CN107436414A - BBU validity test method and apparatus in a kind of storage system - Google Patents

BBU validity test method and apparatus in a kind of storage system Download PDF

Info

Publication number
CN107436414A
CN107436414A CN201710656114.5A CN201710656114A CN107436414A CN 107436414 A CN107436414 A CN 107436414A CN 201710656114 A CN201710656114 A CN 201710656114A CN 107436414 A CN107436414 A CN 107436414A
Authority
CN
China
Prior art keywords
bbu
storage system
validity test
place
discharge current
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710656114.5A
Other languages
Chinese (zh)
Other versions
CN107436414B (en
Inventor
王淑童
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Inspur Intelligent Technology Co Ltd
Original Assignee
Zhengzhou Yunhai Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Yunhai Information Technology Co Ltd filed Critical Zhengzhou Yunhai Information Technology Co Ltd
Priority to CN201710656114.5A priority Critical patent/CN107436414B/en
Publication of CN107436414A publication Critical patent/CN107436414A/en
Application granted granted Critical
Publication of CN107436414B publication Critical patent/CN107436414B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/40Testing power supplies

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)
  • Techniques For Improving Reliability Of Storages (AREA)
  • For Increasing The Reliability Of Semiconductor Memories (AREA)
  • Power Sources (AREA)

Abstract

This application discloses the validity test method of BBU in storage system a kind of, including with prefixed time interval, determine whether BBU is in place;When the BBU is in place, stop PSU power supplies, be switched to BBU power supplies, continue preset time;According to the detection of the discharge current to the BBU, judge whether the BBU is effective, BBU validity test device includes determining unit in the storage system, for prefixed time interval, determining whether BBU is in place;Switch unit, for when the BBU is in place, stopping PSU power supplies, BBU power supplies are switched to, continue preset time;Judging unit, for the detection according to the discharge current to the BBU, judge whether the BBU is effective.BBU validity test method and apparatus in above-mentioned storage system, the reliability of stand-by power supply power supply can be effectively verified, solve the bottleneck that stand-by power supply is powered, effectively reduce the failure-frequency of stand-by power supply.

Description

BBU validity test method and apparatus in a kind of storage system
Technical field
The invention belongs to storage system technical field of power management, more particularly in a kind of storage system BBU it is effective Property method of testing and device.
Background technology
In field of storage, the storing process of mass data, the method for managing power supply of storage system can influence storage system Results validity.In order to reduce the frequency of abnormity of power supply in storage system running, current method for managing power supply is Property monitoring in place is carried out to current power, the power supply reliability of stand-by power supply is not verified, still has higher event Hinder frequency.
The content of the invention
To solve the above problems, the invention provides the validity test method and apparatus of BBU in storage system a kind of, energy The reliability of enough effective checking stand-by power supply power supplies, solves the bottleneck of stand-by power supply power supply, effectively reduces stand-by power supply Failure-frequency.
BBU validity test method in a kind of storage system provided by the invention, including:
With prefixed time interval, determine whether BBU is in place;
When the BBU is in place, stop PSU power supplies, be switched to BBU power supplies, continue preset time;
According to the detection of the discharge current to the BBU, judge whether the BBU is effective.
Preferably, in above-mentioned storage system in BBU validity test method, the determination BBU whether be in place:
Whether the BBU is determined by reading trade name, sequence number and the compatible Warning Mark parameter of the BBU In place.
Preferably, in above-mentioned storage system in BBU validity test method, electric discharge of the basis to the BBU The detection of electric current, judges whether the BBU effectively includes:
The discharge current of the BBU is obtained, judges that the BBU is effective when the discharge current is negative value, and system is delayed Judge that the BBU is faulty during machine.
Preferably, in above-mentioned storage system in BBU validity test method, the scope of the prefixed time interval is More than seven days.
Preferably, in above-mentioned storage system in BBU validity test method, the scope of the preset time is 1 second To 5 seconds.
BBU validity test device in a kind of storage system provided by the invention, including:
Determining unit, for prefixed time interval, determining whether BBU is in place;
Switch unit, for when the BBU is in place, stopping PSU power supplies, BBU power supplies are switched to, continue preset time;
Judging unit, for the detection according to the discharge current to the BBU, judge whether the BBU is effective.
Preferably, in above-mentioned storage system in BBU validity test device, the determining unit is specifically used for passing through Trade name, sequence number and the compatible Warning Mark parameter of the BBU are read to determine whether the BBU is in place.
Preferably, in above-mentioned storage system in BBU validity test device, the judging unit is specifically used for obtaining The discharge current of the BBU, judge that the BBU is effective when the discharge current is negative value, and system delay machine when judge described in BBU is faulty.
By foregoing description, BBU validity test method and apparatus in above-mentioned storage system provided by the invention, Because this method is included with prefixed time interval, determine whether BBU is in place;When the BBU is in place, stop PSU power supplies, switching Powered to BBU, continue preset time;According to the detection of the discharge current to the BBU, judge whether the BBU is effective, therefore The reliability of stand-by power supply power supply can be effectively verified, the bottleneck for solving stand-by power supply power supply, effectively reduces stand-by power supply Failure-frequency.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing There is the required accompanying drawing used in technology description to be briefly described, it should be apparent that, drawings in the following description are only this The embodiment of invention, for those of ordinary skill in the art, on the premise of not paying creative work, can also basis The accompanying drawing of offer obtains other accompanying drawings.
Fig. 1 is the schematic diagram of BBU validity test method in the first storage system that the embodiment of the present application provides;
Fig. 2 is the schematic diagram of BBU validity test device in the first storage system that the embodiment of the present application provides.
Embodiment
The core concept of the present invention, can in the validity test method and apparatus of the BBU in storage system is provided a kind of The reliability of effective checking stand-by power supply power supply, solves the bottleneck of stand-by power supply power supply, effectively reduces the event of stand-by power supply Hinder frequency.
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art are obtained every other under the premise of creative work is not made Embodiment, belong to the scope of protection of the invention.
BBU validity test method is as shown in figure 1, Fig. 1 is in the first storage system that the embodiment of the present application provides The schematic diagram of BBU validity test method in the first storage system that the embodiment of the present application provides, this method include as follows Step:
S1:With prefixed time interval, determine whether BBU is in place;
S2:When the BBU is in place, stop PSU power supplies, be switched to BBU power supplies, continue preset time;
S3:According to the detection of the discharge current to the BBU, judge whether the BBU is effective.
Specifically, C high-level languages can be used to carry out host side operation main program using general processor CPU, CPU is beaten BBU electric discharge enable signal is opened, and closes PSU power supply output enable signal, after CPU waits the time of 1 second, opens PSU's Power supply output enable signal, and close BBU electric discharge enable signal.If BBU discharge failures, system occurs that the machine of delaying shows As otherwise system operation is normal.CPU configuration processors can carry out power down test to BBU, be counted afterwards since being run program When, tested when timing time carries out a power down again more than prefixed time interval, and timing is reset, and after execution terminates, is opened again Beginning timing.
By foregoing description, BBU validity is surveyed in the first above-mentioned storage system that the embodiment of the present application provides Method for testing, due to including with prefixed time interval, determining whether BBU is in place;When the BBU is in place, stops PSU power supplies, cut BBU power supplies are changed to, continue preset time;According to the detection of the discharge current to the BBU, judge whether the BBU is effective, because This can effectively verify the reliability of stand-by power supply power supply, solve the bottleneck of stand-by power supply power supply, effectively reduce standby electricity The failure-frequency in source.
The embodiment of the present application provide second of storage system in BBU validity test method, be it is above-mentioned the first In storage system on the basis of BBU validity test method, in addition to following technical characteristic:
The determination BBU whether be in place:
Whether the BBU is determined by reading trade name, sequence number and the compatible Warning Mark parameter of the BBU In place.
It should be noted that it is only possible to carry out above-mentioned validity test in the presence of only working as BBU, otherwise without any meaning Justice, and the accuracy in bit test is can effectively ensure that using the reading of above-mentioned parameter.
The embodiment of the present application provide the third storage system in BBU validity test method, be it is above-mentioned the first In storage system on the basis of BBU validity test method, in addition to following technical characteristic:
Detection of the basis to the discharge current of the BBU, judges whether the BBU effectively includes:
The discharge current of the BBU is obtained, judges that the BBU is effective when the discharge current is negative value, and system is delayed Judge that the BBU is faulty during machine.
In this case, it is possible to increase the accuracy of judgement, only system do not delay machine when just can prove that BBU can be played Due effect.
The embodiment of the present application provide the 4th kind of storage system in BBU validity test method, be it is above-mentioned the first Into the third storage system it is any in BBU validity test method on the basis of, in addition to following technical characteristic:
The scope of the prefixed time interval is more than seven days.
That is, so it can preferably ensure that BBU had with regard to carrying out a BBU validity test at least through seven days Effect property.
The embodiment of the present application provide the 5th kind of storage system in BBU validity test method, be it is above-mentioned the first Into the third storage system it is any in BBU validity test method on the basis of, in addition to following technical characteristic:
The scope of the preset time is 1 second to 5 seconds.
That is, in general, being powered at least one second using BBU, it becomes possible to verify whether it is effective, ensure sending out During raw emergency, BBU can provide effective power supply in time, ensure storage system timely processing customer data, ensure client The integrality of data.
BBU validity test device is as shown in Fig. 2 Fig. 2 is in the first storage system that the embodiment of the present application provides The schematic diagram of BBU validity test device, the device include in the first storage system that the embodiment of the present application provides:
Determining unit 201, for prefixed time interval, determining whether BBU is in place;
Switch unit 202, for when the BBU is in place, stopping PSU power supplies, BBU power supplies are switched to, when persistently presetting Between;
Judging unit 203, for the detection according to the discharge current to the BBU, judge whether the BBU is effective.
Specifically, C high-level languages can be used to carry out host side operation main program using general processor CPU, CPU is beaten BBU electric discharge enable signal is opened, and closes PSU power supply output enable signal, after CPU waits the time of 1 second, opens PSU's Power supply output enable signal, and close BBU electric discharge enable signal.If BBU discharge failures, system occurs that the machine of delaying shows As otherwise system operation is normal.CPU configuration processors can carry out power down test to BBU, be counted afterwards since being run program When, tested when timing time carries out a power down again more than prefixed time interval, and timing is reset, and after execution terminates, is opened again Beginning timing.
The embodiment of the present application provide second of storage system in BBU validity test device, be it is above-mentioned the first In storage system on the basis of BBU validity test device, in addition to following technical characteristic:
The determining unit is specifically used for trade name, sequence number and compatible Warning Mark by reading the BBU Parameter determines whether the BBU is in place.
It should be noted that it is only possible to carry out above-mentioned validity test in the presence of only working as BBU, otherwise without any meaning Justice, and the accuracy in bit test is can effectively ensure that using the reading of above-mentioned parameter.
The embodiment of the present application provide the third storage system in BBU validity test device, be it is above-mentioned the first In storage system on the basis of BBU validity test device, in addition to following technical characteristic:
The judging unit is specifically used for the discharge current for obtaining the BBU, judges when the discharge current is negative value The BBU is effective, judges that the BBU is faulty during machine and system is delayed.
In this case, it is possible to increase the accuracy of judgement, only system do not delay machine when just can prove that BBU can be played Due effect.
The foregoing description of the disclosed embodiments, professional and technical personnel in the field are enable to realize or using the present invention. A variety of modifications to these embodiments will be apparent for those skilled in the art, as defined herein General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, it is of the invention The embodiments shown herein is not intended to be limited to, and is to fit to and principles disclosed herein and features of novelty phase one The most wide scope caused.

Claims (8)

1. a kind of BBU validity test method in storage system, it is characterised in that including:
With prefixed time interval, determine whether BBU is in place;
When the BBU is in place, stop PSU power supplies, be switched to BBU power supplies, continue preset time;
According to the detection of the discharge current to the BBU, judge whether the BBU is effective.
2. BBU validity test method in storage system according to claim 1, it is characterised in that the determination BBU Whether be in place:
By read trade name, sequence number and the compatible Warning Mark parameter of the BBU determine the BBU whether Position.
3. BBU validity test method in storage system according to claim 1, it is characterised in that described according to right The detection of the discharge current of the BBU, judges whether the BBU effectively includes:
The discharge current of the BBU is obtained, judges that the BBU is effective when the discharge current is negative value, and system is delayed during machine Judge that the BBU is faulty.
4. BBU validity test method in the storage system according to claim any one of 1-3, it is characterised in that institute The scope for stating prefixed time interval is more than seven days.
5. BBU validity test method in the storage system according to claim any one of 1-3, it is characterised in that institute The scope for stating preset time is 1 second to 5 seconds.
A kind of 6. BBU validity test device in storage system, it is characterised in that including:
Determining unit, for prefixed time interval, determining whether BBU is in place;
Switch unit, for when the BBU is in place, stopping PSU power supplies, BBU power supplies are switched to, continue preset time;
Judging unit, for the detection according to the discharge current to the BBU, judge whether the BBU is effective.
7. BBU validity test device in storage system according to claim 6, it is characterised in that described to determine list Member is specifically used for by reading trade name, sequence number and the compatible Warning Mark parameter of the BBU It is no in place.
8. BBU validity test device in storage system according to claim 6, it is characterised in that described to judge list Member is specifically used for the discharge current for obtaining the BBU, judges that the BBU is effective when the discharge current is negative value, and system Delay machine when judge that the BBU is faulty.
CN201710656114.5A 2017-08-03 2017-08-03 Method and device for testing effectiveness of BBU in memory system Active CN107436414B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710656114.5A CN107436414B (en) 2017-08-03 2017-08-03 Method and device for testing effectiveness of BBU in memory system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710656114.5A CN107436414B (en) 2017-08-03 2017-08-03 Method and device for testing effectiveness of BBU in memory system

Publications (2)

Publication Number Publication Date
CN107436414A true CN107436414A (en) 2017-12-05
CN107436414B CN107436414B (en) 2020-06-16

Family

ID=60460377

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710656114.5A Active CN107436414B (en) 2017-08-03 2017-08-03 Method and device for testing effectiveness of BBU in memory system

Country Status (1)

Country Link
CN (1) CN107436414B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108152746A (en) * 2017-12-14 2018-06-12 郑州云海信息技术有限公司 A kind of method and system for detecting stand-by power supply group battery-active
CN109032320A (en) * 2018-07-26 2018-12-18 郑州云海信息技术有限公司 Battery back unit test method and relevant device
CN111312325A (en) * 2020-02-14 2020-06-19 苏州浪潮智能科技有限公司 BBU fault diagnosis method and device, electronic equipment and storage medium
CN113098123A (en) * 2021-03-26 2021-07-09 山东英信计算机技术有限公司 Power supply system and storage device
CN113311350A (en) * 2021-07-28 2021-08-27 苏州浪潮智能科技有限公司 BBU power supply online test device, method and server
CN113742276A (en) * 2021-08-26 2021-12-03 山东云海国创云计算装备产业创新中心有限公司 Memory device and connection device and method of BBU (base band Unit) of memory device

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1869727A (en) * 2005-05-24 2006-11-29 乐金电子(昆山)电脑有限公司 Method for testing voltage of stand-by battery
CN105048439A (en) * 2015-08-10 2015-11-11 福建星网锐捷网络有限公司 Power supply control method and device
CN105811487A (en) * 2014-12-31 2016-07-27 中兴通讯股份有限公司 Battery set, automatic capacity calibration learning method for battery set and automatic capacity calibration learning system
CN105912089A (en) * 2016-04-07 2016-08-31 浪潮电子信息产业股份有限公司 Battery redundancy method, device and system
CN106338690A (en) * 2016-08-25 2017-01-18 浪潮电子信息产业股份有限公司 Standby battery detection method, device and system and power supply method
CN106787154A (en) * 2017-02-24 2017-05-31 郑州云海信息技术有限公司 A kind of stand-by power source device
CN106785145A (en) * 2017-02-04 2017-05-31 郑州云海信息技术有限公司 A kind of battery BBU discharge and recharge detection methods based on Rack racks
CN106908738A (en) * 2017-04-13 2017-06-30 广东浪潮大数据研究有限公司 A kind of automatic testing method of SmartRack reserce cells

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1869727A (en) * 2005-05-24 2006-11-29 乐金电子(昆山)电脑有限公司 Method for testing voltage of stand-by battery
CN105811487A (en) * 2014-12-31 2016-07-27 中兴通讯股份有限公司 Battery set, automatic capacity calibration learning method for battery set and automatic capacity calibration learning system
CN105048439A (en) * 2015-08-10 2015-11-11 福建星网锐捷网络有限公司 Power supply control method and device
CN105912089A (en) * 2016-04-07 2016-08-31 浪潮电子信息产业股份有限公司 Battery redundancy method, device and system
CN106338690A (en) * 2016-08-25 2017-01-18 浪潮电子信息产业股份有限公司 Standby battery detection method, device and system and power supply method
CN106785145A (en) * 2017-02-04 2017-05-31 郑州云海信息技术有限公司 A kind of battery BBU discharge and recharge detection methods based on Rack racks
CN106787154A (en) * 2017-02-24 2017-05-31 郑州云海信息技术有限公司 A kind of stand-by power source device
CN106908738A (en) * 2017-04-13 2017-06-30 广东浪潮大数据研究有限公司 A kind of automatic testing method of SmartRack reserce cells

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张勇才: ""数据存储设备中锂电池管理与监控***的研究"", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108152746A (en) * 2017-12-14 2018-06-12 郑州云海信息技术有限公司 A kind of method and system for detecting stand-by power supply group battery-active
CN109032320A (en) * 2018-07-26 2018-12-18 郑州云海信息技术有限公司 Battery back unit test method and relevant device
CN109032320B (en) * 2018-07-26 2022-04-22 郑州云海信息技术有限公司 Battery backup unit testing method and related equipment
CN111312325A (en) * 2020-02-14 2020-06-19 苏州浪潮智能科技有限公司 BBU fault diagnosis method and device, electronic equipment and storage medium
WO2021159710A1 (en) * 2020-02-14 2021-08-19 苏州浪潮智能科技有限公司 Bbu fault diagnosis method and apparatus, electronic device, and storage medium
CN111312325B (en) * 2020-02-14 2021-10-15 苏州浪潮智能科技有限公司 BBU fault diagnosis method and device, electronic equipment and storage medium
CN113098123A (en) * 2021-03-26 2021-07-09 山东英信计算机技术有限公司 Power supply system and storage device
CN113311350A (en) * 2021-07-28 2021-08-27 苏州浪潮智能科技有限公司 BBU power supply online test device, method and server
CN113742276A (en) * 2021-08-26 2021-12-03 山东云海国创云计算装备产业创新中心有限公司 Memory device and connection device and method of BBU (base band Unit) of memory device

Also Published As

Publication number Publication date
CN107436414B (en) 2020-06-16

Similar Documents

Publication Publication Date Title
CN107436414A (en) BBU validity test method and apparatus in a kind of storage system
CN104991629B (en) Power-fail detecting system and its method
CN109783262A (en) Fault data processing method, device, server and computer readable storage medium
CN103268277B (en) A kind of method and system of output journal information
CN103840432A (en) Motor stalling detection method and system
CN104932963B (en) The method and device of management terminal
CN107145410A (en) After a kind of system exception power down it is automatic on establish the method, system and equipment of machine by cable
EP2624140A1 (en) Method and system for detecting anomaly of network processor
CN110515802A (en) A kind of monitoring method, system and the associated component of server booting failure
CN100359864C (en) Method and apparatus of CPU fault detection for signal processing unit
CN108508874A (en) A kind of method and apparatus of monitoring equipment fault
CN104750567B (en) A kind of watchdog reset method based on FPGA
CN103207825A (en) Method and device for managing faults of entire equipment cabinet
WO2018040968A1 (en) Method and device for facilitating on-site failure tracing and identification of payment terminal
CN109389697A (en) Recording method, equipment and the readable storage medium storing program for executing of underground inspection data inputting time
CN109063473A (en) A kind of convenient household safety monitoring device and method based on computer network
CN103916272B (en) A kind of master control veneer and a kind of master control veneer fault detection method
CN106941434A (en) The detecting system and method for a kind of communication message
CN108802627B (en) Testing method, device and system for BBU independent power supply and readable storage medium
CN109271009A (en) A kind of method, apparatus that control server backboard powers on and CPLD
CN105224426A (en) Physical host fault detection method, device and empty machine management method, system
CN203366114U (en) Relay protection and secondary loop state on-line maintenance system based on SOA
CN209692807U (en) A kind of credible platform measurement guard system of data cell
CN1952904A (en) A testing method and system for timer in embedded system
CN100539716C (en) The method that a kind of main and standby boards is monitored and switched automatically

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20200521

Address after: 215100 No. 1 Guanpu Road, Guoxiang Street, Wuzhong Economic Development Zone, Suzhou City, Jiangsu Province

Applicant after: SUZHOU LANGCHAO INTELLIGENT TECHNOLOGY Co.,Ltd.

Address before: 450018 Henan province Zheng Dong New District of Zhengzhou City Xinyi Road No. 278 16 floor room 1601

Applicant before: ZHENGZHOU YUNHAI INFORMATION TECHNOLOGY Co.,Ltd.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant