CN107450441A - Transformer station's cut-in method and system - Google Patents

Transformer station's cut-in method and system Download PDF

Info

Publication number
CN107450441A
CN107450441A CN201710744651.5A CN201710744651A CN107450441A CN 107450441 A CN107450441 A CN 107450441A CN 201710744651 A CN201710744651 A CN 201710744651A CN 107450441 A CN107450441 A CN 107450441A
Authority
CN
China
Prior art keywords
transformer station
job content
access
operating procedure
instruction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710744651.5A
Other languages
Chinese (zh)
Inventor
张烨
张双辉
高岩
倪玮强
龚强
闫春晓
王震
田欣平
李倩
孙亚丽
李汉枝
刘雅倩
梁立建
韩林海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Cangzhou Power Supply Co of State Grid Hebei Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Cangzhou Power Supply Co of State Grid Hebei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Hebei Electric Power Co Ltd, Cangzhou Power Supply Co of State Grid Hebei Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201710744651.5A priority Critical patent/CN107450441A/en
Publication of CN107450441A publication Critical patent/CN107450441A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers
    • G05B19/048Monitoring; Safety

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Testing Relating To Insulation (AREA)

Abstract

The invention discloses a kind of transformer station's cut-in method and system, is related to transformer station's configuring technical field.Methods described includes the operating procedure write-in that the job content of transformer station's access and the job content are related to instructing card;The job content and the operating procedure are associated using the dispatching of power netwoks instrument to prestore;Incoming instruction is received, the job content of association and the operating procedure associated are transferred according to the incoming instruction;The access of the transformer station is completed with the operating procedure associated according to the job content for the association transferred.After such scheme so that can be accessed during transformer station accesses according to operating procedure while scheduling tool, and also check Detailed operating procedures, accurate control can be realized, simplifies operating procedure, it is not error-prone, it is time saving and energy saving, improve the operating efficiency and quality of technical staff.

Description

Transformer station's cut-in method and system
Technical field
The present invention relates to transformer station's configuring technical field, more particularly to a kind of transformer station's cut-in method and system.
Background technology
As power network intelligent level improves constantly, requirement of the power network relevant speciality to automation main website systemic-function is not yet Disconnected lifting, integral intelligent dispatching of power netwoks control system(D5000 systems)With its powerful systemic-function, numerous function moulds Block, the data acquisition scale of super large meet the requirement of power network development.
However, higher requirement also is proposed to the technical staff of main station system O&M while system is powerful, according to statistics, One transformer station's access D5000 system needs to complete the operation of more than the 60 individual events of sport more or less a hundred, it is difficult to accurate control, safeguards behaviour Make complex steps, easily error, reduce the operating efficiency and quality of technical staff.
The content of the invention
The technical problem to be solved in the present invention is to be directed to above-mentioned the deficiencies in the prior art, there is provided a kind of transformer station's cut-in method And system, the difficulty of transformer station's access can be reduced, improves the degree of accuracy of access, save trouble strength, improves work quality.
In order to solve the above technical problems, the first aspect of the embodiment of the present invention, there is provided a kind of transformer station's cut-in method, bag Include following steps:
Card is instructed into the operating procedure write-in that the job content of transformer station's access and the job content are related to;
The job content and the operating procedure are associated using the dispatching of power netwoks instrument to prestore;
Incoming instruction is received, the job content of association and the operating procedure associated are transferred according to the incoming instruction;
The access of the transformer station is completed with the operating procedure associated according to the job content for the association transferred.
As further technical scheme, the dispatching of power netwoks instrument includes database index device, searcher, graphics edition One or more in device, formula definer and sample definition device.
As further technical scheme, in addition to:
Receive monitoring instruction;
Monitoring request is sent according to the monitoring instruction and arrives monitor workstation, so that the monitor workstation please according to the monitoring Ask the access for monitoring the transformer station.
As further technical scheme, in addition to:
By the operating instruction write-in of the job content of the transformer station's access guidance card;
The job content that the operating instruction and the transformer station access is associated using the dispatching of power netwoks instrument.
As further technical scheme, the job content of transformer station's access is cut including newly-built plant stand, circuit and changes, increases Hold interval, transformation interval and increase interval.
The second aspect of the embodiment of the present invention, there is provided a kind of transformer station's access system, including:
Card module is instructed in write-in, the operating procedure write-in being related to for the job content for accessing transformer station and the job content Instruct card;
Module is associated, for the job content and the operating procedure being closed using the dispatching of power netwoks instrument to prestore Connection;
Module is transferred, for receiving incoming instruction, the job content of association and the operation associated are transferred according to the incoming instruction Step;
Transformer station's AM access module is completed, the change is completed with the operating procedure associated for the job content according to the association transferred The access in power station.
As further technical scheme, the dispatching of power netwoks instrument includes database index device, searcher, graphics edition One or more in device, formula definer and sample definition device.
As further technical scheme, in addition to:
Monitoring instruction module is received, for receiving monitoring instruction;
Transformer station's module is monitored, monitor workstation is arrived for sending monitoring request according to the monitoring instruction, so that the monitoring Work station monitors the access of the transformer station according to the monitoring request.
As further technical scheme, in addition to:
Writing module, the operating instruction write-in of the job content for transformer station to be accessed is described to instruct card;
AM access module is associated, for the operation for the operating instruction and the transformer station being accessed using the dispatching of power netwoks instrument Content is associated.
As further technical scheme, the job content of transformer station's access is cut including newly-built plant stand, circuit and changes, increases Hold interval, transformation interval and increase interval.
The embodiment of the present invention provides a kind of transformer station's cut-in method and system, is accessed transformer station by dispatching of power netwoks instrument Job content and the operating procedure that is related to of job content be associated so that can be according to behaviour during transformer station accesses Make step to access while scheduling tool, and also check Detailed operating procedures, accurate control can be realized, simplify operation Step, it is not error-prone, it is time saving and energy saving, improve the operating efficiency and quality of technical staff.
Brief description of the drawings
Fig. 1 is the step schematic diagram for transformer station's cut-in method that the embodiment of the present invention one provides;
Fig. 2 is the structural representation for transformer station's access system that the embodiment of the present invention two provides;
Fig. 3 is the structural representation for transformer station's access system that the embodiment of the present invention three provides.
Embodiment
The present invention is further detailed explanation with reference to the accompanying drawings and detailed description.
Embodiment one
As shown in figure 1, for a kind of step schematic diagram of transformer station's cut-in method of the present invention, comprise the following steps:
Step S101, card is instructed into the operating procedure write-in that the job content of transformer station's access and the job content are related to.
Specifically, a transformer station is accessed into dispatching of power netwoks control system needs to complete more than the 60 individual events of sport more or less a hundred Operation, these trivial operations and step is many are usually in every particular to be independently accessed, and the problem of various often occur, and not Easily where is the problem for investigation, instructs to block now with electronics, can instruct to block according to electronics, clearly knows that the operation of each step walks Suddenly, and the instrument that needs are dispatched is dispatched out, completes the access of transformer station as indicated, it is necessary first to be done transformer station's access The Detailed operating procedures that job content and each job content are related to, which sort out, to be come, successively according to tree-like arrangement mode typing In blocking to guidance, called after convenient, each job content is a sport, and the operating procedure that each job content is related to is small , belong in the sport of each corresponding job content.
Step S102, the job content and the operating procedure are associated using the dispatching of power netwoks instrument to prestore.
Specifically, electronization instruct card graphical interfaces be by dispatching of power netwoks control system graphing realize , the operating procedure that job content and job content are related to is written on guidance card in a text form, prestored by calling Dispatching of power netwoks various instruments such as database index device, searcher, graphic editor, formula definer and sample definition device In one or more, by transformer station access the job content and the operating procedure be associated, database index device The value of one or more columns per page in database table is ranked up, dispatching of power netwoks control system database table can be quickly accessed using index In customizing messages;The major function of searcher is that the keyword inputted according to user is carried out in the inverted list that index is formed Retrieval, while the covariance mapping between the page and retrieval is completed, the result that will be exported is ranked up, and realize certain use Family relevance feedback mechanism;Graphic editor is the Software tool that various figures are edited for drawing, and is mainly included:Polar plot, Engineering drawing, flow chart, structure chart etc., in this programme, the graphical interfaces that electronization instructs card can be drawn out.
Step S103, incoming instruction is received, the job content of association and the operation associated are transferred according to the incoming instruction Step.
Specifically, after the completion of dispatching of power netwoks instrument is associated with the operating procedure that job content and job content are related to, etc. Instruction to be accessed;After the incoming instruction waiting for receiving user's triggering, job content and the association of association are transferred according to incoming instruction The operating procedure that is related to of job content, operating procedure records the detailed process of each step for the content that fulfils assignment, gives in detail User provides foundation.
Step S104, connecing for the transformer station is completed with the operating procedure associated according to the job content for the association transferred Enter.
Specifically, the job content of association is completed according to the operating procedure of association successively, when all job contents are all complete Cheng Hou, that is, complete the cut-in operation of transformer station.
After such scheme, the job content and job content that are accessed transformer station by dispatching of power netwoks instrument are related to Operating procedure be associated so that transformer station access during can be accessed according to operating procedure while dispatching work Tool, and Detailed operating procedures are also checked, accurate control can be realized, simplifies operating procedure, it is not error-prone, it is time saving and energy saving, Improve the operating efficiency and quality of technical staff.
It is fixed that the dispatching of power netwoks instrument includes database index device, searcher, graphic editor, formula definer and sampling One or more in adopted device.
In addition, in a specific example, methods described also includes:
Receive monitoring instruction.
Specifically, during transformer station accesses, the access overall process of transformer station can also be monitored in real time, after convenient By checking that video recording is conveniently found the problem when ging wrong, while explanation video can also be used as, non-new staffs training, to realize The function, receive the monitoring instruction of user's triggering.
Monitoring request is sent according to the monitoring instruction and arrives monitor workstation, so that the monitor workstation is according to the prison Control request monitors the access of the transformer station.
Specifically, after receiving monitoring instruction, transmission monitoring request is instructed to arrive monitor workstation, monitoring request according to monitoring The numbering of work station to be monitored is carried, monitor workstation monitors the numbering pair according to the numbering of monitoring request and work station to be monitored The access procedure for the transformer station answered, and record, checked after convenient.
In addition, in a specific example, methods described also includes:
By the operating instruction write-in of the job content of the transformer station's access guidance card.
Although specifically, the typing operating procedure in instructing to block, during the operation, it is also possible to because Cause specific has some operating procedures to be not clear how to operate, or does not know reason, so the write operation in instructing to block Illustrate, record the operation reason of operating procedure in operating instruction and the problem of the operating procedure is likely encountered and its solve to do Method.
The job content that the operating instruction and the transformer station access is associated using the dispatching of power netwoks instrument.
The job content of transformer station access includes newly-built plant stand, circuit cut change, increase-volume interval, transformation interval and increase Interval.
Specifically, the content of transformer station's access is a lot, including the content of individual sport and more or less a hundred event more than 60, by these Appearance is refined, be divided into newly-built plant stand, circuit cut change, increase-volume interval, transformation interval and increase are spaced several major parts.
By the installing DB of power network dispatching system on mobile terminal, running independent database instance, line number of going forward side by side Designed according to storehouse, the uniformity of guarantee and the scheduling station system run at present, carry out the verification of database.
After such scheme, fundamentally solve attended operation complex steps present in work, it is difficult to accurate control System, the problem of accurately maintenance, the largely specification maintenance work of scheduling station, the in addition application of this method can improve change The operating efficiency of power station access, according to statistics, is blocked using the guidance, eliminates the time that verification is checked and changed after hours, Average every converting station debugging maintenance time can shorten 2 days, saved cost, obtained huge economic benefit.
Embodiment two
As shown in Fig. 2 be a kind of structural representation of transformer station's access system of the present invention, including:
Card module 201 is instructed in write-in, the operating procedure being related to for the job content for accessing transformer station and the job content Card is instructed in write-in;
Module 202 is associated, for entering the job content and the operating procedure using the dispatching of power netwoks instrument to prestore Row association;
Module 203 is transferred, for receiving incoming instruction, the job content of association and the behaviour associated are transferred according to the incoming instruction Make step;
Transformer station's AM access module 204 is completed, institute is completed with the operating procedure associated for the job content according to the association transferred State the access of transformer station.
After such scheme, the job content and job content that are accessed transformer station by dispatching of power netwoks instrument are related to Operating procedure be associated so that transformer station access during can be accessed according to operating procedure while dispatching work Tool, and Detailed operating procedures are also checked, accurate control can be realized, simplifies operating procedure, it is not error-prone, it is time saving and energy saving, Improve the operating efficiency and quality of technical staff.
Embodiment three
As shown in figure 3, be a kind of structural representation of transformer station's access system of the present invention, including:
Card module 301 is instructed in write-in, the operating procedure being related to for the job content for accessing transformer station and the job content Card is instructed in write-in.
Module 302 is associated, for the job content and the operation being walked using the dispatching of power netwoks instrument to prestore Suddenly it is associated.
Module 303 is transferred, for receiving incoming instruction, job content and the association of association are transferred according to the incoming instruction Operating procedure.
Transformer station's AM access module 304 is completed, it is complete for the job content according to the association transferred and the operating procedure associated Into the access of the transformer station.
It is fixed that the dispatching of power netwoks instrument includes database index device, searcher, graphic editor, formula definer and sampling One or more in adopted device.
In addition, in a specific example, in addition to:
Monitoring instruction module 305 is received, for receiving monitoring instruction;
Transformer station's module 306 is monitored, monitor workstation is arrived for sending monitoring request according to the monitoring instruction, so that the prison Control the access that work station monitors the transformer station according to the monitoring request.
In addition, in a specific example, in addition to:
Writing module 307, the operating instruction write-in of the job content for transformer station to be accessed is described to instruct card;
AM access module 308 is associated, for the operating instruction and the transformer station is accessed using the dispatching of power netwoks instrument Job content is associated.
The job content of transformer station access includes newly-built plant stand, circuit cut change, increase-volume interval, transformation interval and increase Interval.
After such scheme, the job content and job content that are accessed transformer station by dispatching of power netwoks instrument are related to Operating procedure be associated so that transformer station access during can be accessed according to operating procedure while dispatching work Tool, and Detailed operating procedures are also checked, accurate control can be realized, simplifies operating procedure, it is not error-prone, it is time saving and energy saving, Improve the operating efficiency and quality of technical staff.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention All any modification, equivalent and improvement made within refreshing and principle etc., should be included in the scope of the protection.

Claims (10)

1. a kind of transformer station's cut-in method, it is characterised in that comprise the following steps:
Card is instructed into the operating procedure write-in that the job content of transformer station's access and the job content are related to;
The job content and the operating procedure are associated using the dispatching of power netwoks instrument to prestore;
Incoming instruction is received, the job content of association and the operating procedure associated are transferred according to the incoming instruction;
The access of the transformer station is completed with the operating procedure associated according to the job content for the association transferred.
2. transformer station's cut-in method according to claim 1, it is characterised in that the dispatching of power netwoks instrument includes database One or more in index, searcher, graphic editor, formula definer and sample definition device.
3. transformer station's cut-in method according to claim 1, it is characterised in that also include:
Receive monitoring instruction;
Monitoring request is sent according to the monitoring instruction and arrives monitor workstation, so that the monitor workstation please according to the monitoring Ask the access for monitoring the transformer station.
4. transformer station's cut-in method according to claim 1, it is characterised in that also include:
By the operating instruction write-in of the job content of the transformer station's access guidance card;
The job content that the operating instruction and the transformer station access is associated using the dispatching of power netwoks instrument.
5. transformer station's cut-in method according to claim 1, it is characterised in that the job content bag of transformer station's access Include newly-built plant stand, circuit cut change, increase-volume interval, transformation interval and increase interval.
A kind of 6. transformer station's access system, it is characterised in that including:
Card module is instructed in write-in, the operating procedure write-in being related to for the job content for accessing transformer station and the job content Instruct card;
Module is associated, for the job content and the operating procedure being closed using the dispatching of power netwoks instrument to prestore Connection;
Module is transferred, for receiving incoming instruction, the job content of association and the operation associated are transferred according to the incoming instruction Step;
Transformer station's AM access module is completed, the change is completed with the operating procedure associated for the job content according to the association transferred The access in power station.
7. transformer station's access system according to claim 6, it is characterised in that the dispatching of power netwoks instrument includes database One or more in index, searcher, graphic editor, formula definer and sample definition device.
8. transformer station's access system according to claim 6, it is characterised in that also include:
Monitoring instruction module is received, for receiving monitoring instruction;
Transformer station's module is monitored, monitor workstation is arrived for sending monitoring request according to the monitoring instruction, so that the monitoring Work station monitors the access of the transformer station according to the monitoring request.
9. transformer station's access system according to claim 6, it is characterised in that also include:
Writing module, the operating instruction write-in of the job content for transformer station to be accessed is described to instruct card;
AM access module is associated, for the operation for the operating instruction and the transformer station being accessed using the dispatching of power netwoks instrument Content is associated.
10. transformer station's access system according to claim 6, it is characterised in that the job content of transformer station's access Cut including newly-built plant stand, circuit change, increase-volume interval, transformation interval and increase interval.
CN201710744651.5A 2017-08-25 2017-08-25 Transformer station's cut-in method and system Pending CN107450441A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710744651.5A CN107450441A (en) 2017-08-25 2017-08-25 Transformer station's cut-in method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710744651.5A CN107450441A (en) 2017-08-25 2017-08-25 Transformer station's cut-in method and system

Publications (1)

Publication Number Publication Date
CN107450441A true CN107450441A (en) 2017-12-08

Family

ID=60494007

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710744651.5A Pending CN107450441A (en) 2017-08-25 2017-08-25 Transformer station's cut-in method and system

Country Status (1)

Country Link
CN (1) CN107450441A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1353372A (en) * 2000-11-07 2002-06-12 株式会社东芝 Job management system and job management method
CN1932862A (en) * 2005-09-12 2007-03-21 本田技研工业株式会社 System for making operating manual
CN104966140A (en) * 2015-07-30 2015-10-07 广东电网有限责任公司佛山供电局 Mobile engineer station with power grid working cooperatively
CN105512192A (en) * 2015-11-26 2016-04-20 国家电网公司 Method and device for automatically generating maintenance operation instruction books of intelligent station
CN106920071A (en) * 2017-02-23 2017-07-04 广东电网有限责任公司教育培训评价中心 Substation field operation householder method and system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1353372A (en) * 2000-11-07 2002-06-12 株式会社东芝 Job management system and job management method
CN1932862A (en) * 2005-09-12 2007-03-21 本田技研工业株式会社 System for making operating manual
CN104966140A (en) * 2015-07-30 2015-10-07 广东电网有限责任公司佛山供电局 Mobile engineer station with power grid working cooperatively
CN105512192A (en) * 2015-11-26 2016-04-20 国家电网公司 Method and device for automatically generating maintenance operation instruction books of intelligent station
CN106920071A (en) * 2017-02-23 2017-07-04 广东电网有限责任公司教育培训评价中心 Substation field operation householder method and system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
彭莲好等: "《现代信息检索基础教程》", 30 November 2013, 华中科技大学出版社 *

Similar Documents

Publication Publication Date Title
CN106598868B (en) Method and system a little are buried to the application program of client dynamic
CN104123227A (en) Method for automatically generating testing cases
CN104349366B (en) A kind of radio network problems association analysis method based on GIS
CN103914500B (en) A kind of online methods of exhibiting of configuration based on time series data
CN101778400B (en) Database-based telephone traffic analysis and prediction system and telephone traffic prediction method using same
CN103532749A (en) Main station information management system
CN110941653A (en) Data processing method, device, storage medium and terminal
CN104698374A (en) Method for improving testing efficiency and accuracy of automatic relay protecting tester
CN104537496B (en) Intelligent terminal device use condition statistical analysis method and device
CN107992403A (en) IO performance test methods, device, equipment and computer-readable recording medium
CN106909977A (en) Airline e-ticket system
CN102932179A (en) Comprehensive inter-network multi-protection reliability analysis method for power communication services
CN111988474B (en) Electric power intelligent scheduling system based on voice recognition function
CN102137449B (en) Business process method and system for business support system
CN111858521A (en) Distribution network engineering design data sharing cloud platform and application method
CN107450441A (en) Transformer station's cut-in method and system
CN101365212A (en) Indoor coverage maintenance management system
CN104038388A (en) Distributed automatic testing system and automatic testing method for Internet of Things
CN104331426A (en) Quick retrieving method of power system retriever based on browser
CN104216986A (en) Device and method for improving data query efficiency through pre-operation according to data update period
CN108334012A (en) The management system for monitoring of magnanimity internet of things equipment based on GIS
CN104239473B (en) The device and method of data cross-system disposal is carried out based on natural language industry knowledge base
CN104111929A (en) Electronic device and server management control system and method
CN113342987A (en) Composite network construction method of special corpus for power distribution DTU acceptance
CN220139589U (en) Distribution line infrared inspection system based on mobile terminal

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20171208

RJ01 Rejection of invention patent application after publication