CN107476193A - A kind of bridge construction pours device with clump - Google Patents

A kind of bridge construction pours device with clump Download PDF

Info

Publication number
CN107476193A
CN107476193A CN201710686587.XA CN201710686587A CN107476193A CN 107476193 A CN107476193 A CN 107476193A CN 201710686587 A CN201710686587 A CN 201710686587A CN 107476193 A CN107476193 A CN 107476193A
Authority
CN
China
Prior art keywords
slide rail
cement
block
sliding block
bottom plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710686587.XA
Other languages
Chinese (zh)
Other versions
CN107476193B (en
Inventor
胡叙成
徐卉
吕佳兴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Zhifeng Technology Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710686587.XA priority Critical patent/CN107476193B/en
Publication of CN107476193A publication Critical patent/CN107476193A/en
Application granted granted Critical
Publication of CN107476193B publication Critical patent/CN107476193B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Devices For Post-Treatments, Processing, Supply, Discharge, And Other Processes (AREA)

Abstract

The present invention relates to one kind to pour device, more particularly to a kind of bridge construction pours device with clump.The technical problem to be solved in the present invention is to provide it is a kind of it is time saving and energy saving, labor intensity is small, cement, which is not easy to spill, makes clothes dirty, moreover it is possible to cement is compacted, the bridge construction for improving clump quality pours device with clump.In order to solve the above-mentioned technical problem, the invention provides such a bridge construction to pour device with clump, includes bottom plate etc.;Bottom plate top left side is provided with mould, and mold bottom and bottom plate top contact, bottom plate top right side are provided with lowering or hoisting gear, and the Lift Part of lowering or hoisting gear is provided with tilting device, and cement frame is connected with the dumping part of tilting device, and cement frame is located on the right side of mould.Invention achieves it is time saving and energy saving, labor intensity is small, cement, which is not easy to spill, makes clothes dirty, moreover it is possible to cement is compacted, improve clump quality effect.

Description

A kind of bridge construction pours device with clump
Technical field
The present invention relates to one kind to pour device, more particularly to a kind of bridge construction pours device with clump.
Background technology
Bridge, refer generally to be erected in rivers,lakes and seas, the structures for making traffic etc. smoothly to pass through.It is modern to adapt to The transportation industry of high speed development, bridge be also extended to across mountain stream, unfavorable geology or meet other traffic needs and set up make Current more easily building.Bridge is typically made up of superstructure, substructure, bearing and attached structure, top knot Structure is also known as bridge span structure, is across the primary structure of obstacle;Substructure includes abutment, bridge pier and basis;Bearing is spanning knot The load transfer device that the supporting place of structure and bridge pier or abutment is set;Attached structure then refer to transition slab at bridge head, truncated cone banking, shore protection, Training works etc..
Building is the general name of building and structures, be people in order to meet social life needs, utilize grasped thing Matter technological means, and the artificial environment created with certain scientific law, geomantic omen theory and aesthetic principle.
, it is necessary to make clump in bridge construction engineering, the manufacture craft of clump, it is required for that cement first is poured into mould In tool, after placing a period of time formation clump, when further taking out, and manually pouring into cement in mould, waste time and energy, work by force Degree is big, and during pouring mud, cement, which is easily spilt, makes clothes dirty, thus need badly research and development it is a kind of it is time saving and energy saving, labor intensity is small, Cement, which is not easy to spill, makes clothes dirty, moreover it is possible to cement is compacted, the bridge construction for improving clump quality is poured with clump Build device.
The content of the invention
(1) technical problems to be solved
The present invention is when manually cement is poured into mould in order to overcome, waste time and energy, labor intensity it is big, the process of pouring mud In, cement easily spills the shortcomings that making clothes dirty, the technical problem to be solved in the present invention is to provide a kind of time saving and energy saving, work by force Spend small, cement, which is not easy to spill, makes clothes dirty, moreover it is possible to cement is compacted, improves the bridge construction cement of clump quality Pier pours device.
(2) technical scheme
In order to solve the above-mentioned technical problem, device is poured with clump the invention provides such a bridge construction, wrapped Bottom plate, mould, lowering or hoisting gear, tilting device and cement frame are included, bottom plate top left side is provided with mould, mold bottom and base top Portion contacts, and bottom plate top right side is provided with lowering or hoisting gear, and the Lift Part of lowering or hoisting gear is provided with tilting device, and tilting device inclines Cement frame is connected with part, cement frame is located on the right side of mould.
Preferably, lowering or hoisting gear includes riser, the first sliding block, the first slide rail, transverse slat, bracing wire and electronic reel, bottom Plate top right side is provided with riser, is provided with the first slide rail on the left of riser, the first slide rail in being vertically arranged, the first slide rail provided with Its first sliding block coordinated, the first sliding block are slidably matched with the first slide rail, and the first sliding block right flank connects with riser left surface bottom Connect, the first slide rail left surface bottom is provided with transverse slat, is connected at the top of transverse slat with tilting device, and electronic coiling is provided with the top of riser Take turns, be wound with bracing wire on electronic reel, bracing wire tail end is connected with the first slide rail crown center.
Preferably, tilting device includes the first motor, screw mandrel, nut, connecting rope, bearing block, fixed block and support block, Transverse slat top left side is provided with fixed block, is provided with support block, support block top at the top of fixed block by way of bearing pin connection It is connected with cement outer frame bottom left, the second slide rail left surface is fitted with bearing block in both sides up and down, is connected between bearing block Screw mandrel, nut is installed on screw mandrel, nut left surface is connected with connecting rope, and connecting rope tail end connects with cement outer frame right flank bottom Connect, the second slide rail left surface bottom is provided with the first motor, and for the first motor in being vertically arranged, the output shaft of the first motor passes through connection Axle device is connected with screw mandrel bottom.
Preferably, compaction apparatus is also included, compaction apparatus includes 7 templates, sector gear, the second slide rail, the second cunning Block, rack, the first spring, montant, the second motor and depression bar, bottom plate top left side are provided with 7 templates, and 7 templates are located at a mould left side Side, left surface top is provided with the second slide rail in 7 templates, and in being vertically arranged, the second slide rail is provided with to be coordinated the second slide rail with it The second sliding block, the second sliding block is slidably matched with the second slide rail, and the second sliding block right flank is provided with rack, and rack bottom is provided with Depression bar, depression bar are located in mould, with being connected with the first spring among 7 template inner tops at the top of rack, pacify on the right side of 7 template inner tops Equipped with montant, montant bottom is provided with the second motor, and the output shaft of the second motor is connected with sector gear by shaft coupling, fan-shaped Gear is located on the right side of rack, the engagement of sector wheel and rack.
Preferably, shaking device is also included, shaking device includes the 3rd slide rail, the 3rd sliding block, fixed plate, the second bullet Spring, cross bar, contact roller, connecting rod, the 3rd motor and cam, bottom plate top left side are provided with the 3rd slide rail, and the 3rd slide rail is in water Flat to set, the 3rd slide rail is provided with the 3rd sliding block coordinated with it, and the 3rd sliding block is slidably matched with the 3rd slide rail, and mold bottom is also It can be connected with the 3rd slider top, the 3rd sliding block right flank top is provided with cross bar, and cross bar right-hand member is provided with contact roller, bottom Plate top left side is provided with connecting rod, and connecting rod is located on the right side of the 3rd slide rail, and connecting rod top is provided with the 3rd motor, the 3rd motor it is defeated Shaft is connected with cam by shaft coupling, and cam is located on the right side of contact roller, and bottom plate top left side is provided with fixed plate, fixed plate Between 7 templates and the 3rd slide rail, second spring is connected between fixed plate right flank top and the 3rd sliding block left surface.
Preferably, rotating shaft, expansion link, contiguous block and weight block are also included, cement inframe right flank top, which is provided with, to be turned Axle, is provided with expansion link in rotating shaft, and expansion link bottom is provided with contiguous block, and contiguous block bottom is provided with weight block, weight block with Cement inframe bottom contacts.
Preferably, water tank, water pump, outlet pipe and shower nozzle are also included, bottom plate top right side is provided with water tank, and water tank is located at On the right side of riser, water pump is installed among water tank inner bottom part, outlet pipe is connected with water pump, outlet pipe tail end runs through in tank top Between on the left of the electronic reel, outlet pipe tail end is provided with shower nozzle, shower nozzle with outlet pipe is interior connects, shower nozzle is located on cement frame Side.
Preferably, the material of bottom plate is Q235 steel.
Preferably, the material of cement frame is stainless steel.
Operation principle:Cement is poured into cement inframe by operating personnel first, restarts lowering or hoisting gear, the lifting of lowering or hoisting gear Part drives tilting device to move up, and then drives cement frame to move up, when cement frame is moved up positioned at mould upper right Fang Shi, lowering or hoisting gear is closed, start tilting device, tilting device is by cement frame inclining, and then the cement of cement inframe pours into mould In tool.After cement all pours into mould, start tilting device and cement frame is moved to original position, close tilting device, start and rise The Lift Part of falling unit drives cement frame to move down recovery to original position, closes lowering or hoisting gear.When the cement in mould is formed After clump, you can take out clump.
Because lowering or hoisting gear includes riser, the first sliding block, the first slide rail, transverse slat, bracing wire and electronic reel, base top Riser is installed on the right side of portion, the first slide rail is provided with the left of riser, in being vertically arranged, the first slide rail is provided with matches somebody with somebody the first slide rail with it The first sliding block closed, the first sliding block are slidably matched with the first slide rail, and the first sliding block right flank is connected with riser left surface bottom, the One slide rail left surface bottom is provided with transverse slat, is connected at the top of transverse slat with tilting device, and electronic reel is provided with the top of riser, electricity Bracing wire is wound with dynamic reel, bracing wire tail end is connected with the first slide rail crown center, when cement is located at cement inframe, operator Member can start electronic reel and rotate forward, and then bracing wire pulls the first slide rail to move up, and it is horizontal that the first slide rail moves up drive Plate moves up, and then drives cement frame to move up by tilting device, when cement frame is located at mould upper right side, closes electricity Dynamic reel, you can start tilting device and pour into cement in mould.When cement is located in mould, you can start electronic reel Rotate forward, and then transverse slat drives cement frame to move down recovery to original position, closes electronic reel.
It is horizontal because tilting device includes the first motor, screw mandrel, nut, connecting rope, bearing block, fixed block and support block Plate top left side is provided with fixed block, is provided with support block at the top of fixed block by way of bearing pin connection, at the top of support block with Cement outer frame bottom left connects, and the second slide rail left surface is fitted with bearing block in both sides up and down, and silk is connected between bearing block Bar, nut is installed on screw mandrel, nut left surface is connected with connecting rope, and connecting rope tail end connects with cement outer frame right flank bottom Connect, the second slide rail left surface bottom is provided with the first motor, and for the first motor in being vertically arranged, the output shaft of the first motor passes through connection Axle device is connected with screw mandrel bottom, and when cement frame is located at mould upper right side, operating personnel can start the first motor and rotate forward, and first Motor, which rotates forward, drives screw mandrel to rotate forward, and screw mandrel, which rotates forward, drives nut to move up, and nut moves upwardly through connecting rope and drives cement Frame inclining, and then the cement of cement inframe is fallen in mould.After cement is all poured into mould, it is anti-to start the first motor Turn, and then drive cement frame to move down recovery to original position, close the first motor.
Because also including compaction apparatus, compaction apparatus include 7 templates, sector gear, the second slide rail, the second sliding block, Rack, the first spring, montant, the second motor and depression bar, bottom plate top left side are provided with 7 templates, and 7 templates are located on the left of mould, and 7 Left surface top is provided with the second slide rail in template, and for the second slide rail in being vertically arranged, the second slide rail is provided with the coordinated with it Two sliding blocks, the second sliding block are slidably matched with the second slide rail, and the second sliding block right flank is provided with rack, and rack bottom is provided with pressure Bar, depression bar are located in mould, with being connected with the first spring among 7 template inner tops at the top of rack, are installed on the right side of 7 template inner tops There is montant, montant bottom is provided with the second motor, and the output shaft of the second motor is connected with sector gear, sector by shaft coupling Wheel is on the right side of rack, and the engagement of sector wheel and rack, when cement is located in mould, operating personnel can start the second motor Rotate, the second motor, which rotates, drives sector gear to rotate, and because of the effect of the first spring, is moved down on sector gear rotational band carry-over bar Dynamic, the second slide rail play the guiding role with the second sliding block, and rack, which moves up and down, drives depression bar to move up and down, and depression bar is moved up and down to mould Cement in tool is compacted.After cement is compacted, the second motor is closed, and depression bar is moved to original position.In this way, to water Mud carry out compactioncan make cement formed after clump it is more solid.
Because also including shaking device, shaking device include the 3rd slide rail, the 3rd sliding block, fixed plate, second spring, Cross bar, contact roller, connecting rod, the 3rd motor and cam, bottom plate top left side are provided with the 3rd slide rail, and the 3rd slide rail is set in level Put, the 3rd slide rail is provided with the 3rd sliding block that coordinates with it, and the 3rd sliding block is slidably matched with the 3rd slide rail, and mold bottom can be with It is connected with the 3rd slider top, the 3rd sliding block right flank top is provided with cross bar, and cross bar right-hand member is provided with contact roller, base top Connecting rod is installed, connecting rod is located on the right side of the 3rd slide rail, and connecting rod top is provided with the 3rd motor, the output shaft of the 3rd motor on the left of portion Cam is connected with by shaft coupling, cam is located on the right side of contact roller, and bottom plate top left side is provided with fixed plate, and fixed plate is located at Between 7 templates and the 3rd slide rail, second spring is connected between fixed plate right flank top and the 3rd sliding block left surface, works as depression bar While being compacted to cement, start the 3rd motor and rotate, the 3rd motor rotational band moving cam rotates, and cam rotation is with connecing Roller contact is touched, because of the effect of second spring, and then cam driven contact roller moves left and right, and contact roller moves left and right drive 3rd sliding block moves left and right, and the 3rd sliding block moves left and right driven mold and moved left and right, and mould, which moves left and right, rocks cement, and then Depression bar is set preferably to be compacted to cement.After cement is compacted, the 3rd motor is closed.In this way, cement is rocked, Depression bar can be made preferably to be compacted to cement, it is further more solid.
Because also including rotating shaft, expansion link, contiguous block and weight block, cement inframe right flank top is provided with rotating shaft, Expansion link is installed, expansion link bottom is provided with contiguous block, and contiguous block bottom is provided with weight block, weight block and cement in rotating shaft Inframe bottom contacts, when cement frame inclining, because gravity influences, and weight block also slide downward, and then expansion link constantly extends, weight Thing block moves down to be promoted to the cement of cement inframe.When cement is entirely located in mould, weight block is recovered to original again Position.In this way, weight block promotes to cement, cement can be accelerated and fallen in mould, and then improve operating efficiency.
Because also including water tank, water pump, outlet pipe and shower nozzle, bottom plate top right side is provided with water tank, and water tank is positioned at perpendicular On the right side of plate, water pump is installed among water tank inner bottom part, outlet pipe is connected with water pump, outlet pipe tail end is among tank top On the left of electronic reel, outlet pipe tail end is provided with shower nozzle, and with being connected in outlet pipe, shower nozzle is located on cement frame shower nozzle , there is appropriate water side when initial, in water tank, after cement frame recovers to original position, operating personnel can start water pump, and water pump is by water Water in case is pumped into outlet pipe, and then the water in outlet pipe is sprayed by shower nozzle, and water sprays to be cleaned to cement inframe.When After cement frame is cleaned, switch off the pump.In this way, carrying out cleaning to cement frame cement frame can be enable preferably to use next time.
Because the material of bottom plate is Q235 steel, the weight capacity of Q235 steel is strong, acidproof corrosion-resistant, adds the use of bottom plate Life-span.
Because the material of cement frame is stainless steel, stainless steel corrosion resistance and acid resistance are strong, make the service life of cement frame It is longer.
(3) beneficial effect
The present invention is compacted by depression bar to cement, and then improves the quality of clump, meanwhile, also improve work Efficiency, has reached that time saving and energy saving, labor intensity is small, and cement, which is not easy to spill, makes clothes dirty, moreover it is possible to cement is compacted, improved The effect of clump quality.
Brief description of the drawings
Fig. 1 is the main structure diagram of the present invention.
Fig. 2 is the main structure diagram of lowering or hoisting gear of the present invention.
Fig. 3 is the main structure diagram of tilting device of the present invention.
Fig. 4 is the main structure diagram of compaction apparatus of the present invention.
Fig. 5 is the main structure diagram of shaking device of the present invention.
Fig. 6 is the first part main structure diagram of the present invention.
Fig. 7 is second of part main structure diagram of the present invention.
Mark in accompanying drawing for:1- bottom plates, 2- moulds, 3- lowering or hoisting gears, 31- risers, the sliding blocks of 32- first, 33- first are slided Rail, 34- transverse slats, 35- bracing wires, the electronic reels of 36-, 4- tilting devices, the motors of 41- first, 42- screw mandrels, 43- nuts, 44- connect Splicing, 45- bearing blocks, 46- fixed blocks, 47- support blocks, 5- cement frames, 6- compaction apparatus, 61-7 templates, 62- sector gears, The slide rails of 63- second, the sliding blocks of 64- second, 65- racks, the springs of 66- first, 67- montants, the motors of 68- second, 69- depression bars, 7- shakes Dynamic device, the slide rails of 71- the 3rd, the sliding blocks of 72- the 3rd, 73- fixed plates, 74- second springs, 75- cross bars, 76- contact rollers, 77- Connecting rod, the motors of 78- the 3rd, 79- cams, 8- rotating shafts, 9- expansion links, 10- contiguous blocks, 11- weight blocks, 12- water tanks, 13- water pumps, 14- outlet pipes, 15- shower nozzles.
Embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of bridge construction pours device with clump, as shown in figs. 1-7, include bottom plate 1, mould 2, lowering or hoisting gear 3, Tilting device 4 and cement frame 5, the top left side of bottom plate 1 are provided with mould 2, the bottom of mould 2 and the top contact of bottom plate 1, the top of bottom plate 1 Right side is provided with lowering or hoisting gear 3, and the Lift Part of lowering or hoisting gear 3 is provided with tilting device 4, connected on the dumping part of tilting device 4 Cement frame 5 is connected to, cement frame 5 is located at the right side of mould 2.
Embodiment 2
A kind of bridge construction pours device with clump, as shown in figs. 1-7, include bottom plate 1, mould 2, lowering or hoisting gear 3, Tilting device 4 and cement frame 5, the top left side of bottom plate 1 are provided with mould 2, the bottom of mould 2 and the top contact of bottom plate 1, the top of bottom plate 1 Right side is provided with lowering or hoisting gear 3, and the Lift Part of lowering or hoisting gear 3 is provided with tilting device 4, connected on the dumping part of tilting device 4 Cement frame 5 is connected to, cement frame 5 is located at the right side of mould 2.
Lowering or hoisting gear 3 includes riser 31, the first sliding block 32, the first slide rail 33, transverse slat 34, bracing wire 35 and electronic reel 36, the top right side of bottom plate 1 is provided with riser 31, and the left side of riser 31 is provided with the first slide rail 33, and the first slide rail 33 is in be vertically arranged, the One slide rail 33 is provided with the first sliding block 32 coordinated with it, and the first sliding block 32 is slidably matched with the first slide rail 33, the first sliding block 32 Right flank is connected with the left surface bottom of riser 31, and the left surface bottom of the first slide rail 33 is provided with transverse slat 34, and the top of transverse slat 34 is with inclining Focusing device 4 connects, and the top of riser 31 is provided with electronic reel 36, and bracing wire 35, the tail end of bracing wire 35 are wound with electronic reel 36 It is connected with the crown center of the first slide rail 33.
Embodiment 3
A kind of bridge construction pours device with clump, as shown in figs. 1-7, include bottom plate 1, mould 2, lowering or hoisting gear 3, Tilting device 4 and cement frame 5, the top left side of bottom plate 1 are provided with mould 2, the bottom of mould 2 and the top contact of bottom plate 1, the top of bottom plate 1 Right side is provided with lowering or hoisting gear 3, and the Lift Part of lowering or hoisting gear 3 is provided with tilting device 4, connected on the dumping part of tilting device 4 Cement frame 5 is connected to, cement frame 5 is located at the right side of mould 2.
Lowering or hoisting gear 3 includes riser 31, the first sliding block 32, the first slide rail 33, transverse slat 34, bracing wire 35 and electronic reel 36, the top right side of bottom plate 1 is provided with riser 31, and the left side of riser 31 is provided with the first slide rail 33, and the first slide rail 33 is in be vertically arranged, the One slide rail 33 is provided with the first sliding block 32 coordinated with it, and the first sliding block 32 is slidably matched with the first slide rail 33, the first sliding block 32 Right flank is connected with the left surface bottom of riser 31, and the left surface bottom of the first slide rail 33 is provided with transverse slat 34, and the top of transverse slat 34 is with inclining Focusing device 4 connects, and the top of riser 31 is provided with electronic reel 36, and bracing wire 35, the tail end of bracing wire 35 are wound with electronic reel 36 It is connected with the crown center of the first slide rail 33.
Tilting device 4 includes the first motor 41, screw mandrel 42, nut 43, connecting rope 44, bearing block 45, the and of fixed block 46 Support block 47, the top left side of transverse slat 34 are provided with fixed block 46, and the top of fixed block 46 is provided with branch by way of bearing pin connection Bracer 47, for the top of support block 47 with being connected on the left of the outer bottom of cement frame 5, the left surface of the second slide rail 63 is fitted with axle in both sides up and down Bearing 45, screw mandrel 42 is connected between bearing block 45, nut 43 is installed, the left surface of nut 43 is connected with connecting rope on screw mandrel 42 44, the tail end of connecting rope 44 is connected with the external right side face bottom of cement frame 5, and the left surface bottom of the second slide rail 63 is provided with the first motor 41, in being vertically arranged, the output shaft of the first motor 41 is connected the first motor 41 by shaft coupling with the bottom of screw mandrel 42.
Embodiment 4
A kind of bridge construction pours device with clump, as shown in figs. 1-7, include bottom plate 1, mould 2, lowering or hoisting gear 3, Tilting device 4 and cement frame 5, the top left side of bottom plate 1 are provided with mould 2, the bottom of mould 2 and the top contact of bottom plate 1, the top of bottom plate 1 Right side is provided with lowering or hoisting gear 3, and the Lift Part of lowering or hoisting gear 3 is provided with tilting device 4, connected on the dumping part of tilting device 4 Cement frame 5 is connected to, cement frame 5 is located at the right side of mould 2.
Lowering or hoisting gear 3 includes riser 31, the first sliding block 32, the first slide rail 33, transverse slat 34, bracing wire 35 and electronic reel 36, the top right side of bottom plate 1 is provided with riser 31, and the left side of riser 31 is provided with the first slide rail 33, and the first slide rail 33 is in be vertically arranged, the One slide rail 33 is provided with the first sliding block 32 coordinated with it, and the first sliding block 32 is slidably matched with the first slide rail 33, the first sliding block 32 Right flank is connected with the left surface bottom of riser 31, and the left surface bottom of the first slide rail 33 is provided with transverse slat 34, and the top of transverse slat 34 is with inclining Focusing device 4 connects, and the top of riser 31 is provided with electronic reel 36, and bracing wire 35, the tail end of bracing wire 35 are wound with electronic reel 36 It is connected with the crown center of the first slide rail 33.
Tilting device 4 includes the first motor 41, screw mandrel 42, nut 43, connecting rope 44, bearing block 45, the and of fixed block 46 Support block 47, the top left side of transverse slat 34 are provided with fixed block 46, and the top of fixed block 46 is provided with branch by way of bearing pin connection Bracer 47, for the top of support block 47 with being connected on the left of the outer bottom of cement frame 5, the left surface of the second slide rail 63 is fitted with axle in both sides up and down Bearing 45, screw mandrel 42 is connected between bearing block 45, nut 43 is installed, the left surface of nut 43 is connected with connecting rope on screw mandrel 42 44, the tail end of connecting rope 44 is connected with the external right side face bottom of cement frame 5, and the left surface bottom of the second slide rail 63 is provided with the first motor 41, in being vertically arranged, the output shaft of the first motor 41 is connected the first motor 41 by shaft coupling with the bottom of screw mandrel 42.
Also include compaction apparatus 6, compaction apparatus 6 includes 7 templates 61, sector gear 62, the second slide rail 63, second and slided Block 64, rack 65, the first spring 66, montant 67, the second motor 68 and depression bar 69, the top left side of bottom plate 1 are provided with 7 templates 61,7 Template 61 is located at the left side of mould 2, and left surface top is provided with the second slide rail 63 in 7 templates 61, and the second slide rail 63 is in be vertically arranged, Second slide rail 63 is provided with the second sliding block 64 coordinated with it, and the second sliding block 64 is slidably matched with the second slide rail 63, the second sliding block 64 right flanks are provided with rack 65, and the bottom of rack 65 is provided with depression bar 69, and depression bar 69 is located in mould 2, the top of rack 65 and 7 types It is connected among the inner top of plate 61 on the right side of the inner top of first 66,7 template of spring 61 and montant 67 is installed, the bottom of montant 67 is provided with Second motor 68, the output shaft of the second motor 68 are connected with sector gear 62 by shaft coupling, and sector gear 62 is located at rack 65 Right side, sector gear 62 engage with rack 65.
Also include shaking device 7, shaking device 7 includes the 3rd slide rail 71, the 3rd sliding block 72, fixed plate 73, second Spring 74, cross bar 75, contact roller 76, connecting rod 77, the 3rd motor 78 and cam 79, the top left side of bottom plate 1 are provided with the 3rd cunning Rail 71, for the 3rd slide rail 71 in horizontally disposed, the 3rd slide rail 71 is provided with the 3rd sliding block 72 coordinated with it, the 3rd sliding block 72 and the Three slide rails 71 are slidably matched, and the bottom of mould 2 can also be connected with the top of the 3rd sliding block 72, the installation of the right flank top of the 3rd sliding block 72 There is cross bar 75, the right-hand member of cross bar 75 is provided with contact roller 76, and the top left side of bottom plate 1 is provided with connecting rod 77, and connecting rod 77 is located at the 3rd The right side of slide rail 71, the top of connecting rod 77 are provided with the 3rd motor 78, and the output shaft of the 3rd motor 78 is connected with cam by shaft coupling 79, cam 79 is located at the right side of contact roller 76, and the top left side of bottom plate 1 is provided with fixed plate 73, fixed plate 73 positioned at 7 templates 61 with Between 3rd slide rail 71, second spring 74 is connected between the right flank top of fixed plate 73 and the left surface of the 3rd sliding block 72.
Also include rotating shaft 8, expansion link 9, contiguous block 10 and weight block 11, right flank top, which is provided with, in cement frame 5 turns Axle 8, expansion link 9 is installed in rotating shaft 8, the bottom of expansion link 9 is provided with contiguous block 10, and the bottom of contiguous block 10 is provided with weight block 11, weight block 11 contacts with the inner bottom part of cement frame 5.
Also include water tank 12, water pump 13, outlet pipe 14 and shower nozzle 15, the top right side of bottom plate 1 is provided with water tank 12, water tank 12 are provided with water pump 13 among the right side of riser 31, the inner bottom part of water tank 12, and outlet pipe 14, outlet pipe 14 are connected with water pump 13 For tail end through the crown center of water tank 12 positioned at the left side of electronic reel 36, the tail end of outlet pipe 14 is provided with shower nozzle 15, shower nozzle 15 with Connected in outlet pipe 14, shower nozzle 15 is located at the top of cement frame 5.
The material of bottom plate 1 is Q235 steel.
The material of cement frame 5 is stainless steel.
Operation principle:Operating personnel pour into cement in cement frame 5 first, restart lowering or hoisting gear 3, lowering or hoisting gear 3 Lift Part drives tilting device 4 to move up, and then drives cement frame 5 to move up, when cement frame 5 is moved up positioned at mould When having 2 upper right side, lowering or hoisting gear 3 to be closed, starts tilting device 4, tilting device 4 tilts cement frame 5, and then in cement frame 5 Cement pour into mould 2.After cement all pours into mould 2, start tilting device 4 and cement frame 5 is moved to original position, close Tilting device 4, the Lift Part for starting lowering or hoisting gear 3 drive cement frame 5 to move down recovery to original position, close lowering or hoisting gear 3. After the cement in mould 2 forms clump, you can clump is taken out.
Because lowering or hoisting gear 3 include riser 31, the first sliding block 32, the first slide rail 33, transverse slat 34, bracing wire 35 and it is electronic around Line wheel 36, the top right side of bottom plate 1 are provided with riser 31, and the left side of riser 31 is provided with the first slide rail 33, and the first slide rail 33 is in set vertically Put, the first slide rail 33 is provided with the first sliding block 32 coordinated with it, and the first sliding block 32 is slidably matched with the first slide rail 33, and first slides The right flank of block 32 is connected with the left surface bottom of riser 31, and the left surface bottom of the first slide rail 33 is provided with transverse slat 34, the top of transverse slat 34 It is connected with tilting device 4, the top of riser 31 is provided with electronic reel 36, and bracing wire 35, bracing wire 35 are wound with electronic reel 36 Tail end is connected with the crown center of the first slide rail 33, and when cement is located in cement frame 5, operating personnel can start electronic reel 36 rotate forward, and then bracing wire 35 pulls the first slide rail 33 to move up, and the first slide rail 33 moves up band motion plate 34 and moved up, And then drive cement frame 5 to move up by tilting device 4, when cement frame 5 is located at 2 upper right side of mould, close electronic coiling Wheel 36, you can start tilting device 4 and pour into cement in mould 2.When cement is located in mould 2, you can start electronic reel 36 rotate forward, and then transverse slat 34 drives cement frame 5 to move down recovery to original position, closes electronic reel 36.
Because tilting device 4 includes the first motor 41, screw mandrel 42, nut 43, connecting rope 44, bearing block 45, fixed block 46 and support block 47, the top left side of transverse slat 34 is provided with fixed block 46, and the top of fixed block 46 is installed by way of bearing pin connection There is support block 47, the top of support block 47 with being connected on the left of the outer bottom of cement frame 5, all install both sides up and down by the left surface of the second slide rail 63 There is bearing block 45, screw mandrel 42 is connected between bearing block 45, nut 43 is installed on screw mandrel 42, the left surface of nut 43 is connected with Splicing 44, the tail end of connecting rope 44 are connected with the external right side face bottom of cement frame 5, and the left surface bottom of the second slide rail 63 is provided with the first electricity Machine 41, in being vertically arranged, the output shaft of the first motor 41 is connected the first motor 41 by shaft coupling with the bottom of screw mandrel 42, works as cement When frame 5 is located at 2 upper right side of mould, operating personnel can start the first motor 41 and rotate forward, and the first motor 41, which rotates forward, drives screw mandrel 42 Rotating forward, screw mandrel 42, which rotates forward, drives nut 43 to move up, and nut 43 moves upwardly through connecting rope 44 and drives cement frame 5 to tilt, And then the cement in cement frame 5 is fallen in mould 2.After cement is all poured into mould 2, start the first motor 41 and invert, And then drive cement frame 5 to move down recovery to original position, close the first motor 41.
Because also including compaction apparatus 6, compaction apparatus 6 includes 7 templates 61, sector gear 62, the second slide rail 63, Two sliding blocks 64, rack 65, the first spring 66, montant 67, the second motor 68 and depression bar 69, the top left side of bottom plate 1 are provided with 7 templates 61,7 templates 61 are located at the left side of mould 2, and left surface top is provided with the second slide rail 63 in 7 templates 61, and the second slide rail 63 is in vertical Setting, the second slide rail 63 is provided with the second sliding block 64 coordinated with it, and the second sliding block 64 is slidably matched with the second slide rail 63, and second The right flank of sliding block 64 is provided with rack 65, and the bottom of rack 65 is provided with depression bar 69, and depression bar 69 is located in mould 2, the top of rack 65 Montant 67, the bottom of montant 67 are installed on the right side of the inner top of first 66,7 template of spring 61 with being connected among the inner top of 7 template 61 Second motor 68 is installed, the output shaft of the second motor 68 is connected with sector gear 62 by shaft coupling, and sector gear 62 is located at The right side of rack 65, sector gear 62 engages with rack 65, and when cement is located in mould 2, operating personnel can start the second electricity Machine 68 rotates, and the second motor 68, which rotates, drives sector gear 62 to rotate, because of the effect of the first spring 66, the rotational band of sector gear 62 Carry-over bar 65 is moved up and down, and the second slide rail 63 play the guiding role with the second sliding block 64, and rack 65, which moves up and down, to be driven on depression bar 69 Lower movement, depression bar 69 moves up and down to be compacted to the cement in mould 2.After cement is compacted, the second motor 68 is closed, and make Depression bar 69 is moved to original position.In this way, to cement carry out compactioncan make cement formed after clump it is more solid.
Because also including shaking device 7, shaking device 7 include the 3rd slide rail 71, the 3rd sliding block 72, fixed plate 73, Second spring 74, cross bar 75, contact roller 76, connecting rod 77, the 3rd motor 78 and cam 79, the top left side of bottom plate 1 are provided with Three slide rails 71, for the 3rd slide rail 71 in being horizontally disposed with, the 3rd slide rail 71 is provided with the 3rd sliding block 72 coordinated with it, the 3rd sliding block 72 It is slidably matched with the 3rd slide rail 71, the bottom of mould 2 can also be connected with the top of the 3rd sliding block 72, the right flank top of the 3rd sliding block 72 Cross bar 75 is installed, the right-hand member of cross bar 75 is provided with contact roller 76, and the top left side of bottom plate 1 is provided with connecting rod 77, and connecting rod 77 is located at The right side of 3rd slide rail 71, the top of connecting rod 77 are provided with the 3rd motor 78, and the output shaft of the 3rd motor 78 is connected with by shaft coupling Cam 79, cam 79 are located at the right side of contact roller 76, and the top left side of bottom plate 1 is provided with fixed plate 73, and fixed plate 73 is located at 7 templates 61 and the 3rd between slide rail 71, second spring 74 is connected between the right flank top of fixed plate 73 and the left surface of the 3rd sliding block 72, While depression bar 69 is being compacted to cement, starts the 3rd motor 78 and rotate, 79 turns of 78 rotational band moving cam of the 3rd motor Dynamic, cam 79 is rotated and contacted with contact roller 76, and because of the effect of second spring 74, and then cam 79 drives contact roller 76 or so Mobile, contact roller 76, which moves left and right, drives the 3rd sliding block 72 to move left and right, and the 3rd sliding block 72 moves left and right driven mold 2 or so Mobile, mould 2, which moves left and right, rocks cement, and then depression bar 69 is preferably compacted to cement.After cement is compacted, close Close the 3rd motor 78.In this way, being rocked to cement, depression bar 69 can be made preferably to be compacted to cement, further It is more solid.
Because also including rotating shaft 8, expansion link 9, contiguous block 10 and weight block 11, right flank top is installed in cement frame 5 There is rotating shaft 8, expansion link 9 is installed in rotating shaft 8, the bottom of expansion link 9 is provided with contiguous block 10, and the bottom of contiguous block 10 is provided with weight Block 11, weight block 11 contact with the inner bottom part of cement frame 5, and when cement frame 5 tilts, because gravity influences, weight block 11 is also to downslide It is dynamic, and then expansion link 9 constantly extends, weight block 11 moves down to be promoted to the cement in cement frame 5.When cement whole position When in mould 2, weight block 11 is recovered to original position again.In this way, weight block 11 promotes to cement, cement can be accelerated and fallen to In mould 2, and then improve operating efficiency.
Because also including water tank 12, water pump 13, outlet pipe 14 and shower nozzle 15, the top right side of bottom plate 1 is provided with water tank 12, Water tank 12 is located at the right side of riser 31, is provided with water pump 13 among the inner bottom part of water tank 12, outlet pipe 14, water outlet are connected with water pump 13 The tail end of pipe 14 is provided with shower nozzle 15, shower nozzle through the crown center of water tank 12 positioned at the electronic left side of reel 36, the tail end of outlet pipe 14 15 in outlet pipe 14 with connecting, and shower nozzle 15 is located at the top of cement frame 5, when initial, there is appropriate water in water tank 12, when cement frame 5 Recover to original position, operating personnel can start water pump 13, and the water in water tank 12 is pumped into outlet pipe 14 by water pump 13, and then is gone out Water in water pipe 14 is sprayed by shower nozzle 15, and water is sprayed to being cleaned in cement frame 5.After cement frame 5 is cleaned, water is closed Pump 13.In this way, carrying out cleaning to cement frame 5 cement frame 5 can be enable preferably to use next time.
Because the material of bottom plate 1 is Q235 steel, the weight capacity of Q235 steel is strong, acidproof corrosion-resistant, adds making for bottom plate 1 Use the life-span.
Because the material of cement frame 5 is stainless steel, stainless steel corrosion resistance and acid resistance are strong, and make cement frame 5 uses the longevity Order longer.
Embodiment described above only expresses the preferred embodiment of the present invention, and its description is more specific and detailed, but simultaneously Therefore the limitation to the scope of the claims of the present invention can not be interpreted as.It should be pointed out that for one of ordinary skill in the art For, without departing from the inventive concept of the premise, some deformations can also be made, improves and substitutes, these belong to this hair Bright protection domain.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.

Claims (9)

1. a kind of bridge construction pours device with clump, it is characterised in that includes bottom plate (1), mould (2), lowering or hoisting gear (3), tilting device (4) and cement frame (5), bottom plate (1) top left side are provided with mould (2), and mould (2) bottom is pushed up with bottom plate (1) Portion contacts, and bottom plate (1) top right side is provided with lowering or hoisting gear (3), and the Lift Part of lowering or hoisting gear (3) is provided with tilting device (4), Cement frame (5) is connected with the dumping part of tilting device (4), cement frame (5) is located on the right side of mould (2).
2. a kind of bridge construction according to claim 1 pours device with clump, it is characterised in that lowering or hoisting gear (3) Include riser (31), the first sliding block (32), the first slide rail (33), transverse slat (34), bracing wire (35) and electronic reel (36), bottom Plate (1) top right side is provided with riser (31), and the first slide rail (33) is provided with the left of riser (31), and the first slide rail (33) is in set vertically Put, the first slide rail (33) is provided with the first sliding block (32) coordinated with it, and the first sliding block (32) slides with the first slide rail (33) matches somebody with somebody Close, the first sliding block (32) right flank is connected with riser (31) left surface bottom, and the first slide rail (33) left surface bottom is provided with horizontal stroke Plate (34), be connected with tilting device (4) at the top of transverse slat (34), riser (31) top is provided with electronic reel (36), it is electronic around Bracing wire (35) is wound with line wheel (36), bracing wire (35) tail end is connected with the first slide rail (33) crown center.
3. a kind of bridge construction according to claim 2 pours device with clump, it is characterised in that tilting device (4) Include the first motor (41), screw mandrel (42), nut (43), connecting rope (44), bearing block (45), fixed block (46) and support block (47), transverse slat (34) top left side is provided with fixed block (46), is provided with the top of fixed block (46) by way of bearing pin connection Support block (47), support block (47) top on the left of cement frame (5) outer bottom with being connected, both sides above and below the second slide rail (63) left surface Bearing block (45) is fitted with, screw mandrel (42) is connected between bearing block (45), nut (43), nut are installed on screw mandrel (42) (43) left surface is connected with connecting rope (44), and connecting rope (44) tail end is connected with cement frame (5) external right side face bottom, the second slide rail (63) left surface bottom is provided with the first motor (41), and the first motor (41) is in be vertically arranged, the output shaft of the first motor (41) It is connected by shaft coupling with screw mandrel (42) bottom.
4. a kind of bridge construction according to claim 3 pours device with clump, it is characterised in that also includes compacting Device (6), compaction apparatus (6) include 7 templates (61), sector gear (62), the second slide rail (63), the second sliding block (64), tooth Bar (65), the first spring (66), montant (67), the second motor (68) and depression bar (69), bottom plate (1) top left side are provided with 7 types Plate (61), 7 templates (61) are located on the left of mould (2), and the interior left surface top of 7 templates (61) is provided with the second slide rail (63), and second For slide rail (63) in being vertically arranged, the second slide rail (63) is provided with the second sliding block (64) coordinated with it, the second sliding block (64) and the Two slide rails (63) are slidably matched, and the second sliding block (64) right flank is provided with rack (65), and rack (65) bottom is provided with depression bar (69), depression bar (69) is located in mould (2), with being connected with the first spring among 7 templates (61) inner top at the top of rack (65) (66) montant (67), is installed, montant (67) bottom is provided with the second motor (68), the second electricity on the right side of 7 templates (61) inner top The output shaft of machine (68) is connected with sector gear (62) by shaft coupling, and sector gear (62) is located on the right side of rack (65), fan-shaped Gear (62) engages with rack (65).
5. a kind of bridge construction according to claim 4 pours device with clump, it is characterised in that also includes vibrations Device (7), shaking device (7) include the 3rd slide rail (71), the 3rd sliding block (72), fixed plate (73), second spring (74), horizontal stroke Bar (75), contact roller (76), connecting rod (77), the 3rd motor (78) and cam (79), bottom plate (1) top left side are provided with the 3rd Slide rail (71), for the 3rd slide rail (71) in horizontally disposed, the 3rd slide rail (71) is provided with the 3rd sliding block (72) coordinated with it, and the 3rd Sliding block (72) is slidably matched with the 3rd slide rail (71), and mould (2) bottom can also be with being connected at the top of the 3rd sliding block (72), and the 3rd slides Block (72) right flank top is provided with cross bar (75), and cross bar (75) right-hand member is provided with contact roller (76), bottom plate (1) top left side Connecting rod (77) is installed, connecting rod (77) is located on the right side of the 3rd slide rail (71), and connecting rod (77) top is provided with the 3rd motor (78), the The output shaft of three motors (78) is connected with cam (79) by shaft coupling, and cam (79) is located on the right side of contact roller (76), bottom plate (1) top left side is provided with fixed plate (73), and fixed plate (73) is between 7 templates (61) and the 3rd slide rail (71), fixed plate (73) it is connected with second spring (74) between right flank top and the 3rd sliding block (72) left surface.
6. a kind of bridge construction according to claim 5 pours device with clump, it is characterised in that also includes rotating shaft (8), expansion link (9), contiguous block (10) and weight block (11), the interior right flank top of cement frame (5) are provided with rotating shaft (8), rotating shaft (8) expansion link (9) is installed, expansion link (9) bottom is provided with contiguous block (10), and contiguous block (10) bottom is provided with weight block on (11), weight block (11) contacts with cement frame (5) inner bottom part.
7. a kind of bridge construction according to claim 6 pours device with clump, it is characterised in that also includes water tank (12), water pump (13), outlet pipe (14) and shower nozzle (15), bottom plate (1) top right side are provided with water tank (12), and water tank (12) is located at On the right side of riser (31), water pump (13) is installed among water tank (12) inner bottom part, outlet pipe (14), water outlet are connected with water pump (13) Pipe (14) tail end is located on the left of electronic reel (36) through water tank (12) crown center, and outlet pipe (14) tail end is provided with shower nozzle (15), with being connected in outlet pipe (14), shower nozzle (15) is located above cement frame (5) shower nozzle (15).
8. a kind of bridge construction according to claim 7 pours device with clump, it is characterised in that the material of bottom plate (1) Matter is Q235 steel.
9. a kind of bridge construction according to claim 8 pours device with clump, it is characterised in that cement frame (5) Material is stainless steel.
CN201710686587.XA 2017-08-11 2017-08-11 A kind of bridge construction pours device with clump Active CN107476193B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710686587.XA CN107476193B (en) 2017-08-11 2017-08-11 A kind of bridge construction pours device with clump

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710686587.XA CN107476193B (en) 2017-08-11 2017-08-11 A kind of bridge construction pours device with clump

Publications (2)

Publication Number Publication Date
CN107476193A true CN107476193A (en) 2017-12-15
CN107476193B CN107476193B (en) 2019-03-12

Family

ID=60600047

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710686587.XA Active CN107476193B (en) 2017-08-11 2017-08-11 A kind of bridge construction pours device with clump

Country Status (1)

Country Link
CN (1) CN107476193B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108517827A (en) * 2018-05-09 2018-09-11 杭州君呈贸易有限公司 A kind of efficient adjustable deicing salt dispensing apparatus of municipal administration
CN108525379A (en) * 2018-04-27 2018-09-14 赖彦林 A kind of oil exploitation desilter desander
CN110126079A (en) * 2019-05-15 2019-08-16 上海协恒工程管理有限公司 A kind of bridge construction pours device with clump
CN112720781A (en) * 2021-01-04 2021-04-30 郝玉龙 Ceramic tile making devices of archaize building processing usefulness
CN114582218A (en) * 2022-03-04 2022-06-03 燕山大学 Pouring teaching aid

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07259333A (en) * 1994-03-18 1995-10-09 Ohbayashi Corp Construction method of concrete structure
CN2743321Y (en) * 2004-09-10 2005-11-30 叶伟滔 Inverted column lifter
US20090202326A1 (en) * 2007-08-28 2009-08-13 Dustin Cheyenne Strahler Cement truck elevator for additives
CN103603274A (en) * 2013-11-18 2014-02-26 中铁九局集团第一工程有限公司 Bucket-type bridge pier concrete pouring machine
CN106812307A (en) * 2017-03-31 2017-06-09 中国化学工程第七建设有限公司 A kind of constructing device of reinforced concrete structure
CN206374037U (en) * 2017-01-15 2017-08-04 泉州惠安博元工艺品艺术研究所 Lightweight aggregate concrete stirs filling car

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07259333A (en) * 1994-03-18 1995-10-09 Ohbayashi Corp Construction method of concrete structure
CN2743321Y (en) * 2004-09-10 2005-11-30 叶伟滔 Inverted column lifter
US20090202326A1 (en) * 2007-08-28 2009-08-13 Dustin Cheyenne Strahler Cement truck elevator for additives
CN103603274A (en) * 2013-11-18 2014-02-26 中铁九局集团第一工程有限公司 Bucket-type bridge pier concrete pouring machine
CN206374037U (en) * 2017-01-15 2017-08-04 泉州惠安博元工艺品艺术研究所 Lightweight aggregate concrete stirs filling car
CN106812307A (en) * 2017-03-31 2017-06-09 中国化学工程第七建设有限公司 A kind of constructing device of reinforced concrete structure

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108525379A (en) * 2018-04-27 2018-09-14 赖彦林 A kind of oil exploitation desilter desander
CN108517827A (en) * 2018-05-09 2018-09-11 杭州君呈贸易有限公司 A kind of efficient adjustable deicing salt dispensing apparatus of municipal administration
CN110126079A (en) * 2019-05-15 2019-08-16 上海协恒工程管理有限公司 A kind of bridge construction pours device with clump
CN112720781A (en) * 2021-01-04 2021-04-30 郝玉龙 Ceramic tile making devices of archaize building processing usefulness
CN112720781B (en) * 2021-01-04 2023-06-13 中弘泰建设集团有限公司 Floor tile manufacturing device for archaize building processing
CN114582218A (en) * 2022-03-04 2022-06-03 燕山大学 Pouring teaching aid

Also Published As

Publication number Publication date
CN107476193B (en) 2019-03-12

Similar Documents

Publication Publication Date Title
CN107476193A (en) A kind of bridge construction pours device with clump
CN107127005A (en) A kind of traffic bridge cement block breaker
CN207324925U (en) A kind of traffic bridge cement block breaker
CN107127171A (en) A kind of traffic bridge roadblock device for high-efficiency cleaning
CN206635699U (en) A kind of bridge guard rail high-efficiency washing device
CN107059820A (en) A kind of river surface processing unit of environmental protection
CN205636607U (en) Bridge is with water spray heat sink
CN206335694U (en) A kind of efficient concrete segment moves framed automatic turning device
CN106238395A (en) A kind of waste and old mosaic tiles quick treatment device
CN106272945B (en) A kind of process units of steam pressure sand aerated concrete plank
CN107175198A (en) A kind of Bridge guardrail casting and constructing concrete raw material fast screening devices
CN107042186A (en) A kind of bridge railing production pipe mopping device
CN103074871A (en) Arc-shaped slope concrete sliding and lifting template
CN207071557U (en) A kind of traffic bridge roadblock device for high-efficiency cleaning
CN114798629B (en) Concrete grit material washs pond cleaning device
CN106592551A (en) Automatic clearing method for water body floating objects at hydraulic sluice
CN112502100B (en) Rockfill dam concrete panel crawler grooving template and slope concrete construction process
CN215518646U (en) Flood discharge gate maintenance gate used in hydraulic engineering
CN206646465U (en) A kind of compound curved surface structure construction sliding formwork
CN206780659U (en) A kind of agitating device of bridge construction with automatic charging function
CN207003199U (en) A kind of bridge construction applies mud device with pave function
CN201835250U (en) Anti-collision cleaning device for river channel cleaning boat
CN206718108U (en) A kind of structure of steel die
CN205822112U (en) A kind of efficient deicer of bridge
CN205822111U (en) A kind of efficient deicer of bridge

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190203

Address after: Room 1004 and 1006, Building 8, 778 Asia-Pacific Road, Nanhu District, Jiaxing City, Zhejiang Province, 314000

Applicant after: Zhejiang Zhifeng Technology Co., Ltd.

Address before: 150000 No. 1 Sugar Factory Street, Puzhen, Songbei District, Harbin City, Heilongjiang Province

Applicant before: Hu Xucheng

GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A cement pier pouring device for bridge construction

Effective date of registration: 20210802

Granted publication date: 20190312

Pledgee: Agricultural Bank of China Limited by Share Ltd. South Lake branch

Pledgor: Zhejiang Zhifeng Technology Co.,Ltd.