A kind of framework of steel reinforcement tensioning equipment Download PDFInfo
- Publication number
- CN107443564A CN107443564A CN201610368771.5A CN201610368771A CN107443564A CN 107443564 A CN107443564 A CN 107443564A CN 201610368771 A CN201610368771 A CN 201610368771A CN 107443564 A CN107443564 A CN 107443564A
- Authority
- CN
- China
- Prior art keywords
- hydraulic cylinder
- framework
- steel reinforcement
- tensioning
- piston rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B21/00—Methods or machines specially adapted for the production of tubular articles
- B28B21/56—Methods or machines specially adapted for the production of tubular articles incorporating reinforcements or inserts
- B28B21/60—Methods or machines specially adapted for the production of tubular articles incorporating reinforcements or inserts prestressed reinforcements
Landscapes
- Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Chemical & Material Sciences (AREA)
- Ceramic Engineering (AREA)
- Mechanical Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
A kind of framework of steel reinforcement tensioning equipment, including walking mechanism, tensioning mechanism and connection retaining mechanism, the walking mechanism includes base, base is arranged on guide rail by roller, guide rail is consistent with the length direction of electric bar mould, the tensioning mechanism includes hydraulic cylinder, jack, hydraulic cylinder is arranged on base, and the elongation of the piston rod of hydraulic cylinder is controlled by hydraulic power unit, connecting pole axis collinear on the piston rod central axis of hydraulic cylinder and the framework of steel reinforcement of electric bar mould, the jack is symmetrically mounted on hydraulic cylinder both sides, coordinate with hydraulic cylinder, realize tensioning, the connection retaining mechanism includes the screwed pipe being connected with the connecting pole on framework of steel reinforcement and the clamping body being connected with the piston rod of hydraulic cylinder.A kind of framework of steel reinforcement tensioning equipment provided by the invention, by set walking mechanism, tensioning mechanism and connection retaining mechanism, can fast and easy to framework of steel reinforcement carry out tensioning, ensure reinforcing bar intensity meet require.
Description
Technical field
The present invention relates to a kind of cement electric pole production equipment, especially a kind of framework of steel reinforcement tensioning equipment.
Background technology
In cement electric pole production process, the framework of steel reinforcement of mould after grouting is needed to carry out certain prestressed stretch-draw, in preparation before stretching process, it is necessary first to be connected tensioning equipment with the connecting pole of framework of steel reinforcement front end, then control system controls certain power gradually to carry out tensioning.Therefore, the quality of tensioning equipment connection directly affects stretch-draw effect and operating efficiency with stability.
The content of the invention
The technical problems to be solved by the invention are to provide a kind of framework of steel reinforcement tensioning equipment, can carry out accurate prestressed stretch-draw to framework of steel reinforcement, and connect in stretching process it is firm.
In order to solve the above technical problems, the technical solution adopted in the present invention is:
A kind of framework of steel reinforcement tensioning equipment, including walking mechanism, tensioning mechanism and connection retaining mechanism, the walking mechanism includes base, base is arranged on guide rail by roller, guide rail is consistent with the length direction of electric bar mould, the tensioning mechanism includes hydraulic cylinder, jack, hydraulic cylinder is arranged on base, and the elongation of the piston rod of hydraulic cylinder is controlled by hydraulic power unit, connecting pole axis collinear on the piston rod central axis of hydraulic cylinder and the framework of steel reinforcement of electric bar mould, the jack is symmetrically mounted on hydraulic cylinder both sides, coordinate with hydraulic cylinder, realize tensioning, the connection retaining mechanism includes the screwed pipe being connected with the connecting pole on framework of steel reinforcement and the clamping body being connected with the piston rod of hydraulic cylinder.
The clamping body includes the sleeve pipe with screwed pipe welding, and sleeve pipe is provided with through hole, and inserting column is provided with through hole, and inserting column realizes clamping through the through hole on sleeve pipe and corresponding hydraulic cylinder piston rod.
The inserting column upper end is hinged with draw ring.
The clamping body includes the bolted erecting bed of piston rod with hydraulic cylinder, is circumferentially hinged and by bearing pin on pedestal, can be slided up and down along pedestal with erecting bed at least provided with two pedestals, handgrip top on the outside of erecting bed.
The pedestal is three, circumferentially distributed along erecting bed.
It is cased with back-moving spring on the bearing pin of the pedestal, during the non-working condition of hydraulic cylinder, handgrip keeps open configuration.
The handgrip front end is provided with convex block.
A kind of framework of steel reinforcement tensioning equipment of the present invention, has following technique effect:
1), by setting hydraulic cylinder and jack, and by hydraulic power unit control the flexible of hydraulic cylinder, thus can ensure to carry out accurate prestressed stretch-draw to electric pole framework of steel reinforcement, be required so as to ensure that the intensity of deformed bar meets that electric pole makes.
2), pass through two kinds of connection retaining mechanisms be set, it is ensured that it is firm in connection procedure, avoid slipping, and simple in construction, be advantageous to long-term use.
Brief description of the drawings
The invention will be further described with reference to the accompanying drawings and examples:
Fig. 1 is the structural representation of the present invention.
Fig. 2 is the structural representation of the connection retaining mechanism of the present invention(The first).
Fig. 3 is the structural representation of the connection retaining mechanism of the present invention(Second).
Fig. 4 is schematic diagram of the handgrip of the present invention in pedestal.
In figure:Walking mechanism 1, tensioning mechanism 2, connect retaining mechanism 3, base 4, roller 5, guide rail 6, hydraulic cylinder 7, jack 8, hydraulic power unit 9, screwed pipe 10, clamping body 11, sleeve pipe 12, inserting column 13, draw ring 14, erecting bed 15, handgrip 16, convex block 17, pedestal 18.
Embodiment
As shown in Figure 1, a kind of framework of steel reinforcement tensioning equipment, including walking mechanism 1, tensioning mechanism 2 and connection retaining mechanism 3, the walking mechanism 1 includes base 4, base 4 is arranged on guide rail 6 by roller 5, guide rail 6 is consistent with the length direction of electric bar mould, the tensioning mechanism 2 includes hydraulic cylinder 7, jack 8, hydraulic cylinder 7 is arranged on base 4, and the elongation of the piston rod of hydraulic cylinder 7 is controlled by hydraulic power unit 9, connecting pole axis collinear on the piston rod central axis of hydraulic cylinder 7 and the framework of steel reinforcement of electric bar mould, the jack 8 is symmetrically mounted on the both sides of hydraulic cylinder 7, coordinate with hydraulic cylinder 7, realize tensioning, the connection retaining mechanism 3 includes the screwed pipe 10 being connected with the connecting pole on framework of steel reinforcement and the clamping body 11 being connected with the piston rod of hydraulic cylinder 7.
As shown in Fig. 2 the clamping body 11 includes the sleeve pipe 12 welded with screwed pipe 10, sleeve pipe 12 is provided with through hole, and inserting column 13 is provided with through hole, and inserting column 13 realizes clamping through the through hole on sleeve pipe 12 and the piston rod of corresponding hydraulic cylinder 7.
The upper end of inserting column 13 is hinged with draw ring 14.Thus facilitate and take out inserting column, while play spacing effect.
As shown in Figure 3-4, the clamping body 11 includes the bolted erecting bed 15 of piston rod with hydraulic cylinder 7, for the outside of erecting bed 15 circumferentially at least provided with two pedestals 18, the top of handgrip 16 is be hinged with erecting bed 15 and is arranged on by bearing pin on pedestal 18, can be slided up and down along pedestal 18.During work, when hydraulic cylinder piston rod shrinks, the one side of handgrip 16 rotates along the pin joint of erecting bed 15, and multiple handgrips are realized and screwed pipe is firmly grasped;On the other hand, handgrip is slided up and down by bearing pin along pedestal chute, makes the motion of handgrip have directionality.In addition, bearing pin both ends are cambered surface, friction can be reduced.
The pedestal is three, circumferentially distributed along erecting bed 15.Thus structure, when capturing, realization is circumferential firmly grasps, guarantee uniform force, and the connecting pole on reduction framework of steel reinforcement causes the thread abrasion above connecting pole because of local pressure inequality.
It is cased with back-moving spring on the bearing pin of the pedestal 18, during the non-working condition of hydraulic cylinder, handgrip 16 keeps open configuration.Thus structure, ensure that handgrip all has certain elasticity when firmly grasping or unclamping, ensure the buffering during crawl, reduce the impact to workpiece.
As shown in figure 3, the front end of handgrip 16 is provided with convex block 17.Thus structure, ensure when handgrip front end is shunk with the clamping of screwed pipe front end.
Operation principle and process:Illustrated by taking the first connection retaining mechanism 3 as an example.
1), prepare:During work, the mechanism that is movably walking first 1, by connecting pole of the tensioning mechanism 2 on framework of steel reinforcement, start hydraulic power unit 9, stretch out hydraulic cylinder piston rod by reversal valve, while jack is withstood mould;Then, it is threadedly coupled, sleeve pipe 12 is socketed on the piston rod of hydraulic cylinder 7 with connecting pole with screwed pipe 10, passes through the clamping of inserting column 13.
2), tensioning:Hydraulic cylinder piston rod is retracted by reversal valve, drive connection retaining mechanism 3 and framework of steel reinforcement movement, framework of steel reinforcement is produced stretching force by spacing and hydraulic cylinder the pulling of jack.After required stress is reached, the nut of framework of steel reinforcement front end is tightened, connection retaining mechanism 3 is unloaded, that is, completes tensioning.
Claims (7)
- A kind of 1. framework of steel reinforcement tensioning equipment, it is characterised in that:Including walking mechanism(1), tensioning mechanism(2)And connection retaining mechanism(3), the walking mechanism(1)Including base(4), base(4)Pass through roller(5)Installed in guide rail(6)On, guide rail(6)It is consistent with the length direction of electric bar mould, the tensioning mechanism(2)Including hydraulic cylinder(7), jack(8), hydraulic cylinder(7)Installed in base(4)On, and pass through hydraulic power unit(9)Control hydraulic cylinder(7)Piston rod elongation, hydraulic cylinder(7)Piston rod central axis and electric bar mould framework of steel reinforcement on connecting pole axis collinear, the jack(8)It is symmetrically mounted on hydraulic cylinder(7)Both sides and hydraulic cylinder(7)Coordinate, realize tensioning, the connection retaining mechanism(3)Including the screwed pipe being connected with the connecting pole on framework of steel reinforcement(10)With with hydraulic cylinder(7)Piston rod connection clamping body(11).
- A kind of 2. framework of steel reinforcement tensioning equipment according to claim 1, it is characterised in that:The clamping body(11)Including with screwed pipe(10)The sleeve pipe of welding(12), sleeve pipe(12)Through hole is provided with, inserting column is provided with through hole(13), inserting column(13)Through sleeve pipe(12)And corresponding hydraulic cylinder(7)Through hole on piston rod, realizes clamping.
- A kind of 3. framework of steel reinforcement tensioning equipment according to claim 2, it is characterised in that:The inserting column(13)Upper end is hinged with draw ring(14).
- A kind of 4. framework of steel reinforcement tensioning equipment according to claim 1, it is characterised in that:The clamping body(11)Including with hydraulic cylinder(7)The bolted erecting bed of piston rod(15), erecting bed(15)Outside is circumferentially at least provided with two pedestals(18), handgrip(16)Top and erecting bed(15)It is hinged and pedestal is arranged on by bearing pin(18)On, can be along pedestal(18)Slide up and down.
- A kind of 5. framework of steel reinforcement tensioning equipment according to claim 4, it is characterised in that:The pedestal(18)For three, along erecting bed(15)It is circumferentially distributed.
- A kind of 6. framework of steel reinforcement tensioning equipment according to claim 4, it is characterised in that:The pedestal(18)Bearing pin on be cased with back-moving spring, during the non-working condition of hydraulic cylinder, handgrip(16)Keep open configuration.
- A kind of 7. framework of steel reinforcement tensioning equipment according to claim 4, it is characterised in that:The handgrip(16)Front end is provided with convex block(17).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610368771.5A CN107443564A (en) | 2016-05-30 | 2016-05-30 | A kind of framework of steel reinforcement tensioning equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610368771.5A CN107443564A (en) | 2016-05-30 | 2016-05-30 | A kind of framework of steel reinforcement tensioning equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107443564A true CN107443564A (en) | 2017-12-08 |
Family
ID=60485631
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610368771.5A Pending CN107443564A (en) | 2016-05-30 | 2016-05-30 | A kind of framework of steel reinforcement tensioning equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107443564A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108189217A (en) * | 2017-12-29 | 2018-06-22 | 广州德亚机械制造有限公司 | Automatic pile pile molding tensioning all-in-one machine |
CN108284509A (en) * | 2018-01-17 | 2018-07-17 | 湖北工业大学 | A kind of connection locking device |
CN108858734A (en) * | 2018-06-11 | 2018-11-23 | 湖北工业大学 | A kind of pipe pile mould connection locking device |
-
2016
- 2016-05-30 CN CN201610368771.5A patent/CN107443564A/en active Pending
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108189217A (en) * | 2017-12-29 | 2018-06-22 | 广州德亚机械制造有限公司 | Automatic pile pile molding tensioning all-in-one machine |
CN108189217B (en) * | 2017-12-29 | 2021-04-06 | 广州德亚机械制造有限公司 | Automatic tubular pile forming and tensioning integrated machine |
CN108284509A (en) * | 2018-01-17 | 2018-07-17 | 湖北工业大学 | A kind of connection locking device |
CN108284509B (en) * | 2018-01-17 | 2019-11-08 | 湖北工业大学 | A kind of connection locking device |
CN108858734A (en) * | 2018-06-11 | 2018-11-23 | 湖北工业大学 | A kind of pipe pile mould connection locking device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104308040B (en) | Line of power quick Fabrication assembling device | |
CN202655396U (en) | Hydraulic stretching straightening machine | |
CN107443564A (en) | A kind of framework of steel reinforcement tensioning equipment | |
CN113579540A (en) | Welding method for building reinforcement cage | |
CN207914503U (en) | A kind of urban architecture reinforcing bar straightening apparatus | |
CN206416134U (en) | Maintenance work platform | |
CN205630969U (en) | Steel bones RACK tensioning equipment | |
CN113523126B (en) | Expanding device for producing large-caliber high-temperature corrosion-resistant alloy seamless pipe | |
CN106089223A (en) | A kind of TBM Quick air pushes away method | |
CN202390145U (en) | Fixing tool for assembling jacking frame cylinder of steel ladle of refining furnace | |
CN205959624U (en) | Pull -rod machine pull rod controlling means | |
CN211548823U (en) | Vibrating spear with auxiliary device | |
CN102493971B (en) | Bearing pin, inserted pin oil hydraulic cylinder and pin inserting-pulling device | |
CN205765935U (en) | Clutch puller | |
CN203716519U (en) | Carbon fiber cloth tensioning device for strengthening and treatment of concrete column | |
CN219445514U (en) | Telegraph pole tubular pile cage rib stretching machine | |
CN105880976B (en) | The rubber feeding device of motorcycle component assembly machine | |
CN205614593U (en) | Inserted valve extractor | |
CN218110661U (en) | Motor is dismantled and is drawn frock | |
CN219054267U (en) | Thermal state electric steam valve decomposer | |
CN219567447U (en) | Maintenance device for climbing formwork jack | |
CN203039291U (en) | Combined hydraulic tool for replacing linear insulator chain of 750-kilovolt power transmission line | |
CN210790947U (en) | Frame is put in inserting of precast concrete externally-hung wallboard | |
CN209707256U (en) | A kind of reinforcing bar dotting machine | |
CN214444438U (en) | Return-to-zero structure adaptive to annular circulating mechanism screwed with tubular pile die closing die |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20171208 |
|
WD01 | Invention patent application deemed withdrawn after publication |