhaust piece of carry -over
CN106694848A (en) * 2017-01-25 2017-05-24 太仓海嘉车辆配件有限公司 Pressure casting device and method
CN206425527U (en) * 2016-12-30 2017-08-22 宁波市北仑鑫林机电模具有限公司 A kind of exhaust block structure of die casting

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5897478A (en) * 1981-12-02 1983-06-09 有限会社 山崎工作所 Venting device for die
CN203649361U (en) * 2013-11-13 2014-06-18 广东鸿泰科技股份有限公司 Air exhaust block
CN104690246A (en) * 2015-02-12 2015-06-10 宁波君灵模具技术有限公司 Exhaust system
CN105195708A (en) * 2015-10-30 2015-12-30 江苏博众汽车部件有限公司 Anti-carry-over die-casting die assembly exhausting block
CN205128888U (en) * 2015-10-30 2016-04-06 江苏博众汽车部件有限公司 Prevent die casting die combination exhaust piece of carry -over
CN206425527U (en) * 2016-12-30 2017-08-22 宁波市北仑鑫林机电模具有限公司 A kind of exhaust block structure of die casting
CN106694848A (en) * 2017-01-25 2017-05-24 太仓海嘉车辆配件有限公司 Pressure casting device and method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110625086A (en) * 2019-09-26 2019-12-31 浙江华朔科技股份有限公司 Die casting die mold core structure with front blocking insert
CN114799122A (en) * 2022-06-27 2022-07-29 宁波市北仑欣玉模具制造有限公司 Time delay drawing of patterns sliding block set spare and die casting die of die casting die

Also Published As

Publication number Publication date
CN107486547B (en) 2019-11-29

Similar Documents

Publication Publication Date Title
CN107486547A (en) exhaust block and die assembly
CN207343750U (en) A kind of aluminum alloy die-casting die structure easy to the sliding block demoulding
CN209174868U (en) A kind of hub mold cooling device
CN207547573U (en) Die casting and die casting equipment
CN207205224U (en) exhaust block and die assembly
CN210848294U (en) Aluminium ingot continuous casting line drawing of patterns system
CN106925752A (en) A kind of water-cooled low pressure casting die
CN216267447U (en) Injection molding equipment for manufacturing high-performance pipes
CN107457385B (en) Die casting and die casting equipment
CN207577389U (en) exhaust block and die assembly
CN207857814U (en) A kind of anti-race aluminium air discharging structure for mold
CN209006621U (en) A kind of mold of easy-clear casting riser
WO2019225272A1 (en) Injection device for die casting machine, die casting machine, vacuum pipe structure for die casting machine, and casting method
CN210146922U (en) Molding sand cooling device
CN206662206U (en) Charge air cooler air chamber mould
CN103737757B (en) Novel automobile mould
CN208483087U (en) Lithium battery cutting mould full automatic lubricating device
CN106426896A (en) Winding pipe production line
CN201785407U (en) Blast furnace slag flushing tank device
CN205463680U (en) Big recess aluminium alloy mould
CN212551698U (en) A quick cooling device for behind aluminium bar processing
CN210415415U (en) Feed opening cooling device for injection molding machine
CN209297903U (en) A kind of transformer coil casting die
CN219769053U (en) Extrusion charging barrel forming head for winding structure wall pipe
CN218192416U (en) Heating and heat-insulating riser sleeve for high alloy steel casting

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 300143 North Jinba Road, Beichen District, Tianjin City

Patentee after: Tianjin Fali Automobile Die Casting Co.,Ltd.

Address before: 300143 North Jinba Road, Beichen District, Tianjin City

Patentee before: TIANJIN CITY FALI AUTOMOBILE DIE CASTING FACTORY

CP03 Change of name, title or address