CN107394737B - 交流输电线路交叉穿越结构 - Google Patents
交流输电线路交叉穿越结构 Download PDFInfo
- Publication number
- CN107394737B CN107394737B CN201710723592.3A CN201710723592A CN107394737B CN 107394737 B CN107394737 B CN 107394737B CN 201710723592 A CN201710723592 A CN 201710723592A CN 107394737 B CN107394737 B CN 107394737B
- Authority
- CN
- China
- Prior art keywords
- followed successively
- mount point
- line
- anchor support
- route
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G7/00—Overhead installations of electric lines or cables
- H02G7/20—Spatial arrangements or dispositions of lines or cables on poles, posts or towers
Landscapes
- Suspension Of Electric Lines Or Cables (AREA)
- Electric Cable Installation (AREA)
Abstract
本发明涉及交流输电线路交叉穿越结构,包括同电压等级的第一线路和第二线路,所述第一线路和第二线路均为三相单回输电线;第一线路和第二线路走线路径交叉,位于线路交叉的区域,沿输电线路径依次设置有第一耐张塔、第二耐张塔和第三耐张塔,且均为双回路耐张杆塔,每个耐张杆塔左侧和右侧均设置有上、中、下三个挂载点,第一线路和第二线路的相线分别挂载在耐张塔上并交叉穿越。上述输电线路交叉穿越结构,两回线路的相线在耐张杆塔上按序变换位置,充分利用导线的弧垂特性和杆塔层间距离,保障安全距离,实现交叉穿越,无需高架跨越或入地下穿,可大幅减少占地,降低工程成本。
Description
技术领域
本发明涉及高压交流输电线设计、施工,具体的是,同电压等级的两条输电线路的交叉穿越结构。
背景技术
随着城市规模扩张,城区用电量也迅速增加,为满足用电需求,城区负荷中心建设的35kV~500kV电力变电站也越来越多。
由于城区建筑密集,城区内电力架空线路进出线通道也越来越拥挤,由此,不可避免的出现同电压等级电力的线路,相互交叉的情况。
现行的解决方案,可以是采用高塔架空跨越,但由城区居民区、商业区高度密集,要留出两回线路的架空走廊,往往需要大量拆迁,费用高昂,而且架空走廊的占地也造成城市土地资源浪费。
另一种解决方案是一条线路的电缆入地下穿,但其施工成本比架空跨越的方案高4~6倍,而且一旦电缆与热力、燃气、通讯等管网冲突,建设成本会成倍增加,而且留下安全隐患。
发明内容
本发明所要解决的技术问题是:提供一种交流输电线路交叉穿越结构,无需高架跨越或入地下穿,可实现同电压等级的三相单回交流输电线路的交叉穿越。
本发明解决其技术问题所采用的技术方案是:
交流输电线路交叉穿越结构,包括同电压等级的第一线路和第二线路,所述第一线路为三相单回输电线,且三相线分别为A1、B1、C1,第二线路为三相单回输电线,且三相线分别为A2、B2、C2;
所述第一线路和第二线路走线路径交叉,位于线路交叉的区域,沿输电线路径依次设置有第一耐张塔、第二耐张塔和第三耐张塔,且第一耐张塔、第二耐张塔和第三耐张塔均为双回路耐张杆塔,每个耐张杆塔左侧和右侧均设置有上、中、下三个挂载点,所述第一线路和第二线路的相线分别挂载在第一耐张塔、第二耐张塔和第三耐张塔上,且第一线路和第二线路在耐张杆塔上交叉穿越。
进一步的,所述第一线路和第二线路的相线的挂载点位如下:
A1的挂载点依次为左下、右中、右上;
B1的挂载点依次为左上、左上、右中;
C1的挂载点依次为左中、左中、右下;
A2的挂载点依次为右下、左下、左中;
B2的挂载点依次为右上、右上、左上;
C2的挂载点依次为右中、右下、左下;
或者相线的挂载点位如下:
A1的挂载点依次为左下、右下、右中;
B1的挂载点依次为左上、右上、右上;
C1的挂载点依次为左中、左下、右下;
A2的挂载点依次为右下、左中、左中;
B2的挂载点依次为右上、右中、左下;
C2的挂载点依次为右中、左上、左上;
或者相线的挂载点位如下:
A1的挂载点依次为左下、右下、右中;
B1的挂载点依次为左上、左上、右上;
C1的挂载点依次为左中、左下、右下;
A2的挂载点依次为右下、左中、左上;
B2的挂载点依次为右上、右上、左中;
C2的挂载点依次为右中、右中、左下;
或者相线的挂载点位如下:
A1的挂载点依次为左下、右中、右中;
B1的挂载点依次为左上、左中、右下;
C1的挂载点依次为左中、右上、右上;
A2的挂载点依次为右下、左下、左中;
B2的挂载点依次为右上、左上、左上;
C2的挂载点依次为右中、右下、左下。
进一步的,所述第一线路和第二线路为35kv~500kv交流输电线路,所述第一耐张塔、第二耐张塔和第三耐张塔为0~90°双回路终端耐张杆塔。
本发明的有益效果是:上述交流输电线路交叉穿越结构,使用三基双回路耐张杆塔,挂载两回输电线,耐张杆塔左、右侧分别具有上、中、下三个挂载点,两回线路的相线在耐张杆塔上按序变换位置,充分利用导线的弧垂特性和杆塔挂线横担层间距离,保障安全距离,实现交叉穿越,无需高架跨越或入地下穿,可大幅减少占地,降低工程成本。
附图说明
图1是本发明的输电线路交叉穿越结构一种实施例的示意图;
图2是本发明的输电线路交叉穿越结构第二种实施例的示意图;
图3是本发明的输电线路交叉穿越结构第三种实施例的示意图;
图4是本发明的输电线路交叉穿越结构第四种实施例的示意图;
图中附图标记为:第一耐张塔1、第二耐张塔2、第三耐张塔3。
具体实施方式
下面结合附图和实施例对本发明进一步说明:
交流输电线路交叉穿越结构,包括同电压等级的第一线路和第二线路,所述第一线路为三相单回输电线,且三相线分别为A1、B1、C1,第二线路为三相单回输电线,且三相线分别为A2、B2、C2;
所述第一线路和第二线路走线路径交叉,位于线路交叉的区域,沿输电线路径依次设置有第一耐张塔1、第二耐张塔2和第三耐张塔3,且第一耐张塔1、第二耐张塔2和第三耐张塔3均为双回路耐张杆塔,
每个耐张杆塔左侧和右侧均设置有上、中、下三个挂载点,所述第一线路和第二线路的相线分别挂载在第一耐张塔1、第二耐张塔2和第三耐张塔3上,且第一线路和第二线路在耐张杆塔上交叉穿越。
例如可以是第一线路和第二线路的相线的挂载点位如下:
A1的挂载点依次为左下、右中、右上;
B1的挂载点依次为左上、左上、右中;
C1的挂载点依次为左中、左中、右下;
A2的挂载点依次为右下、左下、左中;
B2的挂载点依次为右上、右上、左上;
C2的挂载点依次为右中、右下、左下。
即是按照图1所示视角,第一耐张塔1的A1、B1、C1所在侧为所有耐张杆塔的左侧,A2、B2、C2所在侧为所有耐张杆塔的右侧。
第一线路和第二线路均为交流输电线路,其三相线按照图1所示挂载,第一线路和第二线路分别挂载在第一耐张塔1、第二耐张塔2和第三耐张塔3上。
A1挂载点为左下、右中、右上,即是A1相线依次挂在第一耐张塔1的左侧下部挂载点,第二耐张塔2右侧中部挂载点,第三耐张塔3右侧上部挂载点,A1相线从左侧穿行到右侧。
A2挂载点为右下、左下、左中,即是A2相线依次挂在第一耐张塔1的右侧下部挂载点,第二耐张塔2左侧下部挂载点,第三耐张塔3左侧中部挂载点,A2相线从右侧穿行到左侧。
其他相线挂载方式如下,其含义与A1同理:
B1挂载点为左上、左上、右中;
C1挂载点为左中、左中、右下;
B2挂载点为右上、右上、左上;
C2挂载点为右中、右下、左下。
由此,如图1所示,第一线路和第二线路的三相线在三基耐张杆塔上分别实现交叉穿越,无需高架或下穿,可降低工程成本,节约用地。
显然的,与上述交叉穿越方式同理,还可以有多种挂线方式。
例如典型的可以是如图2所示的:
A1的挂载点依次为左下、右下、右中;
B1的挂载点依次为左上、右上、右上;
C1的挂载点依次为左中、左下、右下;
A2的挂载点依次为右下、左中、左中;
B2的挂载点依次为右上、右中、左下;
C2的挂载点依次为右中、左上、左上;
如图3所示的:
A1的挂载点依次为左下、右下、右中;
B1的挂载点依次为左上、左上、右上;
C1的挂载点依次为左中、左下、右下;
A2的挂载点依次为右下、左中、左上;
B2的挂载点依次为右上、右上、左中;
C2的挂载点依次为右中、右中、左下;
如图4所示的:
A1的挂载点依次为左下、右中、右中;
B1的挂载点依次为左上、左中、右下;
C1的挂载点依次为左中、右上、右上;
A2的挂载点依次为右下、左下、左中;
B2的挂载点依次为右上、左上、左上;
C2的挂载点依次为右中、右下、左下;
以上挂线方式均可实现两回输电线路在三基双回路耐张杆塔上交叉穿越。
本交叉穿越结构的第一耐张塔1、第二耐张塔2和第三耐张塔3优选的可以是0~90°双回路终端耐张杆塔,即每基耐张杆塔允许的输电线方向转角可以是0~90°,优选的,每基耐张杆塔的输电线方向转角因控制在20°以内。
此外,方案确定过程中需要按照行业标准,计算确认导线间安全距离是否合规,进而选择合适的塔型、档距并搭配适宜的导线型号。
例如计算过程可以是:
根据线路电压等级和工程情况,预选两款适合的导线型号;根据导线、地线自身参数,以及工程所在地的风速、覆冰、海拔等气象参数,计算确定耐张塔力学指标,确定塔型;根据风影函数,计算风偏交点位置;预设多个导线安全系数,根据气象参数、导线安全系数、塔型、导线参数等数据,计算导线弧垂、交点风偏抬高等数据;根据弧垂、交点风偏抬高等数据,计算交叉跨越导线,以及同档距相邻层间导线最小安全距离,并确认是否合规;从合规的计算结果中选择确定最终的工程方案,或者重新选择线型、塔型、档距等,再次验算。
Claims (3)
1.交流输电线路交叉穿越结构,包括同电压等级的第一线路和第二线路,所述第一线路为三相单回输电线,且三相线分别为A1、B1、C1,第二线路为三相单回输电线,且三相线分别为A2、B2、C2;
其特征在于,所述第一线路和第二线路走线路径交叉,位于线路交叉的区域,沿输电线路径依次设置有第一耐张塔(1)、第二耐张塔(2)和第三耐张塔(3),且第一耐张塔(1)、第二耐张塔(2)和第三耐张塔(3)均为双回路耐张杆塔,每个耐张杆塔左侧和右侧均设置有上、中、下三个挂载点,所述第一线路和第二线路的相线分别挂载在第一耐张塔(1)、第二耐张塔(2)和第三耐张塔(3)上,且第一线路和第二线路在耐张杆塔上交叉穿越。
2.如权利要求1所述的交流输电线路交叉穿越结构,其特征在于,所述第一线路和第二线路的相线的挂载点位如下:
A1的挂载点依次为左下、右中、右上;
B1的挂载点依次为左上、左上、右中;
C1的挂载点依次为左中、左中、右下;
A2的挂载点依次为右下、左下、左中;
B2的挂载点依次为右上、右上、左上;
C2的挂载点依次为右中、右下、左下;
或者相线的挂载点位如下:
A1的挂载点依次为左下、右下、右中;
B1的挂载点依次为左上、右上、右上;
C1的挂载点依次为左中、左下、右下;
A2的挂载点依次为右下、左中、左中;
B2的挂载点依次为右上、右中、左下;
C2的挂载点依次为右中、左上、左上;
或者相线的挂载点位如下:
A1的挂载点依次为左下、右下、右中;
B1的挂载点依次为左上、左上、右上;
C1的挂载点依次为左中、左下、右下;
A2的挂载点依次为右下、左中、左上;
B2的挂载点依次为右上、右上、左中;
C2的挂载点依次为右中、右中、左下;
或者相线的挂载点位如下:
A1的挂载点依次为左下、右中、右中;
B1的挂载点依次为左上、左中、右下;
C1的挂载点依次为左中、右上、右上;
A2的挂载点依次为右下、左下、左中;
B2的挂载点依次为右上、左上、左上;
C2的挂载点依次为右中、右下、左下。
3.如权利要求1所述的交流输电线路交叉穿越结构,其特征在于,所述第一线路和第二线路为35kv~500kv交流输电线路,所述第一耐张塔(1)、第二耐张塔(2)和第三耐张塔(3)为0~90°双回路终端耐张杆塔。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710723592.3A CN107394737B (zh) | 2017-08-22 | 2017-08-22 | 交流输电线路交叉穿越结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710723592.3A CN107394737B (zh) | 2017-08-22 | 2017-08-22 | 交流输电线路交叉穿越结构 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107394737A CN107394737A (zh) | 2017-11-24 |
CN107394737B true CN107394737B (zh) | 2018-12-28 |
Family
ID=60353829
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710723592.3A Active CN107394737B (zh) | 2017-08-22 | 2017-08-22 | 交流输电线路交叉穿越结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107394737B (zh) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109252732B (zh) * | 2018-10-24 | 2024-03-26 | 国网新疆电力有限公司建设分公司 | 一种双尖横担及输电塔 |
CN109208999B (zh) * | 2018-10-24 | 2023-09-29 | 国网新疆电力有限公司建设分公司 | 一种换位塔及换位方法 |
CN113945783A (zh) * | 2021-09-15 | 2022-01-18 | 国网内蒙古东部电力有限公司电力科学研究院 | 一种单回路干字型耐张塔塔头-跳线真型试验装置 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5777262A (en) * | 1996-07-26 | 1998-07-07 | Aep Energy Services, Inc. | Apparatus and method for increasing electrical clearances of energized conductors |
CN202094570U (zh) * | 2010-12-30 | 2011-12-28 | 国家电网公司 | 双回路换位塔 |
CN104201634A (zh) * | 2014-08-06 | 2014-12-10 | 王力 | 一种单回线路交叉开断方法 |
CN204590741U (zh) * | 2015-01-16 | 2015-08-26 | 成都城电电力工程设计有限公司 | 异形单回路换位塔 |
CN205583601U (zh) * | 2016-04-14 | 2016-09-14 | 中国能源建设集团山西省电力勘测设计院有限公司 | 双回路换位塔上用的铝管式跳线装置 |
-
2017
- 2017-08-22 CN CN201710723592.3A patent/CN107394737B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5777262A (en) * | 1996-07-26 | 1998-07-07 | Aep Energy Services, Inc. | Apparatus and method for increasing electrical clearances of energized conductors |
CN202094570U (zh) * | 2010-12-30 | 2011-12-28 | 国家电网公司 | 双回路换位塔 |
CN104201634A (zh) * | 2014-08-06 | 2014-12-10 | 王力 | 一种单回线路交叉开断方法 |
CN204590741U (zh) * | 2015-01-16 | 2015-08-26 | 成都城电电力工程设计有限公司 | 异形单回路换位塔 |
CN205583601U (zh) * | 2016-04-14 | 2016-09-14 | 中国能源建设集团山西省电力勘测设计院有限公司 | 双回路换位塔上用的铝管式跳线装置 |
Also Published As
Publication number | Publication date |
---|---|
CN107394737A (zh) | 2017-11-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104057842B (zh) | 一种电气化铁路同轴电缆供电*** | |
CN107394737B (zh) | 交流输电线路交叉穿越结构 | |
CN208796792U (zh) | 一种牵引-补偿变压器 | |
CN104091032A (zh) | 重冰区同塔双回路输电线路设计方法 | |
CN105762825B (zh) | 一种直流接地极***及互联的方法 | |
CN205577567U (zh) | 一种双回路双t接钢管杆 | |
Lennerhag | Power system model for resonance studies | |
CN208673836U (zh) | 一种补偿变压器 | |
CN105735731B (zh) | 一种双回路双t接钢管杆 | |
Arcia-Garibaldi et al. | Supergrids in Europe: Past studies and AC/DC transmission new approach | |
CN201307748Y (zh) | 重冰区三角排列双回路塔 | |
Kilter et al. | Modelling of high-speed electrical railway system for transmission network voltage quality analysis: Rail Baltic case study | |
Salimi | A new approach for compaction of HVDC transmission lines and the assessment of the electrical aspects | |
Shovkoplyas et al. | Ensuring reliable operation of electrical network during ice formation on extra high voltage transmission lines | |
CN201306034Y (zh) | 重冰区垂直排列双回路塔 | |
CN218117409U (zh) | ±400kV直流与220kV交流混合输电线路直线塔 | |
CN105990829B (zh) | 一种lcc-vsc混合直流电网测试模型 | |
Alwazah et al. | Solving Problem of Electric Power Shortage Using HVDC | |
Irechukwu et al. | Feasibility analysis of using SWER for Homboza village electrification | |
Gaikwad et al. | Design of integrated transmission and distribution net work for a Green Field smart city | |
CN208347419U (zh) | 一种新型三回输电线路铁塔 | |
Einstein et al. | 5 Design Considerations | |
Abu Al-Seba et al. | Hebron-Al Ezaria 161KV High Voltage Transmission Line Design of 1GW Power | |
Stevens | Design of the Celilo-Sylmar 800-kV dc line-BPA section | |
CN208363767U (zh) | 500kV单回路电缆终端塔 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20221117 Address after: 610000 No. 302, No. 33 Wuqing South Road, Wuhou District, Chengdu City, Sichuan Province Patentee after: SICHUAN ELECTRIC POWER DESIGN & CONSULTING Co.,Ltd. Patentee after: State Grid Sichuan Electric Power Company Construction Branch Address before: No. 1, 2 and 4, 7th floor, building 2, No. 27, Jiangxi street, Wuhou District, Chengdu, Sichuan 610041 Patentee before: SICHUAN ELECTRIC POWER DESIGN & CONSULTING Co.,Ltd. |
|
TR01 | Transfer of patent right |