CN107387878A - A kind of pipe clamp - Google Patents

A kind of pipe clamp Download PDF

Info

Publication number
CN107387878A
CN107387878A CN201710800533.1A CN201710800533A CN107387878A CN 107387878 A CN107387878 A CN 107387878A CN 201710800533 A CN201710800533 A CN 201710800533A CN 107387878 A CN107387878 A CN 107387878A
Authority
CN
China
Prior art keywords
pipe
nail
support post
admittedly
pipe clamp
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710800533.1A
Other languages
Chinese (zh)
Inventor
蒋川
杜文宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yibin Constant Technology Co Ltd
NANXI NANSHAN EQUIPMENT MANUFACTURING CO LTD
Original Assignee
Yibin Constant Technology Co Ltd
NANXI NANSHAN EQUIPMENT MANUFACTURING CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yibin Constant Technology Co Ltd, NANXI NANSHAN EQUIPMENT MANUFACTURING CO LTD filed Critical Yibin Constant Technology Co Ltd
Priority to CN201710800533.1A priority Critical patent/CN107387878A/en
Publication of CN107387878A publication Critical patent/CN107387878A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L3/00Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
    • F16L3/02Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets partly surrounding the pipes, cables or protective tubing

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Supports For Pipes And Cables (AREA)

Abstract

The invention discloses a kind of pipe clamp, belong to pipe installation technique for fixing field, including pipe carrier, follow closely the compression platform of support post and connection between admittedly, compressing platform has the seal face extended outside solid nail support post;Pipe carrier has pipe storage tank, admittedly nail support post offers the solid nail for leading to pipe storage tank;Admittedly the outer surface for following closely support post is provided with the broken layer wing.Pipe clamp structure is reasonable, admittedly the broken layer wing of nail support post makes it easily pass through radiating layer and heat-insulation layer, and it is quick and easy for installation, efficiency of construction is high, highly reliable, can greatly reduce construction cost, and be forever secured firmly to pipe clamp, laying layer, heat-insulation layer on concrete floor, water pipe is changed convenient.The pipe clamp of the present invention is applied to the nailed apparatus of various different dynamics.

Description

A kind of pipe clamp
Technical field
The present invention relates to pipe installation technique for fixing field, in particular to a kind of pipe clamp.
Background technology
At present, both at home and abroad in floor heating finishing water pipe fix it is more using the anti-staple bolt type pierced of band or by expanding screw nail type this Two ways.The country is using the anti-staple bolt type pierced of band as main flow, and which is as instrument carries staple mode by water pipe by one kind It is planted on heat-insulation layer.Due to having larger pressure and vibration when supplying water, for a long time in such circumstances, easily loosen bail, displacement, Cause installation reliability poor.And use swell fixture mode, then need to be punched with electric impact drill, then pipe clamp is fastened on into heat-insulation layer On.Not only low construction efficiency, cost of labor are high and also high to the technical requirements of operator for this mode.
The content of the invention
It is an object of the invention to provide a kind of pipe clamp, is imitated with solving above-mentioned easily loosening, construction existing for existing pipe clamp The problem of rate is low.
To realize the object of the invention, the technical scheme that uses for:A kind of pipe clamp, including pipe carrier, admittedly follow closely support post with And the compression platform of connection between, compressing platform has the seal face extended outside solid nail support post;Pipe carrier has There is pipe storage tank, admittedly nail support post offers the solid nail for leading to pipe storage tank;Admittedly the outer surface for following closely support post is provided with broken The layer wing.
Further, the pipe carrier, admittedly nail support post and compression platform are structure as a whole.
Further, it is provided with nailing in the solid nail.
Further, the upper end of the solid nail is provided with the head of a nail groove for accommodating the nailing head of a nail, Gu nail is and nailing nail rod The nail rod hole of adaptation.
Further, the broken layer wing is pointed away from the lateral edges for following closely support post admittedly.
Further, the broken layer wing is vertically arranged multiple.
Further, the broken layer wing from top to bottom inclines away from the lateral edges for following closely support post admittedly to solid nail support post Tiltedly.
Further, the broken layer wing is set in the outer surface circumference uniform intervals of solid nail support post.
Further, the support post of following closely admittedly is in inverted cone shape.
Further, it is connected with reinforcement between the pipe carrier and compression platform.
The invention has the advantages that pipe clamp structure is reasonable, admittedly the broken layer wing of nail support post makes it easily through radiation Layer and heat-insulation layer, quick and easy for installation, efficiency of construction is high, highly reliable, can greatly reduce construction cost, and by pipe clamp, laying Layer, heat-insulation layer are forever secured firmly on concrete floor, and water pipe is changed convenient.The pipe clamp of the present invention is applied to various different dynamics Nailed apparatus.
Brief description of the drawings
Fig. 1 is the sectional view of pipe clamp provided in an embodiment of the present invention;
Fig. 2 is Fig. 1 side view cutaway drawing;
Fig. 3 is sectional view at A-A in Fig. 1;
Fig. 4 is pipe clamp installation effect figure;
Fig. 5 is the sectional view for the pipe clamp that the another embodiment of invention provides;
Reference:1- pipe carriers, 2- follow closely support post admittedly, and 3- compresses platform, 4- seal faces, 5- pipe storage tanks, the solid nail of 6-, 7- breaks the layer wing, 8- nailings, 9- radiating layers, 10- heat-insulation layers, 11- concrete floors, 12- head of a nail grooves, 13- dowels, 14- water pipes.
Embodiment
The present invention is described in further detail below by specific examples of the implementation and with reference to accompanying drawing.
Fig. 1 to Fig. 5 shows pipe clamp provided by the invention, including pipe carrier 1, follows closely support post 2 admittedly and be connected to two Compression platform 3 between person, compressing platform 3 has the seal face 4 extended outside solid nail support post 2;Pipe carrier 1 has tube capacity Groove 5 is put, admittedly nail support post 2 offers the solid nail 6 for leading to pipe storage tank 5;Admittedly the outer surface for following closely support post 2 is provided with broken layer The wing 7.
The present invention work when, by pipe clamp be arranged on nailed apparatus nail pipe on, can be box hat nail shooting pill, integral plastic housing bullet, watt This gas either compressed air is power, under dynamic action, bar is made inside nailed apparatus and hits penetrating in pipe clamp rapidly Nail 8, is squeezed into concrete floor 11, seal face 4 is pressed on radiating layer 9, so as to reach that radiating layer 9, heat-insulation layer 10 is complete Portion is fastened on the purpose on concrete floor 11.Indoor ground-heating finishing is can be applied to fix using the installation of water pipe 14 of hot-water heating mode, Or the pipe installation of other situations is fixed.
Pipe carrier 1, admittedly nail support post 2 and compression platform 3 are structure as a whole, and are integrally formed.Gu it is provided with nailing in nail 6 8, you can pre-set nailing 8 with pipe clamp, nailing 8 is set into solid nail 6, it is not necessary to is additionally looked in installation adaptable Nailing 8.
Gu the upper end of nail 6 is provided with the head of a nail groove 12 for accommodating the nailing head of a nail, Gu nail is the nail rod being adapted to nailing nail rod Hole.Head of a nail groove 12 communicates in the bottom of pipe storage tank 5 with pipe storage tank 5.Head of a nail groove 12 is the through slot that both ends penetrate pipe clamp.
Gu nail 6 can also be up big and down small stepped hole, Fig. 5 is seen, large diameter hole is the head of a nail groove of the corresponding head of a nail of nailing 8, Diameter holes are the nail rod hole being adapted to the nail rod of nailing 8.The head of a nail of nailing 8 is included completely in head of a nail groove, do not interfere with the water of top The fixation of pipe 14.
The broken layer wing 7 is pointed away from the lateral edges for following closely support post 2 admittedly, sees Fig. 3, breaks the cross sectional dimensions of the layer wing 7 certainly Admittedly nail support post 2 outwards reduces, similar sword side is formed to be penetrated under the dynamic action of nailed apparatus.The broken layer wing 7 is vertical What is set is multiple, and the outer surface circumference uniform intervals for breaking the layer wing 7 in solid nail support post 2 are set, producing balanced forces and strong bonded In radiating layer 9 and heat-insulation layer 10.The broken layer wing 7 could be arranged to bar shaped.The broken layer wing 7 is away from the side for following closely support post 2 admittedly Edge from top to bottom tilts to solid nail support post 2, that is, is integrally formed that lower dimension is small, and upper dimension is big.Admittedly nail support post 2 is in Inverted cone shape, fixed beneficial to heat-insulation layer 10 is squeezed into.
Pipe carrier 1 is in the arc body shape with opening, and pipe storage tank 5 is the arc that angle of circumference is more than 180 °.Pipe carrier 1 Dowel 13 is connected between compression platform 3, strengthens pipe carrier 1 and compresses bonding strength between platform 3, increase pipe carrier 1 Stability of strutting system.Chamber is formed between dowel 13 and compression platform 3 and pipe carrier 1 are cylindrical in Fig. 1, reduces the arc of pipe carrier 1 The bending stress of both sides.
The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the invention, for the skill of this area For art personnel, there can be various modifications and variations in the spirit and principles in the present invention, these equivalent modifications or replacement etc., It is all contained within protection scope of the present invention.

Claims (10)

1. a kind of pipe clamp, it is characterised in that including pipe carrier, the compression of nail support post and connection between is put down admittedly Platform, compressing platform has the seal face extended outside solid nail support post;Pipe carrier has pipe storage tank, admittedly nail support post is opened Provided with the solid nail for leading to pipe storage tank;Admittedly the outer surface for following closely support post is provided with the broken layer wing.
2. pipe clamp according to claim 1, it is characterised in that the pipe carrier, admittedly nail support post and compression platform are Integrative-structure.
3. pipe clamp according to claim 1, it is characterised in that be provided with nailing in the solid nail.
4. pipe clamp according to claim 3, it is characterised in that the upper end of the solid nail is provided with the nail for accommodating the nailing head of a nail Clevis, Gu nail is the nail rod hole being adapted to nailing nail rod.
5. pipe clamp according to claim 1, it is characterised in that the broken layer wing is away from the lateral edges for following closely support post admittedly It is pointed.
6. pipe clamp according to claim 1, it is characterised in that the broken layer wing is vertically arranged multiple.
7. pipe clamp according to claim 6, it is characterised in that the broken layer wing is away from the lateral edges for following closely support post admittedly From top to bottom tilted to solid nail support post.
8. the pipe clamp according to claim 1 or 6, it is characterised in that the broken layer wing is in the outer surface of solid nail support post Circumferential uniform intervals are set.
9. pipe clamp according to claim 1, it is characterised in that the support post of following closely admittedly is in inverted cone shape.
10. pipe clamp according to claim 1, it is characterised in that be connected with reinforcement between the pipe carrier and compression platform Muscle.
CN201710800533.1A 2017-09-07 2017-09-07 A kind of pipe clamp Pending CN107387878A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710800533.1A CN107387878A (en) 2017-09-07 2017-09-07 A kind of pipe clamp

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710800533.1A CN107387878A (en) 2017-09-07 2017-09-07 A kind of pipe clamp

Publications (1)

Publication Number Publication Date
CN107387878A true CN107387878A (en) 2017-11-24

Family

ID=60349624

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710800533.1A Pending CN107387878A (en) 2017-09-07 2017-09-07 A kind of pipe clamp

Country Status (1)

Country Link
CN (1) CN107387878A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2529054Y (en) * 2002-02-01 2003-01-01 李继芳 Pipe hoop
CN2854273Y (en) * 2005-09-06 2007-01-03 骆光勤 Pipe clips with expansion sleeve
CN101893134A (en) * 2010-06-24 2010-11-24 重庆长安汽车股份有限公司 Pipe clamp for fixing water replenishing pipe of water storage bottle
CN202324193U (en) * 2011-11-14 2012-07-11 四川德阳市力协有限责任公司 Integral fastener of fuel gas shooting nail for building heat-insulation layer
CN202646277U (en) * 2012-05-30 2013-01-02 南溪南山设备制造有限公司 Heat preservation nail
CN204267890U (en) * 2014-11-26 2015-04-15 诸暨市峰泰管业有限公司 Duplex pipe clamp
CN205841991U (en) * 2016-07-21 2016-12-28 浙江伟星新型建材股份有限公司 The pipe clamp that a kind of pipeline suspended ceiling is installed
CN207161876U (en) * 2017-09-07 2018-03-30 南溪南山设备制造有限公司 A kind of pipe clamp

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2529054Y (en) * 2002-02-01 2003-01-01 李继芳 Pipe hoop
CN2854273Y (en) * 2005-09-06 2007-01-03 骆光勤 Pipe clips with expansion sleeve
CN101893134A (en) * 2010-06-24 2010-11-24 重庆长安汽车股份有限公司 Pipe clamp for fixing water replenishing pipe of water storage bottle
CN202324193U (en) * 2011-11-14 2012-07-11 四川德阳市力协有限责任公司 Integral fastener of fuel gas shooting nail for building heat-insulation layer
CN202646277U (en) * 2012-05-30 2013-01-02 南溪南山设备制造有限公司 Heat preservation nail
CN204267890U (en) * 2014-11-26 2015-04-15 诸暨市峰泰管业有限公司 Duplex pipe clamp
CN205841991U (en) * 2016-07-21 2016-12-28 浙江伟星新型建材股份有限公司 The pipe clamp that a kind of pipeline suspended ceiling is installed
CN207161876U (en) * 2017-09-07 2018-03-30 南溪南山设备制造有限公司 A kind of pipe clamp

Similar Documents

Publication Publication Date Title
CN207161876U (en) A kind of pipe clamp
CN105297704A (en) Device for reinforcing soft foundation through electroosmosis reinforced piles and construction method
CN106499360A (en) Coal mine underground hydraulic fracturing drilling and hole sealing device
CN105298520A (en) Mine support
CN107387878A (en) A kind of pipe clamp
CN207178405U (en) A kind of shock-absorbing type nailing
CN104372790A (en) Fiber reinforced composite material rib concrete drainage pipe pile
CN206319854U (en) Drilling and hole sealing device for coal mine
CN208236449U (en) A kind of shearing resistance pillar for anchor structure
CN203868082U (en) Adjusting screw
CN205776215U (en) Steel sheet pile inserted to play is with drawing hole instrument
CN103953058B (en) Coaxial steel cylinder basis
CN206034840U (en) Heat decorative integration plate's integrated configuration
CN210318835U (en) Pipe staple bolt
CN209384437U (en) A kind of heat preservation wall body for greenhouse
CN209780227U (en) Building template structure
CN203347163U (en) Anchoring nail for heat insulation plate
CN204081996U (en) A kind of quick inlet well equipment for roadway floor
CN215003227U (en) Carbon dioxide hole gas filling expansion cracking tube
CN211114450U (en) Metal roof fixing support with reinforced waterproof structure
CN218911678U (en) Compression-resistant anti-cracking sewage double-wall winding pipe
CN104295235B (en) A kind of quick inlet well equipment for roadway floor
CN212960388U (en) Ground soaks uranium mining mine drawing liquid drill way connecting device
CN219452121U (en) Rock burst tunnel supporting device
CN212717175U (en) Air compressor oil divides bucket

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20171124