CN107439356A - A kind of method and gabion greening system realized that gabion is stable and afforested - Google Patents

A kind of method and gabion greening system realized that gabion is stable and afforested Download PDF

Info

Publication number
CN107439356A
CN107439356A CN201710531747.3A CN201710531747A CN107439356A CN 107439356 A CN107439356 A CN 107439356A CN 201710531747 A CN201710531747 A CN 201710531747A CN 107439356 A CN107439356 A CN 107439356A
Authority
CN
China
Prior art keywords
gabion
cover
casing
stable
anchor pole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710531747.3A
Other languages
Chinese (zh)
Inventor
刘杰
张罗送
兰俊
高进
雷康佳
庞杰
曽文彦
李国强
宋国飞
吕璐
韩海超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Three Gorges University CTGU
Original Assignee
China Three Gorges University CTGU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Three Gorges University CTGU filed Critical China Three Gorges University CTGU
Priority to CN201710531747.3A priority Critical patent/CN107439356A/en
Publication of CN107439356A publication Critical patent/CN107439356A/en
Pending legal-status Critical Current

Links

Classifications

    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G31/00Soilless cultivation, e.g. hydroponics
    • A01G31/02Special apparatus therefor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/12Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
    • E02B3/129Polyhedrons, tetrapods or similar bodies, whether or not threaded on strings
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P60/00Technologies relating to agriculture, livestock or agroalimentary industries
    • Y02P60/20Reduction of greenhouse gas [GHG] emissions in agriculture, e.g. CO2
    • Y02P60/21Dinitrogen oxide [N2O], e.g. using aquaponics, hydroponics or efficiency measures

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Ocean & Marine Engineering (AREA)
  • Inorganic Chemistry (AREA)
  • Environmental & Geological Engineering (AREA)
  • Crystallography & Structural Chemistry (AREA)
  • Chemical & Material Sciences (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental Sciences (AREA)
  • Revetment (AREA)

Abstract

It is a kind of to realize that gabion is stable and the method for greening, this method comprise the following steps:Step 1:Multiple drilling implantation anchor pole groups are opened up according to the installation site of gabion device in Rock And Soil and poured, the cement slurry poured in drilling is the dilatancy cement mortar containing swelling agent;Step 2:Make the gabion casing with cover formed by braided steel wire;Step 3:Each gabion casing with cover is arranged on Rock And Soil by each anchor pole group and is connected to each other to form gabion device;Step 4:The installation plantation cylinder on each gabion casing with cover of gabion device, plantation cylinder is interior to be filled with the soil containing nutrient solution and grass-seed;Realize stabilization and the greening of gabion.A kind of method and gabion greening system realized that gabion is stable and afforested provided by the invention, can solve the problems, such as that gabion comes off and without greening function, anchor pole and gabion and plantation cylinder are organically combined, the infringement as caused by hydrostatic can be prevented, be advantageous to the stabilization of hillside and seashore, while add afforestation effect.

Description

A kind of method and gabion greening system realized that gabion is stable and afforested
Technical field
The present invention relates to geographic territory it is anticorrosive, consolidate riverbed, river regulation stabilization protective and greening field, especially A kind of method and gabion greening system realized that gabion is stable and afforested.
Background technology
Gabion, refer to prevent that Er She Ge are loaded the cage of stone by current scour for riverbank or structure.Gabion is by gold Category wire rod net cage made of machinery is by the twisted how twisted hexagon net being woven into of two-wire.As a kind of novel ecological grid knot Structure, its new technology shown, new technology, the characteristic of new material, successfully in hydraulic engineering, highway, railway engineering, dyke Protection engineering in be well used, preferably realize the combination of engineering structure and ecological environment.Simultaneously with one The advantages of a little conventional rigid structures have its own by comparison, therefore worldwide have become protection riverbed, administer and slide Slope, prevent and treat mud-rock flow, the preferred structural shape for preventing falling rocks from taking into account environmental protection.At present, gabion is mostly using placement or insertion The mode of common bolt, is easily influenceed by hydrostatic, and protection against erosion ability is weak, is also easy to produce the problem of coming off, be unfavorable for hillside and The stabilization of seashore, and existing gabion is without greening function.
The content of the invention
The technical problems to be solved by the invention are to provide a kind of method and gabion greening realized that gabion is stable and afforested System, can solve the problems, such as that gabion comes off and without greening function, anchor pole and gabion and plantation cylinder are organically combined, can The infringement as caused by hydrostatic is prevented, is advantageous to the stabilization of hillside and seashore, while add afforestation effect.
In order to solve the above technical problems, the technical solution adopted in the present invention is:It is a kind of to realize that gabion is stable and greening Method, this method comprise the following steps:
Step 1:Multiple drilling implantation anchor pole groups are opened up according to the installation site of gabion device in Rock And Soil and poured, are bored The cement slurry poured in hole is the dilatancy cement mortar containing swelling agent;
Step 2:Make the gabion casing with cover formed by braided steel wire;
Step 3:Each gabion casing with cover is arranged on Rock And Soil by each anchor pole group and is connected to each other to form gabion device, band Building stones are filled with coping stone cage casing;
Step 4:The installation plantation cylinder on each gabion casing with cover of gabion device, interior be filled with of plantation cylinder contain nutrient solution and grass The soil of seed;
Realize stabilization and the greening of gabion.
In step 1, anchor pole group is made up of horizontal anchor pole and longitudinal anchor pole, the mass content of swelling agent in dilatancy cement mortar For 10% 25%.
In step 3, horizontal square structure or multiple band coping stones that gabion device is formed for multiple gabion box body splicings with cover Cage casing stacked on top forms step structure.
In step 4, plantation cylinder plants cylinder for the pvc pipe of bending, and plantation cylinder is fixedly installed in gabion with cover by support frame On casing.
It is a kind of to realize that gabion is stable and the system of greening, including the stone on Rock And Soil is fixedly installed in by multigroup anchor pole group Cage assembly, gabion device are the overall structure formed by multiple gabion box body splicings with cover, are filled with each gabion casing with cover Stone layer, installation plantation cylinder on each gabion casing with cover, be filled with the soil horizon containing nutrient solution and grass-seed in plantation cylinder, plantation Cylinder is fixedly installed on gabion casing with cover by support frame.
On the horizontal square structure or multiple gabion casings with cover that gabion device is formed for multiple gabion box body splicings with cover Lower stacking forms step structure.
The height of gabion casing with cover is 0.5-1.0 rice, wherein the height for the stone layer filled is 0.25-0.3 rice.
In support frame, longitudinal section is to be arranged with multiple mounting collars on two parallel cross bars of the support body of triangle in parallel.
A kind of method and gabion greening system realized that gabion is stable and afforested provided by the invention, has the beneficial effect that:
1st, realize the combination of anchor pole and Ecotypic Stone Mesh-box net, infringement can be prevented as caused by hydrostatic, be advantageous to hillside and The stabilization of seashore, and extend the service life of Ecotypic Stone Mesh-box net.
2nd, the variation for adapting to side slope using the flexible structure of gabion casing possesses more preferably without being destroyed than rigid structure Security and stability, it is more notable using this effect after bolt anchorage.
3rd, the expanding radial force provided using the swelling agent in anchoring body, frictional resistance and anchor between anchoring body and Rock And Soil are improved Bond stress between solid and anchor pole, so as to strengthen the withdrawal resistance of anchor pole enhancing gabion box monolithic stability, and make its scouring capability Become stronger.
4th, grass or small shrub are planted in pvc pipe plants cylinder, can gos deep into its root system stable to strengthen seashore in gabion box Property, while strengthen afforestation effect.
Brief description of the drawings
The invention will be further described with reference to the accompanying drawings and examples:
Fig. 1 is the top view that present system gabion device uses horizontal square structure;
Fig. 2 is the side view that present system gabion device uses horizontal square structure;
Fig. 3 is the stereogram that present system gabion device uses horizontal square structure;
Fig. 4 is the schematic diagram that present system gabion device uses step structure;
Fig. 5 is the stereogram that present system gabion device uses step structure;
Fig. 6 is the schematic diagram of supporting frame in present system gabion device;
Fig. 7 is that anchor pole of the present invention expands head with the anchoring body that dilatancy cement mortar is formed.
Embodiment
Embodiment one
It is a kind of to realize that gabion is stable and the method for greening, this method comprise the following steps:
Step 1:Multiple drilling implantation anchor pole groups are opened up according to the installation site of gabion device in Rock And Soil 4 and poured, The cement slurry poured in drilling is the dilatancy cement mortar containing swelling agent;
Comprise the following steps that:
Step 1-1:Along certain angle(It is easy to slip casting, is allowed to not outflow)Drilled with ordinary rock drill on Rock And Soil 4 and clear Hole;
Step 1-2:Horizontal anchor pole 3 is inserted into drilling, is allowed to, positioned at drilling center, incorporation then be poured into drilling containing swollen Swollen dose of dilatancy cement mortar, is conserved;
Step 1-3:Longitudinal anchor pole 2 is inserted into drilling, is allowed to, positioned at drilling center, incorporation then be poured into drilling containing swollen Swollen dose of dilatancy cement mortar, is conserved;
Anchor pole and the anchoring body expansion first 7 that dilatancy cement mortar is formed are as shown in Figure 5.
Step 2:Make the gabion casing 1 with cover formed by braided steel wire;
Gabion steel wire used in gabion casing 1 with cover is by improved corrosion, high intensity, the malleable mild steel wire of tool or cladding PVC above-mentioned steel wire is formed using machinery braiding, and two-wire is twisted the length of part and cannot be less than 50 millimeters during making, to ensure to twist The coat of metal and PVC coating for closing part steel wire are not damaged.
Step 3:Each gabion casing 1 with cover is arranged on Rock And Soil 4 by each anchor pole group and is connected to each other to form gabion Device, gabion casing 1 with cover is interior to be filled with building stones;
Before gabion casing 1 with cover is installed, bank slope and ground should be suitably repaired, and keeps the original shape of bank slope as far as possible, but should not There are obvious protuberance and depression, each gabion casing 1 with cover needs guiding through each corresponding anchor pole group, the adjacent each gabion with cover of same layer Casing 1 is mutually fastened using wiring, forms it into an overall gabion device;
When filling building stones to gabion casing 1 with cover, exposed face application particle diameter is not less than 10 centimetres of cobble, and manually pendulum block is flat It is whole, to obtain surface attractive in appearance and prevent current to be flushed away cobble from grid;
Fill up after building stones i.e. by under top cover lid, then tightened the wire helical form of two coincidences with wiring, pitch in gabion box 50 millimeters are not should be greater than;
Again with backing plate by each rock bolt on anchorage, the metal part of exposure is wrapped up with C15 plain concretes, seals anchor head.
Step 4:The installation plantation cylinder 5 on each gabion casing 1 with cover of gabion device, plantation cylinder 5 is interior to be filled with containing battalion Nutrient solution and the soil of grass-seed, grass can be stably grown in cylinder, its root system can be made to go deep into gabion box, so that gabion device is more steady It is fixed, preferably realize the combination of engineering structure and ecological environment;
Realize stabilization and the greening of gabion.
In step 1, anchor pole group is made up of horizontal anchor pole 3 and longitudinal anchor pole 2, and the quality of swelling agent contains in dilatancy cement mortar Measure as 10% 25%.
In step 3, gabion device is the horizontal square structure or multiple band coping stones that multiple gabion casings 1 with cover are spliced to form The stacked on top of cage casing 1 forms step structure.
In step 4, plantation cylinder 5 plants cylinder for the pvc pipe of bending, and plantation cylinder 5 is fixedly installed in band coping stone by support frame 6 On cage casing 1.
Embodiment two
As shown in Fig. 1-Fig. 7, a kind of system for realizing that gabion is stable and afforests, including rock is fixedly installed in by multigroup anchor pole group Gabion device on the soil body 4, gabion device are the overall structure that is spliced to form by multiple gabion casings 1 with cover, each gabion with cover Be filled with stone layer in casing 1, installation plantation cylinder 5 on each gabion casing 1 with cover, be filled with plantation cylinder 5 containing nutrient solution with The soil horizon of grass-seed, plantation cylinder 5 are fixedly installed on gabion casing 1 with cover by support frame 6.
Gabion device is the horizontal square structure or multiple gabion casings 1 with cover that multiple gabion casings 1 with cover are spliced to form Stacked on top forms step structure.
The height of gabion casing 1 with cover is 0.5-1.0 rice, wherein the height for the stone layer filled is 0.25-0.3 rice.
In support frame 6, longitudinal section is to be arranged with multiple installations in parallel on the support body 6-1 of triangle two parallel cross bar 6-2 Collar 6-3.
Support frame 6 is fixedly installed on gabion casing 1 with cover by wiring.
Grass seeds or small shrub kind in pvc pipe kind cylinder bucket, its root system may pass through gabion box into the soil body after germinating growth, To strengthen reservoir stability stability, while increase aesthetic property.

Claims (8)

  1. A kind of 1. method for realizing that gabion is stable and afforests, it is characterised in that this method comprises the following steps:
    Step 1:In Rock And Soil(4)The middle installation site according to gabion device opens up multiple drilling implantation anchor pole groups and poured Build, the cement slurry poured in drilling is the dilatancy cement mortar containing swelling agent;
    Step 2:Make the gabion casing with cover formed by braided steel wire(1);
    Step 3:By each gabion casing with cover(1)Rock And Soil is arranged on by each anchor pole group(4)Go up and be connected to each other to form gabion Device, gabion casing with cover(1)It is interior to be filled with building stones;
    Step 4:In each gabion casing with cover of gabion device(1)Upper installation plantation cylinder(5), plant cylinder(5)Interior be filled with is contained Nutrient solution and the soil of grass-seed;
    Realize stabilization and the greening of gabion.
  2. A kind of 2. method for realizing that gabion is stable and afforests according to claim 1, it is characterised in that:In step 1, anchor pole Group is by horizontal anchor pole(3)With longitudinal anchor pole(2)Composition, the mass content of swelling agent is 10% 25% in dilatancy cement mortar.
  3. A kind of 3. method for realizing that gabion is stable and afforests according to claim 1, it is characterised in that:In step 3, gabion Device is multiple gabion casings with cover(1)The horizontal square structure or multiple gabion casings with cover being spliced to form(1)Stacked on top Form step structure.
  4. A kind of 4. method for realizing that gabion is stable and afforests according to claim 1, it is characterised in that:In step 4, plantation Cylinder(5)Cylinder is planted for the pvc pipe of bending, plants cylinder(5)Pass through support frame(6)It is fixedly installed in gabion casing with cover(1)On.
  5. A kind of 5. system for realizing that gabion is stable and afforests, it is characterised in that:Including being fixedly installed in rock by multigroup anchor pole group The soil body(4)On gabion device, gabion device be by multiple gabion casings with cover(1)The overall structure being spliced to form, it is each with cover Gabion casing(1)It is interior to be filled with stone layer, each gabion casing with cover(1)Upper installation plantation cylinder(5), plant cylinder(5)Inside it is filled with Soil horizon containing nutrient solution and grass-seed, plant cylinder(5)Pass through support frame(6)It is fixedly installed in gabion casing with cover(1)On.
  6. A kind of 6. system for realizing that gabion is stable and afforests according to claim 5, it is characterised in that:Gabion device is more Individual gabion casing with cover(1)The horizontal square structure or multiple gabion casings with cover being spliced to form(1)Stacked on top forms ladder Shape structure.
  7. A kind of 7. system for realizing that gabion is stable and afforests according to claim 5, it is characterised in that:Gabion casing with cover (1)Height be 0.5-1.0 rice, wherein the height for the stone layer filled is 0.25-0.3 rice.
  8. A kind of 8. system for realizing that gabion is stable and afforests according to claim 5, it is characterised in that:Support frame(6)In, Longitudinal section is the support body of triangle(6-1)Two parallel cross bars(6-2)On be arranged with multiple mounting collars in parallel(6-3).
CN201710531747.3A 2017-07-03 2017-07-03 A kind of method and gabion greening system realized that gabion is stable and afforested Pending CN107439356A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710531747.3A CN107439356A (en) 2017-07-03 2017-07-03 A kind of method and gabion greening system realized that gabion is stable and afforested

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710531747.3A CN107439356A (en) 2017-07-03 2017-07-03 A kind of method and gabion greening system realized that gabion is stable and afforested

Publications (1)

Publication Number Publication Date
CN107439356A true CN107439356A (en) 2017-12-08

Family

ID=60487688

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710531747.3A Pending CN107439356A (en) 2017-07-03 2017-07-03 A kind of method and gabion greening system realized that gabion is stable and afforested

Country Status (1)

Country Link
CN (1) CN107439356A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110055985A (en) * 2019-05-15 2019-07-26 中国葛洲坝集团第一工程有限公司 High-durability earth rock cofferdam or flood bank construction method
CN110984192A (en) * 2019-12-24 2020-04-10 河北水熠木丰工程技术有限责任公司 Highway reconstruction excavated slope reinforcing structure and reinforcing method
CN111074909A (en) * 2018-10-22 2020-04-28 黄种玉 Gabion fixing construction method
CN112538837A (en) * 2020-11-12 2021-03-23 华能澜沧江水电股份有限公司托巴水电工程建设管理局 Method for preventing high-speed water flow impact during building of reservoir bank
CN113481938A (en) * 2021-07-10 2021-10-08 绿美艺环境建设集团有限公司 Silty river stone cage combined plant-growing protection pad ecological revetment and construction method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101558204A (en) * 2007-01-19 2009-10-14 海斯科堡垒有限公司 Gabion
CN201581378U (en) * 2009-12-07 2010-09-15 杭州实创建设有限公司 Green galvanized gabion
CN103866776A (en) * 2014-04-09 2014-06-18 湖北工业大学 Gabion wall ecology slope protection method of construction waste
CN106337394A (en) * 2016-09-22 2017-01-18 水利部中国科学院水工程生态研究所 River bank ecological restoration device and method suitable for mountain river characteristics

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101558204A (en) * 2007-01-19 2009-10-14 海斯科堡垒有限公司 Gabion
CN201581378U (en) * 2009-12-07 2010-09-15 杭州实创建设有限公司 Green galvanized gabion
CN103866776A (en) * 2014-04-09 2014-06-18 湖北工业大学 Gabion wall ecology slope protection method of construction waste
CN103866776B (en) * 2014-04-09 2016-01-20 湖北工业大学 A kind of building waste gabion wall ecological bank protecting method
CN106337394A (en) * 2016-09-22 2017-01-18 水利部中国科学院水工程生态研究所 River bank ecological restoration device and method suitable for mountain river characteristics

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111074909A (en) * 2018-10-22 2020-04-28 黄种玉 Gabion fixing construction method
CN110055985A (en) * 2019-05-15 2019-07-26 中国葛洲坝集团第一工程有限公司 High-durability earth rock cofferdam or flood bank construction method
CN110055985B (en) * 2019-05-15 2020-04-14 国电大渡河猴子岩水电建设有限公司 Construction method of high-durability earth-rock cofferdam or flood bank
CN110984192A (en) * 2019-12-24 2020-04-10 河北水熠木丰工程技术有限责任公司 Highway reconstruction excavated slope reinforcing structure and reinforcing method
CN112538837A (en) * 2020-11-12 2021-03-23 华能澜沧江水电股份有限公司托巴水电工程建设管理局 Method for preventing high-speed water flow impact during building of reservoir bank
CN113481938A (en) * 2021-07-10 2021-10-08 绿美艺环境建设集团有限公司 Silty river stone cage combined plant-growing protection pad ecological revetment and construction method thereof

Similar Documents

Publication Publication Date Title
CN107439356A (en) A kind of method and gabion greening system realized that gabion is stable and afforested
CN107893422B (en) A kind of reinforcement type ecological slope protection structure and its construction method
CN112431213B (en) Ecological comprehensive treatment structure for semi-rigid support of artificial slope and construction method thereof
CN109811776A (en) A kind of assembled lattice Vierendeel girder
CN210151758U (en) Side slope ecological protection structure with water storage and supply system
CN104775395A (en) Arch type flexible ecological revetment structure for small and medium-sized valley or river channel and construction method for arch type flexible ecological revetment structure
CN206681026U (en) Side slope
CN212077981U (en) Combined slope supporting structure
CN211047941U (en) Stable-water-granule spray-seeding vegetation structure for vertical tube bundle substrate on high and steep slope
CN110656653B (en) Double-curve anchor head structure side slope protection device and construction method
NZ521010A (en) Method for soil erosion control works or shore protection works and structure for soil protection or shore protection
CN101235646B (en) Building slope ecological supporting member
CN105064273B (en) A kind of grass planting gabion ecology terraced fields ridge
CN100435616C (en) Re-greening technology of high gradient slope in stone pit
KR100935176B1 (en) A road slope keeping for ecological planting and method
CN207392142U (en) A kind of flexible cladding Soil-nailed slope protection system
CN109958138A (en) A kind of broken Rock And Soil cut slope flexible shoring ruggedized construction and reinforcement means
CN114635432A (en) Construction method of composite ecological slope protection of foundation pit
CN210002422U (en) broken rock soil body cutting slope flexible retaining reinforced structure
CN217500264U (en) Highway, railway or massif bank protection structure
KR100631385B1 (en) construction method of nature embankment
CN208072402U (en) A kind of underwater ground anchor structure
CN110714470A (en) Slope protection system for soil slope and construction method thereof
CN110710420A (en) Rock slope TBS supporting method
CN105297746B (en) Greening system and greening method for prefabricated arch body bearing-type vegetation concrete side slope

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20171208