CN107423868A - A kind of operation of power networks economy ideality evaluation index computational methods and device - Google Patents

A kind of operation of power networks economy ideality evaluation index computational methods and device Download PDF

Info

Publication number
CN107423868A
CN107423868A CN201710244650.4A CN201710244650A CN107423868A CN 107423868 A CN107423868 A CN 107423868A CN 201710244650 A CN201710244650 A CN 201710244650A CN 107423868 A CN107423868 A CN 107423868A
Authority
CN
China
Prior art keywords
economy
average
power
purchases strategies
power networks
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710244650.4A
Other languages
Chinese (zh)
Inventor
刘行健
郑全朝
张勇
廖兵兵
陈奖业
李培隆
梁启周
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhuhai Power Supply Bureau of Guangdong Power Grid Co Ltd
Original Assignee
Guangdong Yitaida Technology Development Co ltd
Zhuhai Power Supply Bureau of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Yitaida Technology Development Co ltd, Zhuhai Power Supply Bureau of Guangdong Power Grid Co Ltd filed Critical Guangdong Yitaida Technology Development Co ltd
Priority to CN201710244650.4A priority Critical patent/CN107423868A/en
Publication of CN107423868A publication Critical patent/CN107423868A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06393Score-carding, benchmarking or key performance indicator [KPI] analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Health & Medical Sciences (AREA)
  • Educational Administration (AREA)
  • Marketing (AREA)
  • Development Economics (AREA)
  • Theoretical Computer Science (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Public Health (AREA)
  • Primary Health Care (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The embodiments of the invention provide a kind of operation of power networks economy ideality evaluation index computational methods and device, the technical problem of management and running professional skill can not be really reflected for average purchases strategies index.Present invention method includes:Optimal load flow is carried out to each generating set according to operation of power networks data and calculates the generating curve for obtaining each generating set for meeting operation of power networks requirement based on the economy optimized operation position under power network actual operating data and under the economy optimized operation locality condition;The first average purchases strategies according to corresponding to the generating curve and default rate for incorporation into the power network calculate operation of power networks economy optimal location, the second average purchases strategies according to corresponding to the actual power generation of unit actual motion and the default rate for incorporation into the power network calculate power network actual motion;So as to calculate operation of power networks economy ideality evaluation index, management and running professional skill can be reflected exactly using operation of power networks economy ideality evaluation index.

Description

A kind of operation of power networks economy ideality evaluation index computational methods and device
Technical field
The present invention relates to power scheduling field, more particularly to a kind of operation of power networks economy ideality evaluation index calculating side Method and device.
Background technology
Rate for incorporation into the power network refers to the electric power and electricity of power network purchase electricity power enterprise, in electricity power enterprise's access main grid structure that point Measure price.Economy operation of power grid just refers to power network power supply cost rate is low or power generation energy resource consumption rate and the minimum bar of Network Loss Rate Run under part.Economy operation of power grid is exactly a very strong power-saving technology of practicality.This technology is to ensure technical security, warp Under the conditions of Ji are rational, existing equipment, element are made full use of, does not invest or has less investment, proved by correlation technique, Optimum operating mode, Load adjustment are chosen, improve power factor, adjustment or changes transformer, electric network reconstruction etc., it is identical transmitting On the basis of electricity, to reach reduction system loss, so as to reach the purpose increased economic efficiency.
For a long time, operation of power networks Economic Evaluation is mainly based upon the analysis of practical operation situation, selected index Predominantly be averaged purchases strategies.
But due to the index actually with power consumption, start-up mode close association, therefore can not really reflect scheduling fortune Row professional skill, business quality in other words can not be effectively embodied, it is not notable enough to lift effect to management and running business.Therefore, Average purchases strategies index can not really reflect that management and running professional skill is that the technology that those skilled in the art's needs solve is asked Topic.
The content of the invention
The embodiments of the invention provide a kind of operation of power networks economy ideality evaluation index computational methods and device, it is used for Average purchases strategies index can not really reflect the technical problem of management and running professional skill.
The embodiment of the present invention provides a kind of operation of power networks economy ideality evaluation index computational methods, including:
Optimal load flow calculating acquisition is carried out to each generating set according to operation of power networks data and is based on power network actual operating data Under economy optimized operation position and meet each of operation of power networks requirement under the economy optimized operation locality condition The generating curve of generating set;
Operation of power networks economy is calculated according to the generating curve and default rate for incorporation into the power network by average computation model The first average purchases strategies corresponding to optimal location, the actual power by average computation model according to unit actual motion Amount and the default rate for incorporation into the power network calculate the second average purchases strategies corresponding to power network actual motion;
It is preferable that operation of power networks economy is calculated according to the described first average purchases strategies and the second average purchases strategies Spend evaluation index.
Preferably, it is described that power network is calculated according to the generating curve and default rate for incorporation into the power network by average computation model The first average purchases strategies corresponding to performance driving economy optimal location specifically include:
The integration of ordinate instantaneous electric amount in the generating curve of each generating set to abscissa time value Unit i is obtained in economy optimized operation position generated energy Wi P
By average computation model according to unit i in economy optimized operation position generated energy Wi PWith default online electricity Valency ηiThe first average purchases strategies λ corresponding to operation of power networks economy optimal location is calculated with the first formulaP
First formula is:
Preferably, it is described to pass through actual power generation of the average computation model according to unit actual motion and default online The second average purchases strategies that electricity price calculates corresponding to power network actual motion are specially:
Actual power generation W by average computation model according to unit actual motioni RWith the default rate for incorporation into the power network ηiThe second average purchases strategies λ corresponding to power network actual motion is calculated with the second formulaR
Second formula is:
Wherein,
Preferably, it is described to calculate operation of power networks according to the described first average purchases strategies and the second average purchases strategies Economy ideality evaluation index is specially:
According to the described first average purchases strategies λPWith the described second average purchases strategies λRPower network fortune is calculated with the 3rd formula Row economy ideality evaluation index γ;
3rd formula is:
The embodiment of the present invention provides a kind of operation of power networks economy ideality evaluation index computing device, based on above-mentioned electricity Network operation economy ideality evaluation index computational methods are calculated, including:
Load flow calculation module, it is based on for carrying out optimal load flow calculating to each generating set according to operation of power networks data Economy optimized operation position under power network actual operating data and the satisfaction under the economy optimized operation locality condition The generating curve of each generating set of operation of power networks requirement;
Cost calculation module, based on by average computation model according to the generating curve and default rate for incorporation into the power network The first average purchases strategies corresponding to operation of power networks economy optimal location are calculated, it is real according to unit by average computation model The actual power generation of border operation and the default rate for incorporation into the power network calculate the second average power purchase corresponding to power network actual motion into This;
Index computing module, for calculating electricity according to the described first average purchases strategies and the second average purchases strategies Network operation economy ideality evaluation index.
Preferably, the cost calculation module includes:
First average purchases strategies computing unit, for according to the generating curve and being preset by average computation model Rate for incorporation into the power network calculate the first average purchases strategies corresponding to operation of power networks economy optimal location;
Second average purchases strategies computing unit, for the reality by average computation model according to unit actual motion Generated energy and the default rate for incorporation into the power network calculate the second average purchases strategies corresponding to power network actual motion.
Preferably, the described first average purchases strategies computing unit includes:
Generated energy obtains subelement, for the ordinate instantaneous electric amount in the generating curve according to each generating set Unit i is obtained in economy optimized operation position generated energy W to the integration of abscissa time valuei P
Preferably, the described first average purchases strategies computing unit also includes:
First average purchases strategies computation subunit, for by average computation model according to unit i in economy most Excellent running position generated energy Wi PWith default rate for incorporation into the power network ηiIt is right that operation of power networks economy optimal location institute is calculated with the first formula The the first average purchases strategies λ answeredP
Preferably, the described second average purchases strategies computing unit is additionally operable to real according to unit by average computation model The actual power generation W of border operationi RWith the default rate for incorporation into the power network ηiCalculated with the second formula corresponding to power network actual motion Second average purchases strategies λR
Preferably, the index computing module is additionally operable to according to the described first average purchases strategies λPIt is average with described second Purchases strategies λROperation of power networks economy ideality evaluation index γ is calculated with the 3rd formula.
As can be seen from the above technical solutions, the embodiment of the present invention has advantages below:
The embodiment of the present invention is based on by carrying out optimal load flow calculating to each generating set according to operation of power networks data Economy optimized operation position and the generating for each generating set for meeting operation of power networks requirement under power network actual operating data is bent Line;Operation of power networks economy is calculated according to the economy optimized operation position, the generating curve and default rate for incorporation into the power network The first average purchases strategies corresponding to optimal location, according to the actual power generation of unit actual motion and the default online Electricity price calculates the second average purchases strategies corresponding to power network actual motion;According to the described first average purchases strategies and described the Two average purchases strategies calculate operation of power networks economy ideality evaluation index, are referred to using the evaluation of operation of power networks economy ideality Mark can reflect management and running professional skill exactly, and management and running business can not really be reflected by solving average purchases strategies index Horizontal technical problem.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing There is the required accompanying drawing used in technology description to be briefly described, it should be apparent that, drawings in the following description are only this Some embodiments of invention, for those of ordinary skill in the art, without having to pay creative labor, may be used also To obtain other accompanying drawings according to these accompanying drawings.
Fig. 1 is one of a kind of operation of power networks economy ideality evaluation index computational methods provided in an embodiment of the present invention The schematic diagram of embodiment;
Fig. 2 is a kind of the another of operation of power networks economy ideality evaluation index computational methods provided in an embodiment of the present invention The schematic diagram of individual embodiment;
Fig. 3 is a kind of the another of operation of power networks economy ideality evaluation index computational methods provided in an embodiment of the present invention The schematic diagram of the application examples of individual embodiment.
Embodiment
The embodiments of the invention provide a kind of operation of power networks economy ideality evaluation index computational methods and device, it is used for Average purchases strategies index can not really reflect the technical problem of management and running professional skill.
To enable goal of the invention, feature, the advantage of the present invention more obvious and understandable, below in conjunction with the present invention Accompanying drawing in embodiment, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that disclosed below Embodiment be only part of the embodiment of the present invention, and not all embodiment.Based on the embodiment in the present invention, this area All other embodiment that those of ordinary skill is obtained under the premise of creative work is not made, belongs to protection of the present invention Scope.
A kind of referring to Fig. 1, operation of power networks economy ideality evaluation index computational methods provided in an embodiment of the present invention One embodiment, including:
101st, optimal load flow calculating acquisition is carried out to each generating set according to operation of power networks data and is based on power network actual motion Economy optimized operation position under data and meet operation of power networks requirement under the economy optimized operation locality condition Each generating set generating curve;
102nd, operation of power networks is calculated according to the generating curve and default rate for incorporation into the power network by average computation model to pass through The first average purchases strategies corresponding to Ji property optimal location, the reality by average computation model according to unit actual motion Generated energy and the default rate for incorporation into the power network calculate the second average purchases strategies corresponding to power network actual motion;
103rd, operation of power networks economy is calculated according to the described first average purchases strategies and the second average purchases strategies Ideality evaluation index.
Above is to a kind of operation of power networks economy ideality evaluation index computational methods provided in an embodiment of the present invention One embodiment is described in detail, and a kind of operation of power networks economy ideality provided in an embodiment of the present invention will be commented below Another embodiment of valency index calculating method is described in detail.
A kind of referring to Fig. 2, operation of power networks economy ideality evaluation index computational methods provided in an embodiment of the present invention Another embodiment, including:
201st, optimal load flow calculating acquisition is carried out to each generating set according to operation of power networks data and is based on power network actual motion Economy optimized operation position under data and meet operation of power networks requirement under the economy optimized operation locality condition Each generating set generating curve;
202nd, the ordinate instantaneous electric amount in the generating curve of each generating set is to abscissa time value Integration obtains unit i in economy optimized operation position generated energy Wi P
203rd, by average computation model according to unit i in economy optimized operation position generated energy Wi POn default Net electricity price ηiThe first average purchases strategies λ corresponding to operation of power networks economy optimal location is calculated with the first formulaP
204th, the actual power generation W by average computation model according to unit actual motioni RWith the default online Electricity price ηiThe second average purchases strategies λ corresponding to power network actual motion is calculated with the second formulaR
205th, according to the described first average purchases strategies λPWith the described second average purchases strategies λRElectricity is calculated with the 3rd formula Network operation economy ideality evaluation index γ;
First formula is:
Second formula is:
Wherein,
3rd formula is:
It should be noted that the generating curve in the embodiment of the present invention refers to using time value as abscissa, with each generating The generated energy corresponding with the corresponding time of unit is the curve of ordinate, according to this generating curve, can use the side of calculus Generated energy of each generating set in preset time period is calculated in method.
Average computation model can apply to the embodiment of the present invention and draw the first formula and the second formula, and this is mathematics Convention, it is common knowledge.
According to Load flow calculation can with the running position to power network, be the running position for including multiple dimensions, these operation In position, there is an optimal position make it that purchases strategies are minimum, turn into economy optimized operation position, with known normal Optimal load flow in knowledge is calculated and can obtained.
In economy optimized operation position, therefore the operational factor of each generating set is it has been determined that can draw each The generating curve of individual generating set.
In the power network of actual motion, actually each power purchase price is fixed, and is provided according to embodiments of the present invention Method can the multi-period optimal load flow based on actual operating data analyze, give possible best operation level, it is actual On delimit the upper limit of performance driving economy, by the contrast of power network practical operation situation and the situation, the quantization for being capable of science is real Border operation level, to instructing the horizontal lifting of management and running significant.
Above is to a kind of operation of power networks economy ideality evaluation index computational methods provided in an embodiment of the present invention Another embodiment is described in detail, below will be to a kind of operation of power networks economy ideality provided in an embodiment of the present invention One embodiment of evaluation index computing device is described in detail.
The embodiment of the present invention provides a kind of one embodiment of operation of power networks economy ideality evaluation index computing device, Calculated based on above-mentioned operation of power networks economy ideality evaluation index computational methods, including:
Load flow calculation module, it is based on for carrying out optimal load flow calculating to each generating set according to operation of power networks data Economy optimized operation position under power network actual operating data and meet power network under economy optimized operation locality condition The generating curve of each generating set of service requirement;
Cost calculation module, for calculating electricity according to generating curve and default rate for incorporation into the power network by average computation model The first average purchases strategies corresponding to network operation economy optimal location, by average computation model according to the actual fortune of unit Capable actual power generation and default rate for incorporation into the power network calculate the second average purchases strategies corresponding to power network actual motion;
Index computing module, for calculating operation of power networks warp according to the first average purchases strategies and the second average purchases strategies Ji property ideality evaluation index.
Cost calculation module includes:
First average purchases strategies computing unit, for by average computation model according to generating curve and default Net electricity price calculates the first average purchases strategies corresponding to operation of power networks economy optimal location;
Second average purchases strategies computing unit, for the reality by average computation model according to unit actual motion Generated energy and default rate for incorporation into the power network calculate the second average purchases strategies corresponding to power network actual motion.
First average purchases strategies computing unit includes:
Generated energy obtains subelement, for the ordinate instantaneous electric amount in the generating curve according to each generating set to horizontal stroke The integration of coordinate time value obtains unit i in economy optimized operation position generated energy Wi P
First average purchases strategies computing unit also includes:
First average purchases strategies computation subunit, for by average computation model according to unit i in economy most Excellent running position generated energy Wi PWith default rate for incorporation into the power network ηiIt is right that operation of power networks economy optimal location institute is calculated with the first formula The the first average purchases strategies λ answeredP
Second average purchases strategies computing unit is additionally operable to the reality by average computation model according to unit actual motion Border generated energy Wi RWith default rate for incorporation into the power network ηiWith the second formula calculate the second average power purchase corresponding to power network actual motion into This λR
Index computing module is additionally operable to according to the first average purchases strategies λPWith the second average purchases strategies λRWith the 3rd formula Calculate operation of power networks economy ideality evaluation index γ.
Above is to a kind of operation of power networks economy ideality evaluation index computing device provided in an embodiment of the present invention One embodiment is described in detail, and a kind of operation of power networks economy ideality provided in an embodiment of the present invention will be commented below The application examples of another embodiment of valency index calculating method is described in detail.
A kind of referring to Fig. 3, operation of power networks economy ideality evaluation index computational methods provided in an embodiment of the present invention The application examples of another embodiment include:
1st, power network actual operating data is counted, carries out multi-period optimal load flow calculating;
Required power network actual operating data includes:1. power network realized load curve, including system loading and each bus Load;2. power transmission and transforming equipment parameter, including transmission capacity, operation have a power failure the period;3. operation of power networks constrains, including profile constraints; 4. unit operation parameter, including fossil capacity, start-stop and climbing capacity, water power generating capacity and the cleaning such as water, wind-powered electricity generation, photovoltaic Power supply generating curve, and the rate for incorporation into the power network of each unit.
According to above-mentioned data message, whole day grid operating conditions can be done with multi-period optimal load flow and calculated, the calculating can In the case of being given at and meet power network actual motion requirement, the generating curve of each unit.
Special instruction, the model are operating analysis computation models common in network system analysis, herein no longer Repeat.
2nd, the average purchases strategies corresponding to operation of power networks economy optimal location are calculated;
Multi-period optimal load flow calculates, and gives based on the economy optimized operation position under power network actual operating data, The generating curve of each unit can be obtained accordingly, if unit i is W in economy optimized operation position generated energyi P, its rate for incorporation into the power network For ηi, then the average purchases strategies λ corresponding to operation of power networks economy optimal locationPFor:
In formula (1), N is the generating set number of units of the whole network.
3rd, power network practical operation situation and operation of power networks economy optimal location are contrasted, it is preferable to calculate operation of power networks economy Spend evaluation index.
If unit i generated energy in actual moving process is Wi R, then average purchases strategies corresponding to power network actual motion λRFor:
It is important to note that in operation of power networks economy optimized operation position and power network actual motion, should meetTherefore both average purchases strategies difference is mainly reflected in the difference on power energy allocation, and the difference is real Management and running level is just reflected on border.It is calculated as follows for this regulation operation of power networks economy ideality evaluation index γ:
A kind of operation of power networks economy ideality appraisal procedure provided in an embodiment of the present invention, with power network actual operating data Based on carry out optimal load flow optimization analysis, determine operation of power networks economy optimal location, by contrast practical operation situation and Operation of power networks economy optimal location, calculate operation of power networks economy ideality evaluation index.
Finally it should be noted that:Above step introduction is merely illustrative of the technical solution of the present invention rather than its limitations, Although the present invention is described in detail with reference to above-described embodiment, those of ordinary skills in the art should understand that:According to The embodiment of the present invention can so be modified or equivalent substitution, and appointing without departing from spirit and scope of the invention What modification or equivalent substitution, it all should cover among scope of the presently claimed invention.
It is apparent to those skilled in the art that for convenience and simplicity of description, the system of foregoing description, The specific work process of device and unit, the corresponding process in preceding method embodiment is may be referred to, will not be repeated here.
Described above, the above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although with reference to before Embodiment is stated the present invention is described in detail, it will be understood by those within the art that:It still can be to preceding State the technical scheme described in each embodiment to modify, or equivalent substitution is carried out to which part technical characteristic;And these Modification is replaced, and the essence of appropriate technical solution is departed from the spirit and scope of various embodiments of the present invention technical scheme.

Claims (10)

  1. A kind of 1. operation of power networks economy ideality evaluation index computational methods, it is characterised in that including:
    Optimal load flow is carried out to each generating set according to operation of power networks data and calculates acquisition based under power network actual operating data Economy optimized operation position and each generating for meeting operation of power networks requirement under the economy optimized operation locality condition The generating curve of unit;
    It is optimal according to the generating curve and default rate for incorporation into the power network calculating operation of power networks economy by average computation model The first average purchases strategies corresponding to position, by average computation model according to the actual power generation of unit actual motion and The default rate for incorporation into the power network calculates the second average purchases strategies corresponding to power network actual motion;
    Calculate operation of power networks economy ideality according to the described first average purchases strategies and the second average purchases strategies and comment Valency index.
  2. A kind of 2. operation of power networks economy ideality evaluation index computational methods according to claim 1, it is characterised in that It is described optimal according to the generating curve and default rate for incorporation into the power network calculating operation of power networks economy by average computation model The first average purchases strategies corresponding to position specifically include:
    Ordinate instantaneous electric amount in the generating curve of each generating set obtains to the integration of abscissa time value Unit i is in economy optimized operation position generated energy Wi P
    By average computation model according to unit i in economy optimized operation position generated energy Wi PWith default rate for incorporation into the power network ηi The first average purchases strategies λ corresponding to operation of power networks economy optimal location is calculated with the first formulaP
    First formula is:
    <mrow> <msup> <mi>&amp;lambda;</mi> <mi>P</mi> </msup> <mo>=</mo> <mfrac> <mrow> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>i</mi> <mo>=</mo> <mn>1</mn> </mrow> <mi>N</mi> </munderover> <msubsup> <mi>W</mi> <mi>i</mi> <mi>P</mi> </msubsup> <msub> <mi>&amp;eta;</mi> <mi>i</mi> </msub> </mrow> <mrow> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>i</mi> <mo>=</mo> <mn>1</mn> </mrow> <mi>N</mi> </munderover> <msubsup> <mi>W</mi> <mi>i</mi> <mi>P</mi> </msubsup> </mrow> </mfrac> <mo>.</mo> </mrow>
  3. A kind of 3. operation of power networks economy ideality evaluation index computational methods according to claim 2, it is characterised in that It is described that power network reality is calculated according to the actual power generation of unit actual motion and default rate for incorporation into the power network by average computation model Run the average purchases strategies of corresponding second in border:
    Actual power generation W by average computation model according to unit actual motioni RWith the default rate for incorporation into the power network ηiWith Second formula calculates the second average purchases strategies λ corresponding to power network actual motionR
    Second formula is:
    <mrow> <msup> <mi>&amp;lambda;</mi> <mi>R</mi> </msup> <mo>=</mo> <mfrac> <mrow> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>i</mi> <mo>=</mo> <mn>1</mn> </mrow> <mi>N</mi> </munderover> <msubsup> <mi>W</mi> <mi>i</mi> <mi>R</mi> </msubsup> <msub> <mi>&amp;eta;</mi> <mi>i</mi> </msub> </mrow> <mrow> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>i</mi> <mo>=</mo> <mn>1</mn> </mrow> <mi>N</mi> </munderover> <msubsup> <mi>W</mi> <mi>i</mi> <mi>R</mi> </msubsup> </mrow> </mfrac> </mrow>
    Wherein,
  4. A kind of 4. operation of power networks economy ideality evaluation index computational methods according to claim 1, it is characterised in that It is described to calculate operation of power networks economy ideality according to the described first average purchases strategies and the second average purchases strategies and comment Valency index is specially:
    According to the described first average purchases strategies λPWith the described second average purchases strategies λROperation of power networks warp is calculated with the 3rd formula Ji property ideality evaluation index γ;
    3rd formula is:
    <mrow> <mi>&amp;gamma;</mi> <mo>=</mo> <mfrac> <msup> <mi>&amp;lambda;</mi> <mi>P</mi> </msup> <msup> <mi>&amp;lambda;</mi> <mi>R</mi> </msup> </mfrac> <mo>&amp;times;</mo> <mn>100</mn> <mi>%</mi> <mo>.</mo> </mrow>
  5. A kind of 5. operation of power networks economy ideality evaluation index computing device, based on any one institute in such as Claims 1-4 The operation of power networks economy ideality evaluation index computational methods stated are calculated, it is characterised in that including:
    Load flow calculation module, power network is based on for carrying out optimal load flow calculating acquisition to each generating set according to operation of power networks data Economy optimized operation position under actual operating data and meet power network under the economy optimized operation locality condition The generating curve of each generating set of service requirement;
    Cost calculation module, for calculating electricity according to the generating curve and default rate for incorporation into the power network by average computation model The first average purchases strategies corresponding to network operation economy optimal location, by average computation model according to the actual fortune of unit Capable actual power generation and the default rate for incorporation into the power network calculate the second average purchases strategies corresponding to power network actual motion;
    Index computing module, for calculating power network fortune according to the described first average purchases strategies and the second average purchases strategies Row economy ideality evaluation index.
  6. A kind of 6. operation of power networks economy ideality evaluation index computing device according to claim 5, it is characterised in that The cost calculation module includes:
    First average purchases strategies computing unit, for by average computation model according to the generating curve and default Net electricity price calculates the first average purchases strategies corresponding to operation of power networks economy optimal location;
    Second average purchases strategies computing unit, for the actual power by average computation model according to unit actual motion Amount and the default rate for incorporation into the power network calculate the second average purchases strategies corresponding to power network actual motion.
  7. A kind of 7. operation of power networks economy ideality evaluation index computing device according to claim 6, it is characterised in that Described first average purchases strategies computing unit includes:
    Generated energy obtains subelement, for the ordinate instantaneous electric amount in the generating curve according to each generating set to horizontal stroke The integration of coordinate time value obtains unit i in economy optimized operation position generated energy Wi P
  8. A kind of 8. operation of power networks economy ideality evaluation index computing device according to claim 6, it is characterised in that Described first average purchases strategies computing unit also includes:
    First average purchases strategies computation subunit, for by average computation model according to unit i in the optimal fortune of economy Line position puts generated energy Wi PWith default rate for incorporation into the power network ηiCalculated with the first formula corresponding to operation of power networks economy optimal location First average purchases strategies λP
  9. A kind of 9. operation of power networks economy ideality evaluation index computing device according to claim 6, it is characterised in that
    Described second average purchases strategies computing unit is additionally operable to the reality by average computation model according to unit actual motion Border generated energy Wi RWith the default rate for incorporation into the power network ηiThe second average purchase corresponding to power network actual motion is calculated with the second formula Electric cost λR
  10. 10. a kind of operation of power networks economy ideality evaluation index computing device according to claim 5, its feature exist In,
    The index computing module is additionally operable to according to the described first average purchases strategies λPWith the described second average purchases strategies λRWith 3rd formula calculates operation of power networks economy ideality evaluation index γ.
CN201710244650.4A 2017-04-14 2017-04-14 A kind of operation of power networks economy ideality evaluation index computational methods and device Pending CN107423868A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710244650.4A CN107423868A (en) 2017-04-14 2017-04-14 A kind of operation of power networks economy ideality evaluation index computational methods and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710244650.4A CN107423868A (en) 2017-04-14 2017-04-14 A kind of operation of power networks economy ideality evaluation index computational methods and device

Publications (1)

Publication Number Publication Date
CN107423868A true CN107423868A (en) 2017-12-01

Family

ID=60424186

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710244650.4A Pending CN107423868A (en) 2017-04-14 2017-04-14 A kind of operation of power networks economy ideality evaluation index computational methods and device

Country Status (1)

Country Link
CN (1) CN107423868A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110363443A (en) * 2019-07-19 2019-10-22 广东电网有限责任公司 The operation situation evaluation method and device of power spot market

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110363443A (en) * 2019-07-19 2019-10-22 广东电网有限责任公司 The operation situation evaluation method and device of power spot market

Similar Documents

Publication Publication Date Title
Wei et al. Economic dispatch savings in the coal-fired power sector: An empirical study of China
Jiang et al. Size optimization and economic analysis of a coupled wind-hydrogen system with curtailment decisions
CN106655246A (en) Method of solving robust two-layer optimization model based on wind power prediction and demand response
CN103839108B (en) Energy saving evaluation system and method for power supply and distribution network of industrial enterprise
CN106127342B (en) Cross-regional tie line transaction optimization method based on SCUC
CN103762589A (en) Method for optimizing new energy capacity ratio in layers in power grid
CN114511128A (en) Carbon emission data processing method and device, storage medium and processor
CN103578047B (en) A kind of electric power system source net load interaction control method
CN106780114A (en) Power network drop after the control of lotus net source coordination damages effect Comprehensive quantitative evaluation method
Yin et al. Long-term price guidance mechanism of flexible energy service providers based on stochastic differential methods
CN103440597A (en) Method for analyzing influence of renewable energy source grid connection on power grid economic operation
CN105226649B (en) One kind predicting improved provincial power network power generation dispatching optimization method based on bus load
CN104820948A (en) Comprehensive assessment method of economic benefit of power distribution network energy storage power station
CN103886514A (en) Power grid development assessment method with economical efficiency and security considered
CN107423868A (en) A kind of operation of power networks economy ideality evaluation index computational methods and device
Song et al. Enhancing envrionmental sustainability via interval optimization for low-carbon economic dispatch in renewable energy power systems: Leveraging the flexible cooperation of wind energy and carbon capture power plants
CN115796447A (en) Greenhouse gas emission reduction calculation method and system for operating virtual power plant
CN115293561A (en) Low-carbon planning method and device for power system considering carbon emission flow
CN111754076B (en) Method and equipment suitable for evaluating electric wholesale market mode
CN107220785A (en) Coordinate power transmission network safety and the reasonable operational efficiency evaluation method and system of development
Tang et al. Benefits allocation method for demand response in smart distribution network with high PV penetration
Chen et al. Coordinated siting and sizing for integrated energy system considering generalized energy storage
Na et al. Coordination and optimization model of wind power grid integrated system considering demand response
CN106602603A (en) Microgrid interaction system and microgrid interaction method in energy Internet environment
CN105811459A (en) Optimized division method for direct-current outgoing wind power base balance regional grid

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20200617

Address after: 519000, 296 Cui Xiang Road, Xiangzhou District, Guangdong, Zhuhai, Xiangzhou

Applicant after: ZHUHAI POWER SUPPLY BUREAU, GUANGDONG POWER GRID Co.,Ltd.

Address before: 519000, 296 Cui Xiang Road, Xiangzhou District, Guangdong, Zhuhai, Xiangzhou

Applicant before: ZHUHAI POWER SUPPLY BUREAU, GUANGDONG POWER GRID Co.,Ltd.

Applicant before: GUANGDONG YITAIDA TECHNOLOGY DEVELOPMENT Co.,Ltd.

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20171201