Prior art keywords
high voltage
alarm
heat pump
conversely
buzzer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710613059.1A
Other languages
Chinese (zh)
Inventor
周建武
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Nezoy Technology Co Ltd
Original Assignee
Guangzhou Nezoy Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Nezoy Technology Co Ltd filed Critical Guangzhou Nezoy Technology Co Ltd
Priority to CN201710613059.1A priority Critical patent/CN107467704A/en
Publication of CN107467704A publication Critical patent/CN107467704A/en
Pending legal-status Critical Current

Links

Classifications

    • AHUMAN NECESSITIES
    • A24TOBACCO; CIGARS; CIGARETTES; SIMULATED SMOKING DEVICES; SMOKERS' REQUISITES
    • A24BMANUFACTURE OR PREPARATION OF TOBACCO FOR SMOKING OR CHEWING; TOBACCO; SNUFF
    • A24B3/00Preparing tobacco in the factory
    • A24B3/10Roasting or cooling tobacco
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F26DRYING
    • F26BDRYING SOLID MATERIALS OR OBJECTS BY REMOVING LIQUID THEREFROM
    • F26B25/00Details of general application not covered by group F26B21/00 or F26B23/00

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Drying Of Solid Materials (AREA)

Abstract

The invention discloses a kind of tobacco heat pump dryer alarm for high voltage processing method and system to be handled by multistage alarm detection, including bypass pressure release, increase circulation wind speed, dual system switchover operation, target temperature, reasonably combined auxiliary heat of electricity etc. is adjusted flexibly, heat pump normal operation can be ensured to greatest extent, both it ensure that the stabilization of equipment or farthest saved energy consumption, it thereby may be ensured that and be smoothed out in whole Tobacco Leaf Curing, tobacco flue-curing success is can also ensure that when extremely intractable alarm for high voltage occurs in heat pump.It the composite can be widely applied to tobacco art of heat pumps.

Description

A kind of tobacco heat pump dryer alarm for high voltage processing method and system
Technical field
At dryer alert process technical field, more particularly to a kind of tobacco heat pump dryer alarm for high voltage Manage method and system.
Background technology
Tobacco flue-curing is one and requires temperature humidity very strict technical process, the control accuracy of normal dry-bulb temperature It is required that being ± 1 DEG C, the control accuracy requirement of wet-bulb temperature is ± 0.5 DEG C.
Tobacco flue-curing is the very wide process of a temperature range, and from the drying muscle stage of changing yellow stage, fixation stage to the end, it is dry Ball temperature range is raised to 68 DEG C from 37 DEG C.
Not too many special tobacco flue-curing heat pump on the market at present, most heat pump producer to method for flue-curing tobacco leaves not It is familiar with, so they carry out tobacco flue-curing using common hot water heat pump controller mostly.Occur in Tobacco Leaf Curing Disorderly closedown caused by the problem of various, particularly alarm for high voltage, causes tobacco flue-curing to fail, and is caused to tobacco grower very big Loss.
The content of the invention
In order to solve the above-mentioned technical problem, the purpose of the present invention is a kind of Automatic Control, and the tobacco that reliability is higher Heat pump dryer alarm for high voltage processing method and system.
The technical solution used in the present invention is:
A kind of tobacco heat pump dryer alarm for high voltage processing method, comprises the following steps:
A, when detecting alarm for high voltage, start buzzer and open by-passing valve;
B, after default stand-by period first stage, detect whether alarm for high voltage also occur, if so, then carrying out blower fan inspection Survey;Conversely, then stopping alarm for high voltage showing and close buzzer, and by-passing valve is closed after the default shut-in time;
C, judge whether another heat pump is in holding state, if so, then starting another heat pump, and close Current heat pump;Conversely, then target temperature is adjusted;
D, detect whether alarm for high voltage also occur, if so, being then adjusted to target temperature;Conversely, then stop high pressure report Alert display and closing buzzer;
E, close current heat pump and start the auxiliary heat of electricity successively, and restarting is current after the default startup time Heat pump;
F, detect whether alarm for high voltage also occur, if so, then closing current heat pump and no longer automatic start, simultaneously The auxiliary hot unlatching of electricity is maintained, until baking terminates;Conversely, then stopping alarm for high voltage showing and close buzzer, and close successively The auxiliary heat of electricity.
As a kind of further improvement of described tobacco heat pump dryer alarm for high voltage processing method, the inspection of described blower fan Survey, the step for specifically include:
B1, the wind speed pattern for detecting circulating fan, judge whether it operates in low-speed mode, if so, then by circulating fan Wind speed pattern switching to fast mode;Conversely, then perform step C;
B2, after the default second stage stand-by period, detect whether alarm for high voltage also occur, if so, then performing step C;Conversely, then stopping alarm for high voltage showing and closes buzzer, and by the wind speed mould of circulating fan after default switching time Formula switches to low-speed mode.
It is described to target as a kind of further improvement of described tobacco heat pump dryer alarm for high voltage processing method Temperature is adjusted, the step for specifically include:
C1, target temperature reduced by 1 DEG C, and detect whether alarm for high voltage also occur, if so, then performing step C2;Conversely, Then stop alarm for high voltage and show and close buzzer, and recover target temperature to shape before after default recovery time State;
C2, target temperature reduced by 2 DEG C, and detect whether alarm for high voltage also occur, if so, then performing step E;Conversely, Then stop alarm for high voltage and show and close buzzer, and recover target temperature to shape before after default recovery time State.
Another technical scheme of the present invention is:
A kind of tobacco heat pump dryer alarm for high voltage processing system, including:
Bypass valve control module, for when detecting alarm for high voltage, starting buzzer and opening by-passing valve;
Aerator supervision module, for after default stand-by period first stage, detecting whether alarm for high voltage also occur, if It is then to carry out aerator supervision;Conversely, then stopping alarm for high voltage showing and close buzzer, and closed after the default shut-in time Close by-passing valve;
System detectio module, for judging whether another heat pump is in holding state, if so, then starting another Heat pump, and close current heat pump;Conversely, then target temperature is adjusted;
Alarm detection module, for detecting whether also there is alarm for high voltage, if so, being then adjusted to target temperature;Instead It, then stop alarm for high voltage and show and close buzzer;
System reboot module, for closing current heat pump and starting the auxiliary heat of electricity successively, and in default startup Between after the current heat pump of restarting;
Final detection module, for detecting whether also there is alarm for high voltage, if so, then closing current heat pump not Automatic start again, while the auxiliary hot unlatching of electricity is maintained, until baking terminates;Conversely, then stopping alarm for high voltage showing and closes honeybee Ring device, and closes the auxiliary heat of electricity successively.
As a kind of further improvement of described tobacco heat pump dryer alarm for high voltage processing system, the aerator supervision Aerator supervision in module, it is specifically included:
Wind speed measurement module, for detecting the wind speed pattern of circulating fan, judge whether it operates in low-speed mode, if It is, then by the wind speed pattern switching of circulating fan to fast mode;Conversely, then execution system detection module;
Mode switch module, for after the default second stage stand-by period, detecting whether alarm for high voltage also occur, if It is, then execution system detection module;Conversely, then stopping alarm for high voltage showing and closes buzzer, and in default switching time Afterwards by the wind speed pattern switching of circulating fan to low-speed mode.
It is described to target as a kind of further improvement of described tobacco heat pump dryer alarm for high voltage processing system Temperature is adjusted, the step for specifically include:
First temperature adjusting module, for target temperature to be reduced into 1 DEG C, and detect whether alarm for high voltage also occur, if so, Then perform second temperature adjusting module;Conversely, then stopping alarm for high voltage showing and closes buzzer, and in default recovery time Target temperature is recovered to state before afterwards;
Second temperature adjusting module, for target temperature to be reduced into 2 DEG C, and detect whether alarm for high voltage also occur, if so, Then execution system restarts module;Conversely, then stopping alarm for high voltage showing and closes buzzer, and will after default recovery time Target temperature recovers to state before.
The beneficial effects of the invention are as follows:
A kind of tobacco heat pump dryer alarm for high voltage processing method of the present invention and system by multistage alarm detection at Reason, can ensure heat pump normal operation to greatest extent, both ensure that the stabilization of equipment or farthest saved energy consumption, so as to It can ensure to be smoothed out in whole Tobacco Leaf Curing, when extremely intractable alarm for high voltage occurs in heat pump It can also ensure that tobacco flue-curing success.
Brief description of the drawings
The embodiment of the present invention is described further below in conjunction with the accompanying drawings:
Fig. 1 is a kind of step flow chart of tobacco heat pump dryer alarm for high voltage processing method of the present invention;
Fig. 2 is a kind of block diagram of tobacco heat pump dryer alarm for high voltage processing system of the present invention.
Embodiment
With reference to figure 1, a kind of tobacco heat pump dryer alarm for high voltage processing method of the present invention, comprise the following steps:
A, when detecting alarm for high voltage, start buzzer and open by-passing valve;
B, after default stand-by period first stage, detect whether alarm for high voltage also occur, if so, then carrying out blower fan inspection Survey;Conversely, then stopping alarm for high voltage showing and close buzzer, and by-passing valve is closed after the default shut-in time;
C, judge whether another heat pump is in holding state, if so, then starting another heat pump, and close Current heat pump;Conversely, then target temperature is adjusted;
D, detect whether alarm for high voltage also occur, if so, being then adjusted to target temperature;Conversely, then stop high pressure report Alert display and closing buzzer;
E, close current heat pump and start the auxiliary heat of electricity successively, and restarting is current after the default startup time Heat pump;
F, detect whether alarm for high voltage also occur, if so, then closing current heat pump and no longer automatic start, simultaneously The auxiliary hot unlatching of electricity is maintained, until baking terminates;Conversely, then stopping alarm for high voltage showing and close buzzer, and close successively The auxiliary heat of electricity.
Wherein, pressure can be let out by opening by-passing valve below safe pressure.
Be further used as preferred embodiment, described aerator supervision, the step for specifically include:
B1, the wind speed pattern for detecting circulating fan, judge whether it operates in low-speed mode, if so, then by circulating fan Wind speed pattern switching to fast mode;Conversely, then perform step C;
B2, after the default second stage stand-by period, detect whether alarm for high voltage also occur, if so, then performing step C;Conversely, then stopping alarm for high voltage showing and closes buzzer, and by the wind speed mould of circulating fan after default switching time Formula switches to low-speed mode.Wherein, the condensation effect of condenser can effectively improve by the switching of blower fan pattern, reduces condensation pressure Power.
Be further used as preferred embodiment, it is described that target temperature is adjusted, the step for specifically include:
C1, target temperature reduced by 1 DEG C, and detect whether alarm for high voltage also occur, if so, then performing step C2;Conversely, Then stop alarm for high voltage and show and close buzzer, and recover target temperature to shape before after default recovery time State;
C2, target temperature reduced by 2 DEG C, and detect whether alarm for high voltage also occur, if so, then performing step E;Conversely, Then stop alarm for high voltage and show and close buzzer, and recover target temperature to shape before after default recovery time State.
In the specific embodiment of the invention, heat pump uses Dual System Design, and the reliability of system greatly improves, and is simultaneously Energy level regulation of uniting is more flexible.The circulating fan is high low speed Double Speed Fan, and air quantity is reduced in tobacco leaf yellowing stage, can maximum journey Degree ground moisturizing, ensure that tobacco leaf smoothly turns yellow while avoids cigarette point from situation about burning occur because of excessive wind speed.In the present embodiment Default stand-by period first stage is 10s, and the default shut-in time is 3min, and the default second stage stand-by period is 15s, Default switching time is 30min, and default recovery time is 30min, and the default startup time is 60min, then it is specially:
S1, when detecting alarm for high voltage, start buzzer and simultaneously open by-passing valve;
S2, detect whether alarm for high voltage also occur after 10s, if so, then performing step S3;Conversely, then stop high pressure report Alert display and closing buzzer, and by-passing valve is closed after 3min;
S3, the wind speed pattern for detecting circulating fan, judge whether it operates in low-speed mode, if so, then by circulating fan Wind speed pattern switching to fast mode;Conversely, then perform step S5;
S4, detect whether alarm for high voltage also occur after 15s, if so, then performing step S5;Conversely, then stop high pressure report Alert display and closing buzzer, and by the wind speed pattern switching of circulating fan to low-speed mode after 30min;
S5, judge whether another heat pump is in holding state, if so, then starting another heat pump, and close Close current heat pump;Conversely, then target temperature is adjusted;
S6, detect whether alarm for high voltage also occur, if so, being then adjusted to target temperature;Conversely, then stop high pressure report Alert display and closing buzzer;
S7, target temperature reduced by 1 DEG C, and detect whether alarm for high voltage also occur, if so, then performing step S8;Conversely, Then stop alarm for high voltage and show and close buzzer, and recover target temperature to state before after 30min;
S8, target temperature reduced by 2 DEG C, and detect whether alarm for high voltage also occur, if so, then performing step S9;Conversely, Then stop alarm for high voltage and show and close buzzer, and recover target temperature to state before after 30min;
S9, close current heat pump and start the auxiliary heat of electricity successively, and current heat pump system is restarted after 60min System;
S10, detect whether alarm for high voltage also occur, if so, then closing current heat pump and no longer automatic start, together When maintain the auxiliary hot unlatching of electricity, until baking terminates;Conversely, then stopping alarm for high voltage showing and close buzzer, and close successively Close the auxiliary heat of electricity.
With reference to figure 2, a kind of tobacco heat pump dryer alarm for high voltage processing system of the invention, including:
Bypass valve control module, for when detecting alarm for high voltage, starting buzzer and opening by-passing valve;
Aerator supervision module, for after default stand-by period first stage, detecting whether alarm for high voltage also occur, if It is then to carry out aerator supervision;Conversely, then stopping alarm for high voltage showing and close buzzer, and closed after the default shut-in time Close by-passing valve;
System detectio module, for judging whether another heat pump is in holding state, if so, then starting another Heat pump, and close current heat pump;Conversely, then target temperature is adjusted;
Alarm detection module, for detecting whether also there is alarm for high voltage, if so, being then adjusted to target temperature;Instead It, then stop alarm for high voltage and show and close buzzer;
System reboot module, for closing current heat pump and starting the auxiliary heat of electricity successively, and in default startup Between after the current heat pump of restarting;
Final detection module, for detecting whether also there is alarm for high voltage, if so, then closing current heat pump not Automatic start again, while the auxiliary hot unlatching of electricity is maintained, until baking terminates;Conversely, then stopping alarm for high voltage showing and closes honeybee Ring device, and closes the auxiliary heat of electricity successively.
It is further used as preferred embodiment, the aerator supervision in the aerator supervision module, it is specifically included:
Wind speed measurement module, for detecting the wind speed pattern of circulating fan, judge whether it operates in low-speed mode, if It is, then by the wind speed pattern switching of circulating fan to fast mode;Conversely, then execution system detection module;
Mode switch module, for after the default second stage stand-by period, detecting whether alarm for high voltage also occur, if It is, then execution system detection module;Conversely, then stopping alarm for high voltage showing and closes buzzer, and in default switching time Afterwards by the wind speed pattern switching of circulating fan to low-speed mode.
Be further used as preferred embodiment, it is described that target temperature is adjusted, the step for specifically include:
First temperature adjusting module, for target temperature to be reduced into 1 DEG C, and detect whether alarm for high voltage also occur, if so, Then perform second temperature adjusting module;Conversely, then stopping alarm for high voltage showing and closes buzzer, and in default recovery time Target temperature is recovered to state before afterwards;
Second temperature adjusting module, for target temperature to be reduced into 2 DEG C, and detect whether alarm for high voltage also occur, if so, Then execution system restarts module;Conversely, then stopping alarm for high voltage showing and closes buzzer, and will after default recovery time Target temperature recovers to state before.
From the foregoing it can be that a kind of tobacco heat pump dryer alarm for high voltage processing method of the present invention and system pass through it is multistage The alarm detection processing of section, including bypass pressure release, increase circulate wind speed, dual system switchover operation, target temperature are adjusted flexibly, closes Auxiliary heat of reason collocation electricity etc., can ensure heat pump normal operation to greatest extent, both ensure that the stabilization or farthest of equipment Energy consumption has been saved, thereby may be ensured that and be smoothed out in whole Tobacco Leaf Curing, has been occurred even in heat pump extremely difficult Tobacco flue-curing success is can also ensure that during the alarm for high voltage of processing.And the present invention uses Dual System Design, considerably increases and sets Standby reliability.More convenient energy level regulation simultaneously, can basis when alarm for high voltage occurs in system using multigroup auxiliary thermal design of electricity Need to automatically engage use, substantially increase the reliability of system.
Above is the preferable implementation to the present invention is illustrated, but the invention is not limited to the implementation Example, those skilled in the art can also make a variety of equivalent variations on the premise of without prejudice to spirit of the invention or replace Change, these equivalent deformations or replacement are all contained in the application claim limited range.

Claims (6)

1. a kind of tobacco heat pump dryer alarm for high voltage processing method, it is characterised in that comprise the following steps:
A, when detecting alarm for high voltage, start buzzer and open by-passing valve;
B, after default stand-by period first stage, detect whether alarm for high voltage also occur, if so, then carrying out aerator supervision; Conversely, then stopping alarm for high voltage showing and close buzzer, and by-passing valve is closed after the default shut-in time;
C, judge whether another heat pump is in holding state, if so, then starting another heat pump, and close current Heat pump;Conversely, then target temperature is adjusted;
D, detect whether alarm for high voltage also occur, if so, being then adjusted to target temperature;Show conversely, then stopping alarm for high voltage Show and close buzzer;
E, close current heat pump and start the auxiliary heat of electricity successively, and current heat is restarted after the default startup time Pumping system;
F, detect whether alarm for high voltage also occur, if so, then closing current heat pump and no longer automatic start, maintain simultaneously The auxiliary hot unlatching of electricity, until baking terminates;Conversely, then stopping alarm for high voltage showing and close buzzer, and it is auxiliary to close electricity successively Heat.
A kind of 2. tobacco heat pump dryer alarm for high voltage processing method according to claim 1, it is characterised in that:
Described aerator supervision, the step for specifically include:
B1, the wind speed pattern for detecting circulating fan, judge whether it operates in low-speed mode, if so, then by the wind of circulating fan Fast mode switches to fast mode;Conversely, then perform step C;
B2, after the default second stage stand-by period, detect whether alarm for high voltage also occur, if so, then performing step C;Instead It, then stop alarm for high voltage and show and close buzzer, and cut the wind speed pattern of circulating fan after default switching time Shift to low-speed mode.
A kind of 3. tobacco heat pump dryer alarm for high voltage processing method according to claim 1, it is characterised in that:Described Target temperature is adjusted, the step for specifically include:
C1, target temperature reduced by 1 DEG C, and detect whether alarm for high voltage also occur, if so, then performing step C2;Conversely, then stop Only alarm for high voltage shows and closed buzzer, and recovers target temperature to state before after default recovery time;
C2, target temperature reduced by 2 DEG C, and detect whether alarm for high voltage also occur, if so, then performing step E;Conversely, then stop Only alarm for high voltage shows and closed buzzer, and recovers target temperature to state before after default recovery time.
A kind of 4. tobacco heat pump dryer alarm for high voltage processing system, it is characterised in that including:
Bypass valve control module, for when detecting alarm for high voltage, starting buzzer and opening by-passing valve;
Aerator supervision module, for after default stand-by period first stage, detecting whether alarm for high voltage also occur, if so, Then carry out aerator supervision;Conversely, then stopping alarm for high voltage showing and closes buzzer, and after the default shut-in time by closing Port valve;
System detectio module, for judging whether another heat pump is in holding state, if so, then starting another heat pump System, and close current heat pump;Conversely, then target temperature is adjusted;
Alarm detection module, for detecting whether also there is alarm for high voltage, if so, being then adjusted to target temperature;Conversely, then Stop alarm for high voltage and show and close buzzer;
System reboot module, for closing current heat pump and starting the auxiliary heat of electricity successively, and after the default startup time Restart current heat pump;
Final detection module, for detecting whether also there is alarm for high voltage, if so, then closing current heat pump and no longer oneself It is dynamic to start, while the auxiliary hot unlatching of electricity is maintained, until baking terminates;Conversely, then stopping alarm for high voltage showing and closes buzzer, And the auxiliary heat of electricity is closed successively.
A kind of 5. tobacco heat pump dryer alarm for high voltage processing system according to claim 4, it is characterised in that:The wind Aerator supervision in machine testing module, it is specifically included:
Wind speed measurement module, for detecting the wind speed pattern of circulating fan, judge whether it operates in low-speed mode, if so, then By the wind speed pattern switching of circulating fan to fast mode;Conversely, then execution system detection module;
Mode switch module, for after the default second stage stand-by period, detecting whether alarm for high voltage also occur, if so, Then execution system detection module;Conversely, then stopping alarm for high voltage showing and closes buzzer, and will after default switching time The wind speed pattern switching of circulating fan is to low-speed mode.
A kind of 6. tobacco heat pump dryer alarm for high voltage processing system according to claim 4, it is characterised in that:
Described is adjusted to target temperature, the step for specifically include:
First temperature adjusting module, for target temperature to be reduced into 1 DEG C, and detect whether alarm for high voltage also occur, if so, then holding Row second temperature adjusting module;Conversely, then stopping alarm for high voltage showing and closes buzzer, and will after default recovery time Target temperature recovers to state before;
Second temperature adjusting module, for target temperature to be reduced into 2 DEG C, and detect whether alarm for high voltage also occur, if so, then holding Row system reboot module;Conversely, then stopping alarm for high voltage showing and closes buzzer, and by target after default recovery time Temperature is recovered to state before.
CN201710613059.1A 2017-07-25 2017-07-25 A kind of tobacco heat pump dryer alarm for high voltage processing method and system Pending CN107467704A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710613059.1A CN107467704A (en) 2017-07-25 2017-07-25 A kind of tobacco heat pump dryer alarm for high voltage processing method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710613059.1A CN107467704A (en) 2017-07-25 2017-07-25 A kind of tobacco heat pump dryer alarm for high voltage processing method and system

Publications (1)

Publication Number Publication Date
CN107467704A true CN107467704A (en) 2017-12-15

Family

ID=60595915

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710613059.1A Pending CN107467704A (en) 2017-07-25 2017-07-25 A kind of tobacco heat pump dryer alarm for high voltage processing method and system

Country Status (1)

Country Link
CN (1) CN107467704A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202281341U (en) * 2011-10-11 2012-06-20 三一重工股份有限公司 Dynamic pressure monitoring device of air conditioner system
KR101303656B1 (en) * 2013-03-15 2013-09-05 주식회사 오페론 Freeze drier
CN204047983U (en) * 2014-08-15 2014-12-31 湖南意歌生态科技有限公司 High-temperature hot pump type tobacco flue-curing house
CN104764140A (en) * 2015-03-19 2015-07-08 珠海格力电器股份有限公司 Condensing pressure control method for refrigerating air conditioning unit
CN104807139A (en) * 2015-04-24 2015-07-29 广东美的制冷设备有限公司 Control method of air conditioner and control device
CN104896666A (en) * 2015-05-28 2015-09-09 广东美的制冷设备有限公司 Control method for outdoor unit of air conditioner and air conditioner
CN105276881A (en) * 2015-10-15 2016-01-27 珠海格力电器股份有限公司 condensing unit operation control method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202281341U (en) * 2011-10-11 2012-06-20 三一重工股份有限公司 Dynamic pressure monitoring device of air conditioner system
KR101303656B1 (en) * 2013-03-15 2013-09-05 주식회사 오페론 Freeze drier
CN204047983U (en) * 2014-08-15 2014-12-31 湖南意歌生态科技有限公司 High-temperature hot pump type tobacco flue-curing house
CN104764140A (en) * 2015-03-19 2015-07-08 珠海格力电器股份有限公司 Condensing pressure control method for refrigerating air conditioning unit
CN104807139A (en) * 2015-04-24 2015-07-29 广东美的制冷设备有限公司 Control method of air conditioner and control device
CN104896666A (en) * 2015-05-28 2015-09-09 广东美的制冷设备有限公司 Control method for outdoor unit of air conditioner and air conditioner
CN105276881A (en) * 2015-10-15 2016-01-27 珠海格力电器股份有限公司 condensing unit operation control method

Similar Documents

Publication Publication Date Title
CN109297220B (en) Anti-freezing control method and device and computer readable storage medium
CN109340901B (en) Anti-freezing control method for low-temperature air source heat pump heating machine
US10849325B2 (en) Intelligent dehumidification device for hot air circulation baking system
US9015960B2 (en) Drying of water damaged buildings
CN104061650A (en) Frosting judgment method of air-cooled heat pump air conditioner
CN109798703B (en) Heat pump unit and defrosting control method and device thereof
CN106016879A (en) Defrosting condition judgment method and device for unit and hot water unit
CN111059691B (en) Control method and device of air source heat pump air conditioner, storage medium and air conditioner
CN106594994A (en) Method and system for automatic and quick start for power-off of unit as well as air conditioner
CN109900027A (en) Air source heat pump antifreeze control method
KR101613948B1 (en) Laver to recycle heat drying equipment included in the dry heat cycle heat pump-type device and method using the same heat of dry air and latent heat recovery method
CN106020301A (en) Control system for intelligent dehumidification device
CN109297148B (en) Heat pump unit, refrigeration starting low-voltage protection method thereof, computer equipment and storage medium
KR102560048B1 (en) High-efficiency integrated absorption cooling system using fuel cell exhaust heat
CN109286138A (en) Prevent the control method and control device of refrigeration unit frosting in dehumidification by condensation device
CN107763887A (en) The control of Energy Level method and control device of a kind of dual system source pump
CN113945086B (en) Method and device for controlling heat pump dryer, electronic equipment and storage medium
CN108413566A (en) The booting energy-saving control system of air conditioner water cold group when a kind of external world's low humidity ball
CN104294560A (en) Automatic drying control method of dry cleaning machine and dry cleaning machine
CN112611215B (en) Control method of air source heat pump dryer with parallel double systems
CN107467704A (en) A kind of tobacco heat pump dryer alarm for high voltage processing method and system
CN208952481U (en) Air conditioner circulation system and air conditioner
CN105066335B (en) A kind of communication cabinet DC frequency converting air-conditioner control system
CN106123333A (en) It is automatically adjusted the air-source water heater of heat exchange efficiency
CN204254747U (en) High temperature formula wind cold drying machine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination