CN107447672A CN201710822281.2A CN201710822281A CN107447672A CN 107447672 A CN107447672 A CN 107447672A CN 201710822281 A CN201710822281 A CN 201710822281A CN 107447672 A CN107447672 A CN 107447672A
Authority
CN
China
Prior art keywords
barricade
prefabricated
jacking
hump
casing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710822281.2A
Other languages
Chinese (zh)
Other versions
CN107447672B (en
Inventor
刘春旺
郝振平
安旭
张鹏
苏献东
李新广
孙晶
秦家玉
杨红霞
李宗璞
王灿
董媛媛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Sixth Group Co Ltd
Tianjin Railway Construction Co Ltd of China Railway Sixth Group Co Ltd
Original Assignee
China Railway Sixth Group Co Ltd
Tianjin Railway Construction Co Ltd of China Railway Sixth Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Sixth Group Co Ltd, Tianjin Railway Construction Co Ltd of China Railway Sixth Group Co Ltd filed Critical China Railway Sixth Group Co Ltd
Priority to CN201710822281.2A priority Critical patent/CN107447672B/en
Publication of CN107447672A publication Critical patent/CN107447672A/en
Application granted granted Critical
Publication of CN107447672B publication Critical patent/CN107447672B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Machines For Laying And Maintaining Railways (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The construction method of jacking casing under a kind of hump line, it uses the prefabricated barricade on box top, then traditionally jacking casing, then prefabricated barricade is connected with each other into integral mode with former rubble bulkhead and constructed;Or first prefabricated barricade prefabricated section, then traditionally jacking casing, then the embedded bar on barricade prefabricated section and box top is connected with each other, finally the integral mode in barricade prefabricated section both ends and the interconnection of former rubble bulkhead is constructed.Time under hump line provided by the invention needed for the construction method of jacking casing is short, therefore the influence of railway operation will can be minimized, and prefabricated barricade can be connected rapidly with former rubble bulkhead it is integral, therefore can ensure barricade be not in because of car slipping and caused by the phenomenon that expands outwardly.In addition, this construction method is reasonable in design, construction cost is low and effect is good.

Description

The construction method of jacking casing under a kind of hump line
Technical field
The invention belongs to rail facility technical field of construction, more particularly to a kind of construction party of jacking casing under hump line Method.
Background technology
With the rapid development of city-building, increasing urban road wears existing railway circuit under needing, often at present Method is jacking.This method is will first to be reinforced by the existing railway circuit of jacking influence area, is then utilized Jack will form the casing of more piece reinforced concrete structure of frame bridge from existing railway circuit side as jacking device Predetermined position in foundation ditch in shoveling below jacking to existing railway circuit.When frame bridge to be placed is located exactly at railway When wearing a hump line under the bottle-neck section and needs of hinge marshalling yard, because railway strand, track switch are more at this, and hump The both sides of line have the discrepancy in elevation, while off-period is shorter, during this period in place and must also complete the jacking of casing whole both There is rail track recovery, it can be seen that the time short difficulty of this engineering is big, therefore how to ensure safety and shorten construction Time, and ensure that construction operation is completed within off-period turns into problem of the pendulum in face of those skilled in the art.
In railway systems, hump line, which is generally in railway terminal marshalling yard, is used for the shunting services such as train disintegration, marshalling Facility, its be ground build just as the koppie of camel peak antiform shape, there is the appropriate gradient, both sides position is set respectively There is the barricade piled up together by slabstone, place an iron railway above, because it is higher by ormal station scene, be similar to hump, therefore gain the name. When carrying out shunting service using hump line, first push train to hump line from side by shunter, when the car group or car of foremost During close to summit, hitch is unclamped, at this moment can utilizes the gravity of train itself, along slope from opposite side automatic shunting to shunting On the scheduled circuit of field, so as to greatly improve the efficiency of shunting service.But because the both sides of hump line are equipped with barricade, and Hump line do not allow again for a long time close, if therefore the jacking of casing had both been completed within shorter off-period, again by jacking The rubble bulkhead heap at place puzzles, and existing jacking construction method can not then complete this engineering.
The content of the invention
In order to solve the above problems, it is an object of the invention to provide a kind of construction method of jacking casing under hump line.
In order to achieve the above object, the construction method of jacking casing includes carrying out in order under hump line provided by the invention The following steps:
1) first using by 3-5-3 hanger rails and the I-steel track strengthening system that beam is formed in length and breadth on hump line by jacking The existing railway circuit of influence area is reinforced, and removes the rubble bulkhead in the region;
2) in the foundation ditch positioned at above-mentioned existing railway circuit side prefabricated more piece reinforced concrete structure casing 2, in advance The position for corresponding to barricade during system on roof box remains for connecting in advance the reinforcing bar of barricade prefabricated section;
3) at the same time, in the barricade prefabricated section of prefabricated reinforced concrete structure outside the venue, and it is pre- on barricade prefabricated section Bury the bottom reinforcement bars for connecting reserved steel bar on casing;
4) use traditional jacking method, by the use of jack be used as jacking device, by composition frame bridge more piece casing from Predetermined position in foundation ditch in shoveling below jacking to existing railway circuit;
5) reserved steel bar on the bottom reinforcement bars and roof box on barricade prefabricated section is welded together, polylith barricade is pre- Clamp dog is set in a manner of end to end, using being arranged in barricade prefabricated section end on lateral surface between adjacent barricade prefabricated section Reinforcing bar or steel plate welding and be connected with each other and prefabricated barricade is made, then by the both ends of prefabricated barricade with by jacking influence area outside Former rubble bulkhead at lateral edges is connected with each other integral;
6) beam reinforcement system in length and breadth and 353 button rails are removed, then below the existing railway circuit by jacking influence area Railway ballast is filled, finally recovers the operation of existing railway circuit, thus completes whole work progress.
The width of described barricade prefabricated section is identical with former rubble bulkhead width, and length determines according to on-site actual situations.
The construction method of jacking casing includes the following steps carried out in order under hump line provided by the invention:
1) first using by 3-5-3 hanger rails and the I-steel track strengthening system that beam is formed in length and breadth on hump line by jacking The existing railway circuit of influence area is reinforced, and removes the rubble bulkhead in the region;
2) in the foundation ditch positioned at above-mentioned existing railway circuit side prefabricated more piece reinforced concrete structure casing, it is prefabricated During the position reserved steel bar of barricade is corresponded on roof box;
3) after the concrete in casing reaches predetermined strength requirement, prefabricated hump barricade is made at above-mentioned reserved steel bar Steel reinforcement cage, and install on the outside of steel reinforcement cage the template of prefabricated hump barricade;
4) casting concrete in the template of above-mentioned prefabricated hump barricade, prefabricated hump gear is made after concrete setting Wall;
5) use traditional jacking method, by the use of jack be used as jacking device, by composition frame bridge more piece casing from Predetermined position in foundation ditch in shoveling below jacking to existing railway circuit, now prefabricated hump barricade and former rubble bulkhead It is generally aligned in the same plane;
6) by the both ends of prefabricated hump barricade with being connected with each other by the former rubble bulkhead at the outer ledge of jacking influence area It is integral;
7) beam reinforcement system in length and breadth and 353 button rails are removed, then below the existing railway circuit by jacking influence area Railway ballast is filled, finally recovers the operation of existing railway circuit, thus completes whole work progress.
The width of described prefabricated hump barricade is identical with former rubble bulkhead width, and elevation of top is apart from existing railway circuit 0.2 meter of sleeper bottom.
Time under hump line provided by the invention needed for the construction method of jacking casing is short, therefore railway will can be transported The influence of battalion minimizes, and prefabricated barricade can be connected rapidly integral with former rubble bulkhead, therefore can ensure barricade Be not in because of car slipping and caused by the phenomenon that expands outwardly.In addition, this construction method is reasonable in design, construction cost is low and effect It is good.
Brief description of the drawings
Fig. 1 is the construction method work progress top view of jacking casing under hump line provided by the invention;
Fig. 2 is the construction method work progress front view of jacking casing under hump line provided by the invention;
Embodiment
The construction method of jacking casing under hump line provided by the invention is carried out with specific embodiment below in conjunction with the accompanying drawings Detailed description.
Embodiment 1:
As shown in figure 1, the construction method of jacking casing includes carrying out down in order under the hump line that the present embodiment provides Row step:
1) first using it is traditional by 3-5-3 hanger rails and the I-steel track strengthening system that beam is formed in length and breadth on hump line Reinforced by the existing railway circuit 1 of jacking influence area, and remove the rubble bulkhead in the region;
2) in the foundation ditch positioned at the above-mentioned side of existing railway circuit 1 prefabricated more piece reinforced concrete structure casing 2, in advance The position for corresponding to barricade during system on the top plate of casing 2 remains for connecting in advance the reinforcing bar of barricade prefabricated section;
3) at the same time, in the barricade prefabricated section of prefabricated reinforced concrete structure outside the venue, width and the original of barricade prefabricated section Rubble bulkhead width is identical, and length determines according to on-site actual situations, and pre-buried for connecting casing 2 on barricade prefabricated section The bottom reinforcement bars of upper reserved steel bar;
4) use traditional jacking method, by the use of jack be used as jacking device, by composition frame bridge more piece casing 2 from Predetermined position in foundation ditch in shoveling below jacking to existing railway circuit 1;
5) bottom reinforcement bars on barricade prefabricated section and the reserved steel bar on the top plate of casing 2 are welded together, polylith barricade Prefabricated section is set in a manner of end to end, using being arranged in barricade prefabricated section end on lateral surface between adjacent barricade prefabricated section Reinforcing bar or steel plate welding and be connected with each other and prefabricated barricade 3 is made, then by the both ends of prefabricated barricade 3 with by the jacking zone of influence Former rubble bulkhead at overseas lateral edges is connected with each other integral;
6) beam reinforcement system in length and breadth and 353 button rails are removed, then below the existing railway circuit 1 by jacking influence area Railway ballast is filled, finally recovers the operation of existing railway circuit 1, thus completes whole work progress.
Embodiment 2:
As shown in figure 1, the construction method of jacking casing includes carrying out down in order under the hump line that the present embodiment provides Row step:
1) first using it is traditional by 3-5-3 hanger rails and the I-steel track strengthening system that beam is formed in length and breadth on hump line Reinforced by the existing railway circuit 1 of jacking influence area, and remove the rubble bulkhead in the region;
2) in the foundation ditch positioned at the above-mentioned side of existing railway circuit 1 prefabricated more piece reinforced concrete structure casing 2, in advance The position reserved steel bar of barricade is corresponded to during system on the top plate of casing 2;
3) after the concrete in casing 2 reaches predetermined strength requirement, prefabricated hump gear is made at above-mentioned reserved steel bar The steel reinforcement cage of wall 4, and install on the outside of steel reinforcement cage the template of prefabricated hump barricade 4;
4) casting concrete in the template of above-mentioned prefabricated hump barricade 4, prefabricated hump gear is made after concrete setting Wall 4, the width of prefabricated hump barricade 4 is identical with former rubble bulkhead width, and elevation of top is apart from the sleeper bottom of existing railway circuit 1 0.2 meter;
5) use traditional jacking method, by the use of jack be used as jacking device, by composition frame bridge more piece casing 2 from In shoveling, jacking is to the predetermined position of the lower section of existing railway circuit 1 in foundation ditch, and now prefabricated hump barricade 4 and former slabstone are kept off Wall is generally aligned in the same plane;
6) by the both ends of prefabricated hump barricade 4 with being connected with each other by the former rubble bulkhead at the outer ledge of jacking influence area It is integral;
7) beam reinforcement system in length and breadth and 353 button rails are removed, then below the existing railway circuit 1 by jacking influence area Railway ballast is filled, finally recovers the operation of existing railway circuit 1, thus completes whole work progress.
Hump line is worn under certain jacking casing requirement of engineering, off-period is only 72 hours, and can not be removed by jacking shadow The existing railway circuit in region is rung, the present inventor is constructed using above-mentioned construction method, and completes construction task on schedule.

Claims (4)

  1. A kind of 1. construction method of jacking casing under hump line, it is characterised in that:Described construction method includes carrying out in order The following steps:
    1) first using by 3-5-3 hanger rails and the I-steel track strengthening system that beam is formed in length and breadth on being influenceed on hump line by jacking The existing railway circuit (1) in region is reinforced, and removes the rubble bulkhead in the region;
    2) in the foundation ditch positioned at above-mentioned existing railway circuit (1) side prefabricated more piece reinforced concrete structure casing (2), in advance The position for corresponding to barricade during system on casing (2) top plate remains for connecting in advance the reinforcing bar of barricade prefabricated section;
    3) at the same time, in the barricade prefabricated section of prefabricated reinforced concrete structure outside the venue, and the pre-buried use on barricade prefabricated section In the bottom reinforcement bars of reserved steel bar on connection casing (2);
    4) traditional jacking method is used, jacking device is used as by the use of jack, by the more piece casing (2) of composition frame bridge from base Predetermined position in hole in shoveling below jacking to existing railway circuit (1);
    5) bottom reinforcement bars on barricade prefabricated section and the reserved steel bar on casing (2) top plate are welded together, polylith barricade is pre- Clamp dog is set in a manner of end to end, using being arranged in barricade prefabricated section end on lateral surface between adjacent barricade prefabricated section Reinforcing bar or steel plate weld and are connected with each other and prefabricated barricade (3) is made, then by the both ends of prefabricated barricade (3) with being influenceed by jacking The former rubble bulkhead of areas outside edge is connected with each other integral;
    6) beam reinforcement system in length and breadth and 353 button rails are removed, is then filled out below the existing railway circuit (1) by jacking influence area Railway ballast is filled, finally recovers the operation of existing railway circuit (1), thus completes whole work progress.
  2. 2. the construction method of jacking casing under hump line according to claim 1, it is characterised in that:Described barricade is prefabricated The width of block is identical with former rubble bulkhead width, and length determines according to on-site actual situations.
  3. A kind of 3. construction method of jacking casing under hump line, it is characterised in that:Described construction method includes carrying out in order The following steps:
    1) first using by 3-5-3 hanger rails and the I-steel track strengthening system that beam is formed in length and breadth on being influenceed on hump line by jacking The existing railway circuit (1) in region is reinforced, and removes the rubble bulkhead in the region;
    2) in the foundation ditch positioned at above-mentioned existing railway circuit (1) side prefabricated more piece reinforced concrete structure casing (2), in advance The position reserved steel bar of barricade is corresponded to during system on casing (2) top plate;
    3) after the concrete in casing (2) reaches predetermined strength requirement, prefabricated hump barricade is made at above-mentioned reserved steel bar (4) steel reinforcement cage, and install on the outside of steel reinforcement cage the template of prefabricated hump barricade (4);
    4) casting concrete in the template of above-mentioned prefabricated hump barricade (4), is made prefabricated hump barricade after concrete setting (4);
    5) traditional jacking method is used, jacking device is used as by the use of jack, by the more piece casing (2) of composition frame bridge from base Predetermined position in hole in shoveling below jacking to existing railway circuit (1), now prefabricated hump barricade (4) and former slabstone Barricade is generally aligned in the same plane;
    6) by the both ends of prefabricated hump barricade (4) with being interconnected to by the former rubble bulkhead at the outer ledge of jacking influence area It is overall;
    7) beam reinforcement system in length and breadth and 353 button rails are removed, is then filled out below the existing railway circuit (1) by jacking influence area Railway ballast is filled, finally recovers the operation of existing railway circuit (1), thus completes whole work progress.
  4. 4. the construction method of jacking casing under hump line according to claim 1, it is characterised in that:Described prefabricated hump The width of barricade (4) is identical with former rubble bulkhead width, and elevation of top is apart from 0.2 meter of the sleeper bottom of existing railway circuit (1).
CN201710822281.2A 2017-09-13 2017-09-13 The construction method of jacking babinet under a kind of hump line Active CN107447672B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710822281.2A CN107447672B (en) 2017-09-13 2017-09-13 The construction method of jacking babinet under a kind of hump line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710822281.2A CN107447672B (en) 2017-09-13 2017-09-13 The construction method of jacking babinet under a kind of hump line

Publications (2)

Publication Number Publication Date
CN107447672A true CN107447672A (en) 2017-12-08
CN107447672B CN107447672B (en) 2018-10-12

Family

ID=60496355

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710822281.2A Active CN107447672B (en) 2017-09-13 2017-09-13 The construction method of jacking babinet under a kind of hump line

Country Status (1)

Country Link
CN (1) CN107447672B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108086063A (en) * 2018-02-05 2018-05-29 石家庄铁道大学 The subgrade reinforcing device and method of hump line line style is safeguarded in a kind of jacking bridge construction

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101343861A (en) * 2008-08-22 2009-01-14 中铁六局集团有限公司 Construction method for replacing old frame bridge by new frame bridge in existing railway lines
KR20150068785A (en) * 2013-12-12 2015-06-22 한국건설기술연구원 Slab gap adjustment apparatus with longitudinal moving and bridge construction method therewith
CN106544934A (en) * 2016-11-08 2017-03-29 中铁六局集团天津铁路建设有限公司 A kind of railway shunting hump line reinforced construction method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101343861A (en) * 2008-08-22 2009-01-14 中铁六局集团有限公司 Construction method for replacing old frame bridge by new frame bridge in existing railway lines
KR20150068785A (en) * 2013-12-12 2015-06-22 한국건설기술연구원 Slab gap adjustment apparatus with longitudinal moving and bridge construction method therewith
CN106544934A (en) * 2016-11-08 2017-03-29 中铁六局集团天津铁路建设有限公司 A kind of railway shunting hump line reinforced construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108086063A (en) * 2018-02-05 2018-05-29 石家庄铁道大学 The subgrade reinforcing device and method of hump line line style is safeguarded in a kind of jacking bridge construction

Also Published As

Publication number Publication date
CN107447672B (en) 2018-10-12

Similar Documents

Publication Publication Date Title
CN103643640B (en) Jacking-first and line-reinforcement-second jacking construction method for frame bridge
CN203487475U (en) Line suspending and reinforcing structure for existing line jacking bridge and culvert construction
CN204385634U (en) Railway is not stopped transport the overall jacking mechanism of cross-line box culvert
CN211257077U (en) Prefabricated assembly and cast-in-place utility tunnel who mixes construction
CN106702912A (en) Construction method of dismantling old beam top and introducing new bridge on existing railway
CN102011351A (en) Railway reinforced construction method
CN110106751B (en) Settlement adjustment method suitable for CRTS II type plate ballastless track
CN107447672B (en) The construction method of jacking babinet under a kind of hump line
CN107829750A (en) A kind of rail road and section shield synchronous construction structure and method against the wind
KR102068441B1 (en) Temporary Strcuture of Underpass Traverse Construction for Traffic Facilities and Tunnel Construction Method Using by This
WO2007032701A1 (en) Reinforced concrete cross-tie
KR101187282B1 (en) Railway bridge constructing method using 2 post type abutment structure
CN104532691A (en) Ballastless track connected-block sleeper
CN217324965U (en) Face track laying base bridge that combines forever
CN105926381A (en) Method for changing ballast track bed of tunnel to ballastless track under condition of uninterrupted train working
CN104652299A (en) Electrified railway existing bridge and culvert whole-hole moving-out construction method
CN102628278B (en) 'U-pipe pier' urban underground railroad
CN104234734A (en) Novel air crossing construction method of deep mine and highland pressure impact coal seam
CN209975279U (en) Settlement adjustment structure suitable for CRTS II type plate ballastless track
CN211900603U (en) Face combination shield structure hole of hoist enclosed construction forever
CN210766876U (en) Prefabricated assembled railway open cut tunnel
CN110857544B (en) High-speed railway safety protection structure and construction method thereof
CN105178190B (en) A kind of construction method of the crossbeam overlay pipe nipple I-steel levelling circuit discrepancy in elevation
CN211006761U (en) Mounting structure of circulating water pipe
CN109826059B (en) Construction method for installing hoisting equipment on station main body and assembling track panel in cooperation with hoisting equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant