CN107476772A CN201710796313.6A CN201710796313A CN107476772A CN 107476772 A CN107476772 A CN 107476772A CN 201710796313 A CN201710796313 A CN 201710796313A CN 107476772 A CN107476772 A CN 107476772A
Authority
CN
China
Prior art keywords
workpiece
male thread
thread workpiece
spring
middle plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710796313.6A
Other languages
Chinese (zh)
Other versions
CN107476772B (en
Inventor
张克南
左其川
雷广进
刘宏亮
杨晓娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
Baoji Oilfield Machinery Co Ltd
CNPC National Oil and Gas Drilling Equipment Engineering Technology Research Center Co Ltd
Original Assignee
Baoji Oilfield Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baoji Oilfield Machinery Co Ltd filed Critical Baoji Oilfield Machinery Co Ltd
Priority to CN201710796313.6A priority Critical patent/CN107476772B/en
Publication of CN107476772A publication Critical patent/CN107476772A/en
Application granted granted Critical
Publication of CN107476772B publication Critical patent/CN107476772B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B23/00Apparatus for displacing, setting, locking, releasing or removing tools, packers or the like in boreholes or wells

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Load-Engaging Elements For Cranes (AREA)
  • Springs (AREA)

Abstract

Included the invention discloses a kind of using large-diameter thread installation method of the spring balancing than pressure, step:1) it is firm to be connected the middle plate in installation tool with male thread workpiece by bolt, and box thread workpiece is reliably fixed;Male thread workpiece is sling by hanger, placed according to male thread workpiece in locus upper, that box thread workpiece is under;Power caused by the deadweight of male thread workpiece, passes to spring by middle plate, spring is in compressive state;2) slowly transfer male thread workpiece and aligned with box thread workpiece, the distance of measurement male thread workpiece lower surface and box thread workpiece upper surface;3) continue to transfer male thread workpiece and the overhead traveling crane that hovers during positive pole whorl work piece thread contact, rotate male thread workpiece, screwed by spring;After certain distance is threaded into, overhead traveling crane is transferred again, continue precession male thread workpiece, such circulate operation, complete the snapping of screw thread.The method of the present invention, frock is simple, easy to operate.

Description

It is a kind of using large-diameter thread installation method of the spring balancing than pressure
Technical field
The invention belongs to sea oil drilling and production equipment manufacturing technical field, is related to a kind of big more straight than pressure using spring balancing Footpath screw thread installation method.
Background technology
Subsea production tree is one of Core equipment of subsea production system, is the critical equipment of ocean deepwater oil and gas development, Its main function is that Oil, Water, Gas that will be produced in Oil/gas Well etc. is controllably transported to production platform or land terminal from seabed.Spiral shell Line connection is the connected mode commonly used in plant equipment between each part, and there is many advantages, such as convenient disassembly, carrying is big to obtain Extensive use, subsea production tree also uses the type of attachment of screw thread and other underwater kits interconnect.
Although being threaded with many advantages, as subsea production tree it is this by major diameter, heavy duty connection screw thread, In its assembling process, influenceed by connector appearance and size, cause equipment not clamp, it is not easy to operate;Simultaneously equipment by itself The influence of deadweight, because the frictional force between screw thread pair is big when vertical docking fastens, often result in screw thread pair thread gluing, sintering.How to have Effect ground carries out the assembling of heavily loaded large-diameter thread, turns into a urgent problem.
The content of the invention
It is an object of the invention to provide a kind of using large-diameter thread installation method of the spring balancing than pressure, solve existing Technology in an assembling process, due to being influenceed by mounting condition limitation or dead weight, causes between screw thread in large-diameter thread Impact or collision;During threaded engagement, cause screw thread pair is stuck to burn the problem of detaining because frictional force is excessive.
The technical solution adopted in the present invention is, a kind of using large-diameter thread installation method of the spring balancing than pressure, profit With a kind of installation tool, implement according to following implementation steps:
Step 1, assembling installation tool, sling male thread workpiece,
It is firm that middle plate in installation tool is connected by bolt with male thread workpiece, and box thread workpiece is reliably solid It is fixed;Male thread workpiece is sling by hanger, placed according to male thread workpiece in locus upper, that box thread workpiece is under;It is public Power caused by whorl work piece deadweight, passes to spring by middle plate, spring is in compressive state;
Step 2, male thread workpiece is aligned into box thread workpiece and transfers to certain position,
Slowly transfer male thread workpiece and aligned with box thread workpiece, measurement male thread workpiece lower surface and box thread workpiece The distance of upper surface;
Step 3, continue to transfer male thread workpiece and carry out spinner with positive pole whorl work piece,
Continue to transfer male thread workpiece and the overhead traveling crane that hovers during positive pole whorl work piece thread contact, rotate male thread workpiece, lead to Spring is crossed to be screwed;After certain distance is threaded into, overhead traveling crane is transferred again, continues precession male thread workpiece, so circulation Operation, complete the snapping of screw thread.
The present invention using large-diameter thread installation method of the spring balancing than pressure, be further characterized in that:
Described installation tool structure is, including top plate, middle plate and lower plywood, hanger are welded on top plate, in Laminate lower surface is welded with upper shell, and lower plywood upper surface is welded with lower shell, and upper shell bottom is put in lower shell inner chamber, Upper shell and lower shell periphery are set with spring, the upper and lower side of spring respectively with middle plate and lower plywood apical grafting;Screw rod on to Under sequentially pass through top plate, middle plate and upper shell, lower shell and lower plywood, and screw rod is set with top plate upper surface location There is first nut, screw rod is set with second nut in middle plate upper surface location, and screw rod is in lower plywood lower surface position set Equipped with the 3rd nut.
Described top plate, middle plate and lower plywood is annular.
Described top plate, middle plate are consistent with the specification of lower plywood.
Described middle plate inner ring position is provided with a circle bolt hole, for installation bolt.
The invention has the advantages that when can effectively avoid the screw thread from dismounting caused by mounting condition limitation or dead weight Impact or collide between screw thread, avoid causing screw thread pair stuck because frictional force is excessive during threaded engagement, burn the phenomenon of button, Specifically include:
1) reduce or offset the caused impulsive force in product transfers docking operation vertically, so as to avoid screw thread from being impacted Deform or destroy caused by and.
2) normal pressure of screw thread secondary surface during spinner is effectively reduced, so as to significantly reduce the frictional force between screw thread, The thread gluing that avoids occurring during screw threads for fastening to greatest extent, burn phenomenon to death.
3) reduce labor intensity, due to alleviating screw thread normal pressure, frictional force is reduced, so as to reduce turning moment.
Brief description of the drawings
Fig. 1 is connected together with male thread workpiece and sling by shackle after the installation tool in the present invention is completed Situation after being aligned with box thread workpiece, in running order one;
Situation when Fig. 2 is spinner, in running order two.
In figure, 1. top plates, 2. middle plates, 3. lower plywoods, 4. screw rods, 5. upper shells, 6. lower shells, 7. springs, 8. spiral shells Mother, 9. bolts, 10. male thread workpiece, 11. box thread workpiece.
Embodiment
The present invention is described in detail with reference to the accompanying drawings and detailed description.
Reference picture 1, Fig. 2, the inventive method use installation tool structure be, including be annular top plate 1, in Laminate 2 and lower plywood 3, the top plate 1, middle plate 2 are consistent with the specification of lower plywood 3;Hanger is welded on top plate 1, The lower surface of middle plate 2 is welded with upper shell 5, and the upper surface of lower plywood 3 is welded with lower shell 6, and the bottom of upper shell 5 puts in lower shell 6 In inner chamber, spring 7 is set with upper shell 5 and the periphery of lower shell 6, the upper and lower side of spring 7 respectively with middle plate 2 and lower plywood 3 Apical grafting;Screw rod 4 sequentially passes through top plate 1, middle plate 2 and upper shell 5, lower shell 6 and lower plywood 3, and screw rod 4 from top to bottom First nut 8 is set with the upper surface location of top plate 1, screw rod 4 is set with second nut in the upper surface location of middle plate 2 8, screw rod 4 is set with the 3rd nut 8 in the lower surface position of lower plywood 3, can be pre- by the upper-lower position change of three nuts 8 First adjust the decrement of spring 7;
Top plate 1, middle plate 2 and lower plywood 3 and spring 7 are connected as a single entity by screw rod 4 by three nuts 8;In middle plate 2 Inner ring position is provided with a circle bolt hole, for installation bolt 9, realizes the connection of installation tool and target workpiece.
The installation method of the present invention, using above-mentioned installation tool, implement according to following implementation steps:
Step 1, assembling installation tool, sling male thread workpiece 10
It is firm that middle plate 2 in installation tool is connected by bolt 9 with male thread workpiece 10, can by box thread workpiece 11 By fixation;Male thread workpiece 10 is sling by hanger, according to male thread workpiece 10 in space bit upper, that box thread workpiece 11 is under Placement location;Male thread workpiece 10 is conducted oneself with dignity caused power, is passed to spring 7 by middle plate 2, spring 7 is in compressive state, this When in running order see Fig. 1;
Step 2, male thread workpiece 10 is aligned into box thread workpiece 11 and transfers to certain position
Slowly transfer male thread workpiece 10 and aligned with box thread workpiece 11, the lower surface of measurement male thread workpiece 10 and female spiral shell The distance of the upper surface of line workpiece 11;Because the effect of spring 7 effectively can alleviate or mitigate impact and collision during decentralization, public spiral shell is prevented Line workpiece 10 and positive pole whorl work piece 11 collide with damaged screw;
Step 3, continue to transfer male thread workpiece 10 and carry out spinner with positive pole whorl work piece 11
Continue to transfer male thread workpiece 10 and the overhead traveling crane that hovers during positive pole 11 thread contact of whorl work piece, rotate male thread workpiece 10, screwed by spring 7;After certain distance is threaded into, overhead traveling crane is transferred again, continues precession male thread workpiece 10, Such circulate operation, the snapping of screw thread is completed, be now in working condition two and see Fig. 2, effectively reduce screw thread during spinner The normal pressure of secondary surface, so as to significantly reduce the frictional force between screw thread, the thread gluing for avoiding occurring during screw threads for fastening to greatest extent, Burn phenomenon to death.
The inventive method has the advantage that compared with traditional overhead traveling crane is directly sling, transfers the assembly method of workpiece:
1) stage is aligned in screw thread, overhead traveling crane decentralization process, because overhead traveling crane decentralization is too fast, causes the impact to screw thread unavoidably, Using the inventive method, impact and collision between workpiece are effectively alleviated and mitigated to spring 7.
2) during being threaded into, it is necessary to transfer overhead traveling crane again, because spring 7 is in compressive state, therefore, day is transferred Car is exactly release spring 7 in fact, and too fast, excessive impact will not be caused to screw thread.
3) in conventional assembling process, screw thread directly bears the gravity of huge workpiece, and direction is downward, and screw thread stress is non-adjustable Section;Using the inventive method, screw thread only slowly bears spring force, and direction is upward, and screw thread stress can be real according to amount of spring compression When control.
4) spring pre compressed magnitude can be adjusted, and avoid caused by telescopic spring workpiece violent play repeatedly up and down;Precommpression Power is bigger, and play is smaller, conversely, the smaller play of pre-compression force is bigger.

Claims (5)

  1. It is 1. a kind of using large-diameter thread installation method of the spring balancing than pressure, it is characterised in that to utilize a kind of installation tool, press Implement according to following implementation steps:
    Step 1, assembling installation tool, sling male thread workpiece (10),
    It is firm that middle plate (2) in installation tool is connected by bolt (9) with male thread workpiece (10), by box thread workpiece (11) it is reliable fixed;Male thread workpiece (10) is sling by hanger, according to male thread workpiece (10) in upper, box thread workpiece (11) Place locus under;Power caused by male thread workpiece (10) deadweight, passes to spring (7) by middle plate (2), makes bullet Spring (7) is in compressive state;
    Step 2, male thread workpiece (10) is aligned into box thread workpiece (11) and transfers to certain position,
    Slowly transfer male thread workpiece (10) and aligned with box thread workpiece (11), measurement male thread workpiece (10) lower surface and mother The distance of whorl work piece (11) upper surface;
    Step 3, continue to transfer male thread workpiece (10) and carry out spinner with positive pole whorl work piece (11),
    Continue to transfer male thread workpiece (10) and the overhead traveling crane that hovers during positive pole whorl work piece (11) thread contact, rotate male thread workpiece (10), screwed by spring (7);After certain distance is threaded into, overhead traveling crane is transferred again, continues precession male thread workpiece (10), such circulate operation, the snapping of screw thread is completed.
  2. It is 2. according to claim 1 using large-diameter thread installation method of the spring balancing than pressure, it is characterised in that:It is described Installation tool structure be that including top plate (1), middle plate (2) and lower plywood (3), hanger are welded on top plate (1), in Laminate (2) lower surface is welded with upper shell (5), and lower plywood (3) upper surface is welded with lower shell (6), and upper shell (5) bottom is put in In lower shell (6) inner chamber, spring (7) is set with upper shell (5) and lower shell (6) periphery, the upper and lower side of spring (7) respectively with Middle plate (2) and lower plywood (3) apical grafting;Screw rod (4) sequentially passes through top plate (1), middle plate (2) and upper shell from top to bottom (5), lower shell (6) and lower plywood (3), and screw rod (4) is set with first nut (8) in top plate (1) upper surface location, Screw rod (4) is set with second nut (8) in middle plate (2) upper surface location, and screw rod (4) is in lower plywood (3) lower surface position It is set with the 3rd nut (8).
  3. It is 3. according to claim 2 using large-diameter thread installation method of the spring balancing than pressure, it is characterised in that:It is described Top plate (1), middle plate (2) and lower plywood (3) be annular.
  4. It is 4. according to claim 2 using large-diameter thread installation method of the spring balancing than pressure, it is characterised in that:It is described Top plate (1), middle plate (2) it is consistent with the specification of lower plywood (3).
  5. It is 5. according to claim 2 using large-diameter thread installation method of the spring balancing than pressure, it is characterised in that:It is described Middle plate (2) inner ring position be provided with a circle bolt hole, for installation bolt (9).
CN201710796313.6A 2017-09-06 2017-09-06 A kind of large-diameter thread installation method using spring balancing than pressure Expired - Fee Related CN107476772B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710796313.6A CN107476772B (en) 2017-09-06 2017-09-06 A kind of large-diameter thread installation method using spring balancing than pressure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710796313.6A CN107476772B (en) 2017-09-06 2017-09-06 A kind of large-diameter thread installation method using spring balancing than pressure

Publications (2)

Publication Number Publication Date
CN107476772A true CN107476772A (en) 2017-12-15
CN107476772B CN107476772B (en) 2019-09-24

Family

ID=60584612

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710796313.6A Expired - Fee Related CN107476772B (en) 2017-09-06 2017-09-06 A kind of large-diameter thread installation method using spring balancing than pressure

Country Status (1)

Country Link
CN (1) CN107476772B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010012555A (en) * 2008-07-03 2010-01-21 Ihi Corp Tool for automatic screwing device
CN202639783U (en) * 2012-07-13 2013-01-02 中国北车集团沈阳机车车辆有限责任公司 Pressing and fixing tool for safe cable joint
CN104476173A (en) * 2014-11-24 2015-04-01 宝鸡石油机械有限责任公司 Method for preventing thread pair from sticking in dismounting and mounting of large-diameter threads
CN205043444U (en) * 2015-09-11 2016-02-24 张树国 Runway type bolt elongator
CN205154068U (en) * 2015-11-24 2016-04-13 宝鸡石油机械有限责任公司 Locking device is fixed a position to mechanical type for chuck

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010012555A (en) * 2008-07-03 2010-01-21 Ihi Corp Tool for automatic screwing device
CN202639783U (en) * 2012-07-13 2013-01-02 中国北车集团沈阳机车车辆有限责任公司 Pressing and fixing tool for safe cable joint
CN104476173A (en) * 2014-11-24 2015-04-01 宝鸡石油机械有限责任公司 Method for preventing thread pair from sticking in dismounting and mounting of large-diameter threads
CN205043444U (en) * 2015-09-11 2016-02-24 张树国 Runway type bolt elongator
CN205154068U (en) * 2015-11-24 2016-04-13 宝鸡石油机械有限责任公司 Locking device is fixed a position to mechanical type for chuck

Also Published As

Publication number Publication date
CN107476772B (en) 2019-09-24

Similar Documents

Publication Publication Date Title
CN106275330B (en) A kind of subsea control modules spring forced locking device
CN203939831U (en) There is the portable casing post docking assembling connecting piece of the locking liner that expands
CN107476772A (en) It is a kind of using large-diameter thread installation method of the spring balancing than pressure
CN106369236A (en) Vertical clamp type connector for underwater manifold
CN201777781U (en) Flange suspension apparatus
CN207277450U (en) A kind of via erecting device
CN204308542U (en) A kind of novel single-stage stretcher
CN208024047U (en) A kind of steel pipe tower structure of scalable installation
CN202417348U (en) Anti-dropping device of drilling tool
CN201211667Y (en) Pin puller special for mechanical equipment installation overhaul
CN202970581U (en) Salvaging device of cables under oil well
CN103266860A (en) Lock-ring installation pressure test tool
CN209179706U (en) A kind of fast salvaging oil/gas well casing bit
CN209919791U (en) Extracting tool for coupling bolt pin bush of generator set
CN201924877U (en) Wellhead operating platform for inner-string cementing
CN207063924U (en) A kind of air operated slips seat
CN206936303U (en) One kind casting sandbox
CN107611850A (en) Portable charged for replacement 35kV strain insulator string specific purpose tools
CN205989282U (en) Casing spider clamps
CN204212728U (en) A kind of spiral sucker-rod fishing tool
CN206581896U (en) A kind of oil field drilling grinds operation anti-rotation device
CN203685792U (en) Cam type rapid locking and separating device
CN203097849U (en) Pop-up key applicable to tool for emergent separation and suspension of drill column
CN202596635U (en) Drive-down bridge plug fishing tool
CN215907768U (en) Casing grouting circulating tool

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210108

Address after: 721002 No.2 Dongfeng Road, Jintai District, Baoji City, Shaanxi Province

Patentee after: BAOJI OILFIELD MACHINERY Co.,Ltd.

Patentee after: CHINA NATIONAL PETROLEUM Corp.

Patentee after: CNPC national oil and gas drilling equipment Engineering Technology Research Center Co.,Ltd.

Address before: 721002 No.2 Dongfeng Road, Jintai District, Baoji City, Shaanxi Province

Patentee before: Baoji Oilfield Machinery Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190924