Prior art keywords
slopes
massif
bag
italic
barricade
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611114853.3A
Other languages
Chinese (zh)
Inventor
邓洪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qinghai Fu Teng Eco Science Technology Co Ltd
Original Assignee
Qinghai Fu Teng Eco Science Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qinghai Fu Teng Eco Science Technology Co Ltd filed Critical Qinghai Fu Teng Eco Science Technology Co Ltd
Priority to CN201611114853.3A priority Critical patent/CN107401180A/en
Publication of CN107401180A publication Critical patent/CN107401180A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G9/00Cultivation in receptacles, forcing-frames or greenhouses; Edging for beds, lawn or the like
    • A01G9/02Receptacles, e.g. flower-pots or boxes; Glasses for cultivating flowers

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Abstract

The invention discloses a kind of special equipment of the greening construction of roadside massif vertical retaining wall, including italic, barricade is fixedly connected with the top of italic, the side of barricade is installed with retaining ring, fixed cover is connected to steel bar column in retaining ring, and ecology bag is fixedly connected with italic, and the side of ecology bag is fixedly connected with junction button, junction button includes substrate, and spine is installed with substrate.The present invention is by setting retaining ring, cat ladder and pole-climbing, massif slope is cleared up first, make the gradient on massif slope more smooth, consequently facilitating the grappling terminal operation in later stage, then fixed steel bars post at the barricade at the top of italic is passed through, play a part of fixing ground in advance, then ecology bag is fixed in italic by steel bar column, so as to prevent the soil losses in italic, then the fixing connection buckle on ecology bag is passed through, so as to which ecology bag is fixed in italic, prevent ecology bag from being blown away by strong wind.

Description

The greening construction method and special equipment of a kind of roadside massif vertical retaining wall
Technical field
The present invention relates to hill afforestating technical field, specially a kind of greening construction side of roadside massif vertical retaining wall Method and special equipment.
Background technology
With the continuous enhancing of China's economic strength and the raising of people's environmental consciousness, the Protective strategy of ecological environment is got over Paid attention to get over.
Conventional greening technique in the range of the world today under general land occupation condition is more ripe and achieves good make Woods afforestation effect, but the afforestation technology under the conditions of Difficult site then lags far behind agricultural and the demand of ecological construction, Constantly accelerate with the process of urbanization, many places constantly carry out land development, arbitrarily excavate massif, and open circuit takes the shapes such as stone Into substantial amounts of exposed hill, original vegetation and landforms, some areas severe water and soil erosion are destroyed, ecological environment is progressively disliked Change, geological disaster takes place frequently, therefore strengthens the regulation and revegetation work to exposed hill, it has also become forestry and ecological construction work The most important thing of work, turn into an important content of various regions socio-economic development, for a long time, for various tired in global range Difficult afforestation technology on the spot has carried out substantial amounts of exploratory development.
A kind of artificial greening method of exposed hill as disclosed in China Patent No. is CN201110451366.7, the greening side Although method plants different plant trees for different massif soil environments, the work(of the ecological balance is reached to a certain extent Effect, but because exposed hill is generally wild environment, meagrely-populated, the greening method lacks at the grappling fastening to massif Reason, after firm planting plants trees seedling, such as runs into strong wind weather, easily seedling is uprooped by strong wind, whole so as to cause All that has been achieved is spoiled for individual greening work.
The content of the invention
(One)The technical problem of solution
In view of the shortcomings of the prior art, the invention provides a kind of greening construction method of roadside massif vertical retaining wall and specially With equipment, solve the problems, such as that existing hill afforestating method lacks grappling fastening processing.
(Two)Technical scheme
To achieve the above object, the present invention provides following technical scheme:A kind of greening construction of roadside massif vertical retaining wall Special equipment, including italic, be fixedly connected with barricade at the top of the italic, the side of the barricade is installed with locking Ring, fixed cover is connected to steel bar column in the retaining ring, ecology bag is fixedly connected with the italic, the side of the ecology bag is consolidated Surely junction button is connected with, the junction button includes substrate, spine is installed with the substrate, and the bottom of the substrate is fixed Ponding bag is installed, and ponding bag is between spine, the italic be divided into from top to bottom the first slopes, the second slopes, 3rd slopes and the 4th slopes.
A kind of greening construction method of roadside massif vertical retaining wall, its step are as follows:
S1, massif cleaning:Debris on massif slope is cleared up, metaphor weeds, shrub and rubble, weeds pass through mowing Machine is cleared up, and shrub is cut by electric saw, and rubble is cleared up by stone crusher, after cleaning, to recessed on slope Hole carries out processing of banketing, and slope then is carried out into overall leveling processing, makes the gradient on slope roughly the same with the massif entirety gradient;
S2, implantation steel bar column:After gradient leveling, length identical stainless steel rebar post is taken, steel bar column is moved at barricade, Steel bar column is spaced substantially equidistant on barricade, then steel bar column is fixed on barricade by retaining ring;
S3, implantation ecology bag:After steel bar column implantation, size and slope size identical ecology bag are cut, then by ecology bag Side alignd with the side of barricade, then be fixed on by retaining ring on steel bar column, so that ecology bag is fixed on the one of barricade Side;
S4, fixed ecology bag:After the completion for the treatment of that ecological pocket planting enters, to the top fixing connection buckle of ecology bag, first by junction button etc. Distance is sequentially arranged in the first slopes, the second slopes, the 3rd slopes and the 4th slopes, then according to from left to right from top to bottom Order successively by the spine insertion ecology bag on junction button, and spine is penetrated ecology bag and be plugged in massif slope;
S5, fluting:The ecology bag being implanted in the first slopes, the second slopes, the 3rd slopes and the 4th slopes is subjected to grooving, groove Mouth is circular, and a diameter of 50-80 centimetres of notch, and the distance between notch and notch are 100-150 centimetres, depth of rebate For 20-30 centimetres;
S6, notch plantation:Respectively vegetation is planted into the notch in the first slopes, the second slopes, the 3rd slopes and the 4th slopes Vegetable seeds, can plant Chinese rose, cloves, cercis, the goose palm seize, fiery spine, heronsbill pittosporum tobira, winged euonymus, oleander etc., plantation finishes Afterwards, watered, the irrigation amount of each notch is 800-1200 milliliters every time, waits after the completion of watering, Tu Chu is carried out back to notch Reason, makes the height of notch and ecology bag remain basically stable, then notch is carried out every 5-7 days to pour water process, continues 20-30 days to be Can.
Preferably, the retaining ring is locked by fastening bolt to steel bar column.
Preferably, the side of the italic is provided with cat ladder, and pole-climbing is installed with the cat ladder.
Preferably, the steel bar column can be transported steel bar column to barricade successively by using the method for artificial climbing cat ladder On, so as to avoid due to the defects of barricade is higher in construction, and scaffold is not easy to place.
Preferably, the ponding bag of the junction button bottom offers small opening, can drink up the rain, and a diameter of 5-8 of small opening Millimeter, can be by small opening by the soil of rain penetration to massif slope after ponding bag is collected into rainwater, and rainwater passes through infiltration It can be poured to the flowers, plants and trees in notch.
(Three)Beneficial effect
The invention provides a kind of greening construction method of roadside massif vertical retaining wall and special equipment.Possess following beneficial Effect:
(1), the present invention by setting retaining ring, steel bar column, ecology bag, junction button, bolt, cat ladder and pole-climbing, first to massif Slope is cleared up, and makes the gradient on massif slope more smooth, consequently facilitating the grappling terminal operation in later stage, then by oblique Fixed steel bars post at barricade at the top of body, play a part of fixing ground in advance, be then fixed on ecology bag by steel bar column In italic, so as to prevent the soil losses in italic, then by the fixing connection buckle on ecology bag, so as to give birth to State bag is fixed in italic, prevents ecology bag from being blown away by strong wind, and the ponding bag of junction button bottom offers small opening, can absorb rain Water, can be by small opening by the soil of rain penetration to massif slope after ponding bag is collected into rainwater, and rainwater can by infiltration To be poured to the flowers, plants and trees in notch.
(2), the present invention by setting the first slopes, the second slopes, the 3rd slopes and the 4th slopes, by by italic according to The difference of soil environment is divided into four pieces, and different plant trees are planted in four pieces of slopes, and different mountains is directed to so as to reach Body soil environment plants different plant trees, reaches the effect of the ecological balance, exposed hill can be made to recover ecology as early as possible flat Weighing apparatus.
Brief description of the drawings
Fig. 1 is schematic structural view of the invention;
Fig. 2 is connection fastener structure schematic diagram of the present invention.
In figure:1 italic, 2 barricades, 3 retaining rings, 4 steel bar columns, 5 ecology bags, 6 junction buttons, 61 substrates, 62 spines, 63 ponding Bag, 7 first slopes, 8 second slopes, 9 the 3rd slopes, 10 the 4th slopes, 11 fastening bolts, 12 cat ladders, 13 pole-climbings.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art are obtained every other under the premise of creative work is not made Embodiment, belong to the scope of protection of the invention.
As shown in Figure 1-2, the present invention provides a kind of technical scheme:A kind of greening construction of roadside massif vertical retaining wall Special equipment, including italic 1, the side of italic 1 be provided with cat ladder 12, pole-climbing 13 be installed with cat ladder 12, italic 1 Top is fixedly connected with barricade 2, and the side of barricade 2 is installed with retaining ring 3, and retaining ring 3 is by fastening bolt 11 to reinforcing bar Post 4 is locked, and fixed cover is connected to steel bar column 4 in retaining ring 3, and ecology bag 5, the side of ecology bag 5 are fixedly connected with italic 2 Junction button 6 is fixedly connected with, junction button 6 includes substrate 61, is installed with spine 62 in substrate 61, the bottom of substrate 61 is fixed Ponding bag 63 is installed, and ponding bag 63, between spine 62, italic 1 is divided into the first slopes 7, the second slope from top to bottom Body 8, the 3rd slopes 9 and the 4th slopes 10.
A kind of greening construction method of roadside massif vertical retaining wall, its step are as follows:
S1, massif cleaning:Debris on massif slope is cleared up, metaphor weeds, shrub and rubble, weeds pass through mowing Machine is cleared up, and shrub is cut by electric saw, and rubble is cleared up by stone crusher, after cleaning, to recessed on slope Hole carries out processing of banketing, and slope then is carried out into overall leveling processing, makes the gradient on slope roughly the same with the massif entirety gradient, Massif slope is cleared up first, makes the gradient on massif slope more smooth, consequently facilitating the grappling terminal operation in later stage;
S2, implantation steel bar column:After gradient leveling, length identical stainless steel rebar post is taken, steel bar column is moved to barricade 2 Place, steel bar column 4 can be transported steel bar column 4 to barricade 2 successively by using the method for artificial climbing cat ladder 12, so as to avoid Due to the defects of barricade is higher, and scaffold is not easy to place in construction, steel bar column 4 is spaced substantially equidistant on barricade 2, Ran Houtong Cross retaining ring 3 steel bar column 4 is fixed on barricade 2, then by the fixed steel bars post 4 at the barricade 2 at the top of italic 1, play The effect of fixed ground in advance;
S3, implantation ecology bag:After the implantation of steel bar column 4, size and slope size identical ecology bag 5 are cut, then by ecology The side of bag 5 is alignd with the side of barricade 2, then is fixed on by retaining ring 3 on steel bar column 4, so that ecology bag 5 is fixed on gear The side of wall 2, then ecology bag 5 is fixed in italic 1 by steel bar column 4, so as to prevent the soil stream in italic 1 Lose;
S4, fixed ecology bag 5:, first will connection to the top fixing connection buckle 6 of ecology bag 5 after the completion for the treatment of that ecology bag 5 is implanted into Button 6 is equidistantly arranged in the first slopes 7, the second slopes 8, the 3rd slopes 9 and the 4th slopes 10, then according to from a left side to Spine 62 on junction button 6 is inserted in ecology bag 5, and spine 62 is penetrated ecology bag 5 simultaneously by right order from top to bottom successively It is plugged in massif slope, the ponding bag 63 of the bottom of junction button 6 offers small opening, can drink up the rain, and a diameter of 5-8 of small opening Millimeter, can be by small opening by the soil of rain penetration to massif slope after ponding bag 63 is collected into rainwater, and rainwater is by oozing It can be poured thoroughly to the flowers, plants and trees in notch, then by the fixing connection buckle 6 on ecology bag 5, so as to give birth to State bag 5 is fixed in italic 1, prevents ecology bag 5 from being blown away by strong wind, and the ponding bag 63 of the bottom of junction button 6 offers small opening, can be with Drink up the rain, can be by small opening by the soil of rain penetration to massif slope after ponding bag 63 is collected into rainwater, rainwater leads to Crossing infiltration can be poured to the flowers, plants and trees in notch;
S5, fluting:The ecology bag 5 being implanted in the first slopes 7, the second slopes 8, the 3rd slopes 9 and the 4th slopes 10 is carried out Grooving, notch is circular, and a diameter of 50-80 centimetres of notch, and the distance between notch and notch are 100-150 centimetres, Depth of rebate is 20-30 centimetres;
S6, notch plantation:Planted respectively into the notch in the first slopes 7, the second slopes 8, the 3rd slopes 9 and the 4th slopes 10 Woody plant seed, can plant Chinese rose, cloves, cercis, the goose palm seize, fiery spine, heronsbill pittosporum tobira, winged euonymus, oleander etc., plantation After, watered, the irrigation amount of each notch is 800-1200 milliliters every time, waits after the completion of watering, notch is returned Soil processing, makes the height of notch and ecology bag 5 remain basically stable, then notch was carried out in each 5-7 days pouring water process, continues 20- 30 days, by the way that italic 1 is divided into four pieces according to the difference of soil environment, and different plant trees is planted in four pieces of slopes Wood, the different plant trees of different massif soil environment plantations are directed to so as to reach, reaches the effect of the ecological balance, can make Exposed hill recovers the ecological balance as early as possible.
It should be noted that herein, such as first and second or the like relational terms are used merely to a reality Body or operation make a distinction with another entity or operation, and not necessarily require or imply and deposited between these entities or operation In any this actual relation or order.Moreover, term " comprising ", "comprising" or its any other variant are intended to Nonexcludability includes, so that process, method, article or equipment including a series of elements not only will including those Element, but also the other element including being not expressly set out, or it is this process, method, article or equipment also to include Intrinsic key element.In the absence of more restrictions, the key element limited by sentence "including a ...", it is not excluded that Other identical element also be present in process, method, article or equipment including the key element.
Although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of changes, modification can be carried out to these embodiments, replace without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (6)

1. a kind of special equipment of the greening construction of roadside massif vertical retaining wall, including italic (1), it is characterised in that:Institute State and barricade (2) is fixedly connected with the top of italic (1), the side of the barricade (2) is installed with retaining ring (3), the lock Tight ring (3) interior fixed cover is connected to steel bar column (4), and ecology bag (5) is fixedly connected with the italic (2), the ecology bag (5) Side is fixedly connected with junction button (6), and the junction button (6) includes substrate (61), point is installed with the substrate (61) Pierce (62), the bottom of the substrate (61) is installed with ponding bag (63), and ponding bag (63) is located between spine (62), institute State italic (1) and be divided into the first slopes (7), the second slopes (8), the 3rd slopes (9) and the 4th slopes (10) from top to bottom.
2. a kind of special equipment of the greening construction of roadside massif vertical retaining wall according to claim 1, its feature It is:The retaining ring (3) is locked by fastening bolt (11) to steel bar column (4).
3. a kind of special equipment of the greening construction of roadside massif vertical retaining wall according to claim 1, its feature It is:The side of the italic (1) is provided with cat ladder (12), and pole-climbing (13) is installed with the cat ladder (12).
A kind of 4. greening construction method of roadside massif vertical retaining wall, it is characterised in that its step is as follows:
S1, massif cleaning:Debris on massif slope is cleared up, metaphor weeds, shrub and rubble, weeds pass through mowing Machine is cleared up, and shrub is cut by electric saw, and rubble is cleared up by stone crusher, after cleaning, to recessed on slope Hole carries out processing of banketing, and slope then is carried out into overall leveling processing, makes the gradient on slope roughly the same with the massif entirety gradient;
S2, implantation steel bar column:After gradient leveling, length identical stainless steel rebar post is taken, steel bar column is moved to barricade (2) Place, steel bar column (4) is spaced substantially equidistant on barricade (2), steel bar column (4) then is fixed on into barricade (2) by retaining ring (3) On;
S3, implantation ecology bag:After steel bar column (4) implantation, size and slope size identical ecology bag (5) are cut, then will The side of ecology bag (5) is alignd with the side of barricade (2), then is fixed on by retaining ring (3) on steel bar column (4), so that raw State bag (5) is fixed on the side of barricade (2);
S4, fixed ecology bag (5):It is first to the top fixing connection buckle (6) of ecology bag (5) after the completion for the treatment of ecology bag (5) implantation Junction button (6) is equidistantly first arranged in the first slopes (7), the second slopes (8), the 3rd slopes (9) and the 4th slopes (10) on, the spine (62) on junction button (6) is then inserted into ecology bag (5) successively according to order from left to right from top to bottom It is interior, and spine (62) is penetrated ecology bag (5) and be plugged in massif slope;
S5, fluting:The ecology that will be implanted in the first slopes (7), the second slopes (8), the 3rd slopes (9) and the 4th slopes (10) Bag (5) carries out grooving, and notch is circular, and a diameter of 50-80 centimetres of notch, and the distance between notch and notch are 100- 150 centimetres, depth of rebate is 20-30 centimetres;
S6, notch plantation:Respectively to the groove in the first slopes (7), the second slopes (8), the 3rd slopes (9) and the 4th slopes (10) It is intraoral plantation woody plant seed, can plant Chinese rose, cloves, cercis, goose the palm seize, fiery spine, heronsbill pittosporum tobira, winged euonymus, folder bamboo Peach etc., after plantation, watered, the irrigation amount of each notch is 800-1200 milliliters every time, is waited after the completion of watering, to groove Mouth carries out back soil processing, the height of notch and ecology bag (5) is remained basically stable, then notch is carried out at watering every 5-7 days Reason, continue 20-30 days.
A kind of 5. greening construction method of roadside massif vertical retaining wall according to claim 4, it is characterised in that:Institute Stating steel bar column (4) can transport steel bar column (4) to barricade (2) successively by using the method for artificial climbing cat ladder (12), So as to avoid due to the defects of barricade is higher in construction, and scaffold is not easy to place.
A kind of 6. greening construction method of roadside massif vertical retaining wall according to claim 4, it is characterised in that:Institute The ponding bag (63) for stating junction button (6) bottom offers small opening, can drink up the rain, and a diameter of 5-8 millimeters of small opening, ponding bag (63), can be by small opening by the soil of rain penetration to massif slope after being collected into rainwater, rainwater can be given by infiltration Flowers, plants and trees in notch is poured.
CN201611114853.3A 2016-12-07 2016-12-07 The greening construction method and special equipment of a kind of roadside massif vertical retaining wall Pending CN107401180A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611114853.3A CN107401180A (en) 2016-12-07 2016-12-07 The greening construction method and special equipment of a kind of roadside massif vertical retaining wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611114853.3A CN107401180A (en) 2016-12-07 2016-12-07 The greening construction method and special equipment of a kind of roadside massif vertical retaining wall

Publications (1)

Publication Number Publication Date
CN107401180A true CN107401180A (en) 2017-11-28

Family

ID=60389608

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611114853.3A Pending CN107401180A (en) 2016-12-07 2016-12-07 The greening construction method and special equipment of a kind of roadside massif vertical retaining wall

Country Status (1)

Country Link
CN (1) CN107401180A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201132963Y (en) * 2007-12-05 2008-10-15 深圳市民泰绿景环保科技有限公司 Flexible ecological slope retaining wall structure
CN102204483A (en) * 2010-12-15 2011-10-05 张宇顺 Stable wall face three-dimensional greening structure and method
CN102888826A (en) * 2012-10-31 2013-01-23 重庆丹海实业有限公司 Hydro-fluctuation belt side slope ecological management method based on ecological bag
CN105178245A (en) * 2015-08-18 2015-12-23 水利部交通运输部国家能源局南京水利科学研究院 Large filling bag ecological embankment and revetment building method for river lake channel
US20160047108A1 (en) * 2010-07-30 2016-02-18 Alfreds & Alfreds, Inc. Retaining Wall Systems and Methods of Constructing Same
JP5913701B1 (en) * 2015-08-06 2016-04-27 前田工繊株式会社 Temporary dual-use main soil structure and its construction method
CN205530337U (en) * 2016-02-02 2016-08-31 广西进联德环保工程有限公司 Ecological retaining wall system
CN106149753A (en) * 2015-03-31 2016-11-23 芦彦 A kind of multi-functional retaining wall for hydraulic engineering

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201132963Y (en) * 2007-12-05 2008-10-15 深圳市民泰绿景环保科技有限公司 Flexible ecological slope retaining wall structure
US20160047108A1 (en) * 2010-07-30 2016-02-18 Alfreds & Alfreds, Inc. Retaining Wall Systems and Methods of Constructing Same
CN102204483A (en) * 2010-12-15 2011-10-05 张宇顺 Stable wall face three-dimensional greening structure and method
CN102888826A (en) * 2012-10-31 2013-01-23 重庆丹海实业有限公司 Hydro-fluctuation belt side slope ecological management method based on ecological bag
CN106149753A (en) * 2015-03-31 2016-11-23 芦彦 A kind of multi-functional retaining wall for hydraulic engineering
JP5913701B1 (en) * 2015-08-06 2016-04-27 前田工繊株式会社 Temporary dual-use main soil structure and its construction method
CN105178245A (en) * 2015-08-18 2015-12-23 水利部交通运输部国家能源局南京水利科学研究院 Large filling bag ecological embankment and revetment building method for river lake channel
CN205530337U (en) * 2016-02-02 2016-08-31 广西进联德环保工程有限公司 Ecological retaining wall system

Similar Documents

Publication Publication Date Title
US11591765B2 (en) Structure and method for three-dimensional restoration of slope soil in abandoned ion-absorbed rare earth mining area
Wang et al. Karst rocky desertification in southwestern China: geomorphology, landuse, impact and rehabilitation
Yang et al. Ecological restoration of highway slope by covering with straw-mat and seeding with grass–legume mixture
CN108124632B (en) greening method suitable for high and steep shale slope
Keever et al. Plant succession on exposed granite of rocky face mountain, Alexander County, North Carolina
CN105210494B (en) Loess steep slope is mixed to hand over Afforestation method
CN105075596A (en) Method for improving west Sichuan grassland desertification land by utilizing ecological vegetations
CN103340038A (en) Wide and narrow terrace field mixture slope surface soil preparation and forestation method
CN107027500B (en) Method for restoring land-tracking ecology
CN112219589B (en) Method for recovering vegetation on high and steep fissure development slope in northwest arid region
CN102392453A (en) Terrace bank construction method for changing slope farmland into level terrace in reservoir area of Three Gorges
CN110800414B (en) Terrain renovation method for natural recovery of Siberian larch in gold mining damaged area
CN103362135B (en) Fang Beng hilllock, protect water and soil net grass bank protection
CN105665439A (en) Practical method for farmland soil cadmium pollution remediationby planting Salix jiangsuensis J795
CN105625440A (en) Vegetation restoration method for rock slope and hard protection slope
CN104663344A (en) Mountain fruit growing method
Roose et al. Six rules for the rapid restoration of degraded lands: Synthesis of 17 case studies in tropical and Mediterranean climates
CN107737805A (en) A kind of ecological restoring method of zinc cadmium heavy-metal contaminated soil
CN107401180A (en) The greening construction method and special equipment of a kind of roadside massif vertical retaining wall
CN109565995A (en) A kind of method for recovering vegetation of dry valley engineering body excavation slope
CN211881394U (en) Newly-built three-dimensional multiple-effect planting structure in scattered living bamboo garden
CN111226674A (en) Newly-built scattered-growth bamboo garden three-dimensional multi-effect planting structure and construction method thereof
CN104612170B (en) A kind of nursing structure for heavy grade rock side-slope
Klyushin et al. The current state of boggy territories in the Meshchyora national park
CN102953387B (en) Ecological slope protection method suitable for earth-rock mountain areas

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20171128

RJ01 Rejection of invention patent application after publication