CN107377880A CN201710626702.4A CN201710626702A CN107377880A CN 107377880 A CN107377880 A CN 107377880A CN 201710626702 A CN201710626702 A CN 201710626702A CN 107377880 A CN107377880 A CN 107377880A
Authority
CN
China
Prior art keywords
mould
chamber
segmentation
casting
left mould
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710626702.4A
Other languages
Chinese (zh)
Other versions
CN107377880B (en
Inventor
周永羊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaoxing Vibration Machinery Co Ltd
Original Assignee
Shaoxing Vibration Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaoxing Vibration Machinery Co Ltd filed Critical Shaoxing Vibration Machinery Co Ltd
Priority to CN201710626702.4A priority Critical patent/CN107377880B/en
Publication of CN107377880A publication Critical patent/CN107377880A/en
Application granted granted Critical
Publication of CN107377880B publication Critical patent/CN107377880B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22CFOUNDRY MOULDING
    • B22C9/00Moulds or cores; Moulding processes
    • B22C9/06Permanent moulds for shaped castings
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22CFOUNDRY MOULDING
    • B22C9/00Moulds or cores; Moulding processes
    • B22C9/06Permanent moulds for shaped castings
    • B22C9/065Cooling or heating equipment for moulds
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D27/00Treating the metal in the mould while it is molten or ductile ; Pressure or vacuum casting
    • B22D27/04Influencing the temperature of the metal, e.g. by heating or cooling the mould

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Molds, Cores, And Manufacturing Methods Thereof (AREA)

Abstract

The invention discloses it is a kind of realize gravitational casting when consecutive solidification mould, including left mould tool and right mould tool, heater is provided with to delay the cooled and solidified speed of the second casting unit at the left mould tool of the corresponding second left mould chamber, at the right mould tool of the corresponding second right mould chamber, cooling device is provided with to accelerate the cooled and solidified speed of the 3rd casting unit at the left mould tool of the corresponding 3rd left mould chamber, at the right mould tool of the corresponding 3rd right mould chamber, finally realizes the 4th casting unit, the 3rd casting unit, the second casting unit and the first casting unit consecutive solidification.The present invention has advantages below and effect:For aluminium casting structure, by locally setting heater or cooling device, so as to adjust the cooled and solidified speed of aluminium casting each several part so that aluminium casting can realize consecutive solidification, so as to improve the formed precision of aluminium casting and Forming Quality.

Description

A kind of mould of consecutive solidification when realizing gravitational casting
Technical field
The present invention relates to casting technology field, more particularly to a kind of mould of consecutive solidification when realizing gravitational casting.
Background technology
Gravitational casting refers to that molten metal injects the technique of casting mold, also referred to as gravity casting under terrestrial gravitation effect.Broad sense Gravitational casting includes sand casting, metal mold casting, model casting, lost foam casting, mud mould casting etc.;Narrow adopted gravitational casting Refer mainly to metal mold casting.
Consecutive solidification principle be the big position of thickness that shrinkage cavity is likely to occur on aluminium casting by laying the technological measures such as rising head, Position of the aluminium casting away from rising head is first solidified, followed by solidified close to the position of rising head, be finally only rising head and solidify in itself.
As Fig. 8 institutes illustrated example illustrates, if the aluminium casting of shaping is following shape, in terms of sectional view, on to Under include the first casting unit a, the second casting unit b, the 3rd casting unit c, the 4th casting unit d successively, while the region shared by it is pressed According to arranging from big to small, it, which puts in order, is followed successively by:First casting unit a, the 3rd casting unit c, the second casting unit b, the 4th casting Portion d.Because of the irregular of aluminium casting shape so that its local wall thickness is blocked up, local wall thickness is excessively thin, so as to cause aluminium casting to be difficult shape Into consecutive solidification, so as to can be aluminium casting be internally formed shrinkage cavity and shrinkage porosite the defects of.
It is final logical so as to which the cooling velocity of aluminium casting everywhere be adjusted now typically by adjusting the wall thickness of mould The cooperation of mold wall thickness and aluminium casting shape is crossed to realize consecutive solidification, if but aluminium casting part it is increasingly complex, that regulation The required factor considered is more during mold wall thickness, relatively complicated when designing mould.
The content of the invention
It is an object of the invention to provide it is a kind of realize gravitational casting when consecutive solidification mould, can conveniently realize to aluminium casting Consecutive solidification.
The present invention above-mentioned technical purpose technical scheme is that:One kind is realized suitable during gravitational casting The mould of sequence solidification, including left mould tool and right mould have, the first left mould formed with corresponding first casting unit on the left mould tool Chamber, the second left mould chamber of corresponding second casting unit, the 3rd left mould chamber of corresponding 3rd casting unit, the 4th of corresponding 4th casting unit the Left mould chamber, the second right mould of upper the first right mould chamber formed with corresponding first casting unit of right mould tool, correspondingly the second casting unit Chamber, the 3rd right mould chamber of corresponding 3rd casting unit, the 4th right mould chamber of corresponding 4th casting unit, the corresponding second left mould chamber Heater is provided with to delay the cooling of the second casting unit to coagulate at left mould tool, at the right mould tool of the corresponding second right mould chamber Gu speed, correspond at the left mould tool of the 3rd left mould chamber, be provided with cooling at the right mould tool of the corresponding 3rd right mould chamber Device to accelerate the cooled and solidified speed of the 3rd casting unit, finally realize the 4th casting unit, the 3rd casting unit, the second casting unit with And the first casting unit consecutive solidification.
By using such scheme, according to institute's illustrated example in background technology, the normal freezing order of the aluminium casting is successively For:4th casting unit, the second casting unit, the 3rd casting unit, the first casting unit, the consecutive solidification of aluminium casting can not be now realized, Now aluminium casting is internally formed shrinkage cavity and shrinkage porosite the defects of, now by the left mould tool of corresponding 3rd left mould chamber, it is right Answer and be provided with cooling device at the right mould tool of the 3rd right mould chamber to accelerate the cooled and solidified speed of the 3rd casting unit, it is final to realize 4th casting unit, the 3rd casting unit, the second casting unit and the first casting unit consecutive solidification.
The further setting of the present invention is:Left mould tool include four respectively with the first left mould chamber, described second The corresponding segmentation left mould of left mould chamber, the 3rd left mould chamber, the 4th left mould chamber, right mould tool include four respectively with The corresponding segmentation right mould of the first right mould chamber, the second right mould chamber, the 3rd right mould chamber, the 4th right mould chamber, The heater is arranged on the segmentation left mould of the corresponding second left mould chamber, the segmentation right mould of the corresponding second right mould chamber On, the cooling device is arranged on the segmentation left mould of the corresponding 3rd left mould chamber, the segmentation right side of the corresponding 3rd right mould chamber On mould.
By using such scheme, multiple segmentation left moulds are divided into by left mould tool, right mould tool is divided into multiple segmentation right sides Mould, so as to need to set the segmentation left mould of heater and cooling device or segmentation right mould to separate, finally can individually it exist It is processed in single split left mould or single split right mould, avoids whole mould from being carried, so as to which convenient set is heated Device and cooling device.
The further setting of the present invention is:The segmentation left mould of the corresponding second left mould chamber, corresponding second right side It is provided with mounting groove in the segmentation right mould of die cavity, electric heating tube that the heater includes being embedded in the mounting groove, The temperature sensor being embedded in the mounting groove, the temperature sensor is by temperature feedback to control panel for described in control The heating-up temperature of electric heating tube.
By using such scheme, the segmentation left mould of corresponding second left mould chamber can be heated by electric heating tube, correspond to second The segmentation right mould of right mould chamber, so as to delay the cooled and solidified speed of the second casting unit by way of heating, so as to realize aluminium The consecutive solidification of casting, while temperature sensor can detect the segmentation left mould of corresponding second left mould chamber, correspond to the second right mould chamber The temperature of right mould is segmented, so as to which signal is fed back into control panel, the heating-up temperature of electric heating tube is adjusted by control panel.
The further setting of the present invention is:The segmentation left mould of the corresponding 3rd left mould chamber, corresponding 3rd right side Cooling line is provided with the segmentation right mould of die cavity, the cooling device includes what is communicated with the arrival end of the cooling line Condensed water water inlet pipe, the condensed water outlet pipe communicated with the port of export of the cooling line.
By using such scheme, by leading to condensed water in cooling line, accelerate the so as to lead to overcooled mode The cooling velocity of three casting units, so as to realize the consecutive solidification of aluminium casting.
The further setting of the present invention is:It is adjacent formed with the first heat-insulation chamber between two adjacent segmentation left moulds Two segmentation right moulds between formed with the second heat-insulation chamber, first heat-insulation chamber is formed to be leaned in any segmentation left mould It is segmented described in close on the end face of left mould, second heat-insulation chamber is formed in any segmentation right mould close to described in top points On the end face of section right mould, first heat-insulation chamber communicates and combined to form ring-type with second heat-insulation chamber.
By using such scheme, because mould is made by metal, the effect of general mutual conduction heat Preferably, during aluminium casting consecutive solidification is realized by heater and cooling device, the first heat-insulation chamber and second are passed through Heat-insulation chamber can reduce the transmission of heat, so as to which the temperature that avoids causing whole mould after heat transfer is in scope very nearly the same It is interior so that the setting of heater and cooling device loses effect.
The further setting of the present invention is:Asbestos layer is provided with first heat-insulation chamber, second heat-insulation chamber, institute State the bottom wall of the first heat-insulation chamber, be further opened with incubation cavity on the bottom wall of second heat-insulation chamber.
By using such scheme, asbestos have extremely fireproof, electrical insulating property and thermal insulation, are important prevent fires, absolutely Edge and insulation material, by setting asbestos layer, the transmission of heat can be reduced;The setting of incubation cavity simultaneously, also make it that segmentation is left Certain gap be present between mould or segmentation right mould, reduce the heat being delivered on asbestos layer.
The further setting of the present invention is:On the bottom wall of first heat-insulation chamber, on the bottom wall of second heat-insulation chamber It is provided with multiple alignment pins, collet is arranged with the alignment pin, under the segmentation left mould lower surface, the segmentation right mould End face offers the locating slot for the alignment pin insertion for supplying lower section.
By using such scheme, alignment pin is embedded in the positioning that locating slot interior energy realizes left mould tool and right mould tool, so as to Location and installation, and the collet on alignment pin are carried out, the problem of alignment pin conducts heat in positioning can be weakened.
The further setting of the present invention is:Connection is provided with multiple segmentation left moulds, multiple segmentation right moulds Part, multiple segmentation left moulds, multiple described are segmented in right mould offer multiple corresponding connecting holes, multiple segmentations Connecting hole in left mould, corresponding in multiple segmentation right moulds communicates, and the connector includes being set in multiple institutes communicated State the instlated tubular in connecting hole, the bolt through the instlated tubular, the nut that is threaded on the bolt.
By using such scheme, on left mould tool and right mould tool, entered by being arranged after instlated tubular by bolt and nut Row is fixed, the problem of heat is conducted during so as to weaken because of bolt connection.
In summary, the invention has the advantages that:For the structure of aluminium casting, by locally setting heating dress Put or cooling device, so as to adjust the cooled and solidified speed of aluminium casting each several part so that aluminium casting energy consecutive solidification, so as to carry The formed precision of high aluminium casting;Simultaneously by carrying out subsection setup to left mould tool and right mould tool and being thermally shielded so that segmentation is left Heat between mould, segmentation right mould is not easy to transmit.
Brief description of the drawings
Fig. 1 is the structural representation of embodiment 1;
Fig. 2 is provided with the segmentation left mould of heater and is segmented the structural representation of right mould;
Fig. 3 is Fig. 2 partial exploded view;
Fig. 4 is provided with the segmentation left mould of cooling device and is segmented the structural representation of right mould;
Fig. 5 is Fig. 4 in-profile figure;
Fig. 6 is the top view of embodiment 1;
Fig. 7 is the sectional view at A-A in Fig. 6;
Fig. 8 is the aluminium casting structure chart illustrated in background technology.
In figure:1st, left mould has;11st, the first left mould chamber;12nd, the second left mould chamber;13rd, the 3rd left mould chamber;14th, the 4th left mould Chamber;15th, it is segmented left mould;151st, the first heat-insulation chamber;2nd, right mould has;21st, the first right mould chamber;22nd, the second right mould chamber;23rd, the 3rd is right Die cavity;24th, the 4th right mould chamber;25th, it is segmented right mould;251st, the second heat-insulation chamber;3rd, heater;31st, electric heating tube;32nd, temperature Sensor;4th, cooling device;41st, condensed water water inlet pipe;42nd, condensed water outlet pipe;5th, mounting groove;51st, incubation cavity;52nd, cool down Pipeline;53rd, locating slot;54th, connecting hole;6th, asbestos layer;7th, alignment pin;71st, collet;8th, connector;81st, instlated tubular;82nd, spiral shell Bolt;83rd, nut;9th, sprue cup;91st, countersunk head screw;A, the first casting unit;B, the second casting unit;C, the 3rd casting unit;D, the 4th Casting unit.
Embodiment
The present invention is described in further detail below in conjunction with accompanying drawing.
Embodiment 1:A kind of mould of consecutive solidification when realizing gravitational casting, is said with the aluminium casting illustrated in Fig. 4 It is bright, as shown in figure 1, including left mould tool 1 and right mould tool 2, left mould tool 1 includes four and is sequentially connected the segmentation connect from top to bottom Left mould 15, right mould tool 2 are sequentially connected the segmentation right mould 25 connect from top to bottom including four, the segmentation left mould 15 and most in the top The junction of segmentation right mould 25 of upper end is formed with being provided with sprue cup 9.Sprue cup 9 is arranged on left mould tool 1 by countersunk head screw 91 And on right mould tool 2.
Coordinate Fig. 7 and Fig. 8, be respectively formed with corresponding first casting unit a's in four segmentation left moulds 15 from top to bottom First left mould chamber 11, corresponding second casting unit b the second left mould chamber 12, corresponding 3rd casting unit c the 3rd left mould chamber 13, correspondingly 4th casting unit d the 4th left mould chamber 14;Corresponding first casting is respectively formed with four segmentation right moulds 25 from top to bottom Portion a the first right mould chamber 21, corresponding second casting unit b the second right mould chamber 22, corresponding 3rd casting unit c the 3rd right mould chamber 23rd, corresponding 4th casting unit d the 4th right mould chamber 24.Sprue cup 9 connects the first left mould chamber 11 and the first right mould chamber 21 is formed Cavity so that aluminium liquid can be entered by sprue cup 9 left mould tool 1 and right mould tool 2 in, and because sprue cup size compared with Greatly so that the solidification that sprue cup 9 also can be to aluminium casting can carry out feeding.
As shown in Figure 2 and Figure 3, in the segmentation left mould 15 of corresponding second left mould chamber 12, the segmentation of corresponding second right mould chamber 22 Heater 3 is provided with right mould 25 to delay the second casting unit b(See Fig. 8)Cooled and solidified speed.It is left corresponding second Mounting groove 5 is offered in the segmentation left mould 15 of die cavity 12, the segmentation right mould 25 of corresponding second right mould chamber 22.Heater 3 wraps Include the electric heating tube 31 being embedded in mounting groove 5, the temperature sensor being embedded in mounting groove 5 32.Pass through temperature sensor 32 By temperature feedback to control panel(Do not illustrate in figure)Place, so as to be controlled to the heating-up temperature of electric heating tube 31.
As shown in Figure 4 and Figure 5, in the segmentation left mould 15 of corresponding 3rd left mould chamber 13, point of corresponding 3rd right mould chamber 23 Cooling device 4 is provided with to accelerate the 3rd casting unit c in section right mould 25(See Fig. 8)Cooled and solidified speed.The corresponding 3rd Cooling line 52, cooling dress are offered in the segmentation left mould 15 of left mould chamber 13, the segmentation right mould 25 of corresponding 3rd right mould chamber 23 Put the 4 condensed water water inlet pipes 41 for including communicating with the arrival end of cooling line 52, communicate with the port of export of cooling line 52 it is cold Condensate outlet pipe 42.Condensed water water inlet pipe 41 and condensed water outlet pipe 42 are connected with cooling tower simultaneously, can make it that cooling is solidifying Water realizes cooling effect in flowing.
As shown in fig. 7, formed with the first heat-insulation chamber 151 between adjacent two segmentations left moulds 15, adjacent two points Formed with the second heat-insulation chamber 251 between section right mould 25, the first heat-insulation chamber 151 is formed to be segmented in any segmentation left mould 15 close to top On the end face of left mould 15, the second heat-insulation chamber 251 is formed in any segmentation right mould 25 on the end face of top segmentation right mould 25, the One heat-insulation chamber 151 communicates and combined to form ring-type with the second heat-insulation chamber 251.In the first heat-insulation chamber 151, the second heat-insulation chamber 251 The asbestos layer 6 of asbestos composition is placed with, to realize the effect for weakening heat transfer, while bottom wall in the first heat-insulation chamber 151, Incubation cavity 51 is further opened with the bottom wall of second heat-insulation chamber 251.
As shown in fig. 7, in order to realize between adjacent segmentation left mould 15, be positioned between adjacent segmentation right mould 25. On the bottom wall of the first heat-insulation chamber 151, multiple alignment pins 7, alignment pin 7 are integrally provided with the bottom wall of the second heat-insulation chamber 251 On be arranged with collet 71, segmentation left mould 15 lower surface, the lower surface for being segmented right mould 25 offer and supply the alignment pin 7 of lower section embedding The locating slot 53 entered.Collet 71 is made up of high temperature resistant heat insulation cotton.
As shown in fig. 7, in order to realize the company of realization between the segmentation right mould 25 between adjacent segmentation left mould 15, adjacent Connect.Connector 8 is provided with multiple segmentation left moulds 15, multiple segmentation right moulds 25.Simultaneously in multiple segmentation left moulds 15, multiple Multiple corresponding connecting holes 54 are offered in segmentation right mould 25, in multiple segmentation left moulds 15, phase in multiple segmentation right moulds 25 Corresponding connecting hole 54 communicates.Connector 8 includes being set in instlated tubular 81 in multiple connecting holes 54 communicated, through instlated tubular 81 bolt 82, the nut 83 being threaded on bolt 82.
Implementation principle:By at the left mould of corresponding 3rd left mould chamber 13 tool 1, the right mould tool 2 of corresponding 3rd right mould chamber 23 Place is provided with cooling device 4 to accelerate the 3rd casting unit c cooled and solidified speed, finally realizes the 4th casting unit d, the 3rd casting Portion c, the second casting unit b and the first casting unit a consecutive solidifications are made, the final Forming Quality for improving aluminium casting.
This specific embodiment is only explanation of the invention, and it is not limitation of the present invention, people in the art Member can make the modification of no creative contribution to the present embodiment as needed after this specification is read, but as long as at this All protected in the right of invention by Patent Law.

Claims (8)

1. a kind of mould of consecutive solidification when realizing gravitational casting, including left mould tool(1)And right mould tool(2), the left mould tool (1)On formed with corresponding first casting unit(a)The first left mould chamber(11), corresponding second casting unit(b)The second left mould chamber (12), corresponding 3rd casting unit(c)The 3rd left mould chamber(13), corresponding 4th casting unit(d)The 4th left mould chamber(14), it is described Right mould has(2)On formed with corresponding first casting unit(a)The first right mould chamber(21), corresponding second casting unit(b)It is second right Die cavity(22), corresponding 3rd casting unit(c)The 3rd right mould chamber(23), corresponding 4th casting unit(d)The 4th right mould chamber(24), It is characterized in that:The corresponding second left mould chamber(12)Left mould tool(1)Place, the corresponding second right mould chamber(22)Right mould tool (2)Place is provided with heater(3)To delay the second casting unit(b)Cooled and solidified speed, the corresponding 3rd left mould chamber (13)Left mould tool(1)Place, the corresponding 3rd right mould chamber(23)Right mould tool(2)Place is provided with cooling device(4)To add Fast 3rd casting unit(c)Cooled and solidified speed, finally realize the 4th casting unit(d), the 3rd casting unit(c), the second casting unit (b)And first casting unit(a)Consecutive solidification.
A kind of 2. mould of consecutive solidification when realizing gravitational casting according to claim 1, it is characterised in that:The left mould Tool(1)Including four respectively with the first left mould chamber(11), the second left mould chamber(12), the 3rd left mould chamber(13)、 The 4th left mould chamber(14)Corresponding segmentation left mould(15), the right mould tool(2)It is right with described first respectively including four Die cavity(21), the second right mould chamber(22), the 3rd right mould chamber(23), the 4th right mould chamber(24)Corresponding segmentation Right mould(25), the heater(3)It is arranged on the corresponding second left mould chamber(12)Segmentation left mould(15), corresponding described the Two right mould chambers(22)Segmentation right mould(25)On, the cooling device(4)It is arranged on the corresponding 3rd left mould chamber(13)Point Duan Zuomo(15), the corresponding 3rd right mould chamber(23)Segmentation right mould(25)On.
A kind of 3. mould of consecutive solidification when realizing gravitational casting according to claim 2, it is characterised in that:Described in corresponding Second left mould chamber(12)The segmentation left mould(15), the corresponding second right mould chamber(22)Segmentation right mould(25)On be respectively provided with There is mounting groove(5), the heater(3)Including being embedded in the mounting groove(5)Interior electric heating tube(31), be embedded in it is described Mounting groove(5)Interior temperature sensor(32), the temperature sensor(32)By temperature feedback to control panel for control institute State electric heating tube(31)Heating-up temperature.
A kind of 4. mould of consecutive solidification when realizing gravitational casting according to claim 2, it is characterised in that:Described in corresponding 3rd left mould chamber(13)The segmentation left mould(15), the corresponding 3rd right mould chamber(23)Segmentation right mould(25)On be respectively provided with There is cooling line(52), the cooling device(4)Including with the cooling line(52)Arrival end communicate condensed water water inlet Pipe(41)And the cooling line(52)The condensed water outlet pipe that communicates of the port of export(42).
A kind of 5. mould of consecutive solidification when realizing gravitational casting according to claim 2, it is characterised in that:Adjacent two The individual segmentation left mould(15)Between formed with the first heat-insulation chamber(151), adjacent two segmentation right moulds(25)Between shape Into there is the second heat-insulation chamber(251), first heat-insulation chamber(151)Formed in any segmentation left mould(15)Close to described in top It is segmented left mould(15)End face on, second heat-insulation chamber(251)Formed in any segmentation right mould(25)Close to top institute State segmentation right mould(25)End face on, first heat-insulation chamber(151)With second heat-insulation chamber(251)Communicate and combine formation Ring-type.
A kind of 6. mould of consecutive solidification when realizing gravitational casting according to claim 5, it is characterised in that:Described first Heat-insulation chamber(151), second heat-insulation chamber(251)Inside it is provided with asbestos layer(6), first heat-insulation chamber(151)Bottom wall, Second heat-insulation chamber(251)Bottom wall on be further opened with incubation cavity(51).
A kind of 7. mould of consecutive solidification when realizing gravitational casting according to claim 5, it is characterised in that:Described first Heat-insulation chamber(151)Bottom wall on, second heat-insulation chamber(251)Bottom wall on be provided with multiple alignment pins(7), the positioning Pin(7)On be arranged with collet(71), the segmentation left mould(15)Lower surface, the segmentation right mould(25)Lower surface open up There is the alignment pin for supplying lower section(7)Embedded locating slot(53).
A kind of 8. mould of consecutive solidification when realizing gravitational casting according to claim 1, it is characterised in that:It is multiple described It is segmented left mould(15), multiple segmentation right moulds(25)On be provided with connector(8), multiple segmentation left moulds(15), it is more The individual segmentation right mould(25)On offer multiple corresponding connecting holes(54), multiple segmentation left moulds(15)It is upper, more The individual segmentation right mould(25)Upper corresponding connecting hole(54)Communicate, the connector(8)Including being set in multiple communicate The connecting hole(54)Interior instlated tubular(81), through the instlated tubular(81)Bolt(82), be threaded in the bolt (82)On nut(83).
CN201710626702.4A 2017-07-24 2017-07-24 A kind of mold of consecutive solidification when realizing gravitational casting Active CN107377880B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710626702.4A CN107377880B (en) 2017-07-24 2017-07-24 A kind of mold of consecutive solidification when realizing gravitational casting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710626702.4A CN107377880B (en) 2017-07-24 2017-07-24 A kind of mold of consecutive solidification when realizing gravitational casting

Publications (2)

Publication Number Publication Date
CN107377880A true CN107377880A (en) 2017-11-24
CN107377880B CN107377880B (en) 2019-07-02

Family

ID=60342642

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710626702.4A Active CN107377880B (en) 2017-07-24 2017-07-24 A kind of mold of consecutive solidification when realizing gravitational casting

Country Status (1)

Country Link
CN (1) CN107377880B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0739993A (en) * 1993-08-03 1995-02-10 Toyota Motor Corp Structure of metallic mold for casting
CN102284696A (en) * 2011-05-30 2011-12-21 佛山市南海奔达模具有限公司 Temperature control method of no-riser aluminium-alloy casting mold
CN102441658A (en) * 2010-09-30 2012-05-09 通用电气公司 Unidirectional solidification process and apparatus therefor
CN103147120A (en) * 2013-04-01 2013-06-12 东方电气集团东方汽轮机有限公司 Directional solidification device of high-temperature alloy
CN104907541A (en) * 2014-03-13 2015-09-16 赛科/沃里克欧洲有限责任公司 Method of the directional solidification of the castings of gas turbine blades and a device for producing the castings of gas turbine blades

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0739993A (en) * 1993-08-03 1995-02-10 Toyota Motor Corp Structure of metallic mold for casting
CN102441658A (en) * 2010-09-30 2012-05-09 通用电气公司 Unidirectional solidification process and apparatus therefor
CN102284696A (en) * 2011-05-30 2011-12-21 佛山市南海奔达模具有限公司 Temperature control method of no-riser aluminium-alloy casting mold
CN103147120A (en) * 2013-04-01 2013-06-12 东方电气集团东方汽轮机有限公司 Directional solidification device of high-temperature alloy
CN104907541A (en) * 2014-03-13 2015-09-16 赛科/沃里克欧洲有限责任公司 Method of the directional solidification of the castings of gas turbine blades and a device for producing the castings of gas turbine blades

Also Published As

Publication number Publication date
CN107377880B (en) 2019-07-02

Similar Documents

Publication Publication Date Title
CN103736965B (en) The temperature-controlled process of magnesium alloy die casting mould
JPS6036118A (en) High-temperature manifold device
CN104493113B (en) A kind of long carbon fiber and metal composite continuous casting installation for casting and technique
CN105750499A (en) Method of utilizing conformal cold iron and forced convection to locally cool investment casting
CN106890985A (en) It is a kind of for manufacturing casting device and method without shrinkage cavity casting
CN102284696A (en) Temperature control method of no-riser aluminium-alloy casting mold
CN104742349A (en) Heat-insulating multi-layer composite extrusion die head
CN212495266U (en) Aluminum alloy gas-sliding casting crystallizer
CN107377880A (en) A kind of mould of consecutive solidification when realizing gravitational casting
CN1268459C (en) Oriented solidification casting method and apparatus
CN111036850A (en) Casting process design of frame-shaped structure cast steel node for engineering building
CN206405411U (en) A kind of aluminum alloy door die casting equipment
CN105690676A (en) Injection molding device with heating molding cavities
CN105234358B (en) Cast iron tubing horizontal continuous casting equipment and technique
CN104741559B (en) Equipment and technical method suitable for 5356 aluminium alloy continuous casting fine forming
CN213317606U (en) Die-casting forming die for automobile thin-wall parts
CN206643335U (en) It is a kind of to be used to manufacture the casting device without shrinkage cavity casting
CN203144557U (en) Bidirectional enhanced gas cooling device in crystal growth device
CN212603222U (en) Realize balanced mould of mould temperature
CN103706779A (en) Method and device for controlling temperature of mould heated by fuel gas in sectionalized mode in aluminium alloy gravity casting
CN104722715B (en) A kind of heater of cylinder head casting rising head
CN102601974A (en) Forming method for engineering plastic profile and special tool
CN207072081U (en) A kind of injection mold
CN207130306U (en) A kind of homogeneous furnace compound heat preservation system
CN206662223U (en) A kind of wide face copper coin of new type superthin plate slab crystallizer

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant