CN107387056A - A kind of casing programme of the horizontal docking geothermal well of heat exchange type - Google Patents

A kind of casing programme of the horizontal docking geothermal well of heat exchange type Download PDF

Info

Publication number
CN107387056A
CN107387056A CN201710726447.0A CN201710726447A CN107387056A CN 107387056 A CN107387056 A CN 107387056A CN 201710726447 A CN201710726447 A CN 201710726447A CN 107387056 A CN107387056 A CN 107387056A
Authority
CN
China
Prior art keywords
well
horizontal
straight
eye
drives
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710726447.0A
Other languages
Chinese (zh)
Inventor
张晓宏
荀迎九
陈先虎
姬永涛
樊占龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Coalfield Geology Group Co Ltd
Original Assignee
Shaanxi Coalfield Geology Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi Coalfield Geology Group Co Ltd filed Critical Shaanxi Coalfield Geology Group Co Ltd
Priority to CN201710726447.0A priority Critical patent/CN107387056A/en
Publication of CN107387056A publication Critical patent/CN107387056A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/30Specific pattern of wells, e.g. optimising the spacing of wells
    • E21B43/305Specific pattern of wells, e.g. optimising the spacing of wells comprising at least one inclined or horizontal well
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices or the like
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B36/00Heating, cooling or insulating arrangements for boreholes or wells, e.g. for use in permafrost zones
    • E21B36/003Insulating arrangements
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24TGEOTHERMAL COLLECTORS; GEOTHERMAL SYSTEMS
    • F24T10/00Geothermal collectors
    • F24T10/10Geothermal collectors with circulation of working fluids through underground channels, the working fluids not coming into direct contact with the ground
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/10Geothermal energy

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Fluid Mechanics (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Physics & Mathematics (AREA)
  • Sustainable Development (AREA)
  • Sustainable Energy (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Earth Drilling (AREA)

Abstract

A kind of casing programme of the horizontal docking geothermal well of heat exchange type provided by the invention, horizontal engineering well shaft form U-typed pipeline with straight well pit shaft slitless connection, and by the use of pit shaft in itself as heat exchanger channels, section surface area is big, and amount of heat exchange water is big, and heat exchange amount is big;Solve the problems, such as existing mid-deep strata geothermal resource of hydrothermal type development scheme " both having taken heat or water intaking ", be truly realized the purpose of " only taking heat not fetch water ";Meanwhile the present invention only realizes heat exchange using cold and hot water circulation, groundwater abstraction, water conservation, while not polluted underground water, not green.

Description

A kind of casing programme of the horizontal docking geothermal well of heat exchange type
Technical field
The invention belongs to geothermal energy development technical field, is related to a kind of horizontal casing programme for docking geothermal well of heat exchange type.
Background technology
The domestic exploitation at present to 1500~3000m mid-deep strata geothermal resource of hydrothermal types has three kinds of modes:The first is to bore A bite straight well, therefrom direct extraction geothermal water, not recharge;Second is to bore a bite straight well as extraction well, and periphery bores more mouthfuls Straight well is combined as inverted well, extraction with recharge;The third is to bore a bite straight well, the tripping in concentric tube in well, using concentric Pipe is inside and outside to carry out cold and hot water circulation heat exchange.Problems be present in these three development schemes:1. all by aqueous heat reservori (sand layers) As target zone, aqueous heat reservori tripping in filter pipe completion (filter pipe by seamless steel cased bore-bole after stainless steel outer packed drainage Net composition), thus do not completely cut off between pit shaft and heat reservori, hydraulic connection be present;2. have and different degrees of directly or indirectly take out Underground water is taken, and excessive groundwater abstraction is easily caused surface subsidence aggravation, ground fissure activity increase;3. influenceed by formation properties, Recharge underground water less effective, it is difficult to reach and adopt filling balance, while the easy polluted underground water of recharge water;4. straight well concentric tube heat exchange by Casing programme size limits, and the concentric tube caliber of tripping in is smaller, and circulating water flow and heat exchange amount are smaller.In general, at present Development scheme can not reach or can not be fully achieved the purpose of " only taking heat not fetch water ".
The content of the invention
It is an object of the invention to provide a kind of casing programme of the horizontal docking geothermal well of heat exchange type, solves existing middle depth The problem of layer geothermal resource of hydrothermal type development scheme " both having taken heat or water intaking ", it is truly realized the purpose of " only taking heat not fetch water ".
In order to achieve the above object, the technical solution adopted by the present invention is:
A kind of casing programme of the horizontal docking geothermal well of heat exchange type provided by the invention, including straight well and horizontal engineering well, Straight well and horizontal engineering well dock in bottom to be connected, overall U-shaped structure.
Preferably, straight well including straight well one drives a well eye and straight well two drives a well eye, and the eye that drives a well of straight well one is opened in ground to steady Determine between clay layer or basement rock, straight well two drive a well eye be opened in straight well one drive a well eye shaft bottom into purpose heat reservori thickness be more than Between 6m any shale layer.
Preferably, the intraocular that drives a well of straight well one is provided with straight well one and drives sleeve pipe from the drive a well bottom of eye of ground to straight well one;
The intraocular that drives a well of straight well two is provided with straight well two and drives sleeve pipe from the drive a well bottom of eye of ground to straight well two, wherein, straight well Two open that sleeve pipe drives sleeve pipe including the first straight well two, the second straight well two drives sleeve pipe and glass reinforced plastic sleeve, and the first straight well two is driven sleeve pipe and set Put from ground to straight well and at horizontal engineering well docking port;Glass reinforced plastic sleeve is arranged on straight well and horizontal engineering well docking port Place;Second straight well two opens the bottom that sleeve pipe is arranged on from straight well and horizontal engineering well docking port to straight well two eye that drives a well.
Preferably, straight well one drives a well the borehole wall of eye and straight well one is opened and opens cementing concrete filled with straight well one between sleeve pipe;Directly It is filled between the bottom of well two opens that sleeve pipe drives sleeve pipe with straight well one respectively, straight well two drives a well a borehole wall and straight well two drives a well eye Straight well two opens cementing concrete.
Preferably, the first straight well two drives sleeve pipe and is enclosed with polyurethane foam heat insulation material, polyurethane close to the one end on ground Of length no more than straight well one of cellular insulant opens the length of sleeve pipe.
Preferably, horizontal engineering well including horizontal engineering well one drives a well eye and horizontal engineering well two drives a well eye, wherein, it is horizontal The eye that drives a well of engineering well one is opened in ground to stablizing between clay layer or basement rock, and horizontal engineering well two eye that drives a well is opened in horizontal work The drive a well bottoms of eye of Cheng Jingyi connect to shale layer and with the eye that drives a well of straight well two.
Preferably, horizontal engineering well two eye that drives a well includes vertical section, inclination section and horizontal segment, and is followed successively by from top to bottom vertical Straight section, inclination section and horizontal segment, bottom and the straight well two of horizontal segment drive a well eye and straight well two is driven sleeve pipe and is docked and connected.
Preferably, horizontal engineering well one intraocular that drives a well is provided with level from the drive a well bottom of eye of ground to horizontal engineering well one Engineering well one drives sleeve pipe;Horizontal engineering well two intraocular that drives a well is provided with level from the drive a well bottom of eye of ground to horizontal engineering well two Engineering well two drives sleeve pipe.
Preferably, horizontal engineering well one drive sleeve pipe and horizontal engineering well one drive a well eye the borehole wall between be filled with horizontal engineering Well one opens cementing concrete;Horizontal engineering well two opens that sleeve pipe and horizontal engineering well two drive a well the borehole wall of eye and horizontal engineering well one opens set Between pipe cementing concrete is opened filled with horizontal engineering well two.
Preferably, when straight well and horizontal engineering well are docked and connected in bottom, using glass reinforced plastic sleeve docking or cave pair Connect.
Compared with prior art, the beneficial effects of the invention are as follows:
A kind of casing programme of the horizontal docking geothermal well of heat exchange type provided by the invention, horizontal engineering well shaft and straight well well Cylinder slitless connection forms U-typed pipeline, and by the use of pit shaft in itself as heat exchanger channels, section surface area is big, and amount of heat exchange water is big, heat exchange Amount is big;Solve the problems, such as existing mid-deep strata geothermal resource of hydrothermal type development scheme " both having taken heat or water intaking ", be truly realized " only Take heat do not fetch water " purpose;Meanwhile the present invention only realizes heat exchange using cold and hot water circulation, groundwater abstraction, protection water do not provide Source, while not polluted underground water, it is green.
Further, the annular space between pit shaft and heat reservori all realizes cement sealing, while the point selection that will be docked and connected exists In shale layer, it ensure that pit shaft completely cuts off completely with aqueous heat reservori, pit shaft is inside and outside to be not present hydraulic connection.
Further, straight well two is opened cannula tip and wrapped up using insulation material, can effectively reduce in straight well pit shaft hot water with The heat exchange of low temperature formation, improve well head leaving water temperature.
Brief description of the drawings
Fig. 1 is casing programme schematic diagram;
Wherein, 1, the eye that drives a well that eye 2, straight well one drive sleeve pipe 3, straight well one opens cementing concrete 4, straight well two drives a well of straight well one 5a, the first straight well two open sleeve pipe 5b, the second straight well two is opened sleeve pipe 6, glass reinforced plastic sleeve 7, insulation material 8, straight well two and opened admittedly Well cement 9, horizontal engineering well one drive a well, and eye 10, horizontal engineering well one drive sleeve pipe 11, horizontal engineering well one opens cementing concrete 12nd, horizontal engineering well two drive a well eye 13, kickoff point (KOP) 14, landing point 15, be docked and connected a little 16, horizontal engineering well two drive sleeve pipe 17th, horizontal engineering well two opens cementing concrete.
Embodiment
The present invention is described in detail with reference to the accompanying drawings and detailed description.
To solve the above problems, first developing horizontally-butted wells for mid-deep strata geothermal resource of hydrothermal type, straight well is utilized Pit shaft after being docked and connected with horizontal engineering well forms U-typed pipeline, at the same using steel sleeve coordinate well cementing of cement and stratum every Absolutely, really realize and develop mid-deep strata geothermal resource of hydrothermal type in a manner of " only taking heat not fetch water ".
As shown in figure 1, the present invention provides a kind of casing programme of the horizontal docking geothermal well of heat exchange type, including straight well and level Engineering well, wherein, straight well and horizontal engineering well are docked in bottom and connected, overall U-shaped structure.
Wherein, straight well including straight well one drives a well eye 1 and straight well two drives a well eye 4, and the eye 1 that drives a well of straight well one is opened in ground to steady Determine between clay layer or basement rock, straight well two drive a well eye 4 be opened in straight well one drive a well eye 1 shaft bottom to some thickness of purpose heat reservori >Between 6m shale layer.
Straight well one drives a well and is provided with straight well one from the drive a well bottom of eye 1 of ground to straight well one and opens sleeve pipe 2, straight well one in eye 1 Driving sleeve pipe 2 includes the petroleum casing pipe that several external diameters are 339.7mm, wall thickness 9.65mm, material are J55 grade of steels, and oil set Pipe is connected through a screw thread between any two;Straight well one drives a well the borehole wall of eye 1 and straight well one open opened filled with straight well one between sleeve pipe 2 it is solid Well cement 3.
Straight well two drives a well and is provided with straight well two from the drive a well bottom of eye 4 of ground to straight well two and drives sleeve pipe in eye 4, wherein, directly Well two opens that sleeve pipe opens sleeve pipe 5a including the first straight well two, the second straight well two opens sleeve pipe 5b and glass reinforced plastic sleeve 6, and the first straight well two is opened Sleeve pipe 5a is arranged on from ground to straight well and at horizontal engineering well docking port;Glass reinforced plastic sleeve 6 is arranged on straight well and horizontal engineering Jing Duijiekouchu;Second straight well two, which is opened sleeve pipe 5b and is arranged on from straight well and horizontal engineering well docking port to straight well two, to drive a well eye 4 Bottom;First straight well two opens sleeve pipe 5a and glass reinforced plastic sleeve 6, the straight well two of glass reinforced plastic sleeve 6 and second are opened between sleeve pipe 5b It is connected through a screw thread.
Specifically, the first straight well two open sleeve pipe 5a and the second straight well two open sleeve pipe 5b structure it is identical, by least one The petroleum casing screw that external diameter is 177.8mm, wall thickness 8.05mm, material are J55 grade of steels is formed by connecting;Glass reinforced plastic sleeve 6 External diameter is 177.8mm, length 8m;Using the purpose of glass reinforced plastic sleeve, first, its shearing strength is weak compared with steel sleeve, it is easy to drilled Head drills;Second, itself does not have magnetic, also it is unaffected by the magnetic field, when being docked and connected, the measuring instrument of strong magnetic signal will be received In tripping in glass reinforced plastic sleeve, the rotation magnetic signal that strong magnetic joint is sent at drill bit can be uninterruptedly received, ensures connection docking Operation is smoothed out.
The bottom of straight well two opens that sleeve pipe drives sleeve pipe 2 with straight well one respectively, straight well two drives a well the borehole wall of eye 4 and straight well two drives a well eye 4 Cementing concrete 8 is opened between portion filled with straight well two;Meanwhile first straight well two open sleeve pipe 5a top (close to ground one end) Polyurethane foam heat insulation material 7 is enclosed with, of length no more than straight well one of polyurethane foam heat insulation material 7 opens the length of sleeve pipe 2.
Horizontal engineering well including horizontal engineering well one drives a well eye 9 and horizontal engineering well two drives a well eye 12, wherein, horizontal engineering The eye 9 that drives a well of well one is opened in ground to stablizing between clay layer or basement rock, and horizontal engineering well two eye 12 that drives a well is opened in horizontal work The drive a well bottoms of eye 9 of Cheng Jingyi connect to shale layer and with the eye 4 that drives a well of straight well two.
Wherein, horizontal engineering well one drives a well and the drive a well bottom of eye 9 of ground to horizontal engineering well one is provided with level in eye 9 Engineering well one drives sleeve pipe 10, horizontal engineering well one open sleeve pipe 10 by several external diameters be 244.5mm, wall thickness 8.94mm, material Petroleum casing pipe for J55 grade of steels is spliced;Meanwhile horizontal engineering well one is opened sleeve pipe 10 and horizontal engineering well one and driven a well eye 9 Between the borehole wall cementing concrete 11 is opened filled with horizontal engineering well one.
Horizontal engineering well two drives a well and the drive a well bottom of eye 12 of ground to horizontal engineering well two is provided with horizontal work in eye 12 Cheng Jing bis- drives sleeve pipe 16, horizontal engineering well two open sleeve pipe 16 by several external diameters be 139.7mm, wall thickness 7.72mm, material be The petroleum casing pipe of J55 grade of steels is spliced;It is (floating that the bottom that horizontal engineering well two drives sleeve pipe 16 is connected with drillable float collar, float shoe Hoop, float shoe prevent the annex of cement mortar adverse current to be arranged on sleeve bottom, during for cementing the well, and to be bored after well cementation logical to be formed Road), with being threadedly coupled between sleeve pipe and between sleeve pipe and drillable float collar float plug;
It is 177.8mm that straight well two, which opens sleeve outer, and it is 139.7mm that horizontal engineering well two, which opens sleeve outer, so that two wells connect After logical docking, horizontal engineering well two is opened sleeve pipe cross section and can be completely embedded among the longitudinal section that straight well two drives sleeve pipe, hydrous water Mud is cemented the well, and realization insulates completely with stratum, and pit shaft will not produce hydraulic connection with heat reservori.
Meanwhile horizontal engineering well two opens that sleeve pipe 16 and horizontal engineering well two drive a well the borehole wall of eye 12 and horizontal engineering well one is opened Between sleeve pipe 10 cementing concrete 17 is opened filled with horizontal engineering well two.
The present invention also provides a kind of construction method of the casing programme of the horizontal docking geothermal well of heat exchange type, including following step Suddenly:
The first step, since floor surface, perforate is carried out using a diameter of 444.5mm drill bit, drills topsoil and pine Layer is dissipated, until pierce in stable clay layer or below bedrock surface, straight well one is formed and drives a well eye 1;
Second step, driven a well in straight well one and straight well one is placed in eye 1 drive sleeve pipe 2;
3rd step, using conventional cementing technology to straight well one drive sleeve pipe 2 and straight well one drive a well eye 1 the borehole wall between fill it is straight Well one opens cementing concrete 3, until straight well one is opened cementing concrete 3 and returned to ground;
4th step, since straight well one drive a well eye 1 bottom, using a diameter of 241.3mm drill bit two open, until Pierce thickness in purpose heat reservori>Below 6m any shale layer, form straight well two and drive a well eye 4;
5th step, drive a well eye 4 in straight well two and straight well one is opened and straight well two is placed in sleeve pipe 2 drives sleeve pipe, while ensure straight well Two glass reinforced plastic sleeves 6 opened in sleeve pipe are placed in shale layer, and open sleeve pipe 5a top parcel polyurethane foam in the first straight well two Insulation material 7;
6th step, using dual density cement mortar it is disposable on return cementing technology and drive sleeve pipe to straight well two respectively and opened with straight well two Filling straight well two opens cementing concrete 8 between the borehole wall of well 4 and straight well one drive sleeve pipe 2, until straight well two is opened cementing concrete 8 and returned to ground Face;
7th step, since floor surface, perforate is carried out using a diameter of 311.1mm drill bit, drills topsoil and pine Layer is dissipated, until pierce in stable clay layer or below bedrock surface, the horizontal engineering well one of formation drives a well eye 9;
8th step, sleeve pipe 10 is driven in the horizontal engineering well one horizontal engineering well one of placement in eye 9 that drives a well;
9th step, to horizontal engineering well one sleeve pipe 10 is driven using conventional cementing technology and horizontal engineering well one drives a well eye 9 Fill level engineering well one opens cementing concrete 11 between the borehole wall, until horizontal engineering well one is opened cementing concrete 11 and returned to ground;
Tenth step, since horizontal engineering well one drive a well eye 9 bottom, using a diameter of 215.9mm drill bits two open, Wherein, crept into first with plumbness to kickoff point (KOP) 13, crept into landing point 14 (with the deflecting the boring rate of engineering design afterwards Land point well is horizontal), finally keep well horizontality to be drilled into and be docked and connected a little 15, realize and the fiberglass of straight well Sleeve pipe 6 is docked and connected (such as fiber glass reinforced plastic cover pipeline section has carried out drawing cave processing, then is docked and connected with cave).Wherein, kickoff point (KOP) 13rd, the position of landing point 14 is according to thickness in straight well purpose heat reservori>6m mud stone layer depth, straight well and horizontal engineering well well head The distance between and horizontal engineering well two open up meter deflecting the boring rate determine;
Horizontal engineering well two open make deflecting the boring rate can not be too small, if deflecting the boring rate<6 °/30m, then angle buildup interval is too It is long, too many horizontal displacement on the one hand has been consumed in landing point (14) position, landing point (14) and connectivity points may be caused (15) distance is less than 60m, it is difficult to which be docked and connected success;On the other hand, the working time of underground deflecting tool is also increased, is increased Add operating expenses;
Horizontal engineering well two drives a well a build angle rate can not be too big, if deflecting the boring rate>9 °/30m, inclination section well can be caused Eye curvature is too big, and increase down-hole equipment while also results in horizontal engineering well two and opens sleeve pipe tripping in and be stranded in the work risk of this section Difficulty, produce situation not in place under sleeve pipe.Therefore optimal well build angle rate is 6~9 °/30m, using 6~9 °/30m deflecting Rate, can make well keep excellent curvature, and the pressure of the drill that one side ground is transmitted loses smaller in inclination section, it is ensured that the pressure of the drill is suitable Profit is delivered at drill bit;On the other hand, injury of the drilling tool in well internal rotation to well and drilling tool in itself is smaller, ensure that well The safety of eye and down-hole equipment;
The horizontal exploitation standard of engineering well twoArc orbit.From the symmetry of circular arc, kickoff point (KOP) (13) is with connecting pair The vertical depth TVD of contact (15)15-TVD13With kickoff point (KOP) (13) and the horizontal displacement difference VS of landing point (14)14-VS13Equivalent be present Relation.Two optimal 6~9 °/30m of well build angle rate of exploitation, vertical depth and horizontal displacement caused by inclination section are 190~286m.
If the distance between two well well heads are d, during due to being docked and connected, at least between landing point (14) and connectivity points (15) 60m, thus have following relation:
If 250m≤d≤346m,:190≤TVD15-TVD13≤d-60;190≤VS14-VS13≤d-60
If d>346m, then:190≤TVD15-TVD13≤286;190≤VS14-VS13≤286;
11st step, drive a well eye 12 in horizontal engineering well two and horizontal engineering well one opens the horizontal engineering well of placement in sleeve pipe 10 Two drive sleeve pipe 16;
12nd step, using dual density cement mortar it is disposable on return cementing technology and open sleeve pipe 16 and water to horizontal engineering well two Flat engineering well two drive a well eye 12 and horizontal engineering well one drive sleeve pipe 10 between fill level engineering well two open cementing concrete 17, until Horizontal engineering well two is opened cementing concrete 17 and returned to ground;
When horizontal engineering well two opens well cementation, mud is filled in straight well pit shaft, straight well well head is provided with pressure control device, pressure Force control device is connected with pressure control device valve, during beginning, first closing presure control device valve, when horizontal engineering well well Cement mortar drives a well into horizontal engineering well two eye 12 from a little 15 positions that are docked and connected in cylinder and horizontal engineering well two is opened between sleeve pipe 16 Annular space when, open straight well pressure control device valve, with straight well pit shaft calculation of capacity, release more than 50m straight well pit shafts Interior mud, cement sealing is set to be docked and connected a little next section of straight well pit shaft on 15, to improve the cement sealing quality of the position;Well Annular space between cylinder and heat reservori all realizes cement sealing, while will be docked and connected point selection in shale layer, ensure that pit shaft Completely cut off completely with aqueous heat reservori, pit shaft is inside and outside to be not present hydraulic connection.
13rd step, horizontal engineering well two are opened after cementing concrete 17 reaches the cementing time, tripping in drilling tool in horizontal engineering well Residual cement and horizontal engineering well two open the casing hardware of the end of sleeve pipe 16 in cleaning pit shaft, until two well shafts communicate, straight well Residual cement in interior tripping in drilling tool cleaning pit shaft, until straight well artificial bottom of a well;
14th step, well-flushing is carried out to straight well and horizontal engineering well shaft, water sand removal is washed till and uses up.
When horizontal engineering well and straight well are docked and connected, it is docked and connected technique according to glass reinforced plastic sleeve, then fiber glass reinforced plastic cover Pipe 6 is placed in thickness>In 6m shale layers, hoop is terminated thereon and is higher by shale layer top circle 1m or so, is no longer separately dealt with;According to cave Be docked and connected technique, then glass reinforced plastic sleeve 6 is placed in thickness>In 6m shale layers, hoop is terminated thereon and is higher by shale layer top circle 1m or so, Straight well two is opened after cementing concrete reaches the cementing time, Special cutting tool under lower going-into-well in straight well pit shaft, from shale layer top circle with Start at lower 1.5~2m, cut open glass reinforced plastic sleeve 6 from top to bottom, form diameter 500mm, 2~3m of height cylindrical cave.
Casing programme in the present invention, developed mainly for 1500~3000m mid-deep stratas geothermal resource of hydrothermal type, its heat storage Layer temperature is generally 50~200 DEG C.The horizontal well drilling eye in this kind of heat reservori rock stratum, rock are influenceed caused by Low temperature drilling fluid Effect of expanding with heat and contract with cold is smaller, meanwhile, horizontal well two drives a well outside diameter that eye uses as 215.9mm, well in drilling process Stability is preferable, coordinates the technologies such as mud off, can guarantee that hole stability safety;Simultaneously as the horizontal engineering in the present invention The eye that drives a well of the two of well includes tilting section, and the structure is adapted to the area use of urban district Deng You places size limitation, also is adapted for Liang Jingjing Field locations of the mouth distance no more than 1500m use.

Claims (10)

  1. A kind of 1. casing programme of the horizontal docking geothermal well of heat exchange type, it is characterised in that:Including straight well and horizontal engineering well, straight well Dock and connect in bottom with horizontal engineering well, overall U-shaped structure.
  2. A kind of 2. casing programme of the horizontal docking geothermal well of heat exchange type according to claim 1, it is characterised in that:Straight well bag Include that straight well one drives a well eye (1) and straight well two drives a well eye (4), the eye (1) that drives a well of straight well one is opened in ground to stablizing clay layer or base Between rock, straight well two drive a well eye (4) be opened in straight well one drive a well eye (1) shaft bottom into purpose heat reservori thickness more than 6m appoint Between meaning shale layer.
  3. A kind of 3. casing programme of the horizontal docking geothermal well of heat exchange type according to claim 2, it is characterised in that:Straight well one Drive a well and be provided with straight well one from the drive a well bottom of eye (1) of ground to straight well one and drive sleeve pipe (2) in eye (1);
    Straight well two drives a well and is provided with straight well two from the drive a well bottom of eye (4) of ground to straight well two and drives sleeve pipe in eye (4), wherein, directly Well two opens that sleeve pipe drives sleeve pipe (5a) including the first straight well two, the second straight well two drives sleeve pipe (5b) and glass reinforced plastic sleeve (6), and first is straight Well two is driven sleeve pipe (5a) and is arranged on from ground to straight well and at horizontal engineering well docking port;Glass reinforced plastic sleeve (6) is arranged on straight well At horizontal engineering well docking port;Second straight well two open sleeve pipe (5b) be arranged on from straight well with horizontal engineering well docking port to straight Well two drives a well the bottoms of eye (4).
  4. A kind of 4. casing programme of the horizontal docking geothermal well of heat exchange type according to claim 3, it is characterised in that:Straight well one Drive a well the borehole wall of eye (1) and straight well one is opened and opens cementing concrete (3) filled with straight well one between sleeve pipe (2);Straight well two drives sleeve pipe point Sleeve pipe (2) is not driven with straight well one, between the bottom of straight well two drives a well eye (4) borehole wall and straight well two drives a well eye (4) filled with straight Well two opens cementing concrete (8).
  5. A kind of 5. casing programme of the horizontal docking geothermal well of heat exchange type according to claim 3, it is characterised in that:First is straight Well two drives sleeve pipe (5a) and is enclosed with polyurethane foam heat insulation material (7), polyurethane foam heat insulation material (7) close to the one end on ground Of length no more than straight well one open the length of sleeve pipe (2).
  6. A kind of 6. casing programme of the horizontal docking geothermal well of heat exchange type according to claim 1, it is characterised in that:Horizontal work Cheng Jing including horizontal engineering well one drives a well eye (9) and horizontal engineering well two drives a well eye (12), wherein, horizontal engineering well one drives a well eye (9) ground is opened in stablizing between clay layer or basement rock, and horizontal engineering well two eye (12) that drives a well is opened in horizontal engineering well one The drive a well bottom of eye (9) connects to shale layer and with the eye (4) that drives a well of straight well two.
  7. A kind of 7. casing programme of the horizontal docking geothermal well of heat exchange type according to claim 6, it is characterised in that:Horizontal work The eyes (12) that drive a well of Cheng Jing bis- include vertical section, inclination section and horizontal segment, and are followed successively by vertical section, inclination section and level from top to bottom Section, bottom and the straight well two of horizontal segment drive a well eye (4) and straight well two is driven sleeve pipe and is docked and connected.
  8. A kind of 8. casing programme of the horizontal docking geothermal well of heat exchange type according to claim 6, it is characterised in that:Horizontal work Cheng Jingyi drives a well and is provided with horizontal engineering well one from the drive a well bottom of eye (9) of ground to horizontal engineering well one and drives sleeve pipe in eye (9) (10);Horizontal engineering well two drives a well and the drive a well bottom of eye (12) of ground to horizontal engineering well two is provided with horizontal work in eye (12) Cheng Jing bis- drives sleeve pipe (16).
  9. A kind of 9. casing programme of the horizontal docking geothermal well of heat exchange type according to claim 8, it is characterised in that:Horizontal work Between the borehole wall of Cheng Jingyi drives sleeve pipe (10) and horizontal engineering well one drives a well eye (9) cementing concrete is opened filled with horizontal engineering well one (11);Horizontal engineering well two opens that sleeve pipe (16) and horizontal engineering well two drive a well the borehole wall of eye (12) and horizontal engineering well one drives sleeve pipe (10) cementing concrete (17) is opened between filled with horizontal engineering well two.
  10. 10. a kind of casing programme of the horizontal docking geothermal well of heat exchange type according to claim any one of 3-9, its feature exist In:When straight well and horizontal engineering well are docked and connected in bottom, docked using glass reinforced plastic sleeve (6) docking or cave.
CN201710726447.0A 2017-08-22 2017-08-22 A kind of casing programme of the horizontal docking geothermal well of heat exchange type Pending CN107387056A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710726447.0A CN107387056A (en) 2017-08-22 2017-08-22 A kind of casing programme of the horizontal docking geothermal well of heat exchange type

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710726447.0A CN107387056A (en) 2017-08-22 2017-08-22 A kind of casing programme of the horizontal docking geothermal well of heat exchange type

Publications (1)

Publication Number Publication Date
CN107387056A true CN107387056A (en) 2017-11-24

Family

ID=60354105

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710726447.0A Pending CN107387056A (en) 2017-08-22 2017-08-22 A kind of casing programme of the horizontal docking geothermal well of heat exchange type

Country Status (1)

Country Link
CN (1) CN107387056A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109740203A (en) * 2018-12-18 2019-05-10 新疆贝肯能源工程股份有限公司 Orientation trajectory design method for underground heat well development
CN110108054A (en) * 2019-05-05 2019-08-09 赵爱连 A kind of air-ground temperature difference utilizes system and method
CN111456720A (en) * 2020-03-24 2020-07-28 中国地质科学院勘探技术研究所 Heat exchange isolation mining method for geothermal communication well
CN114440479A (en) * 2021-12-20 2022-05-06 中煤地质集团有限公司 Novel geothermal underground heat exchanger structure and construction method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5246273A (en) * 1991-05-13 1993-09-21 Rosar Edward C Method and apparatus for solution mining
CN1515783A (en) * 2003-08-29 2004-07-28 化工部长沙设计研究院 Method for exploiting natural alkali mineral by utilizing horizontal butt well
CN101395338A (en) * 2005-01-14 2009-03-25 哈利伯顿能源服务公司 System and method for producing fluids from a subterranean formation
CN101629485A (en) * 2009-06-17 2010-01-20 中国地质科学院勘探技术研究所 Exploitation method of communication well of geothermal energy bore well
CN102116140A (en) * 2011-01-25 2011-07-06 煤炭科学研究总院西安研究院 Construction method for enhancing extraction effect of ground coal bed gas

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5246273A (en) * 1991-05-13 1993-09-21 Rosar Edward C Method and apparatus for solution mining
CN1515783A (en) * 2003-08-29 2004-07-28 化工部长沙设计研究院 Method for exploiting natural alkali mineral by utilizing horizontal butt well
CN101395338A (en) * 2005-01-14 2009-03-25 哈利伯顿能源服务公司 System and method for producing fluids from a subterranean formation
CN101629485A (en) * 2009-06-17 2010-01-20 中国地质科学院勘探技术研究所 Exploitation method of communication well of geothermal energy bore well
CN102116140A (en) * 2011-01-25 2011-07-06 煤炭科学研究总院西安研究院 Construction method for enhancing extraction effect of ground coal bed gas

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109740203A (en) * 2018-12-18 2019-05-10 新疆贝肯能源工程股份有限公司 Orientation trajectory design method for underground heat well development
CN110108054A (en) * 2019-05-05 2019-08-09 赵爱连 A kind of air-ground temperature difference utilizes system and method
CN111456720A (en) * 2020-03-24 2020-07-28 中国地质科学院勘探技术研究所 Heat exchange isolation mining method for geothermal communication well
CN111456720B (en) * 2020-03-24 2023-05-23 中国地质科学院勘探技术研究所 Heat exchange isolation exploitation method for geothermal communication well
CN114440479A (en) * 2021-12-20 2022-05-06 中煤地质集团有限公司 Novel geothermal underground heat exchanger structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN107476797A (en) A kind of construction method of the casing programme of the horizontal docking geothermal well of heat exchange type
CN107387056A (en) A kind of casing programme of the horizontal docking geothermal well of heat exchange type
CN104533288B (en) A kind of fish spicule shape multilevel branch horizontal well shale gas reservoir that bores is drilled the method that well is with increasing production
CN106245626A (en) A kind of hard formation churning driven enters method
CN107119669A (en) For shield, the pre-pouring grout consolidated subsoil method in house is worn in side in water-rich sand layer
CN107476301A (en) A kind of full casing follow-up step construction method of bridge pile foundation
CN105649012A (en) Construction method for bored pile of subway station enclosure structure of upper-soft lower-hard ground
CN103670271B (en) Two-way Cycle relay-type coal seam drilling method
CN104832119A (en) Window opening and sidetrack drilling short-radius horizontal well and reverse circulation well cementing and water plugging method
CN107366531B (en) One kind being based on the horizontal docking style geothermal well borehole track of inclined shaft and design method
CN104633996A (en) Water source heat pump recharging technical method
CN107724953A (en) The down-the-hole hammer reverse circulating drilling process construction method of Fluid Sealing
CN106930276A (en) The deep hole blasting of rotary digging bored concrete pile and the construction method of conduit rotary digging removing obstacles
CN110185413A (en) A method of stable slip casting channel is formed on easy collapse hole stratum
CN105064336A (en) Hole forming construction method for three-section type pedestal pile
CN107747312A (en) A kind of method of sand and gravel stratum well cementing construction
CN105239564A (en) Construction method of cast-in-place pile with combination of full-sleeve and mud protecting wall
WO2014114090A1 (en) Engineering drilling rig capable of super-fluid concrete pressure-grouted pile construction in competent bed
CN103015408A (en) Cast-in-place pile synchronous casing hole-forming constructing method
CN109667276A (en) A kind of karst cave treatment and tracking grouting construction method
CN203569561U (en) Novel pile forming device of steel pipe protection wall cast-in-place piles following up drill
Xiumin et al. Research and application of gas-lift reverse circulation drilling technology to geothermal well construction in Dalian Jiaoliu Island
CN208605162U (en) A kind of shield tunnel geological prospecting borehole hole sealing structure
CN107575159A (en) Heat-exchange tube mounting process in a kind of geothermal well well
CN207377561U (en) The bad water-bearing layer positioning targeting slip casting Mine Shaft Lining of rock section and constructing device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20171124