CN107387102A - A kind of reconstruction shield machine of shield tunnel - Google Patents

A kind of reconstruction shield machine of shield tunnel Download PDF

Info

Publication number
CN107387102A
CN107387102A CN201710721401.XA CN201710721401A CN107387102A CN 107387102 A CN107387102 A CN 107387102A CN 201710721401 A CN201710721401 A CN 201710721401A CN 107387102 A CN107387102 A CN 107387102A
Authority
CN
China
Prior art keywords
shield
reconstruction
shield tunnel
shell
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710721401.XA
Other languages
Chinese (zh)
Other versions
CN107387102B (en
Inventor
黄大维
冯青松
刘为民
李明华
罗锟
龚凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
East China Jiaotong University
Original Assignee
East China Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by East China Jiaotong University filed Critical East China Jiaotong University
Priority to CN201710721401.XA priority Critical patent/CN107387102B/en
Publication of CN107387102A publication Critical patent/CN107387102A/en
Application granted granted Critical
Publication of CN107387102B publication Critical patent/CN107387102B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
    • E21D9/08Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining with additional boring or cutting means other than the conventional cutting edge of the shield

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention discloses a kind of reconstruction shield machine of shield tunnel, the shield machine of rebuilding includes the outer shield shell being coaxially disposed and interior shield shell;Annular soil cabin plastron is connected between the front end of the outer shield shell and the interior shield shell;The front of the annular soil cabin plastron is provided with annular cutterhead;The outer shield shell is internally provided with existing shield tunnel circularity correcting system and existing shield tunnel dismounting system.It is an advantage of the invention that; the shield tunnel that the reconstruction shield machine will successfully can be scrapped is removed; assemble new shield tunnel simultaneously; solve the problems, such as that existing shield tunnel is scrapped processing and is difficult to and new built shield tunnel locus; and the disturbance to stratum is reduced to greatest extent, tunnel surrounding environment and structures are protected to greatest extent.

Description

A kind of reconstruction shield machine of shield tunnel
Technical field
The invention belongs to Tunnel Engineering field, and in particular to a kind of reconstruction shield machine of shield tunnel.
Background technology
Shield tunnel has certain design life, and from the point of view of the shield tunnel runed, its badly broken, such as Malformation is excessive, the breakage of structure crack, corner angle, structural percolating water etc., seriously threaten the service life of shield tunnel.Cause This, the shield tunnel runed carries out the fact that reconstruction will be inevitable in the near future.If however, in existing shield The direct moulded lining in tunnel, from the point of view of design, the requirement of subway train gauge can not be met at all.It is if existing shield tunnel is straight Connect discarded, new built shield tunnel looks for another way, then after in the future unstability occurs for existing shield tunnel, will directly affect its earth's surface, week Closed structure thing etc., and Underground Space Resource does not also allow.Therefore, how to be removed existing close to the shield tunnel scrapped, How new built shield tunnel locus selects, and how new built shield tunnel is that Shield-bored tunnels field is inevitable Problem.And the space resources of existing shield tunnel is utilized, while existing shield tunnel is removed, then new shield is assembled again Structure tunnel is effective solution route of above mentioned problem.But have, existing shield machine can not meet above-mentioned function.
The content of the invention
According to the deficiencies of the prior art described above, It is an object of the present invention to provide a kind of reconstruction shield of shield tunnel Machine, the reconstruction shield machine new built shield tunnel of synchronous construction while existing tunnel is removed, efficiently solves existing tunnel The problem of being difficult to scrap processing, and new built shield tunnel space problem.
The object of the invention is realized and completed by following technical scheme:
A kind of reconstruction shield machine of shield tunnel, the shield machine of rebuilding include the outer shield shell being coaxially disposed and interior shield shell;Institute State outer shield shell front end and the interior shield shell between be connected with annular soil cabin plastron;The front of the annular soil cabin plastron is set It is equipped with annular cutterhead;The outer shield shell be internally provided with existing shield tunnel circularity correcting system and existing shield tunnel is torn open Except system.
It is annular Tu Cang between the native storehouse plastron of annular and the cutterhead, the back side of the annular soil cabin plastron is provided with Soil cabin deslagging device and the annular cutterhead driving device for driving the annular cutterhead to rotate.
The inner surface setting of the interior shield shell has anterior shield shell waterproof construction.
The front edge of the interior shield shell is provided with some directive wheels.
The existing shield tunnel circularity correcting system includes triatic stay and the correction disk being made up of some correction bars; The center for correcting disk is vertically set on the leading section of the triatic stay;Each correction bar is arranged radially, and is formed The correction disk;The first end for correcting bar connects the triatic stay.
Described to correct the expansion link that bar is hydraulic-driven, its second end is connected with guide wheel.
One end of the triatic stay is fixedly connected on the correcting system support inside the outer shield shell.
The triatic stay is coaxially disposed with the interior shield shell.
Some hydraulic tops towards the outer shield shell rear end that are internally provided with of the outer shield shell enter oil cylinder.
The internal diameter of the outer shield shell is more than the external diameter 15-30cm of new built shield tunnel.
It is an advantage of the invention that the shield tunnel that the reconstruction shield machine will successfully can be scrapped is removed, assemble simultaneously New shield tunnel, solve the problems, such as that existing shield tunnel is scrapped processing and is difficult to and new built shield tunnel locus, and it is maximum The disturbance to stratum is reduced to limit, protects tunnel surrounding environment and structures to greatest extent.
Brief description of the drawings
Fig. 1 is the sectional view of the reconstruction shield machine in the present invention;
Fig. 2 is the partial enlarged drawing in Fig. 1 at A in the present invention;
Fig. 3 is that the schematic diagram in the disk course of work is corrected in the present invention.
Embodiment
The feature of the present invention and other correlated characteristics are described in further detail by embodiment below in conjunction with accompanying drawing, with It is easy to the understanding of technical staff of the same trade:
Such as Fig. 1-3, mark 1-19 is respectively in figure:Rebuild shield machine 1, existing shield tunnel 2, outer shield shell 3, interior shield shell 4, annular Soil cabin plastron 5, annular cutterhead 6, existing shield tunnel remove system 7, existing shield tunnel circularity correcting system 8, newly-built shield Tunnel 9, triatic stay 10, correct bar 11, correct disk 12, correcting system support 13, guide wheel 14, annular cutterhead driving device 15, Soil cabin deslagging device 16, anterior shield shell waterproof construction 17, directive wheel 18, hydraulic top enter oil cylinder 19, the native storehouse 20 of annular.
Embodiment:As shown in figure 1, the present embodiment is specifically related to a kind of reconstruction shield machine of shield tunnel, the reconstruction shield Machine 1 includes the outer shield shell 3 of tubular and interior shield shell 4;Interior shield shell 4 is arranged on the inside of outer shield shell 3, and the two is coaxially disposed;Outside Annular soil cabin plastron 5 is connected between the front end of shield shell 3 and interior shield shell 4;It is provided with the front openings of annular soil cabin plastron 5 Annular cutterhead 6, it is the native storehouse 20 of annular between the native storehouse plastron 5 of annular and annular cutterhead 6;Outer shield shell 3 is internally provided with existing shield Structure tunnel circularity correcting system 8;Interior shield shell 4 is used for the outer surface for being set in existing shield tunnel 2, and existing shield tunnel removes system System 7 is used for the section of jurisdiction that existing shield tunnel 2 is removed in the jack-in process of shield machine 1 is rebuild.
As shown in Figure 1, 2, annular cutterhead 6 is looped around the outer surface of interior shield shell 4;The external diameter of annular cutterhead 6 and outer shield shell 3 Diameter is identical, and the back side of annular soil cabin plastron 5 is provided with annular cutterhead driving device 15;Annular cutterhead driving device 15 is used for Axis of the annular cutterhead 6 along outer shield shell 3 is driven to rotate;It can be cut in the annular rotation process of cutterhead 6 and rebuild the front of shield machine 1 The soil body;It is additionally provided with soil cabin deslagging device 16 at the back side of annular soil cabin plastron 5, the dregs in annular soil cabin 20 can pass through soil Cabin deslagging device 16 is discharged;The reconstruction shield machine 1 of the present embodiment can be balancing earth-pressure shielding machine, or mud and water balance shield Structure machine.
As shown in Figure 1, 2, in order to ensure the sealing between the inner surface of interior shield shell 4 and the outer surface of existing shield tunnel 2 Property;There is anterior shield shell waterproof construction 17 in the inner surface setting of interior shield shell 4;Anterior shield shell waterproof construction 17 and existing shield tunnel 2 Outer surface is brought into close contact, and the underground water and mud that can prevent from rebuilding the front of shield machine 1 enter the inside for rebuilding shield machine 1; Can smoothly it be slided along the outer surface of existing shield tunnel 2 in order to ensure rebuilding interior shield shell 4 in the jack-in process of shield machine 1, The front edge of interior shield shell 4 is provided with multiple directive wheels 18.
As shown in Figure 1,3, existing shield tunnel 2 experienced very long use process after building up, existing in the process It can be deformed in the presence of the external force such as the stratum differential settlement of shield tunnel 2, the section shape of the existing shield tunnel 2 after deformation The cross sectional shape of shape and interior shield shell 4 is inconsistent so that interior shield shell 4 can not be slided successfully along the outer surface of existing shield tunnel 2 It is dynamic;In order to solve this problem, the inside of the reconstruction shield machine 1 of the present embodiment is provided with existing shield tunnel circularity correcting system 8;Existing shield tunnel circularity correcting system 8 includes triatic stay 10 and the correction disk 12 being made up of more correction bars 11;Water The one end for supporting bar 10 is fixedly connected on correcting system support 13 internally;Triatic stay 10 is coaxially disposed with interior shield shell 4.
As shown in Figure 1,3, triatic stay 10 is vertically connected on the center for correcting disk 12;It is each to correct 11 radial row of bar Row, form and correct disk;Correct first end connection triatic stay 10 end of bar 11;The second end for correcting bar 11 is provided with guide wheel 14;Correct the expansion link that bar 11 is hydraulic-driven, each expansion link it is flexible can length it is identical, so as to form rounded correction Disk;Guide wheel 14 can allow the second end for correcting bar 11 in the jack-in process of shield machine 1 is rebuild along existing shield tunnel 2 Inner surface slide, reach the guiding of external shield shell 3.
As shown in Figure 1,3, the cross sectional shape of existing shield tunnel 2 is entered using existing shield tunnel circularity correcting system 8 During row is corrected, correction disk 12 is arranged on to the end of existing shield tunnel 2, corrects disk 12 and existing shield tunnel 2 Axis is vertical, and the second end of the correction bar 11 for correcting disk 12 is shored to the inner surface in existing shield tunnel 2;It is each by adjusting The flexible of bar 11 is corrected, the cross sectional shape for the existing shield tunnel 2 for correcting the position of disk 12 can be not only adjusted, can also pass through Attachment structure between tunnel duct piece so that the front and rear sides that the active force of correction corrects the position of disk 12 to adjustment are transmitted, from And zonal correction is carried out to the whole a range of existing shield tunnel 2 in front of correction disk 12 so that interior shield shell 4 can be suitable Freely slided along the outer surface of existing shield tunnel 2;In addition, correct disk 12 and may also function as supporting role, avoid existing The end of shield tunnel 2 caves in unloading process.
As shown in figure 1, some hydraulic tops towards rear end that are internally provided with of outer shield shell 3 enter oil cylinder 19;Rebuilding shield In the jack-in process of machine 1, continue the assembled new built shield tunnel 9 in rear end section of jurisdiction, the external diameter of new built shield tunnel 9 is slightly less than outer The internal diameter of shield shell 3;The internal diameter of outer shield shell 3 is more than the external diameter 15-30cm of new built shield tunnel 9.The external diameter ratio of new built shield tunnel 9 The big 1-2m of external diameter of existing shield tunnel 2,2 big 0.1-0.25m of section of jurisdiction thickness ratio existing shield tunnel;Pushed up rebuilding shield machine 1 During entering, hydraulic top enters oil cylinder 19 and shores section of jurisdiction leading edge in new built shield tunnel 9.
As shown in figure 1, the method that rebuilding tunnel is carried out using the reconstruction shield machine 1 of the present embodiment is comprised the following steps:
1)As shown in figure 1, shield machine 1 will be rebuild installed in the end of existing shield tunnel 2;The interior shield shell 4 of shield machine will be rebuild It is set in the outer surface of existing shield tunnel 2;
2)As shown in figure 1, rebuilding the jacking forward of shield machine 1, system is corrected using internal existing shield tunnel circularity before jacking The end of 8 pairs of existing shield tunnels 2 of system is corrected, and system is corrected because existing shield tunnel 2 obtains existing shield tunnel circularity The correction of system 8, therefore the outer surface of existing shield tunnel 2 that the directive wheel 18 rebuild on shield machine 1 can be along after being corrected Carry out guiding slip;After the completion of jacking, the end of the dismounting existing shield tunnel 2 of system 7 is removed using the existing shield tunnel of inside End, and the section of jurisdiction of the assembled new built shield tunnel 9 of afterbody in outer shield shell 3;The jack-in process of above-mentioned reconstruction shield machine 1 is repeated, directly Rebuild and complete to the existing shield tunnel.
The advantageous effects of the present embodiment are:The shield tunnel that the reconstruction shield machine will successfully can be scrapped is removed, New shield tunnel is assembled simultaneously, existing shield tunnel is solved and scraps that processing is difficult to and new built shield tunnel locus is asked Topic, and the disturbance to stratum is reduced to greatest extent, tunnel surrounding environment and structures are protected to greatest extent.

Claims (10)

  1. A kind of 1. reconstruction shield machine of shield tunnel, it is characterised in that it is described rebuild shield machine include the outer shield shell that is coaxially disposed with And interior shield shell;Annular soil cabin plastron is connected between the front end of the outer shield shell and the interior shield shell;The annular soil cabin The front of plastron is provided with annular cutterhead;The outer shield shell is internally provided with existing shield tunnel circularity correcting system and both There is shield tunnel to remove system.
  2. A kind of 2. reconstruction shield machine of shield tunnel according to claim 1, it is characterised in that the native storehouse plastron of annular It is annular Tu Cang between the cutterhead, the back side of the annular soil cabin plastron is provided with soil cabin deslagging device and for driving The annular cutterhead driving device that the annular cutterhead rotates.
  3. A kind of 3. reconstruction shield machine of shield tunnel according to claim 1, it is characterised in that the interior table of the interior shield shell Face is provided with anterior shield shell waterproof construction.
  4. A kind of 4. reconstruction shield machine of shield tunnel according to claim 1, it is characterised in that the front end of the interior shield shell Edge is provided with some directive wheels.
  5. A kind of 5. reconstruction shield machine of shield tunnel according to claim 1, it is characterised in that the existing shield tunnel Circularity correcting system includes triatic stay and the correction disk being made up of some correction bars;The center for correcting disk is vertically arranged In the leading section of the triatic stay;Each correction bar is arranged radially, and forms the correction disk;It is described to correct the of bar One end connects the triatic stay.
  6. 6. the reconstruction shield machine of a kind of shield tunnel according to claim 5, it is characterised in that the correction bar is hydraulic pressure The expansion link of driving, its second end are connected with guide wheel.
  7. A kind of 7. reconstruction shield machine of shield tunnel according to claim 5, it is characterised in that the one of the triatic stay End is fixedly connected on the correcting system support inside the outer shield shell.
  8. 8. the reconstruction shield machine of a kind of shield tunnel according to claim 5, it is characterised in that the triatic stay and institute Interior shield shell is stated to be coaxially disposed.
  9. A kind of 9. reconstruction shield machine of shield tunnel according to claim 1, it is characterised in that the inside of the outer shield shell It is provided with some hydraulic tops towards the outer shield shell rear end and enters oil cylinder.
  10. A kind of 10. reconstruction shield machine of shield tunnel according to claim 1, it is characterised in that the internal diameter of the outer shield shell More than the external diameter 15-30cm of new built shield tunnel.
CN201710721401.XA 2017-08-22 2017-08-22 Reconstruction shield machine for shield tunnel Active CN107387102B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710721401.XA CN107387102B (en) 2017-08-22 2017-08-22 Reconstruction shield machine for shield tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710721401.XA CN107387102B (en) 2017-08-22 2017-08-22 Reconstruction shield machine for shield tunnel

Publications (2)

Publication Number Publication Date
CN107387102A true CN107387102A (en) 2017-11-24
CN107387102B CN107387102B (en) 2023-11-14

Family

ID=60352714

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710721401.XA Active CN107387102B (en) 2017-08-22 2017-08-22 Reconstruction shield machine for shield tunnel

Country Status (1)

Country Link
CN (1) CN107387102B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108571322A (en) * 2018-05-16 2018-09-25 华东交通大学 A kind of shield machine ventral brush device and its replacing options

Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07173989A (en) * 1993-12-17 1995-07-11 Kawasaki Heavy Ind Ltd Shield machine
JPH07269272A (en) * 1994-03-30 1995-10-17 Daiho Constr Co Ltd Shield driving method for existing pipe removal and new piping construction
JPH08291691A (en) * 1995-04-20 1996-11-05 Tokyu Constr Co Ltd Shielding machine and method for reconstructing tunnel
JPH0988474A (en) * 1995-09-27 1997-03-31 Tokyo Met Gov Gesuido Service Kk Joint method of tunnel and shield excavator used therefor
JPH09132999A (en) * 1995-11-08 1997-05-20 Shiraishi:Kk Assembling construction method for segment covering and shield machine
JPH09133000A (en) * 1995-11-08 1997-05-20 Shiraishi:Kk Assembling construction method for segment covering and shield machine
JP2000226988A (en) * 1999-02-08 2000-08-15 Daiho Constr Co Ltd Shield driving machine and shield driving method
JP2001107699A (en) * 1999-10-12 2001-04-17 Kawasaki Heavy Ind Ltd Existing tunnel removing method and shield machine for use in removing existing tunnel
JP2003336485A (en) * 2002-05-17 2003-11-28 Maeda Corp Shield machine
JP2004003378A (en) * 2003-09-05 2004-01-08 Okumura Corp The propulsion method for shield machine
CN201300156Y (en) * 2008-11-25 2009-09-02 浙江省交通工程建设集团有限公司 Roundness corrector for steel casing
CN102200014A (en) * 2010-03-23 2011-09-28 同济大学 Earth pressure balance type annular shield machine
CN102305083A (en) * 2011-08-01 2012-01-04 北京市三一重机有限公司 Shield machine and anterior shield system thereof
CN102430657A (en) * 2012-01-12 2012-05-02 信阳市四通机械制造有限公司 Tube expander
CN103706670A (en) * 2013-12-12 2014-04-09 中铁十四局集团有限公司 Shield tail arc degree on-site correcting device of extra-large-diameter shield tunneling machine
CN105257310A (en) * 2015-11-04 2016-01-20 上海大学 Heading face advance protective type shield
CN207111097U (en) * 2017-08-22 2018-03-16 华东交通大学 A kind of reconstruction shield machine of shield tunnel

Patent Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07173989A (en) * 1993-12-17 1995-07-11 Kawasaki Heavy Ind Ltd Shield machine
JPH07269272A (en) * 1994-03-30 1995-10-17 Daiho Constr Co Ltd Shield driving method for existing pipe removal and new piping construction
JPH08291691A (en) * 1995-04-20 1996-11-05 Tokyu Constr Co Ltd Shielding machine and method for reconstructing tunnel
JPH0988474A (en) * 1995-09-27 1997-03-31 Tokyo Met Gov Gesuido Service Kk Joint method of tunnel and shield excavator used therefor
JPH09132999A (en) * 1995-11-08 1997-05-20 Shiraishi:Kk Assembling construction method for segment covering and shield machine
JPH09133000A (en) * 1995-11-08 1997-05-20 Shiraishi:Kk Assembling construction method for segment covering and shield machine
JP2000226988A (en) * 1999-02-08 2000-08-15 Daiho Constr Co Ltd Shield driving machine and shield driving method
JP2001107699A (en) * 1999-10-12 2001-04-17 Kawasaki Heavy Ind Ltd Existing tunnel removing method and shield machine for use in removing existing tunnel
JP2003336485A (en) * 2002-05-17 2003-11-28 Maeda Corp Shield machine
JP2004003378A (en) * 2003-09-05 2004-01-08 Okumura Corp The propulsion method for shield machine
CN201300156Y (en) * 2008-11-25 2009-09-02 浙江省交通工程建设集团有限公司 Roundness corrector for steel casing
CN102200014A (en) * 2010-03-23 2011-09-28 同济大学 Earth pressure balance type annular shield machine
CN102305083A (en) * 2011-08-01 2012-01-04 北京市三一重机有限公司 Shield machine and anterior shield system thereof
CN102430657A (en) * 2012-01-12 2012-05-02 信阳市四通机械制造有限公司 Tube expander
CN103706670A (en) * 2013-12-12 2014-04-09 中铁十四局集团有限公司 Shield tail arc degree on-site correcting device of extra-large-diameter shield tunneling machine
CN105257310A (en) * 2015-11-04 2016-01-20 上海大学 Heading face advance protective type shield
CN207111097U (en) * 2017-08-22 2018-03-16 华东交通大学 A kind of reconstruction shield machine of shield tunnel

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
黄涛: "浅谈地铁隧道盾构法施工技术", 《现代国企研究》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108571322A (en) * 2018-05-16 2018-09-25 华东交通大学 A kind of shield machine ventral brush device and its replacing options
CN108571322B (en) * 2018-05-16 2023-08-15 华东交通大学 Shield tunneling machine tail brush device and replacement method thereof

Also Published As

Publication number Publication date
CN107387102B (en) 2023-11-14

Similar Documents

Publication Publication Date Title
CN207111097U (en) A kind of reconstruction shield machine of shield tunnel
CN206987822U (en) A kind of anti-card machine TBM for possessing radial expansion shield body function
CN109973116A (en) A kind of tunnel segment structure and its construction method of the anti-floating of shield tunnel
CN204591286U (en) A kind of small curvature radius tunneling shield cardan shaft line traffic control mechanism
CN101963060A (en) Tunnel construction method based on steel tube arch-rib supporting structure
CN109915160A (en) Shield machine shield body
CN106150512A (en) A kind of shield receives with steel bushing counter-force car device
CN107387103A (en) A kind of reconstruction construction method of shield tunnel
CN105822329B (en) A kind of construction method of support bracket, supporting construction and supporting construction
CN107975383A (en) Underground chamber tee T intersection excavation supporting construction method
CN107387102A (en) A kind of reconstruction shield machine of shield tunnel
CN106761787A (en) The variable spoke type shield cutter in outline excavation face and its construction method
CN103321646A (en) Ground pass shield tunneling machine
CN112682061A (en) Tunnel structure and construction method
CN103742155B (en) A kind of long-span segment method for dismounting
CN201301714Y (en) Water-stopping device for procedure of exiting starting well or entering receiving well of tunneling machine tool
CN106499403A (en) A kind of small diameter central axle drives triumphant formula TBM
CN204298832U (en) Horizontal support structure in armored concrete donut framework in a kind of deep basal pit
CN105673034A (en) Split starting shield tunneling machine and temporary deslagging system
CN107288654A (en) Super-span dome hollow ring in underground nuclear reactor cavern excavates structure and excavation method
CN105065032B (en) Suitable for the large cross-section tunnel support system construction method of steep dip stratified rock masses
CN208815392U (en) A kind of trestle with rescue run channel
CN205714206U (en) A kind of isoplanar multi-cutter-disk rectangular tunnel boring machine for rich water cobblestone stratum
CN205676920U (en) Service sleeve structure removed by a kind of subway station concrete support rope saw
CN210637089U (en) Novel pipe shed structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant