CN107369105A - Water feeding method and device based on tier building - Google Patents

Water feeding method and device based on tier building Download PDF

Info

Publication number
CN107369105A
CN107369105A CN201710453372.3A CN201710453372A CN107369105A CN 107369105 A CN107369105 A CN 107369105A CN 201710453372 A CN201710453372 A CN 201710453372A CN 107369105 A CN107369105 A CN 107369105A
Authority
CN
China
Prior art keywords
feedwater
information
duration
consumption data
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710453372.3A
Other languages
Chinese (zh)
Inventor
杜浩
薛康
阚海丽
孙伯宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
POLYTRON TECHNOLOGIES Inc
Original Assignee
POLYTRON TECHNOLOGIES Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by POLYTRON TECHNOLOGIES Inc filed Critical POLYTRON TECHNOLOGIES Inc
Priority to CN201710453372.3A priority Critical patent/CN107369105A/en
Publication of CN107369105A publication Critical patent/CN107369105A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Health & Medical Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention proposes a kind of water feeding method and device based on tier building, wherein, method includes:Multiple feedwater information are obtained, and then for each feedwater information, calculate resource consumption data corresponding to each feedwater duration, and the curve that rendering resource consumption data changes with feedwater duration.Then, the curve according to corresponding to multiple feedwater information is contrasted, and to select target feedwater information from the multiple feedwater information, and feeds water information to the building water supply using the target.Due to the curve based on resource consumption data with feedwater duration change, selected target feedwater information carries out building water supply, solves water supply modes of the prior art, efficiency is poor, less efficient technical problem.

Description

Water feeding method and device based on tier building
Technical field
The present invention relates to INTELLIGENT BUILDING TECHNIQUE field, more particularly to a kind of water feeding method and device based on tier building.
Background technology
When skyscraper feeds water, subregion can be carried out to building.But in the prior art, generally use is more fixed The partition method of pattern, after subregion, according to pressure index, ensure that each subregion when depressurizing defective valve, will not destroy Water appliance.
Inventor has found that this water supply modes of the prior art, efficiency is poor, less efficient.
The content of the invention
It is contemplated that at least solves one of technical problem in correlation technique to a certain extent.
Therefore, first purpose of the present invention is to propose a kind of water feeding method based on tier building, it is existing to solve Water supply modes in technology, efficiency is poor, less efficient technical problem.
Second object of the present invention is to propose a kind of waterworks based on tier building.
Third object of the present invention is to propose a kind of computer equipment.
Fourth object of the present invention is to propose a kind of non-transitorycomputer readable storage medium.
The 5th purpose of the present invention is to propose a kind of computer program product.
For the above-mentioned purpose, first aspect present invention embodiment proposes a kind of water feeding method based on tier building, bag Include:
Obtain multiple feedwater information;Wherein, each described feedwater information, for being divided in instruction building respectively to moisture Floor value corresponding to area;
For each feedwater information, resource consumption data corresponding to each feedwater duration, and rendering resource consumption number are calculated According to the curve with feedwater duration change;
Contrasted according to curve corresponding to the multiple feedwater information, to select mesh from the multiple feedwater information Mark feedwater information;
Information is fed water to the building water supply using the target.
Alternatively, in one embodiment of this invention, the curve according to corresponding to the multiple feedwater information is carried out pair Than, to select target feedwater information from the multiple feedwater information, including:
According to curve corresponding to the multiple feedwater information, resource consumption data are contrasted;
The minimum target feedwater information of resource consumption data is selected from the multiple feedwater information.
Alternatively, in one embodiment of this invention, it is described for each feedwater information, it is corresponding to calculate each feedwater duration Resource consumption data, including:
Obtain constant drain data corresponding to the feedwater information;
Calculate power consumption data corresponding to each feedwater duration;
According to power consumption data corresponding to constant drain data and each feedwater duration, each feedwater duration pair is calculated The resource consumption data answered.
Alternatively, in one embodiment of this invention, it is described according to constant drain data and each feedwater duration pair The power consumption data answered, resource consumption data corresponding to each feedwater duration are calculated, including:
For each feedwater duration t, using formula P=p1×t/T+p2, it is calculated corresponding to the feedwater duration t Resource consumption data P;Wherein, p1For constant drain data, p2For power consumption data corresponding to the feedwater duration t, T is pre- If total duration.
Alternatively, in one embodiment of this invention, it is described to calculate power consumption data corresponding to each feedwater duration, bag Include:
For each feedwater duration t, according to formula p2=W × t × X, electricity corresponding to the feedwater duration t is calculated Can consumption data p2;Wherein, W is the power sum of water pump in each feedwater subregion, and X is electricity charge quota.
Alternatively, in one embodiment of this invention, in each subregion water pump power w, be the stream according to the subregion The efficiency calculation of water pump obtains in lift, default Margin coefficient and the subregion needed for amount, the subregion;
Wherein, the flow of the subregion refers to user's water consumption sum in the subregion.
The method of the embodiment of the present invention, by obtaining multiple feedwater information, and then for each feedwater information, calculate each Feed water resource consumption data corresponding to duration, and the curve that rendering resource consumption data changes with feedwater duration.Then, according to more Curve corresponding to individual feedwater information is contrasted, and to select target feedwater information from the multiple feedwater information, and is used The target feeds water information to the building water supply.Due to the curve based on resource consumption data with feedwater duration change, select Target feedwater information carries out building water supply, solves water supply modes of the prior art, efficiency is poor, and less efficient technology is asked Topic.
For the above-mentioned purpose, second aspect of the present invention embodiment proposes a kind of waterworks based on tier building, bag Include:
Acquisition module, for obtaining multiple feedwater information;Wherein, each described feedwater information, for indicating in building Floor value corresponding to each feedwater subregion of division;
Computing module, for for each feedwater information, calculating resource consumption data corresponding to each feedwater duration, and paint The curve that resource consumption data processed change with feedwater duration;
Contrast module, contrasted for the curve according to corresponding to the multiple feedwater information, with from the multiple feedwater Target feedwater information is selected in information;
Execution module, for feeding water information to the building water supply using the target.
The waterworks based on tier building of the embodiment of the present invention, by obtaining multiple feedwater information, and then for every One feedwater information, resource consumption data corresponding to each feedwater duration are calculated, and rendering resource consumption data becomes with feedwater duration The curve of change.Then, the curve according to corresponding to multiple feedwater information is contrasted, to be selected from the multiple feedwater information Target feedwater information, and information is fed water to the building water supply using the target.Due to based on resource consumption data with feedwater The curve of duration change, selected target feedwater information carry out building water supply, solve water supply modes of the prior art, efficiency compared with Difference, less efficient technical problem.
For the above-mentioned purpose, third aspect present invention embodiment proposes a kind of computer equipment, including:Memory, place The computer program managed device and storage on a memory and can run on a processor, it is characterised in that the computing device During described program, the water feeding method based on tier building described in first aspect is realized.
To achieve these goals, fourth aspect present invention embodiment proposes a kind of computer-readable storage of non-transitory Medium, when the instruction in the storage medium is performed by processor, it is able to carry out being built based on multilayer described in first aspect The water feeding method built.
To achieve these goals, fifth aspect present invention embodiment proposes a kind of computer program product, when described When instruction processing unit in computer program product performs, the water feeding method based on tier building described in first aspect is performed.
The additional aspect of the present invention and advantage will be set forth in part in the description, and will partly become from the following description Obtain substantially, or recognized by the practice of the present invention.
Brief description of the drawings
Of the invention above-mentioned and/or additional aspect and advantage will become from the following description of the accompanying drawings of embodiments Substantially and it is readily appreciated that, wherein:
A kind of schematic flow sheet for water feeding method based on tier building that Fig. 1 is provided by the embodiment of the present invention;
Fig. 2 is change curve schematic diagram of the resource consumption data with feedwater duration;
Fig. 3 is piping schematic corresponding to option A;And
Fig. 4 is a kind of structural representation of the waterworks based on tier building provided in an embodiment of the present invention.
Embodiment
Embodiments of the invention are described below in detail, the example of the embodiment is shown in the drawings, wherein from beginning to end Same or similar label represents same or similar element or the element with same or like function.Below with reference to attached The embodiment of figure description is exemplary, it is intended to for explaining the present invention, and is not considered as limiting the invention.
Below with reference to the accompanying drawings a kind of water feeding method and device based on tier building of the embodiment of the present invention are described.
A kind of schematic flow sheet for water feeding method based on tier building that Fig. 1 is provided by the embodiment of the present invention.
When skyscraper feeds water, subregion can be carried out to building.But in the prior art, generally use is more fixed The partition method of pattern.Specifically, after by subregion, pressure index is only seen, according to pressure index, ensures that each subregion exists When depressurizing defective valve, water appliance will not be destroyed.Inventor find, this water supply modes of the prior art, efficiency compared with Difference, it is less efficient.
For this problem, the embodiments of the invention provide the water feeding method based on tier building, to solve prior art Middle water supply modes, efficiency is poor, less efficient technical problem.As shown in figure 1, should based on tier building to method include with Lower step:
Step 101, multiple feedwater information are obtained.
Wherein, each described feedwater information, floor value corresponding to each feedwater subregion divided in being built for instruction.
Step 102, for each feedwater information, resource consumption data corresponding to each feedwater duration are calculated, and draw money The curve that source consumption data changes with feedwater duration.
Specifically, constant drain data corresponding to feedwater information are obtained;Calculate power consumption number corresponding to each feedwater duration According to;According to power consumption data corresponding to constant drain data and each feedwater duration, calculate corresponding to each feedwater duration Resource consumption data.
As a kind of possible implementation, for each feedwater duration t, using formula P=p1×t/T+p2, calculate Obtain resource consumption data P corresponding to the feedwater duration t;Wherein, p1For constant drain data, p2For t pairs of the duration of feedwater The power consumption data answered, T are default total duration.
Wherein, p is being calculated2When, for each feedwater duration t, according to formula p2=W × t × X, be calculated it is described to Power consumption data p corresponding to water duration t2;Wherein, W is the power sum of water pump in each feedwater subregion, and X is electricity charge quota.
Meanwhile in each subregion water pump power w, be lift according to needed for the flow of the subregion, the subregion, pre- If the efficiency calculation of water pump obtains in Margin coefficient and the subregion;Wherein, the flow of the subregion refers in the subregion User's water consumption sum.
Such as:The lift of the flow × subregion of the power w=of the water pump subregions in each subregion × default Margin coefficient/ The efficiency of water pump in the subregion.
Step 103, the curve according to corresponding to the multiple feedwater information is contrasted, with from the multiple feedwater information Select target feedwater information.
Specifically, the curve according to corresponding to multiple feedwater information, contrasts resource consumption data.Selected from multiple feedwater information Select out the minimum target feedwater information of resource consumption data.
Step 104, information is fed water to the building water supply using the target.
In the present embodiment, by obtaining multiple feedwater information, and then for each feedwater information, each feedwater duration is calculated Corresponding resource consumption data, and the curve that rendering resource consumption data changes with feedwater duration.Then, believed according to multiple feedwater Curve is contrasted corresponding to breath, to select target feedwater information from the multiple feedwater information, and uses the target The information that feeds water is to the building water supply.Due to the curve based on resource consumption data with feedwater duration change, selected target feedwater Information carries out building water supply, solves water supply modes of the prior art, efficiency is poor, less efficient technical problem.
For an embodiment in clear explanation, a kind of specifically water feeding method based on tier building is present embodiments provided Flow.Illustrated below by taking 24 layers of building as an example.
First, three kinds of partition schemes A, B, C are obtained.
Option A:1~12 Ceng Weidi areas, 13~24 Ceng Weigao areas.
Option b:1~8 Ceng Weidi areas, 9~16 Ceng Weizhong areas, 17~24 Ceng Weigao areas.
Scheme C:1~4 Ceng Weidi areas, 5~14 Ceng Weizhong areas, 15~24 Ceng Weigao areas.
So as to obtain three feedwater information, three kinds of partition schemes are corresponded to respectively.
For each feedwater information, the calculating of resource consumption data is carried out.
, it is necessary to preset operation total duration T in calculating process, in the present embodiment, it is 20 years to take T.
As a kind of possible application scenarios, calculated for feedwater information A, resource as shown in table 1 below can be obtained and disappeared Consume tables of data.
Feed water duration t Constant drain data p1 Power consumption data p2 Resource consumption data P
Year Member Member Wan Yuan
2 148175.6 37402.56 18.56
4 296351.2 74805.12 37.12
6 444526.8 112207.68 55.67
8 592702.4 149610.24 74.23
10 740878 187012.8 92.79
12 889053.6 224415.36 111.35
14 1037229.2 261817.92 129.90
16 1185404.8 299220.48 148.46
18 1333580.4 336623.04 167.02
20 141756 374025.6 185.58
The feedwater information of table 1 A resource consumption data
It should be noted that foregoing resource consumption data P is specifically as follows energy supply cost;Power consumption data p2Specifically may be used Think the electricity charge;Constant drain data p1It is specifically as follows fixed investment to share.
Wherein, cost=(water pump investment+pipeline investment) × run time/20+ electricity charge is energized;
The electricity charge=(the low area of the water pump electrical power+high area of water pump electrical power) × run time × electricity charge quota;
The low area of the low area × lift of the low area=flow of the water pump electrical power × low area of Margin coefficient/pump efficiency;
The high area of the high area × lift of the high area=flow of the water pump electrical power × high area of Margin coefficient/pump efficiency.
And then calculated for feedwater information B, resource consumption tables of data as shown in table 2 below can be obtained.
Feed water duration t Constant drain data p1 Power consumption data p2 Resource consumption data P
Year Member Member Wan Yuan
2 160785.6 39087.36 19.99
4 321571.2 78174.72 39.97
6 482356.8 117262.08 59.96
8 643142.4 156349.44 79.95
10 803928 195436.8 99.94
12 964713.6 234524.16 119.92
14 1125499.2 273611.52 139.91
16 1286284.8 312698.88 159.90
18 1447070.4 351786.24 179.89
20 1607856 390873.6 199.87
The feedwater information of table 2 B resource consumption data
It should be noted that foregoing resource consumption data P is specifically as follows energy supply cost;Power consumption data p2Specifically may be used Think the electricity charge;Constant drain data p1It is specifically as follows fixed investment to share.
Wherein, cost=(water pump investment+pipeline investment) × run time/20+ electricity charge is energized;
The electricity charge=(area+high area of water pump electrical power in the low area of water pump electrical power+water pump electrical power) × run time × electricity charge By norm;
The low area of the low area × lift of the low area=flow of the water pump electrical power × low area of Margin coefficient/pump efficiency;
Area in area × Margin coefficient/pump efficiency in area × lift in area=flow in water pump electrical power;
The high area of the high area × lift of the high area=flow of the water pump electrical power × high area of Margin coefficient/pump efficiency.
Finally, calculated for feedwater information C, resource consumption tables of data as shown in table 3 below can be obtained.
The feedwater information of table 3 C resource consumption data
It should be noted that foregoing resource consumption data P is specifically as follows energy supply cost;Power consumption data p2Specifically may be used Think the electricity charge;Constant drain data p1It is specifically as follows fixed investment to share.
Wherein, cost=(water pump investment+pipeline investment) × run time/20+ electricity charge is energized;
The electricity charge=(area+high area of water pump electrical power in the low area of water pump electrical power+water pump electrical power) × run time × electricity charge By norm;
The low area of the low area × lift of the low area=flow of the water pump electrical power × low area of Margin coefficient/pump efficiency;
Area in area × Margin coefficient/pump efficiency in area × lift in area=flow in water pump electrical power;
The high area of the high area × lift of the high area=flow of the water pump electrical power × high area of Margin coefficient/pump efficiency.
According to feedwater information A, feedwater information B and the information C that feeds water resource consumption data, difference rendering resource consumption data With the change curve of feedwater duration, illustrate so as to obtain resource consumption data as shown in Figure 2 with the change curve of feedwater duration Figure.As shown in Fig. 2 abscissa is feedwater duration, typically in units of year, ordinate is resource consumption numerical value.
In order to select long-term use of most economical feedwater partition scheme most saved, by curve comparison, as shown in Figure 2, give Water information A in the 3rd year and after, be all that resource consumption data are minimum, so as to select feed water information A as target feedwater information, Separate water supply is subsequently carried out to building using option A corresponding to target feedwater information.
When being fed water, piping schematic corresponding to option A will be as shown in figure 3, respectively by different water pumps to right The feedwater subregion answered is fed water.
In the present embodiment, by obtaining multiple feedwater information, and then for each feedwater information, each feedwater duration is calculated Corresponding resource consumption data, and the curve that rendering resource consumption data changes with feedwater duration.Then, believed according to multiple feedwater Curve is contrasted corresponding to breath, to select target feedwater information from the multiple feedwater information, and uses the target The information that feeds water is to the building water supply.Due to the curve based on resource consumption data with feedwater duration change, selected target feedwater Information carries out building water supply, solves water supply modes of the prior art, efficiency is poor, less efficient technical problem.
Fig. 4 is a kind of structural representation of the waterworks based on tier building provided in an embodiment of the present invention.Such as Fig. 4 institutes Show, being somebody's turn to do the waterworks based on tier building includes:Acquisition module 41, computing module 42, contrast module 43 and execution module 44.
Acquisition module 41, for obtaining multiple feedwater information.
Wherein, each described feedwater information, floor value corresponding to each feedwater subregion divided in being built for instruction.
Computing module 42, for for each feedwater information, calculate it is each feedwater duration corresponding to resource consumption data, and The curve that rendering resource consumption data changes with feedwater duration.
Specifically, computing module 42, specifically for obtaining constant drain data corresponding to feedwater information, and then calculate and respectively give Power consumption data corresponding to water duration, according to power consumption number corresponding to constant drain data and each feedwater duration According to resource consumption data corresponding to each feedwater duration of calculating.
As a kind of possible implementation, for each feedwater duration t, using formula P=p1×t/T+p2, calculate Obtain resource consumption data P corresponding to the feedwater duration t;Wherein, p1For constant drain data, p2For t pairs of the duration of feedwater The power consumption data answered, T are default total duration.
For each feedwater duration t, according to formula p2=W × t × X, electricity corresponding to the feedwater duration t is calculated Can consumption data p2;Wherein, W is the power sum of water pump in each feedwater subregion, and X is electricity charge quota.Wherein, water in each subregion The power w of pump, it is lift according to needed for the flow of the subregion, the subregion, water in default Margin coefficient and the subregion What the efficiency calculation of pump obtained.
It should be noted that the flow of subregion refers to user's water consumption sum in the subregion.
Contrast module 43, contrasted for the curve according to corresponding to the multiple feedwater information, to be given from the multiple Target feedwater information is selected in water information.
Specifically, contrast module 43, specifically for the curve according to corresponding to the multiple feedwater information, resource consumption is contrasted Data;The minimum target feedwater information of resource consumption data is selected from the multiple feedwater information.
Execution module 44, for feeding water information to the building water supply using the target.
In this implementation, by obtaining multiple feedwater information, and then for each feedwater information, each feedwater duration pair is calculated The resource consumption data answered, and the curve that rendering resource consumption data changes with feedwater duration.Then, according to multiple feedwater information Corresponding curve is contrasted, and to select target feedwater information from the multiple feedwater information, and is given using the target Water information is to the building water supply.Due to the curve based on resource consumption data with feedwater duration change, selected target feedwater letter Breath carries out building water supply, solves water supply modes of the prior art, efficiency is poor, less efficient technical problem.
It should be noted that the foregoing explanation to the water feeding method embodiment based on tier building is also applied for the reality The waterworks based on tier building of example are applied, here is omitted.
In order to realize above-described embodiment, the present invention also proposes a kind of computer equipment, including:Processor, and for depositing Store up the memory of the processor-executable instruction.
Wherein, processor is configured as:
Obtain multiple feedwater information;Wherein, each described feedwater information, for being divided in instruction building respectively to moisture Floor value corresponding to area;
For each feedwater information, resource consumption data corresponding to each feedwater duration, and rendering resource consumption number are calculated According to the curve with feedwater duration change;
Contrasted according to curve corresponding to the multiple feedwater information, to select mesh from the multiple feedwater information Mark feedwater information;
Information is fed water to the building water supply using the target.
In order to realize above-described embodiment, the present invention also proposes a kind of non-transitorycomputer readable storage medium, when described When instruction in storage medium is performed by processor, a kind of water feeding method based on tier building, methods described are able to carry out Including:
Obtain multiple feedwater information;Wherein, each described feedwater information, for being divided in instruction building respectively to moisture Floor value corresponding to area;
For each feedwater information, resource consumption data corresponding to each feedwater duration, and rendering resource consumption number are calculated According to the curve with feedwater duration change;
Contrasted according to curve corresponding to the multiple feedwater information, to select mesh from the multiple feedwater information Mark feedwater information;
Information is fed water to the building water supply using the target.
In order to realize above-described embodiment, the present invention also proposes a kind of computer program product, when the computer program produces When instruction processing unit in product performs, a kind of water feeding method based on tier building is performed, methods described includes:
Obtain multiple feedwater information;Wherein, each described feedwater information, for being divided in instruction building respectively to moisture Floor value corresponding to area;
For each feedwater information, resource consumption data corresponding to each feedwater duration, and rendering resource consumption number are calculated According to the curve with feedwater duration change;
Contrasted according to curve corresponding to the multiple feedwater information, to select mesh from the multiple feedwater information Mark feedwater information;
Information is fed water to the building water supply using the target.
In the description of this specification, reference term " one embodiment ", " some embodiments ", " example ", " specifically show The description of example " or " some examples " etc. means specific features, structure, material or the spy for combining the embodiment or example description Point is contained at least one embodiment or example of the present invention.In this manual, to the schematic representation of above-mentioned term not Identical embodiment or example must be directed to.Moreover, specific features, structure, material or the feature of description can be with office Combined in an appropriate manner in one or more embodiments or example.In addition, in the case of not conflicting, the skill of this area Art personnel can be tied the different embodiments or example and the feature of different embodiments or example described in this specification Close and combine.
In addition, term " first ", " second " are only used for describing purpose, and it is not intended that instruction or hint relative importance Or the implicit quantity for indicating indicated technical characteristic.Thus, define " first ", the feature of " second " can be expressed or Implicitly include at least one this feature.In the description of the invention, " multiple " are meant that at least two, such as two, three It is individual etc., unless otherwise specifically defined.
Any process or method described otherwise above description in flow chart or herein is construed as, and represents to include Module, fragment or the portion of the code of the executable instruction of one or more the step of being used to realize custom logic function or process Point, and the scope of the preferred embodiment of the present invention includes other realization, wherein can not press shown or discuss suitable Sequence, including according to involved function by it is basic simultaneously in the way of or in the opposite order, carry out perform function, this should be of the invention Embodiment person of ordinary skill in the field understood.
Expression or logic and/or step described otherwise above herein in flow charts, for example, being considered use In the order list for the executable instruction for realizing logic function, may be embodied in any computer-readable medium, for Instruction execution system, device or equipment (such as computer based system including the system of processor or other can be held from instruction The system of row system, device or equipment instruction fetch and execute instruction) use, or combine these instruction execution systems, device or set It is standby and use.For the purpose of this specification, " computer-readable medium " can any can be included, store, communicate, propagate or pass Defeated program is for instruction execution system, device or equipment or the dress used with reference to these instruction execution systems, device or equipment Put.The more specifically example (non-exhaustive list) of computer-readable medium includes following:Electricity with one or more wiring Connecting portion (electronic installation), portable computer diskette box (magnetic device), random access memory (RAM), read-only storage (ROM), erasable edit read-only storage (EPROM or flash memory), fiber device, and portable optic disk is read-only deposits Reservoir (CDROM).In addition, computer-readable medium, which can even is that, to print the paper of described program thereon or other are suitable Medium, because can then enter edlin, interpretation or if necessary with it for example by carrying out optical scanner to paper or other media His suitable method is handled electronically to obtain described program, is then stored in computer storage.
It should be appreciated that each several part of the present invention can be realized with hardware, software, firmware or combinations thereof.Above-mentioned In embodiment, software that multiple steps or method can be performed in memory and by suitable instruction execution system with storage Or firmware is realized.Such as, if realized with hardware with another embodiment, following skill well known in the art can be used Any one of art or their combination are realized:With the logic gates for realizing logic function to data-signal from Logic circuit is dissipated, the application specific integrated circuit with suitable combinational logic gate circuit, programmable gate array (PGA), scene can compile Journey gate array (FPGA) etc..
Those skilled in the art are appreciated that to realize all or part of step that above-described embodiment method carries Suddenly it is that by program the hardware of correlation can be instructed to complete, described program can be stored in a kind of computer-readable storage medium In matter, the program upon execution, including one or a combination set of the step of embodiment of the method.
In addition, each functional unit in each embodiment of the present invention can be integrated in a processing module, can also That unit is individually physically present, can also two or more units be integrated in a module.Above-mentioned integrated mould Block can both be realized in the form of hardware, can also be realized in the form of software function module.The integrated module is such as Fruit is realized in the form of software function module and as independent production marketing or in use, can also be stored in a computer In read/write memory medium.
Storage medium mentioned above can be read-only storage, disk or CD etc..Although have been shown and retouch above Embodiments of the invention are stated, it is to be understood that above-described embodiment is exemplary, it is impossible to be interpreted as the limit to the present invention System, one of ordinary skill in the art can be changed to above-described embodiment, change, replace and become within the scope of the invention Type.

Claims (10)

1. a kind of water feeding method based on tier building, it is characterised in that comprise the following steps:
Obtain multiple feedwater information;Wherein, each described feedwater information, for each feedwater subregion pair for indicating to divide in building The floor value answered;
For each feedwater information, calculate it is each feedwater duration corresponding to resource consumption data, and rendering resource consumption data with Feed water the curve that duration changes;
According to it is the multiple feedwater information corresponding to curve contrasted, with from it is the multiple feedwater information in select target to Water information;
Information is fed water to the building water supply using the target.
2. the water feeding method according to claim 1 based on tier building, it is characterised in that described to be given according to the multiple Curve corresponding to water information is contrasted, to select target feedwater information from the multiple feedwater information, including:
According to curve corresponding to the multiple feedwater information, resource consumption data are contrasted;
The minimum target feedwater information of resource consumption data is selected from the multiple feedwater information.
3. the water feeding method according to claim 1 based on tier building, it is characterised in that described for each feedwater Information, resource consumption data corresponding to each feedwater duration are calculated, including:
Obtain constant drain data corresponding to the feedwater information;
Calculate power consumption data corresponding to each feedwater duration;
According to power consumption data corresponding to constant drain data and each feedwater duration, calculate corresponding to each feedwater duration Resource consumption data.
4. the water feeding method according to claim 3 based on tier building, it is characterised in that described according to constant drain number According to this and power consumption data corresponding to each feedwater duration, resource consumption data corresponding to each feedwater duration are calculated, including:
For each feedwater duration t, using formula P=p1×t/T+p2, resource corresponding to the feedwater duration t is calculated Consumption data P;Wherein, p1For constant drain data, p2It is default for power consumption data, T corresponding to the feedwater duration t Total duration.
5. the water feeding method according to claim 3 based on tier building, it is characterised in that described to calculate each feedwater duration Corresponding power consumption data, including:
For each feedwater duration t, according to formula p2=W × t × X, the electric energy corresponding to duration t that feeds water is calculated and disappears Consume data p2;Wherein, W is the power sum of water pump in each feedwater subregion, and X is electricity charge quota.
6. the water feeding method according to claim 5 based on tier building, it is characterised in that
The power w of water pump in each subregion, it is lift according to needed for the flow of the subregion, the subregion, default allowance system The efficiency calculation of water pump obtains in number and the subregion;
Wherein, the flow of the subregion refers to user's water consumption sum in the subregion.
A kind of 7. waterworks based on tier building, it is characterised in that including:
Acquisition module, for obtaining multiple feedwater information;Wherein, each described feedwater information, for indicating to divide in building Each feedwater subregion corresponding to floor value;
Computing module, for for each feedwater information, calculating resource consumption data corresponding to each feedwater duration, and draw money The curve that source consumption data changes with feedwater duration;
Contrast module, contrasted for the curve according to corresponding to the multiple feedwater information, with from the multiple feedwater information In select target feedwater information;
Execution module, for feeding water information to the building water supply using the target.
8. a kind of computer equipment, it is characterised in that including memory, processor and storage on a memory and can be in processor The computer program of upper operation, it is characterised in that during the computing device described program, realize as appointed in claim 1-6 The water feeding method based on tier building described in one.
9. a kind of non-transitorycomputer readable storage medium, is stored thereon with computer program, it is characterised in that the program quilt The water feeding method based on tier building as any one of claim 1-6 is realized during computing device.
10. a kind of computer program product, when the instruction in the computer program product is by computing device, perform as weighed Profit requires the water feeding method based on tier building any one of 1-6.
CN201710453372.3A 2017-06-15 2017-06-15 Water feeding method and device based on tier building Pending CN107369105A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710453372.3A CN107369105A (en) 2017-06-15 2017-06-15 Water feeding method and device based on tier building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710453372.3A CN107369105A (en) 2017-06-15 2017-06-15 Water feeding method and device based on tier building

Publications (1)

Publication Number Publication Date
CN107369105A true CN107369105A (en) 2017-11-21

Family

ID=60306470

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710453372.3A Pending CN107369105A (en) 2017-06-15 2017-06-15 Water feeding method and device based on tier building

Country Status (1)

Country Link
CN (1) CN107369105A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204139252U (en) * 2014-10-20 2015-02-04 徐秉正 A kind of highrise building secondary water supply system
CN104674894A (en) * 2014-11-28 2015-06-03 武汉邦信汇通科技股份有限公司 Partition water supply system and method
CN104846901A (en) * 2014-10-25 2015-08-19 青岛万力科技有限公司 High-rise partitioned tandem water supply equipment
WO2016006872A1 (en) * 2014-07-08 2016-01-14 Lg Electronics Inc. Chiller
CN205530466U (en) * 2016-04-20 2016-08-31 佟伟 High layer laminate who supplies water stably supplies water saving system
CN106088212A (en) * 2016-07-14 2016-11-09 广州京维智能科技有限公司 A kind of water supply network multi-layer automatic Mesh Partition Method
CN106499001A (en) * 2016-12-23 2017-03-15 山东科源供排水设备工程有限公司 Flow subregion intelligent water supply system and its using method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016006872A1 (en) * 2014-07-08 2016-01-14 Lg Electronics Inc. Chiller
CN204139252U (en) * 2014-10-20 2015-02-04 徐秉正 A kind of highrise building secondary water supply system
CN104846901A (en) * 2014-10-25 2015-08-19 青岛万力科技有限公司 High-rise partitioned tandem water supply equipment
CN104674894A (en) * 2014-11-28 2015-06-03 武汉邦信汇通科技股份有限公司 Partition water supply system and method
CN205530466U (en) * 2016-04-20 2016-08-31 佟伟 High layer laminate who supplies water stably supplies water saving system
CN106088212A (en) * 2016-07-14 2016-11-09 广州京维智能科技有限公司 A kind of water supply network multi-layer automatic Mesh Partition Method
CN106499001A (en) * 2016-12-23 2017-03-15 山东科源供排水设备工程有限公司 Flow subregion intelligent water supply system and its using method

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
宁海燕: "高层建筑生活给水***的节能和优化研究", 《中国优秀硕士学位论文全文数据库工程科技II辑》 *
张勤 等: "高层建筑给水***能耗构成和节能措施分析", 《中国给水排水》 *
郑启萍: "高层建筑给水方案的选择与优化", 《中国优秀硕士学位论文全文数据库工程科技II辑》 *

Similar Documents

Publication Publication Date Title
CN107315772B (en) The problem of based on deep learning matching process and device
DE102017120452A1 (en) Evaluation of input data rarity in calculation units of a neural network
Ebrahimnejad et al. A novel approach for sensitivity analysis in linear programs with trapezoidal fuzzy numbers
CN106131698A (en) Information display method and device and electronic equipment
CN106250012A (en) Screen intensity and color temperature adjusting method, device and terminal unit
CN108302719A (en) Control method, device, system and the storage medium of multi-online air-conditioning system
CN107346659A (en) Audio recognition method, device and terminal based on artificial intelligence
CN107544903A (en) Page specification detection method, device and computer equipment
CN109670491A (en) Identify method, apparatus, equipment and the storage medium of facial image
CN106469107A (en) A kind of capacity prediction methods of storage resource and device
CN109059224A (en) Control method, device and the apparatus of air conditioning of the apparatus of air conditioning
CN107504643A (en) The control method and device of air-conditioning
CN108228596A (en) A kind of dynamic data methods of exhibiting
CN107220063A (en) Dynamic wallpaper generation method and device
CN104534679B (en) Heat pump water-heating machine and the temperature control method of water and device for heat pump water-heating machine
CN107369105A (en) Water feeding method and device based on tier building
Ezimadu A mathematical model of the effect of subsidy transfer in cooperative advertising using differential game theory
CN109028470A (en) Control method, device and the apparatus of air conditioning of the apparatus of air conditioning
CN107644065A (en) The construction method and device of company information relational network
CN107391105A (en) Text method for drafting and device
CN104463627B (en) Data processing method and device
CN105744047A (en) Information display method and device for mobile terminal
CN104764113B (en) The control method for lowering temp of power device, device and air conditioner in air conditioner
CN103606175B (en) The display packing of a kind of map hotspot icon and controller
CN107315804A (en) Picture loading method and device and electronic equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20171121

RJ01 Rejection of invention patent application after publication