CN107476180A - Discharge the steel concrete composite continuous bridge of bridge guidance tape tension - Google Patents

Discharge the steel concrete composite continuous bridge of bridge guidance tape tension Download PDF

Info

Publication number
CN107476180A
CN107476180A CN201710677635.9A CN201710677635A CN107476180A CN 107476180 A CN107476180 A CN 107476180A CN 201710677635 A CN201710677635 A CN 201710677635A CN 107476180 A CN107476180 A CN 107476180A
Authority
CN
China
Prior art keywords
guidance tape
bridge
concrete
steel
bridge guidance
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710677635.9A
Other languages
Chinese (zh)
Other versions
CN107476180B (en
Inventor
周志祥
邓国军
乔心格
邵帅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Jiaotong University
Original Assignee
Chongqing Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Jiaotong University filed Critical Chongqing Jiaotong University
Priority to CN201710677635.9A priority Critical patent/CN107476180B/en
Publication of CN107476180A publication Critical patent/CN107476180A/en
Application granted granted Critical
Publication of CN107476180B publication Critical patent/CN107476180B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D1/00Bridges in general
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of steel concrete composite continuous bridge for discharging bridge guidance tape tension, including girder steel and the concrete bridge guidance tape being fixed on girder steel, concrete bridge guidance tape is set above the intermediate pier corresponding to continuous bridge extends transversely through breaking joint, and make between concrete bridge guidance tape and girder steel this extend transversely through breaking joint both sides partial section have it is relative can longitudinal extension deformation;Tension unloading caused by high hogging moment is transferred to girder steel by the present invention, is avoided concrete bridge guidance tape tension, is optimized the stress of whole steel concrete combination beam, can play the performance advantage of steel and concrete;The vertical load of bridge guidance tape is directly passed to girder steel, and ensure that bridge guidance tape will not produce abnormal vertical deformation, and effectively alleviate bridge guidance tape and girder steel and connect the stress concentration and fatigue problem of partial zones from being fixed to having a common boundary of separating, greatly simplify bridge guidance tape construction and construction technology, improve the overall stress performance of bridge, so as to extend its service life, construction and maintenance cost are reduced.

Description

Discharge steel-concrete composite continuous bridge of bridge guidance tape tension
Technical field
The invention belongs to science of bridge building apparatus field, more particularly to a kind of steel-concrete combination for discharging bridge guidance tape tension connects Continuous beam bridge.
Background technology
There is steel-concrete composite continuous beam driving to smooth out, and performance is good, with material economy, is easy to batch production, standard Change the number of advantages such as construction.The conventional form of construction work of existing steel-concrete composite continuous beam for installation girder steel on bridge pier just Position, hoisting prefabricated concrete bridge guidance tape is in place on girder steel, and cast-in-place combination concrete forms steel-concrete composite beam bridge, then by opening Deformed bar is drawn to apply compressive pre-stress to negative moment area concrete bridge guidance tape.
" the steel-concrete composite beams bridge and its build that the continuous prefabricated-pushing tow in section is coupled afterwards in place that the present inventor applies early stage Make method " (application for a patent for invention number:201611148449.8), more conventional assembled steel-concrete composite beam bridge construction avoids Over-size transport lifting and the trouble of cast-in-place combination concrete construction, but have how to overcome negative moment area bridge road board concrete Because the effect of shrinkage and creep, vehicle and temperature load produces excessive tension problem.Normal practice is to form steel-concrete combination After beam bridge, compressive pre-stress is applied to negative moment area concrete bridge guidance tape by prestressed reinforcement of tensioning.It must so undergo Preserved pipeline in bridge guidance tape, prestressed strand being penetrated, stretch-draw prestressing force beam is implemented to anchor to tonnage is set, to deformed bar, Prestress pipe is in the milk, it is last local to pour a series of cumbersome techniques such as sealing off and covering anchorage concrete, the construction of bridge guidance tape because This becomes sufficiently complex, and engineering practice shows in hyperstatic steel-concrete composite continuous beam, to negative moment area coagulation Native bridge guidance tape locally applies prestressing force to avoid effect caused by crack is usually difficult from reaching desired level.
Therefore, it is necessary to being improved in existing steel-concrete composite continuous bridge structure, can give full play to steel and The strength advantage of concrete, concrete in tension cracking disease is avoided, simplifies bridge guidance tape construction and construction technology, it is overall to improve bridge Stress performance, so as to extend its service life, reduce and build and maintenance cost.
The content of the invention
In view of this, it is an object of the invention to provide a kind of steel-concrete composite continuous bridge for discharging bridge guidance tape tension, energy The strength advantage of steel and concrete is enough given full play to, avoids concrete in tension cracking disease, simplifies bridge guidance tape construction and applies Work technique, the overall stress performance of bridge is improved, so as to extend its service life, reduce construction and maintenance cost.
Steel-concrete composite continuous bridge of the release bridge guidance tape tension of the present invention, including girder steel and be fixed on girder steel Concrete bridge guidance tape, the concrete bridge guidance tape is set above the intermediate pier corresponding to continuous bridge extends transversely through breaking joint, and Shi Tongqiao roads Between plate and girder steel this extend transversely through breaking joint both sides partial section have it is relative can longitudinal extension deformation.
Further, the concrete bridge guidance tape be lower bands longitudinal direction floor plank frame, longitudinal floor of the concrete bridge guidance tape Both sides respectively by being fixedly installed vertical steel plate, it is described extend transversely through breaking joint be located at continuous bridge intermediate pier top and pass through Wear the concrete bridge guidance tape cross section including vertical steel plate;High negative moment area in intermediate pier both sides, the concrete bridge guidance tape lead to Cross the upper flange that vertical steel plate is connected to girder steel by the vertical spacing of connecting bolt I, the connecting bolt I and vertical steel plate or/and There is longitudinal surplus so that can longitudinal extension deformation with relative between concrete bridge guidance tape and girder steel between the upper flange of girder steel; Span centre section in addition to the high negative moment area except intermediate pier both sides, the concrete bridge guidance tape are fixed on by vertical steel plate weld The upper flange of girder steel.
Further, from can longitudinal extension deformation jointing be transitioned into and be welded and fixed the partial section of section, the concrete Connection is fastened and fixed by high-strength connecting bolt II between the upper flange of the vertical steel plate and girder steel of bridge guidance tape.
Further, can longitudinal extension deformation jointing and from can longitudinal extension deformation jointing be transitioned into welding The partial section of fixing section, the vertical steel plate strip have the lower flange extended laterally outward to form L-shaped structure, the Tong Qiao roads Connected between plate and the upper flange of girder steel by lower flange by the vertical spacing of connecting bolt I;From can longitudinal extension deformation connection Section is transitioned into the partial section for being welded and fixed section, and the vertical steel plate of the concrete bridge guidance tape passes through lower flange and the upper limb of girder steel Connection is fastened and fixed by high-strength connecting bolt II between plate.
Further, the bolt hole that the lower flange of steel plate or/and the upper flange of girder steel coordinate with connecting bolt I described vertically is The bar hole of longitudinal direction so that connecting bolt I and vertical have between the lower flange of steel plate or/and the upper flange of girder steel more than longitudinal direction Amount.
Further, the vertical side that the vertical steel plate passes through the pre-buried longitudinal floor for being fixed on concrete bridge guidance tape of WELDING STUDS.
Further, from can longitudinal extension deformation jointing be transitioned into and be welded and fixed the partial section of section, the company Connecting bolt II longitudinally arranged at least two.
The beneficial effects of the invention are as follows:The steel of the release bridge guidance tape tension of the present invention-concrete composite continuous bridge construction, Bridge guidance tape above continuous bridge intermediate pier, which is set, to be extended transversely through breaking joint and allows partial section to have freely stretching for relative girder steel, Tension caused by high hogging moment is subjected to unloading by the concrete bridge guidance tape of steel-concrete composite beams and is transferred to girder steel, avoids mixing Native bridge guidance tape tension is coagulated, optimizes the stress of whole steel-concrete composite beams, the performance that can play steel and concrete is excellent Gesture;Concrete bridge guidance tape and girder steel from be fixed to can longitudinal extension deformation transition partial section, by setting fastening bolt Bridge guidance tape and girder steel can effectively be alleviated from the stress concentration and fatigue problem for being fixed to the boundary connection partial zones separated;To height Negative moment area is by setting vertical spacing connecting bolt and bar hole, and the vertical load of bridge guidance tape is directly passed to girder steel, both Bridge guidance tape freely stretching with respect to girder steel longitudinal direction is met, also ensures that bridge guidance tape will not produce abnormal vertical deformation, greatly simplifies Bridge guidance tape construction and construction technology, the overall stress performance of bridge is improved, so as to extend its service life, and can substantially be reduced Its construction cost.
Brief description of the drawings
The invention will be further described with reference to the accompanying drawings and examples.
Fig. 1 is the structural representation of the present invention;
Fig. 2 is enlarged drawing at Figure 1A;
Fig. 3 is Figure 1B-B to diagrammatic cross-section;
Fig. 4 is Fig. 1 C-C to diagrammatic cross-section.
Embodiment
Fig. 1 is the structural representation of the present invention, and Fig. 2 is enlarged drawing at Figure 1A, and Fig. 3 is Figure 1B-B to diagrammatic cross-section, Fig. 4 It is Fig. 1 C-C to diagrammatic cross-section, as shown in the figure:Steel-concrete composite continuous bridge of the release bridge guidance tape tension of the present embodiment, Including girder steel 2 and the concrete bridge guidance tape 1 being fixed on girder steel 2, the concrete bridge guidance tape 1 is on the intermediate pier 3 corresponding to continuous bridge Side sets and extends transversely through breaking joint 11, and makes to extend transversely through the both sides of breaking joint 11 (along bridge at this between concrete bridge guidance tape 1 and girder steel 2 Longitudinal both sides) partial section have it is relative can longitudinal extension deformation, i.e., vertical between the section concrete bridge guidance tape 1 and girder steel 2 It can slide within the specific limits upwards, the concrete bridge guidance tape by tension caused by high hogging moment by steel-concrete composite beams Carry out unloading and be transferred to girder steel, avoid concrete bridge guidance tape tension, optimize the stress of whole steel-concrete composite beams, Neng Goufa Wave the performance advantage of steel and concrete;Intermediate pier refers to bridge in centre portion of the bridge in addition to end bay bridge pier Pier, the beam section on intermediate pier is negative moment area;The prefabricated later stage of concrete bridge guidance tape 1 is located in girder steel 2 and connected, in Tong Qiao roads Plate position corresponding with intermediate pier, which is opened, extends transversely through breaking joint so that the concrete bridge guidance tape of the high negative moment area of intermediate pier pier top is not held Be directly transferred to girder steel by pulling force, and by pulling force, this advantage that steel bear pulling force waved from distribution, ensure whole bridge by Power state.The lateral cross section of whole concrete bridge guidance tape should be run through through groove, including concrete bridge guidance tape is set to be fixed on girder steel Steel plate, the steel plate can be located at concrete bridge guidance tape bottommost, can also be located at the both sides of the web of concrete bridge guidance tape.
In the present embodiment, the concrete bridge guidance tape 1 is the plank frame of lower bands longitudinal direction floor 12, and cross section is T-shaped;It is described The both sides of longitudinal floor 12 of concrete bridge guidance tape 1 are respectively by being fixedly installed vertical steel plate 8, as illustrated, the two of longitudinal floor 12 Individual transverse side is provided with vertical steel plate, belongs to symmetrical structure, sets, will not be repeated here to be connected to girder steel;It is described Extend transversely through breaking joint 11 be located at continuous bridge intermediate pier 3 top and through the horizontal stroke of concrete bridge guidance tape 1 including vertical steel plate 8 including Section;High negative moment area in the both sides of intermediate pier 3, the concrete bridge guidance tape 1 are vertically limited by vertical steel plate 8 by connecting bolt I 6 Position is connected to the upper flange 21 of girder steel 2, i.e., described girder steel 2 is I-beam, and the concrete bridge guidance tape 1 is located at the upper flange of I-beam 2 21 upper surfaces, there is longitudinal surplus between the connecting bolt I 6 and vertical steel plate or/and the upper flange 21 of girder steel 2 so that concrete Can longitudinal extension deformation with relative between bridge guidance tape and girder steel;In addition to the high negative moment area of the both sides of intermediate pier 3 Span centre section, the concrete bridge guidance tape 1 are fixedly welded on the upper flange 21 of girder steel 2 by vertical steel plate 8.
The vertical steel plate 8 is typically fixed by pre-buried realize of WELDING STUDS or other shear connectors, it is described extend transversely through it is disconnected Seam 11 is located at high negative moment area, and high negative moment area is located in negative moment area a, belongs to negative moment area and acted on by hogging moment Larger partial section, high negative moment area refers to that concrete receives the effect of the tension that the hogging moment produces may Cracking, and except remaining section of high negative moment area in negative moment area, concrete bridge guidance tape is produced by hogging moment is born Pulling force when be unlikely to ftracture, can carry out detection acquisition according to different bridges in engineering practice;High hogging moment area section concrete structure Make and bear pulling force greatly and concentrate the most, open extend transversely through breaking joint beneficial to the elimination concrete bridge guidance tape pulling force from source herein;It is negative in height Span centre section beyond moment of flexure section, including negative moment area in addition to high negative moment area and sagging moment section b, it is described Concrete bridge guidance tape 1 is fixed on girder steel 1 (the general fixed form using welding) by vertical steel plate 8;Certainly, will in connecting bolt I 6 Vertical spacing connects between concrete bridge guidance tape 1 and girder steel 2, and (upper and lower) should not exist and loosen in closure;This structure is bearing to bear During moment of flexure, breaking joint 11 is extended transversely through because concrete bridge guidance tape 1 has, girder steel 2 can occur when bearing and shifting the hogging moment come Deformation, then can produce longitudinally opposite displacement between concrete bridge guidance tape 1, and the connecting bolt I 6 with longitudinal surplus adapts to the longitudinal direction Displacement, to ensure the clear and definite of stress, further it is beneficial to play material load advantage.
In the present embodiment, (between concrete bridge guidance tape 1 and girder steel 2) from can longitudinal extension deformation jointing be transitioned into welding The partial section of fixing section, pass through high-strength connecting bolt between the upper flange of the vertical steel plate and girder steel of the concrete bridge guidance tape II is fastened and fixed connection.For the connected mode of foregoing connecting bolt I, beneficial to preferable transfer pulling force, and except high negative curved (including negative moment area in addition to high negative moment area and sagging moment section a) are due to concrete for span centre section beyond square section Connecting structure between bridge guidance tape 1 and girder steel 2 is beneficial to pulling force and pressure caused by the section, then is then that welding is solid in the section Fixed connection (concrete bridge guidance tape is directly welded on girder steel by general use by the shearing steel plate of bottom), therefore, having longitudinally to stretch Compression deformation jointing, which is transitioned into, to be welded and fixed the partial section of section and then undergos mutation, and is easy to produce stress concentration and fatigue, This optimization for being mutated the overall stress for being unfavorable for bridge;Connecting bolt II 7 is fastened and fixed connection and refers to connecting bolt II and in the absence of all directions surplus, directly by being fastenedly connected;Welded because the bonding strength of connecting bolt II 7 is generally less than Connect, but due to there is no activity surplus, then form intensity being fixedly connected higher than connecting bolt I 6;By can produce straight skidding to Connecting bolt II is fastened and fixed and arrives welding structure again, the gentle change of intensity, beneficial to the load transition of whole bridge, avoids being mutated The destruction that caused stress concentration and fatigue are formed.
In the present embodiment, can longitudinal extension deformation jointing (the high negative moment area in intermediate pier both sides) and from Can longitudinal extension deformation jointing be transitioned into the partial section for being welded and fixed section, the vertical steel plate 8 is with laterally outward The lower flange 5 of extension forms L-shaped structure, by lower flange 5 by connecting between the concrete bridge guidance tape 1 and the upper flange 21 of girder steel 2 The vertical spacing of bolt I 6 connects;From can longitudinal extension deformation jointing be transitioned into and be welded and fixed the partial section of section, institute The vertical steel plate for stating concrete bridge guidance tape is solid by being fastened between lower flange 5 and the upper flange 21 of girder steel by high-strength connecting bolt II 7 Fixed connection;As illustrated, lower flange 5 can be integrally formed in negative moment area a and shearing steel plate 8, it can also pass through the welding in later stage Formed;It is in 90 ° of angles between lower flange 5 and shearing steel plate 8, similar to steel angle structure.
In the present embodiment, the lower flange 5 of the vertical steel plate or/and the upper flange 21 of girder steel 2 coordinate with connecting bolt I 6 Bolt hole for the bar hole of longitudinal direction be bar hole, in the present embodiment, bolt hole 51 that lower flange 5 coordinates with connecting bolt I 6 It can not be bar hole for the bolt hole of bar hole, and girder steel 2, be easy to in-situ precast processing.So that connecting bolt I and vertical steel plate Lower flange or/and girder steel upper flange between there is longitudinal surplus.
In the present embodiment, the vertical steel plate 8 passes through the perpendicular of the pre-buried longitudinal floor 11 for being fixed on concrete bridge guidance tape 1 of WELDING STUDS To side, the side of left and right two is respectively provided with, and will not be repeated here.
In the present embodiment, from can longitudinal extension deformation jointing be transitioned into and be welded and fixed the partial section of section, institute State connecting bolt II longitudinally arranged at least two;Further alleviate the mutation between positive hogging moment transition region, reduce moment of flexure and produced Raw pressure mutation, ensures good stress;Connecting bolt II typically uses high-strength bolt, to ensure that connection is strong Degree;During actual use, connecting bolt I 6 is longitudinally arranged multiple;Certainly, also can (sagging moment section b) be close to negative in span centre region Moment of flexure section a regional area is fastened and fixed by connecting bolt II, can also realize the purpose of the present invention.
Finally illustrate, the above embodiments are merely illustrative of the technical solutions of the present invention and it is unrestricted, although with reference to compared with The present invention is described in detail good embodiment, it will be understood by those within the art that, can be to the skill of the present invention Art scheme is modified or equivalent substitution, and without departing from the objective and scope of technical solution of the present invention, it all should cover at this Among the right of invention.

Claims (7)

  1. A kind of 1. steel-concrete composite continuous bridge for discharging bridge guidance tape tension, it is characterised in that:Including girder steel and it is fixed on girder steel On concrete bridge guidance tape, the concrete bridge guidance tape is set above the intermediate pier corresponding to continuous bridge extends transversely through breaking joint, and makes concrete Between bridge guidance tape and girder steel this extend transversely through breaking joint both sides partial section have it is relative can longitudinal extension deformation.
  2. 2. steel-concrete composite continuous bridge of release bridge guidance tape tension according to claim 1, it is characterised in that:It is described Concrete bridge guidance tape is the plank frame of lower bands longitudinal direction floor, and longitudinal floor both sides of the concrete bridge guidance tape pass through fixed setting respectively Have a vertical steel plate, it is described extend transversely through breaking joint be located at continuous bridge intermediate pier top and through including vertical steel plate Concrete bridge guidance tape cross section;High negative moment area in intermediate pier both sides, the concrete bridge guidance tape is by vertical steel plate by connecting bolt I Vertical spacing is connected to the upper flange of girder steel, has between the connecting bolt I and vertical steel plate or/and the upper flange of girder steel vertical To surplus so that can longitudinal extension deformation with relative between concrete bridge guidance tape and girder steel;Born in the height except intermediate pier both sides curved Span centre section beyond square section, the concrete bridge guidance tape are fixed on the upper flange of girder steel by vertical steel plate weld.
  3. 3. steel-concrete composite continuous bridge of release bridge guidance tape tension according to claim 2, it is characterised in that:From Can longitudinal extension deformation jointing be transitioned into the partial section for being welded and fixed section, the vertical steel plate and steel of the concrete bridge guidance tape Connection is fastened and fixed by high-strength connecting bolt II between the upper flange of beam.
  4. 4. steel-concrete composite continuous bridge of release bridge guidance tape tension according to claim 3, it is characterised in that:Can Longitudinal extension deform jointing and from can longitudinal extension deformation jointing be transitioned into and be welded and fixed the partial section of section, The vertical steel plate strip has the lower flange extended laterally outward to form L-shaped structure, the upper flange of the concrete bridge guidance tape and girder steel it Between by lower flange by the vertical spacing of connecting bolt I connect;From can longitudinal extension deformation jointing be transitioned into and be welded and fixed The partial section of section, the vertical steel plate of the concrete bridge guidance tape by between lower flange and the upper flange of girder steel by high-strength connection Bolt II is fastened and fixed connection.
  5. 5. steel-concrete composite continuous bridge of release bridge guidance tape tension according to claim 4, it is characterised in that:It is described The bolt hole that the lower flange of vertical steel plate or/and the upper flange of girder steel coordinate with connecting bolt I is longitudinal bar hole so that even Connecting bolt I and vertically there is longitudinal surplus between the lower flange of steel plate or/and the upper flange of girder steel.
  6. 6. steel-concrete composite continuous bridge of release bridge guidance tape tension according to claim 2, it is characterised in that:It is described The vertical side that vertical steel plate passes through the pre-buried longitudinal floor for being fixed on concrete bridge guidance tape of WELDING STUDS.
  7. 7. steel-concrete composite continuous bridge of release bridge guidance tape tension according to claim 5, it is characterised in that:From Can longitudinal extension deformation jointing be transitioned into the partial section for being welded and fixed section, the connecting bolt II is longitudinally arranged extremely It is few two.
CN201710677635.9A 2017-08-09 2017-08-09 Discharge steel-concrete composite continuous bridge of bridge guidance tape tensile stress Expired - Fee Related CN107476180B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710677635.9A CN107476180B (en) 2017-08-09 2017-08-09 Discharge steel-concrete composite continuous bridge of bridge guidance tape tensile stress

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710677635.9A CN107476180B (en) 2017-08-09 2017-08-09 Discharge steel-concrete composite continuous bridge of bridge guidance tape tensile stress

Publications (2)

Publication Number Publication Date
CN107476180A true CN107476180A (en) 2017-12-15
CN107476180B CN107476180B (en) 2019-09-10

Family

ID=60600051

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710677635.9A Expired - Fee Related CN107476180B (en) 2017-08-09 2017-08-09 Discharge steel-concrete composite continuous bridge of bridge guidance tape tensile stress

Country Status (1)

Country Link
CN (1) CN107476180B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107938493A (en) * 2017-12-28 2018-04-20 贵州大学 A kind of novel fabricated combination beam
CN108643449A (en) * 2018-04-18 2018-10-12 浙江交通职业技术学院 A kind of detachably prefabricated assembled Steel-concrete Combined Beam Structures and manufacture craft
CN115125835A (en) * 2022-06-22 2022-09-30 保利长大工程有限公司 Prefabricated bridge deck structure of steel plate combination beam

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0350139A2 (en) * 1983-11-07 1990-01-10 Harumoto Iron Works Co., Ltd. A method for forming a composite structural member
JPH11222817A (en) * 1998-02-06 1999-08-17 Nippon Steel Corp Continuous composite bridge
CN102086629A (en) * 2010-12-10 2011-06-08 清华大学 Longitudinally slidable steel-concrete anti-lifting connecting member and construction method thereof
CN102505624A (en) * 2011-10-17 2012-06-20 武汉理工大学 Anti-cracking steel-concrete combined continuous girder bridge of negative moment region
CN202626842U (en) * 2012-06-13 2012-12-26 中交通力建设股份有限公司 Reinforced structure used for exerting prestressing force on highway bridge floor layer
CN103031808A (en) * 2013-01-08 2013-04-10 北京玻钢院复合材料有限公司 Fiber-reinforced composite bridge deck and preparation and installation method thereof
CN204715195U (en) * 2015-04-09 2015-10-21 武汉市政工程设计研究院有限责任公司 A kind of Gang Liang – concrete slab composite continuous bridge hogging moment area cracking resistance structure
CN206173784U (en) * 2016-11-11 2017-05-17 重庆大学 Vertically can there be limited -slip to move connecting piece

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0350139A2 (en) * 1983-11-07 1990-01-10 Harumoto Iron Works Co., Ltd. A method for forming a composite structural member
JPH11222817A (en) * 1998-02-06 1999-08-17 Nippon Steel Corp Continuous composite bridge
CN102086629A (en) * 2010-12-10 2011-06-08 清华大学 Longitudinally slidable steel-concrete anti-lifting connecting member and construction method thereof
CN102505624A (en) * 2011-10-17 2012-06-20 武汉理工大学 Anti-cracking steel-concrete combined continuous girder bridge of negative moment region
CN202626842U (en) * 2012-06-13 2012-12-26 中交通力建设股份有限公司 Reinforced structure used for exerting prestressing force on highway bridge floor layer
CN103031808A (en) * 2013-01-08 2013-04-10 北京玻钢院复合材料有限公司 Fiber-reinforced composite bridge deck and preparation and installation method thereof
CN204715195U (en) * 2015-04-09 2015-10-21 武汉市政工程设计研究院有限责任公司 A kind of Gang Liang – concrete slab composite continuous bridge hogging moment area cracking resistance structure
CN206173784U (en) * 2016-11-11 2017-05-17 重庆大学 Vertically can there be limited -slip to move connecting piece

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107938493A (en) * 2017-12-28 2018-04-20 贵州大学 A kind of novel fabricated combination beam
CN108643449A (en) * 2018-04-18 2018-10-12 浙江交通职业技术学院 A kind of detachably prefabricated assembled Steel-concrete Combined Beam Structures and manufacture craft
CN115125835A (en) * 2022-06-22 2022-09-30 保利长大工程有限公司 Prefabricated bridge deck structure of steel plate combination beam

Also Published As

Publication number Publication date
CN107476180B (en) 2019-09-10

Similar Documents

Publication Publication Date Title
CN106835951B (en) The replaceable prefabricated assembled combined beam structure of one kind and manufacturing process
CN105839510B (en) A kind of steel and ultra-high performance concrete composite continuous bridge structure and its construction method
CN101613990B (en) Construction method of railway steel truss girder T-shaped stiffening rib orthotropic slab bridge deck
CN108060636B (en) The construction method of overall assembled composite beam bridge
CN105113405B (en) A kind of combined bridge deck based on steel and UHPC
CN102146658B (en) Locally uncombined suspension bridge steel-concrete combined bridge deck system and construction method of combined bridge deck system
CN107476180B (en) Discharge steel-concrete composite continuous bridge of bridge guidance tape tensile stress
CN105839534B (en) Steel and ultra-high performance concrete compoboard jointing and construction method
CN109610313B (en) Longitudinal rib staggered arrangement structure of profile steel-UHPC composite board and construction method thereof
CN103306214A (en) Novel reinforcement device for reinforced concrete beam and floor slab and construction method thereof
CN105862597B (en) A kind of multiple-piece composite beam bridge top and the bottom monolithic construction construction method
CN108118610A (en) A kind of ultra-high performance concrete and regular reinforcement concrete combination beam
CN114411975B (en) Structure of composite bolting shear key
CN205822006U (en) Steel and ultra-high performance concrete compoboard jointing
CN108589512B (en) Steel-concrete combined beam structure suitable for heavy-duty railway
CN108374317A (en) A kind of steel concrete using mixing floorings combines continuous beam and its construction method entirely
CN105735099B (en) Construction time uses the simple supported-to-continuous girder bridge and its construction method of external prestressing
CN106087694B (en) Assembling steel plate-beams of concrete combined bridge structure and construction method
CN109972510A (en) A kind of assembled combined bridge deck system of the bar away from adjustable U-bolt connector
CN105951574B (en) The construction method of continuous composite beam bridge
CN109267470A (en) A kind of assembled type steel-concrete preflex composite continuous bridge and its construction method
CN108824701A (en) A kind of part steel pipe prestressing force corrugated web combination beam
CN110273362B (en) Orthogonal U-shaped steel bridge deck
CN108221636A (en) In across the steel reinforced concrete composite beam bridge constructed using no mount approach and into bridge method
CN208668245U (en) A kind of steel-UHPC combination beam construction for cable-stayed bridge

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190910