CN107447722A - A kind of river levee assembled material - Google Patents
A kind of river levee assembled material Download PDFInfo
- Publication number
- CN107447722A CN107447722A CN201710686492.8A CN201710686492A CN107447722A CN 107447722 A CN107447722 A CN 107447722A CN 201710686492 A CN201710686492 A CN 201710686492A CN 107447722 A CN107447722 A CN 107447722A
- Authority
- CN
- China
- Prior art keywords
- river levee
- plate
- groove
- assembled material
- main boards
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 239000000463 material Substances 0.000 title claims abstract description 29
- 238000007789 sealing Methods 0.000 claims description 17
- 238000010276 construction Methods 0.000 abstract description 12
- 239000011435 rock Substances 0.000 abstract description 9
- 239000002689 soil Substances 0.000 abstract description 6
- 230000009286 beneficial effect Effects 0.000 abstract description 3
- 238000005516 engineering process Methods 0.000 description 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 3
- 238000009412 basement excavation Methods 0.000 description 2
- 230000008901 benefit Effects 0.000 description 2
- 238000005266 casting Methods 0.000 description 2
- 239000004035 construction material Substances 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000010412 perfusion Effects 0.000 description 2
- 238000005452 bending Methods 0.000 description 1
- 230000000903 blocking effect Effects 0.000 description 1
- 239000004566 building material Substances 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 230000002354 daily effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 230000003203 everyday effect Effects 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 231100000614 poison Toxicity 0.000 description 1
- 230000007096 poisonous effect Effects 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 238000009966 trimming Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/04—Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
- E02B3/06—Moles; Piers; Quays; Quay walls; Groynes; Breakwaters ; Wave dissipating walls; Quay equipment
- E02B3/066—Quays
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Revetment (AREA)
Abstract
A kind of river levee assembled material, including two parallel main boards, connected between the both ends of two main boards by connecting plate, at least one hole is provided with connecting plate, at least one supporting plate is connected with two main boards, the bearing of trend of supporting plate is consistent with the direction of main board, and at least one hole is provided with supporting plate;A first groove is respectively provided with one end outer surface of two main boards, first fixture block, the first fixture block energy clamping first groove are respectively provided with the other end inner surface of two main boards.Beneficial effects of the present invention:River levee is constructed flexibly simply, and product weight is light, is reduced construction manpower, is shortened the engineering time, cost is low, safe;River levee has very high steadiness, prevents soil loss, and can beautify river course, convenient to clean river levee;Solve the problems, such as damage hill exploitation rock and fall trees to make template, protect ecological environment.
Description
Technical field
The present invention relates to a kind of river levee assembled material, belong to hydraulic engineering technical field.
Background technology
River levee filling Construction Technique is the key technology in water conservancy construction, the surveying setting-out of GPRS river levee filling construction,
Do foundation excavation well emphatically, flood dam fills, the innovation of slope trimming key technology, only in this way river levee could be filled conscientiously
Construction technology is fulfilled, and reaches the purpose brought benefits to the people.
China is built using soil property river levee or the concrete river levee of large rock mass and wooden model as river course dash more at present
Thing.In existing river levee work progress, it usually needs river is drained.Made using the concrete river levee of large rock mass and wooden model
For river course water retaining structure when, exploitation rock failure mechanism of rock massif, in order to make the template felling woods, destroy ecological environment, together
When expend a large amount of manpower and materials, cost is high, and river levee landslide easily occurs in existing river levee large rock mass, easily sends out security incident.
Soil property river levee has the features such as to ground strong adaptability, application safety and less investment.But soil property river levee is constructed using measurement
Unwrapping wire-foundation excavation-constructs the mode of dykes and dams, and process is complicated, and consumption manpower is big.To be laid during surveying setting-out before engineering construction
Good SURVEYING CONTROL NETWORK, permanent coordinate stake and horizontal reference point stake are made into each control point, and take corresponding safeguard measure, with
It is tamper-proof.Three supplies and one leveling are carried out, terminate water supply and drainage pipeline, temporary electricity route arrangement before engineering construction, to ensure
Meet construction production, living needs.Live temporary construction road will be arranged along Around, ensure levee foundation not ponding, and carrying out
The corresponding measure of draining.The foundation excavation stage needs staged and layered is averagely lower to dig, and deburring and clear bottom, whether to check position repeatedly
Accurately, it is impossible to which mistake is dug or backbreak, it is desirable to high, labor intensive and time.
The content of the invention
The present invention is filled with solving existing river levee in view of the deficienciess of the prior art, provide a kind of river levee assembled material
Ecological environment to be destroyed in construction, expends a large amount of manpower and materials, cost is high, and the problem of easy hair security incident.
The technical scheme that the present invention solves above-mentioned technical problem is as follows:A kind of river levee assembled material, including two parallel
Main board, connected by connecting plate between the both ends of two main boards, at least one hole is provided with the connecting plate,
At least one supporting plate is connected with two main boards, the bearing of trend of the supporting plate is consistent with the direction of main board,
At least one hole is provided with the supporting plate;It is respectively provided with a first groove on one end outer surface of two main boards, two
First fixture block, the first fixture block energy clamping first groove are respectively provided with the other end inner surface of the individual main board.
Beneficial effects of the present invention:The river levee assembled material is easy to assembly quick, according to terrain or can use needs
Assembled, it is not necessary to river is drained, directly may be inserted into river and then concrete perfusion.Specifically utilize the first fixture block card
First groove on tight adjacent body plate is combined.Main board provides the stop supported for constructing for river bed, can be to main body
Joints cement or concrete in plate, river levee are built quick and convenient.The height and thickness of assembled material can construct according to actual river course
Need to be produced, there is very high flexibility.Supporting plate can further provide for supporting, and improve durability, the stability of river levee
And service life.Concrete can carry out shunting from the hole in supporting plate and reach overall filling, reach and be integrally formed, river levee is more firm
Gu.The inner space of whole river levee assembled material is sized for, and carries out pouring for appropriate concrete, and ensure that whole construct
The stability and fastness of system.
The present invention is further arranged to, and support bar is connected between two adjacent supporting plates.
Pass through above-mentioned technical proposal, internal structure of the support bar further for the river levee assembled material provide support, enter one
Step ensures structural stability during casting concrete.
The present invention is further arranged to, and the cross section of the supporting plate is plane, V-shape or arc, preferably V-shape or
Arc.
When the supporting plate of Pass through above-mentioned technical proposal, V-shape or arc is beneficial to later stage casting concrete, concrete perfusion arrives
Other spaces, it ensure that concreting fully and be uniformly distributed, the firm river levee being integrally formed.
The present invention is further arranged to, in addition to cover plate, and cover plate includes sealing plate and is connected to sealing plate same side two
The clamp at end, latch, latch energy clamping first groove are provided with the inside of clamp.
Pass through above-mentioned technical proposal, due to being provided with hole on the connecting plate at the both ends of main board, sealed when pouring using cover plate
Block end.Cover plate is stuck in one end of two main boards, passes through latch and first groove clamping fixed.
The present invention is further arranged to, in addition to Corner Link, and the Corner Link is parallelepiped, wherein two
Individual adjacent surface is sealing, and another two is provided with hole on surface;The second fixture block is provided with the both sides for opening a porose surface,
Second fixture block energy clamping first groove;Second groove is provided with the both sides for opening another porose surface, second groove is by first
Fixture block clamping.
Pass through above-mentioned technical proposal, the adjacent surface of two of which are arranged to sealing, and one is to provide support, second, envelope
Stifled concrete.Another two is provided with hole on surface, for into concrete, the Corner Link and connecting material being fixed and formed surely
Fixed one.Corner Link realizes the angled connection of multiple river levee assembled materials, and the big I of connection angle is connected by corner
The angle-determining of fitting.
The present invention is further arranged to, and is connected between two adjacent sealing surfaces consistent with Corner Link bearing of trend
Baffle plate, form triangular prism between the baffle plate and two sealing surfaces.
Pass through above-mentioned technical proposal, triangular prism have good stability, can according to be actually needed choose whether to pour it is mixed
Solidifying soil.Making for concrete can not be saved when the pressure that dike assembled material needs to bear is smaller to being poured in triangular prism
Dosage.
The present invention is further arranged to, and the quantity of the baffle plate is 1-3.
Pass through above-mentioned technical proposal, the quantity for increasing baffle plate add support force and stability, can without or reduce
Concrete pours.
The present invention is further arranged to, each part of the river levee construction material, such as supporting plate, the first fixture block,
Two fixture blocks, support bar, the material of latch can be various materials, preferably PVC material, and environment-protecting and non-poisonous, product quality is light, can save
Manpower, shorten the engineering time.
In summary, the invention has the advantages that:
(1) construction material height and thickness can according to actual river course construct needs be produced, this for actual production not
Stack pile, the product of different length have very high flexibility;
(2) product weight can gently substantially reduce construction manpower, and shorten the engineering time, substantially reduce cost,
Reduce the generation of security incident;
(3) river levee has very high steadiness, prevents soil loss, has beautification function to river course, is not in weathering
Phenomenon, river levee can be cleaned conveniently;
(4) Construction Mode of the concrete river levee of original large rock mass and wooden model is changed, solves damage hill
Exploitation rock and the problem of making template of falling trees, protect ecological environment.
Brief description of the drawings
Technical scheme in order to illustrate the embodiments of the present invention more clearly, it will use below required in embodiment
Accompanying drawing is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the present invention, for this area
For those of ordinary skill, on the premise of not paying creative work, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is the structural representation of the embodiment of the present invention;
Fig. 2 is the structural representation of the embodiment of the present invention;
Fig. 3 is the structural representation of Corner Link;
Fig. 4 is the structural representation of cover plate;
Fig. 5 is the structural representation after the present invention is assembled in embodiment.
Wherein, 1, main board;2nd, baffle plate;3rd, connecting plate;4th, supporting plate;5th, first groove;6th, the first fixture block;7th, support
Bar;8th, cover plate;9th, sealing plate;10th, clamp;11st, latch;12nd, Corner Link;13rd, the second fixture block;14th, second groove.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete
Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.It is based on
Embodiment in the present invention, those of ordinary skill in the art are obtained every other under the premise of creative work is not made
Embodiment, belong to the scope of protection of the invention.
As shown in figure 1, a kind of river levee assembled material, including two parallel main boards 1, the both ends of two main boards 1 it
Between connected by connecting plate 3, at least one hole is provided with connecting plate 3, at least one support is connected with two main boards 1
Plate 4, the bearing of trend of supporting plate 4 is consistent with the direction of main board 1, and at least one hole is provided with supporting plate 4;Two main boards 1
One end outer surface on be respectively provided with a first groove 5, one first card is respectively provided with the other end inner surface of two main boards 1
Block 6, the first fixture block 6 can clamping first grooves 5.
In order to further improve the inside fastness of river levee assembled material, in one embodiment of the invention, such as Fig. 2 institutes
Show, support bar 7 is connected between two adjacent supporting plates 4.Supporting plate 4 is shaped as plane, V-shape or arc, excellent
Select V-shape or arc.
For blocking concrete, in one embodiment of the invention, in addition to cover plate 8, as shown in figure 4, cover plate 8 includes
Sealing plate 9 and the clamp 10 for being connected to the same side both ends of sealing plate 9, latch 11 is provided with the inner side of clamp 10, latch 11 can block
Tight first groove 5.
In order to adapt to the use needs of the different angle of different terrain, using Corner Link 12 by river levee assembled material group
Dress, as shown in figure 3, Corner Link 12 is parallelepiped, the adjacent surface of two of which is the structure of Corner Link 12
Sealing, another two is provided with hole on surface;The second fixture block 13, the energy of the second fixture block 13 are provided with the both sides for opening a porose surface
Clamping first groove 5;Second groove 14 is provided with the both sides for opening another porose surface, second groove 14 is by the first fixture block 6
Clamping.In another embodiment of the present invention, it is connected between two adjacent sealing surfaces and the side of extension of Corner Link 12
To consistent baffle plate 2, keep off between 2 plates and two sealing surfaces and form triangular prism.The quantity of baffle plate 2 is 1-3.
As an example, Fig. 5 is the structural representation after the present invention is assembled, using multiple river levee assembled materials
Progress linearly constructs river levee, and the river levee that can carry out with reference to Corner Link 12 different bending angles is constructed.
The existing efficiency constructed with large rock mass is very low, can only be constructed 10 meters per work daily, and utilizes quick group
The New Building Materials of river levee are filled, can be constructed for each person every day 50 meters.
Presently preferred embodiments of the present invention is these are only, is not intended to limit the invention, it is all in the spirit and principles in the present invention
Within, any modification, equivalent substitution and improvements made etc., it should be included in the scope of the protection.
Claims (7)
- A kind of 1. river levee assembled material, it is characterised in that:Including two parallel main boards, the both ends of two main boards it Between connected by connecting plate, at least one hole is provided with the connecting plate, at least one is connected with two main boards Individual supporting plate, the bearing of trend of the supporting plate is consistent with the direction of main board, and at least one hole is provided with the supporting plate;Two It is respectively provided with a first groove on one end outer surface of the individual main board, it is each on the other end inner surface of two main boards Provided with first fixture block.
- A kind of 2. river levee assembled material according to claim 1, it is characterised in that:Between two adjacent supporting plates It is connected with support bar.
- A kind of 3. river levee assembled material according to claim 1 or 2, it is characterised in that:The cross section of the supporting plate is Plane, V-shape or arc.
- A kind of 4. river levee assembled material according to claim 1, it is characterised in that:Also include cover plate, cover plate includes sealing Plate and the clamp for being connected to sealing plate same side both ends, are provided with latch, latch energy clamping first groove on the inside of clamp.
- A kind of 5. river levee assembled material according to claim 1, it is characterised in that:Also include Corner Link, described turn Angle connector is parallelepiped, and the adjacent surface of two of which is sealing, and another two is provided with hole on surface;It is porose opening The both sides on one surface are provided with the second fixture block, the second fixture block energy clamping first groove;Opening the both sides on another porose surface Provided with second groove, second groove is by the first fixture block clamping.
- A kind of 6. river levee assembled material according to claim 5, it is characterised in that:Connected between two adjacent sealing surfaces There is the baffle plate consistent with delivering connector bearing of trend, triangular prism is formed between the baffle plate and two sealing surfaces.
- A kind of 7. river levee assembled material according to claim 6, it is characterised in that:The quantity of the baffle plate is 1-3.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710686492.8A CN107447722B (en) | 2017-08-11 | 2017-08-11 | River levee assembly device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710686492.8A CN107447722B (en) | 2017-08-11 | 2017-08-11 | River levee assembly device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107447722A true CN107447722A (en) | 2017-12-08 |
CN107447722B CN107447722B (en) | 2021-01-19 |
Family
ID=60492099
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710686492.8A Expired - Fee Related CN107447722B (en) | 2017-08-11 | 2017-08-11 | River levee assembly device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107447722B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108505687A (en) * | 2018-06-05 | 2018-09-07 | 江苏凤腾塑料有限公司 | A kind of concrete strengthening device of PVC extrusion moldings |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP5508306B2 (en) * | 2011-02-01 | 2014-05-28 | 大成建設株式会社 | Levitation breakwater |
CN105464271A (en) * | 2015-01-17 | 2016-04-06 | 刘绮琪 | Section connecting and assembling mechanism |
CN106368167A (en) * | 2016-09-22 | 2017-02-01 | 杭州中车车辆有限公司 | Anti-flood combined type baffle mechanism |
CN206408583U (en) * | 2016-12-01 | 2017-08-15 | 天津港第四港埠有限公司 | A kind of ground anti-skid structure |
-
2017
- 2017-08-11 CN CN201710686492.8A patent/CN107447722B/en not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP5508306B2 (en) * | 2011-02-01 | 2014-05-28 | 大成建設株式会社 | Levitation breakwater |
CN105464271A (en) * | 2015-01-17 | 2016-04-06 | 刘绮琪 | Section connecting and assembling mechanism |
CN106368167A (en) * | 2016-09-22 | 2017-02-01 | 杭州中车车辆有限公司 | Anti-flood combined type baffle mechanism |
CN206408583U (en) * | 2016-12-01 | 2017-08-15 | 天津港第四港埠有限公司 | A kind of ground anti-skid structure |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108505687A (en) * | 2018-06-05 | 2018-09-07 | 江苏凤腾塑料有限公司 | A kind of concrete strengthening device of PVC extrusion moldings |
Also Published As
Publication number | Publication date |
---|---|
CN107447722B (en) | 2021-01-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202466604U (en) | Self-locking protection brick | |
CN103422501B (en) | Anti-floating anchor rod structure in sand seam geology and construction method thereof | |
CN210482200U (en) | Ecological bank protection structure of high and steep river course bank slope | |
CN108661069A (en) | Close on the wall piled anchor composite structure and method of old Retaining Wall Reinforcement under the load of river road surface | |
CN102304926B (en) | Method for fixing telegraph pole on wetland | |
CN210975741U (en) | Reinforced structure of earth and rockfill dam | |
CN210857112U (en) | Hidden water conservancy slope protection structure | |
CN111576454A (en) | Combined protective structure for side slope retaining wall and steel pipe pile and construction method thereof | |
CN113250240A (en) | Combined side slope protection structure and process of layered net type gabion and concrete | |
CN112281868A (en) | Support system and method combining temporary foundation pit support and permanent slope support | |
CN103334450B (en) | Construction method of pile precast slab retaining wall with drainage ditch | |
CN204491641U (en) | Waterwall unit and self-balancing cofferdam structure | |
CN107447722A (en) | A kind of river levee assembled material | |
CN203429645U (en) | Slope support structure assembly | |
CN203821306U (en) | Flexible anti-scour protection pad | |
CN110295573A (en) | Adapt to the channel revetment project post-evaluation structure of construction time severe hydrometeorological condition | |
CN213682159U (en) | Ecological compound slope protection | |
CN209084162U (en) | A kind of Large Underground pipeline anchor block | |
CN209066483U (en) | A kind of assembled ecology retaining wall | |
CN203145011U (en) | Anchor rod structure with anti-floating capacity | |
CN206245321U (en) | Cut slope composite supporting construction | |
CN217078853U (en) | Retaining wall for hydraulic engineering | |
CN206385502U (en) | A kind of assembling-type precast channel revetment of rapid construction | |
CN211060926U (en) | A work base observation mound for deep overburden | |
CN219753135U (en) | Gardens waterscape revetment structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20210205 Address after: 201700 room 586, area F, 5 / F, building 1, 1288 Huateng Road, Huaxin Town, Qingpu District, Shanghai Patentee after: Shanghai yedun Fire Safety Technology Co.,Ltd. Address before: 201799 room 701, 7 / F, block B, building 4, 1777 Hualong Road, Huaxin Town, Qingpu District, Shanghai Patentee before: YUEDAO INDUSTRY (SHANGHAI) Co.,Ltd. |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210119 Termination date: 20210811 |