CN107358562A - For the electric network emergency repairing flattening command system and method under Rainfall Disaster - Google Patents
For the electric network emergency repairing flattening command system and method under Rainfall Disaster Download PDFInfo
- Publication number
- CN107358562A CN107358562A CN201710587484.8A CN201710587484A CN107358562A CN 107358562 A CN107358562 A CN 107358562A CN 201710587484 A CN201710587484 A CN 201710587484A CN 107358562 A CN107358562 A CN 107358562A
- Authority
- CN
- China
- Prior art keywords
- information
- emergency
- platform
- repair
- fault
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 19
- 230000008439 repair process Effects 0.000 claims abstract description 111
- 230000005540 biological transmission Effects 0.000 claims description 51
- 238000012544 monitoring process Methods 0.000 claims description 26
- 238000007726 management method Methods 0.000 claims description 13
- APTZNLHMIGJTEW-UHFFFAOYSA-N pyraflufen-ethyl Chemical compound C1=C(Cl)C(OCC(=O)OCC)=CC(C=2C(=C(OC(F)F)N(C)N=2)Cl)=C1F APTZNLHMIGJTEW-UHFFFAOYSA-N 0.000 claims description 12
- 230000007257 malfunction Effects 0.000 claims description 4
- 230000005611 electricity Effects 0.000 claims description 3
- 230000002093 peripheral effect Effects 0.000 claims description 3
- 230000015572 biosynthetic process Effects 0.000 claims description 2
- 238000012423 maintenance Methods 0.000 claims description 2
- 238000006243 chemical reaction Methods 0.000 claims 1
- 230000002708 enhancing effect Effects 0.000 abstract description 3
- 230000002452 interceptive effect Effects 0.000 abstract description 3
- 230000000694 effects Effects 0.000 description 6
- 230000008569 process Effects 0.000 description 5
- 230000004888 barrier function Effects 0.000 description 4
- 238000012876 topography Methods 0.000 description 4
- 238000011161 development Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 210000003813 thumb Anatomy 0.000 description 2
- 238000012800 visualization Methods 0.000 description 2
- 238000004458 analytical method Methods 0.000 description 1
- 238000000205 computational method Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000000605 extraction Methods 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/10—Services
- G06Q50/26—Government or public services
- G06Q50/265—Personal security, identity or safety
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Tourism & Hospitality (AREA)
- Health & Medical Sciences (AREA)
- Economics (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- Human Resources & Organizations (AREA)
- Marketing (AREA)
- Primary Health Care (AREA)
- Strategic Management (AREA)
- General Physics & Mathematics (AREA)
- General Health & Medical Sciences (AREA)
- General Business, Economics & Management (AREA)
- Water Supply & Treatment (AREA)
- Public Health (AREA)
- Computer Security & Cryptography (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- Alarm Systems (AREA)
Abstract
The invention belongs to electric power network technique field, discloses a kind of electric network emergency repairing flattening command system being used under Rainfall Disaster and method, builds perfect emergency first-aid repair Precaution Tactics automatically according to fault type etc.:The emergency first-aid repair instrument of the decisions such as rational meteorological condition time.By the emergency first-aid repair Precaution Tactics built automatically, intelligent adjustment assigns repairing task to repair personnel, ensures repairing the safe and stable, reliable of work, Effec-tive Function.The practical application scene rushed to repair with reference to electric network emergency under Rainfall Disaster, there is provided obtain the condition of a disaster information, line information and the instrument for rushing to repair place and environment information whenever and wherever possible;The very first time allows emergency first-aid repair instruction to be communicated to specific repair personnel on hand, judges to provide foundation to provide comprehensive commander.Direct interactive between enhancing repair personnel, the passivity of arrangement need to be commanded by reducing everything;Organically combine reality, it is ensured that the reasonability of command deployment, and the ability that repair personnel quickly reaches the spot.
Description
Technical field
The invention belongs to electric power network technique field, more particularly to a kind of electric network emergency repairing flattening being used under Rainfall Disaster
Command system and method.
Background technology
At present, " flattening " management method is a kind of Novel work management method under current " internet+" pattern, is passed through
Using advanced development of Mobile Internet technology, the management for going " proceduring " is realized, reduces management level, shortens instruction flow, lifting
Command and management efficiency.Intelligent mobile phone terminal function is growing, waterproof, dust-proof, can store present graphical, voice, word number
It is longer according to, continuous working period.Wechat enterprise-level application on intelligent mobile phone terminal accesses mobile service management for enterprise and carried
Supplied solid foundation, opened up mobile cooperation new tunnel, solve traditional cell phone can only one-way voice link up, no
The more people of energy participate in the pattern that ditch passes through jointly, and passage base has been established for the emergency first-aid repair business development of " flattening " management mode
Plinth.
In summary, the problem of prior art is present be:After Rainfall Disaster occurs, all power network repairing staff exist
Outdoor field work, it is more that emergency first-aid repair instruction reception and registration process reports level, easily produces and omits and distortion.Electric network emergency always refers to
After the repairing instruction waved is passed on, it can not quickly know whether truly to be communicated to specific all repair personnel of a line.In disaster relief and rescue
The circuit corrupted information that process is found lacks visualization record, reports instrument, and traditional mode reporting by telephone describes unclear, and report is gone through
History is difficult to thumb.Disaster relief and rescue engineering, first-line staff lack related disaster monitoring system Monitoring Data, and inquiry data level is more
More, data acquisition is not in time.Disaster relief process, mutual aid unmanageable between numerous teams, difficult coordinate, easily shift responsibility onto others and refer to, it is necessary to wait
Center United Dispatching is waved, reduces first-aid repair efficiency.Disaster relief carrying notebook computer is inconvenient to work out of doors, using based on intelligent hand
Machine terminal device is more convenient, multipurpose.
The content of the invention
The problem of existing for prior art, the invention provides a kind of electric network emergency repairing being used under Rainfall Disaster is flat
Graduation command system and method.
The present invention is achieved in that a kind of electric network emergency repairing flattening command system being used under Rainfall Disaster, institute
State and be provided with for the electric network emergency repairing flattening command system under Rainfall Disaster:Emergency commanding platform, put down with emergency command
The power transmission line intelligent fault monitoring system of platform connection, lightning location system, transmission line information system, generalized information system, public gas
As system, power network microclimate information system;
The power transmission line intelligent fault monitoring system provides the fault location information of repairing circuit to emergency commanding platform;
The lightning location system provides the thunderbolt situation information of line fault point periphery thunder and lightning to emergency commanding platform;
The transmission line information system provides trouble point upper boom tower basic condition and the week of circuit to emergency commanding platform
Side landform, geomorphology information;
The generalized information system provides the graphical information of abort situation point and its associated circuitry, geographical seat to emergency commanding platform
Cursor position information;
The Public meteorology system to emergency commanding platform provide fault zone currently with follow-up weather information;
The power network microclimate information system to emergency commanding platform provide trouble point circuit pass through transformer station inside and
Surrounding enviroment weather information;
The emergency commanding platform system is stored in server, and the server connects fire wall;The fire wall passes through
Network connecting radio base station;The wireless base station provides wireless signal to intelligent movable mobile phone end.
Further, the emergency commanding platform is the control and command platform of flattened management, collect fault message and
User profile, and pass through applicative notifications repair personnel of the platform on wechat enterprise number, abort situation, fault type, faulty section
The information such as domain environment, while the scene feedback of repair personnel is received, and cooperate with peripheral position repair personnel to carry out resource comprehensive association
Adjust and arrange.All commanders, reception, all use of deployment information are visible per family on maneuvering platform, and can be between repair personnel mutually
Carry out task coordinate.
Further, after user pays close attention to wechat enterprise number application corresponding to emergency commanding platform, as long as mobile phone is online, just it is in
The constantly logging status of 24 hours;When the power transmission line intelligent fault monitoring system provides transmission line of electricity to emergency commanding platform
Fault warning information:Time of casualty, tripping operation line name, accident are separate, nature of trouble, thunderbolt property, starting shaft tower are numbered, eventually
Only shaft tower numbering, accident shaft tower are numbered, and corresponding warning information can be received by becoming on the mobile phone terminal of user, while in information clearly
Rush to repair the failure shaft tower numbering of circuit;Platform meeting simultaneously is numbered according to the failure shaft tower received and time of failure information,
New query statement is generated to be inquired about to described lightning location system;The thunderbolt object information inquired:Time, latitude,
Longitude, electric current, counterattack, acquisition station number, are delivered on the emergency commanding platform by corresponding interface, and user passes through corresponding micro-
Letter enterprise number can receive the result of inquiry;
While user is according to the fault warning information of reception:Trip line name, accident shaft tower numbering, generates new inquiry
Instruct and inquired about to described transmission line information system, inquire the detail information of failure shaft tower:Turriform, location
Shape, landforms, height, date of putting into operation;The information inquired is stored on the emergency commanding platform, and user passes through corresponding wechat
Enterprise number receives the result of inquiry;
Meanwhile emergency commanding platform can be according to the fault warning information received:Trip line name, accident shaft tower volume
Number, generate new query statement and inquired about to described generalized information system, inquire the detail location coordinate information of failure shaft tower,
The coordinate information inquired is stored on the emergency commanding platform, and passes through the emergency commanding platform and wechat map interface
Geographical position graphics are formed, user can realize the navigation in geographical position by corresponding wechat enterprise number;
Meanwhile the emergency commanding platform can need to carry out according to the position of fault geographic position name of storage, and user
On the date of repairing, generate new query statement and inquired about automatically to described Public meteorology information, accurately inquire locality
Weather information, user can quickly be known by corresponding wechat enterprise number;
On the basis of in the external environment condition data needed for all rapid rush-repairs, quickly association prepares, cammander is to pass through
Emergency commanding platform is stated to carry out commanding assigning for instruction to the bottom-up employee for having paid close attention to platform and corresponding to wechat enterprise number;
Bottom-up employee will receive commander's command information by wechat enterprise number corresponding to platform:Task place, maintenance participate in
Personnel, in place personnel;Meanwhile bottom-up employee is made whether to perform report in place and feedback to commander's instruction, report and feedback
Data are sent by wechat enterprise number corresponding to platform to all command reception people, realize that the constantly division of labor of repairing task is coordinated.
Another object of the present invention is to provide a kind of electric network emergency repairing flattening commander system being used under Rainfall Disaster
System operation method comprises the following steps:
Step 1, power transmission line intelligent fault monitoring system are found because of line tripping warning information caused by Rainfall Disaster
Afterwards, information is sent to the emergency first-aid repair platform of the present invention by data-interface;
Step 2, after emergency first-aid repair platform receives the fault message of power transmission line intelligent fault monitoring system, from information
Middle extraction time of failure data, and fault time data are sent to lightning location system;
Step 3, obtained according to fault time data from lightning location system and lightning fault specifically occurs in fault time
Overhead line structures information;
Step 4, the overhead line structures information of acquisition is sent to transmission line information system and generalized information system;
Step 5, the detailed attribution information of overhead line structures is got from transmission line information system;
Step 6, by Step 1: the information that step 3 and step 5 are obtained carries out comprehensive associative combination, formation one
Detailed line tripping fault related information.
Step 7, the detailed geographical location information of trouble point is got from generalized information system according to step 4 content;
Step 8, after the detailed geographical location information of trouble point is arranged into querying condition, respectively in Public meteorology information
Inquired about in system and power network microclimate system;
Step 9, the Query Result of emergency first-aid repair platform obtaining step eight:Position weather information result;
Step 10, the detailed fault correlation that emergency first-aid repair platform combines according to position weather information result with step 6 are believed
Breath, forms scientific and rational emergency first-aid repair job placement period planning;
Step 11, when emergency first-aid repair platform is according to the detailed fault correlation information being combined into and emergency first-aid repair job placement
Between plan, by emergency first-aid repair Platform Server, link internet, transmit channel by wechat enterprise number, be sent automatically to institute
Have on the intelligent movable mobile phone end of repair personnel;Repair personnel is to the fault message received and emergency first-aid repair job placement time
It can carry out receiving feedback or advisory feedback, all feedback informations can pass through wechat enterprise number and transmit channel by emergency first-aid repair platform again
Receive, store and be forwarded on the intelligent movable mobile phone end with commanding power personnel;Commanding can be in time according to feedback letter
Breath, commander's instruction is resend, realize the flattened management operation of commander;Meanwhile all repair personnel can pass through wechat and look forward to
Industry transmission channel obtains the every system data accessed on emergency first-aid repair platform, voluntarily checks, utilizes, lifting repairing work effect
Rate.
Further, before described emergency commanding platform is built, if each repairing instruction publisher arranges issue and robbed
The total time expended required for before repairing instruction is X1;
Specific execution step is as follows:The first step, supervised if user receives power transmission line intelligent failure by SMS
The warning information that examining system is sent, and information is manually split, prepare the inquiry that different words is used in different system,
It is A to need the consuming time;
Second step, if the text information that the first step is replicated, which is input to, inquires detailed thunderbolt letter in lightning location system
Breath is, it is necessary to which it is B to expend the time;
3rd step, if by the first step replicate text information be input in transmission line information system inquire it is detailed by
Failure shaft tower information is, it is necessary to which it is C to expend the time;
4th step, if by the first step replicate text information be input in generalized information system inquire it is detailed by failure shaft tower
Geographical position coordinates are, it is necessary to which it is D to expend the time;
5th step, if being formed event by failure shaft tower geographical position coordinates information combination wechat map by what the 5th step inquired
Barrier point position navigation is, it is necessary to which it is E to expend the time;
6th step, if by the 5th step inquire by failure shaft tower geographical location information and it is expected that emergency repair time is input to public affairs
Corresponding weather information is inquired about in weather information altogether, it is necessary to it is F to expend the time, because optimal emergency repair time be decided by the meteorological date because
Element is, it is necessary to carry out N wheel traversals;If, it is necessary to the total time X1=A+B+C+D+E+F* expended before each repairing instruction issue
N。
Advantages of the present invention and good effect are:The integrated failure notification message of the present invention, Public meteorology information, the micro- gas of power network
Image information, the intelligent repairing for carrying out emergency command arrange.According to fault type, the gas of trouble point sending zone is as situation, event
Barrier point perimeter circuit tower structure and topography and geomorphology, build perfect emergency first-aid repair Precaution Tactics automatically:Rational meteorological condition
The emergency first-aid repair instrument that the precautionary measures, topography and geomorphology required for time, overhead line structures structure determine.It is emergent by what is built automatically
Precaution Tactics are rushed to repair, intelligent adjustment assigns repairing task to repair personnel, ensures the safe and stable, reliable, high of repairing work
Effect operation.The practical application scene rushed to repair with reference to electric network emergency under Rainfall Disaster, there is provided obtain the condition of a disaster information, line whenever and wherever possible
The instrument of road information and repairing place and environment information;The very first time allows emergency first-aid repair instruction to be communicated to specific repair personnel on hand,
And it would know that whether instruction passes in place.Line repair personnel scene feedback is received in time, judges to provide to provide comprehensive commander
Foundation.Direct interactive between enhancing repair personnel, the passivity of arrangement need to be commanded by reducing everything;Realize position of fault position
Put, position of fault climate condition information, faulty line data, repair personnel geographical position combination reality, it is ensured that commander
The reasonability of allotment, and the ability that repair personnel quickly reaches the spot.
Brief description of the drawings
Fig. 1 is the electric network emergency repairing flattening command system structure provided in an embodiment of the present invention being used under Rainfall Disaster
Schematic diagram;
In figure:1st, emergency commanding platform;2nd, power transmission line intelligent fault monitoring system;3rd, lightning location system;4th, transmit electricity
Line information system;5th, generalized information system;6th, Public meteorology system 6;7th, power network microclimate information system;8th, wireless base station;9th, it is mobile
Mobile phone end;10th, fire wall;11st, server.
Fig. 2 is the electric network emergency repairing flattening command system operation provided in an embodiment of the present invention being used under Rainfall Disaster
Method flow diagram.
Embodiment
In order to further understand the content, features and effects of the present invention, hereby enumerating following examples, and coordinate accompanying drawing
Describe in detail as follows.
At present, after Rainfall Disaster occurs, all power networks rush to repair staff's field work out of doors, emergency first-aid repair instruction
It is more that reception and registration process reports level, easily produces and omits and distortion., can not be fast after the repairing instruction of electric network emergency commander in chief is passed on
Speed knows whether truly to be communicated to specific all repair personnel of a line.Lack in the circuit corrupted information that disaster relief and rescue process is found
Visualization record, report instrument, traditional mode reporting by telephone describe it is unclear, report history be difficult to thumb.Disaster relief and rescue engineering, one
Informant person lacks related disaster monitoring system Monitoring Data, and inquiry data level is more more, and data acquisition is not in time.The disaster relief
Journey, mutual aid unmanageable between numerous teams, it is difficult coordinate, easily shift responsibility onto others, it is necessary to wait command centre's United Dispatching, reduce repairing effect
Rate.Disaster relief carrying notebook computer is inconvenient to work out of doors, using based on intelligent mobile phone terminal equipment is more convenient, multipurpose.
The present invention is described in detail below in conjunction with the accompanying drawings.
As shown in figure 1, the electric network emergency repairing flattening commander system provided in an embodiment of the present invention being used under Rainfall Disaster
System, is provided with:Emergency commanding platform 1, power transmission line intelligent fault monitoring system 2, the thunder and lightning being connected with emergency commanding platform are fixed
Position system 3, transmission line information system 4, generalized information system 5, Public meteorology system 6, power network microclimate information system 7.
The power transmission line intelligent fault monitoring system provides the fault location information of repairing circuit to emergency commanding platform,
The lightning location system provides the thunderbolt situation information of line fault point periphery thunder and lightning, the power transmission line to emergency commanding platform
Road information system provides the trouble point upper boom tower basic condition and periphery landform, geomorphology information of circuit to emergency commanding platform;
The generalized information system 5 provides the graphical information of abort situation point and its associated circuitry, geographical seat to emergency commanding platform
Cursor position information, the Public meteorology system provides fault zone currently with follow-up weather information to emergency commanding platform, described
Power network microclimate information system provides trouble point circuit to emergency commanding platform and passes through transformer station inside and surrounding enviroment meteorology
Information.
The emergency commanding platform system is stored in server 11, and the server connects fire wall 10;The fire wall
Pass through network connecting radio base station 8;The wireless base station 8 provides wireless signal to intelligent movable mobile phone end 9.
The present invention is to rush to repair flattening command system, the integrated failure notification of the present invention for the electric network emergency under Rainfall Disaster
Information, Public meteorology information, power network microclimate information, the intelligent repairing for carrying out emergency command arrange.According to fault type, therefore
The gas of barrier point sending zone builds perfect emergent rob as situation, trouble point perimeter circuit tower structure and topography and geomorphology automatically
Repair Precaution Tactics:The precautionary measures, emergent the robbing of topography and geomorphology decision required for rational meteorological condition time, overhead line structures structure
Repair instrument.
By the emergency first-aid repair Precaution Tactics built automatically, intelligent adjustment assigns repairing task to repair personnel, ensures
Rush to repair the safe and stable, reliable of work, Effec-tive Function.The practical application scene rushed to repair with reference to electric network emergency under Rainfall Disaster, is carried
Supply to obtain the condition of a disaster information, line information and the instrument for rushing to repair place and environment information whenever and wherever possible;The very first time allows emergency first-aid repair
Instruction is communicated to specific repair personnel on hand, and would know that whether instruction passes in place.Line repair personnel scene is received in time
Feedback, judge to provide foundation to provide comprehensive commander.Direct interactive between enhancing repair personnel, peace need to be commanded by reducing everything
The passivity of row;Realize position of fault position, position of fault climate condition information, faulty line data, repair personnel's geography position
The combination reality put, it is ensured that the reasonability of command deployment, and the ability that repair personnel quickly reaches the spot.
The structure of the present invention is explained in detail below in conjunction with the accompanying drawings.
As shown in figure 1, the power transmission line intelligent malfunction monitoring being connected including emergency commanding platform 1, with emergency commanding platform 1
System 2, lightning location system 3, transmission line information system 4, generalized information system 5, Public meteorology system 6, power network microclimate information system
System 7, the power transmission line intelligent fault monitoring system 2 provide the fault location information of repairing circuit, institute to emergency commanding platform 1
State the thunderbolt situation information that lightning location system 3 provides line fault point periphery thunder and lightning to emergency commanding platform 1, the power transmission line
Road information system 4 provides the trouble point upper boom tower basic condition and periphery landform, geomorphology information of circuit to emergency commanding platform 1,
The generalized information system 5 provides abort situation point and its graphical information, the geographical coordinate position of associated circuitry to emergency commanding platform 1
Information, the Public meteorology system 6 to emergency commanding platform 1 provide fault zone currently with follow-up weather information, the power network
Microclimate information system 7 provides trouble point circuit to emergency commanding platform 1 and passes through transformer station inside and the meteorological letter of surrounding enviroment
Breath.The system of emergency commanding platform 1 is stored in server 11, and the server 11 connects fire wall 10;The fire wall 10
Pass through network connecting radio base station 8;The wireless base station 8 provides wireless signal to intelligent movable mobile phone end 9.
The emergency commanding platform 1 is the control and command platform of a flattened management, collects fault message and user's letter
Breath, and pass through applicative notifications repair personnel of the platform on wechat enterprise number, abort situation, fault type, fault zone environment
Etc. information, while the scene feedback of repair personnel is received, and cooperate with peripheral position repair personnel to carry out resource comprehensive and coordinate to arrange.
All commanders, reception, all use of deployment information are visible per family on maneuvering platform, and can carry out task mutually between repair personnel
Coordinate.
The present invention relies on wechat enterprise number to apply the versatility of the mobile platform having, the convenience used and can be quick
Platform application is extended into repair personnel's intelligent movable mobile phone end 9 inside all power networks.During repairing, cammander is only needed by certainly
This dock door on body intelligent movable mobile phone end 9 in wechat enterprise number, repairing information can be sent directly in platform
Each participates in personnel's intelligent movable mobile phone end 9 of repairing work.After command information is sent, repair personnel's intelligent movable mobile phone
Will all there be prompt message and suggestion voice in end 9, and repair personnel checks that information will be recorded with no, and feeds back to the hair of command information
The person of sending and the personnel of all participation activities know jointly.After certain time, the personnel to not checking command information in time, this hair
The bright intelligent mobile mobile phone end 9 that will dial repair personnel in the form of phone automatically, repair personnel is reminded to check commander's letter
Breath.Before repairing instruction transmission is not read, the indivedual repair personnel consulted can carry out live feedback to instruction and report instruction to send out
The person of sending is appropriately modified, it is ensured that commander's direct orders and in time, it is correct.
The present invention realizes the comprehensive association of trouble point information and automatic commander.By power transmission line intelligent fault monitoring system 2
After emergency commanding platform 1 being accessed with lightning location system 3, transmission line information system 4, generalized information system 5.By platform to power transmission line
Circuit can carry out automatic 24 hours on-line uninterruptions commander under a situation arises in natural calamities such as heavy rains, work as power transmission line intelligent
When the hair existing line of fault monitoring system 2 has tripping fault, power transmission line intelligent fault monitoring system 2 sends fault warning automatically
To emergency commanding platform 1, emergency commanding platform 1 receives automatic lighting location when calling the failure to occur after fault message to be believed information
Nearby overhead line structures information, position of failure point are geographical for breath, trouble point, and are combined into a detailed accident analysis information, pass through
Emergency commanding platform 1 is sent to the intelligent movable mobile phone end 9 of circuit repairing staff.
As shown in Fig. 2 electric network emergency repairing flattening command system operation under Rainfall Disaster provided in an embodiment of the present invention
Method comprises the following steps:
S101:After power transmission line intelligent fault monitoring system is found because of line tripping warning information caused by Rainfall Disaster,
Information is sent to the emergency first-aid repair platform of the present invention by data-interface.
S102:After emergency first-aid repair platform receives the fault message of power transmission line intelligent fault monitoring system, from information
Time of failure data are extracted, and fault time data are sent to lightning location system.
S103:Obtained according to fault time data from lightning location system and lightning fault specifically occurs in fault time
Thunderbolt information.
S104:The overhead line structures information of acquisition is sent to transmission line information system and generalized information system.
S105:The detailed attribution information of overhead line structures is got from transmission line information system.
S106:The information that S101, S103 and S105 are obtained carries out comprehensive associative combination, forms a detailed line
Road tripping fault related information.
S107:The detailed geographical location information of trouble point is got from generalized information system according to S104 contents, and combines wechat
Map forms trouble point navigation.
S108:After the detailed geographical location information of trouble point is arranged into querying condition, respectively in Public meteorology information system
Inquired about in system and power network microclimate system.
S109:Emergency first-aid repair platform obtains S108 Query Result:Position weather information result.
S110:The detailed fault correlation information that emergency first-aid repair platform combines according to position weather information result with S106, shape
Into scientific and rational emergency first-aid repair job placement period planning.
S111:Finally, emergency first-aid repair platform is according to the detailed fault correlation information being combined into and emergency first-aid repair job placement
Period planning, by emergency first-aid repair Platform Server, links internet, transmits channel by wechat enterprise number, is sent automatically to
On the intelligent movable mobile phone end of all repair personnel.
S110 acquisition, the data arranged are put into the emergent plateform system and synchronize comprehensive association, can be calculated
Go out the relatively reasonable emergency first-aid repair job placement time, and with power transmission line intelligent malfunction monitoring data, overhead line structures data,
Fault point geographical position information, failure shaft tower details, emergency repair time point weather information store database server together
In.
Before emergency commanding platform of the present invention construction, if each repairing instruction publisher arranges issue repairing
The total time expended required for before instruction is X1.
Specific execution step is as follows:The first step, supervised if user receives power transmission line intelligent failure by SMS
The warning information that examining system is sent, and information is manually split, prepare the inquiry that different words is used in different system,
It is A to need the consuming time;
Second step, if the text information that the first step is replicated, which is input to, inquires detailed thunderbolt letter in lightning location system
Breath is, it is necessary to which it is B to expend the time;
3rd step, if by the first step replicate text information be input in transmission line information system inquire it is detailed by
Failure shaft tower information is, it is necessary to which it is C to expend the time;
4th step, if by the first step replicate text information be input in generalized information system inquire it is detailed by failure shaft tower
Geographical position coordinates are, it is necessary to which it is D to expend the time;
5th step, if being formed event by failure shaft tower geographical position coordinates information combination wechat map by what the 5th step inquired
Barrier point position navigation is, it is necessary to which it is E to expend the time;
6th step, if by the 5th step inquire by failure shaft tower geographical location information and it is expected that emergency repair time is input to public affairs
Corresponding weather information is inquired about in weather information altogether, it is necessary to it is F to expend the time, because optimal emergency repair time be decided by the meteorological date because
Element is, it is necessary to carry out N wheel traversals.Therefore set before each repairing instruction is issued, it is necessary to the total time X1=A+B+C+D+E expended
+F*N。
If the computational methods of emergency commanding platform system service of the present invention are parallel processings, under above traditional mode
6 step computings almost handle simultaneously, therefore computational efficiency is at least 6 times manually calculated, realizes that trouble point is believed according to the present invention
Comprehensive association and the method commanded automatically are ceased, it is necessary to the total time X2=X1/6 expended before each repairing instruction issue.
So the time according to needed for electric network emergency repairing work commander's command content under usual Rainfall Disaster is 1 hour, use
If after emergency commanding platform system service of the present invention, all emergency first-aid repair work commander's command contents prepare only to need 10 points
Kind, efficiency improves 84%.
In S111, commanding can quickly adjust in time according to feedback information and resend commander's instruction, realize commander
Flattened management operation.Meanwhile all repair personnel can pass through wechat enterprise number transmission channel and obtain emergency first-aid repair platform
Every system data of upper access, is voluntarily checked, is utilized, lifting repairing operating efficiency.
It is described above to be only the preferred embodiments of the present invention, any formal limitation not is made to the present invention,
Every technical spirit according to the present invention belongs to any simple modification made for any of the above embodiments, equivalent variations and modification
In the range of technical solution of the present invention.
Claims (5)
1. a kind of electric network emergency repairing flattening command system being used under Rainfall Disaster, it is characterised in that described to be used for heavy rain
Electric network emergency repairing flattening command system under disaster is provided with:Emergency commanding platform, be connected with emergency commanding platform it is defeated
Electric line intelligent fault monitoring system, lightning location system, transmission line information system, generalized information system, Public meteorology system, electricity
Net microclimate information system;
The power transmission line intelligent fault monitoring system provides the fault location information of repairing circuit to emergency commanding platform;
The lightning location system provides the thunderbolt situation information of line fault point periphery thunder and lightning to emergency commanding platform;
The transmission line information system provides the trouble point upper boom tower basic condition and circumferentially of circuit to emergency commanding platform
Shape, geomorphology information;
The generalized information system provides graphical information, the geographical coordinate position of abort situation point and its associated circuitry to emergency commanding platform
Confidence ceases;
The Public meteorology system to emergency commanding platform provide fault zone currently with follow-up weather information;
The power network microclimate information system provides trouble point circuit to emergency commanding platform and passes through transformer station inside and periphery
Environment weather information;
The emergency commanding platform system is stored in server, and the server connects fire wall;The fire wall passes through network
Connect wireless base station;The wireless base station provides wireless signal to intelligent movable mobile phone end.
2. the electric network emergency repairing flattening command system being used for as claimed in claim 1 under Rainfall Disaster, it is characterised in that institute
Control and command platform of the emergency commanding platform for a flattened management is stated, collects fault message and user profile, and by flat
The information such as applicative notifications repair personnel of the platform on wechat enterprise number, abort situation, fault type, fault zone environment, simultaneously
The scene feedback of repair personnel is received, and cooperates with peripheral position repair personnel to carry out resource comprehensive and coordinates to arrange;On maneuvering platform
All commanders, reception, all use of deployment information are visible per family, and can carry out task coordinate mutually between repair personnel.
3. the electric network emergency repairing flattening command system being used for as claimed in claim 1 under Rainfall Disaster, it is characterised in that use
After wechat enterprise number application corresponding to family concern emergency commanding platform, as long as mobile phone is online, just in the constantly login of 24 hours
State;When the power transmission line intelligent fault monitoring system provides transmission line malfunction warning information to emergency commanding platform:Thing
Therefore time, tripping operation line name, accident are separate, nature of trouble, thunderbolt property, starting shaft tower numbering, terminate shaft tower numbering, accident
Shaft tower is numbered, and corresponding warning information can be received by becoming on the mobile phone terminal of user, while the failure of circuit is clearly rushed to repair in information
Shaft tower is numbered;Platform can generate new inquiry and refer to according to the failure shaft tower numbering and time of failure information received simultaneously
Make to described lightning location system and being inquired about;The thunderbolt object information inquired:Time, latitude, longitude, electric current, counterattack,
Acquisition station number, it is delivered to by corresponding interface on the emergency commanding platform, user can be received by corresponding wechat enterprise number
To the result of inquiry;
While user is according to the fault warning information of reception:Trip line name, accident shaft tower numbering, generates new query statement
Inquired about to described transmission line information system, inquire the detail information of failure shaft tower:Turriform, place landform,
Landforms, height, date of putting into operation;The information inquired is stored on the emergency commanding platform, and user is looked forward to by corresponding wechat
Industry number receives the result of inquiry;
Meanwhile emergency commanding platform can be according to the fault warning information received:Trip line name, accident shaft tower numbering, raw
Cheng Xin query statement is inquired about to described generalized information system, is inquired the detail location coordinate information of failure shaft tower, is inquired
Coordinate information be stored on the emergency commanding platform, and pass through the emergency commanding platform and wechat map interface and form ground
Location graphic conversion is managed, user can realize the navigation in geographical position by corresponding wechat enterprise number;
Meanwhile the emergency commanding platform can need to be rushed to repair according to the position of fault geographic position name of storage, and user
Date, generate new query statement and inquired about automatically to described Public meteorology information, accurately inquire locality meteorology
Information, user can quickly be known by corresponding wechat enterprise number;
The external environment condition data needed for all rapid rush-repairs quickly association prepare on the basis of, cammander with by it is described should
Anxious maneuvering platform carries out commanding assigning for instruction to the bottom-up employee for having paid close attention to platform and corresponding to wechat enterprise number;
Bottom-up employee will receive commander's command information by wechat enterprise number corresponding to platform:Task place, maintenance participant,
Personnel in place;Meanwhile bottom-up employee is made whether to perform report in place and feedback to commander's instruction, report is led to feedback data
Cross wechat enterprise number corresponding to platform to send to all command reception people, realize that the constantly division of labor of repairing task is coordinated.
4. a kind of electric network emergency repairing flattening command system operation method being used for as claimed in claim 1 under Rainfall Disaster,
Characterized in that, the electric network emergency repairing flattening command system operation method being used under Rainfall Disaster includes following step
Suddenly:
Step 1, will after power transmission line intelligent fault monitoring system is found because of line tripping warning information caused by Rainfall Disaster
Information is sent to the emergency first-aid repair platform of the present invention by data-interface;
Step 2, after emergency first-aid repair platform receives the fault message of power transmission line intelligent fault monitoring system, carried from information
Time of failure data are taken, and fault time data are sent to lightning location system;
Step 3, the line that lightning fault specifically occurs in fault time is obtained from lightning location system according to fault time data
Line pole tower information;
Step 4, the overhead line structures information of acquisition is sent to transmission line information system and generalized information system;
Step 5, the detailed attribution information of overhead line structures is got from transmission line information system;
Step 6, by Step 1: the information that step 3 and step 5 are obtained carries out comprehensive associative combination, formation one is in detail
Line tripping fault related information;
Step 7, the detailed geographical location information of trouble point is got from generalized information system according to step 4 content;
Step 8, after the detailed geographical location information of trouble point is arranged into querying condition, respectively in Public meteorology information system
Inquired about with power network microclimate system;
Step 9, the Query Result of emergency first-aid repair platform obtaining step eight:Position weather information result;
Step 10, the detailed fault correlation information that emergency first-aid repair platform combines according to position weather information result with step 6, shape
Into scientific and rational emergency first-aid repair job placement period planning;
Step 11, emergency first-aid repair platform are counted according to the detailed fault correlation information being combined into and emergency first-aid repair job placement time
Draw, by emergency first-aid repair Platform Server, link internet, transmit channel by wechat enterprise number, be sent automatically to all rob
Repair on the intelligent movable mobile phone end of personnel;Repair personnel can enter to the fault message received and emergency first-aid repair job placement time
Row receives feedback or advisory feedback, and all feedback informations can pass through wechat enterprise number transmission channel and be connect by emergency first-aid repair platform again
Receive, store and be forwarded on the intelligent movable mobile phone end with commanding power personnel;Commanding can in time according to feedback information,
Commander's instruction is resend, realizes the flattened management operation of commander;Meanwhile all repair personnel can pass through wechat enterprise number
Transmission channel obtains the every system data accessed on emergency first-aid repair platform, voluntarily checks, utilizes, lifting repairing operating efficiency.
5. the electric network emergency repairing flattening command system operation method being used for as claimed in claim 4 under Rainfall Disaster, it is special
Sign is,
Before described emergency commanding platform is built, if each repairing instruction publisher arranges institute before issue repairing instruction
The total time for needing to expend is X1;
Specific execution step is as follows:The first step, if user receives power transmission line intelligent malfunction monitoring system by SMS
Unite the warning information that sends, and information manually split, prepare different words for the inquiry in different system, it is necessary to
The consuming time is A;
Second step, if the text information that the first step is replicated, which is input to, inquires detailed thunderbolt information in lightning location system,
It is B to need the consuming time;
3rd step, if by the first step replicate text information be input in transmission line information system inquire it is detailed by failure
Shaft tower information is, it is necessary to which it is C to expend the time;
4th step, if the text information that the first step is replicated be input in generalized information system inquire it is detailed geographical by failure shaft tower
Position coordinates is, it is necessary to which it is D to expend the time;
5th step, if being formed trouble point by failure shaft tower geographical position coordinates information combination wechat map by what the 5th step inquired
Navigate, it is necessary to which it is E to expend the time position;
6th step, if by the 5th step inquire by failure shaft tower geographical location information and it is expected that emergency repair time is input to public gas
Corresponding weather information is inquired about in image information, it is necessary to it be F to expend the time, because optimal emergency repair time is decided by meteorological date factor, need
Carry out N wheel traversals;If, it is necessary to the total time X1=A+B+C+D+E+F*N expended before each repairing instruction issue.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710587484.8A CN107358562A (en) | 2017-07-18 | 2017-07-18 | For the electric network emergency repairing flattening command system and method under Rainfall Disaster |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710587484.8A CN107358562A (en) | 2017-07-18 | 2017-07-18 | For the electric network emergency repairing flattening command system and method under Rainfall Disaster |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107358562A true CN107358562A (en) | 2017-11-17 |
Family
ID=60285022
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710587484.8A Pending CN107358562A (en) | 2017-07-18 | 2017-07-18 | For the electric network emergency repairing flattening command system and method under Rainfall Disaster |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107358562A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108805303A (en) * | 2018-06-19 | 2018-11-13 | 南方电网科学研究院有限责任公司 | A kind of transmission tower emergency first-aid repair method and system |
CN109741208A (en) * | 2018-12-14 | 2019-05-10 | 广州供电局有限公司 | Large area blackout emergency first-aid repair scheme determines method and apparatus |
CN110543952A (en) * | 2019-08-28 | 2019-12-06 | 国网山东省电力公司 | power grid fault auxiliary decision system combined with ranging information and implementation method thereof |
US20220132290A1 (en) * | 2020-10-28 | 2022-04-28 | Tg-17, Llc | Systems and methods for generating emergency response |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2008027315A (en) * | 2006-07-24 | 2008-02-07 | Hitachi East Japan Solutions Ltd | Physical distribution network evaluation support method, physical distribution network evaluation support program and physical distribution network evaluation support apparatus |
US20080150736A1 (en) * | 2006-12-20 | 2008-06-26 | Hsin-Fa Fang | Management system with real-time interaction for enviromental monitoring and method thereof |
CN102118021A (en) * | 2010-01-05 | 2011-07-06 | 华北电力科学研究院有限责任公司 | Transmission line three-dimensional panoramic model-based fault processing method and system |
CN104655986A (en) * | 2015-02-26 | 2015-05-27 | 国家电网公司 | Method for judging lightning stroke fault point of tripped transmission line |
CN104809663A (en) * | 2015-05-07 | 2015-07-29 | 海南电力技术研究院 | Power professional technique service assurance surveillance system and method |
CN104931851A (en) * | 2015-05-22 | 2015-09-23 | 广西电网有限责任公司电力科学研究院 | Transmission line lightning fault intelligent analysis platform and analysis method |
CN105116292A (en) * | 2015-09-09 | 2015-12-02 | 广东电网有限责任公司电力科学研究院 | Line lightning strike fault point locating method and system |
CN105590160A (en) * | 2015-10-30 | 2016-05-18 | 国网山东省电力公司青岛供电公司 | Three-dimensional emergency command method and system on the basis of GIS |
CN105894397A (en) * | 2016-04-26 | 2016-08-24 | 山东智洋电气股份有限公司 | Power transmission line management system based on WeChat platform |
CN105915441A (en) * | 2016-05-20 | 2016-08-31 | 国家电网公司 | WeChat repair method based on distribution network emergency repair command system |
CN105956105A (en) * | 2016-05-04 | 2016-09-21 | 国网山东省电力公司青岛供电公司 | Mobile application method and device, mobile terminal as well as an emergency system |
-
2017
- 2017-07-18 CN CN201710587484.8A patent/CN107358562A/en active Pending
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2008027315A (en) * | 2006-07-24 | 2008-02-07 | Hitachi East Japan Solutions Ltd | Physical distribution network evaluation support method, physical distribution network evaluation support program and physical distribution network evaluation support apparatus |
US20080150736A1 (en) * | 2006-12-20 | 2008-06-26 | Hsin-Fa Fang | Management system with real-time interaction for enviromental monitoring and method thereof |
CN102118021A (en) * | 2010-01-05 | 2011-07-06 | 华北电力科学研究院有限责任公司 | Transmission line three-dimensional panoramic model-based fault processing method and system |
CN104655986A (en) * | 2015-02-26 | 2015-05-27 | 国家电网公司 | Method for judging lightning stroke fault point of tripped transmission line |
CN104809663A (en) * | 2015-05-07 | 2015-07-29 | 海南电力技术研究院 | Power professional technique service assurance surveillance system and method |
CN104931851A (en) * | 2015-05-22 | 2015-09-23 | 广西电网有限责任公司电力科学研究院 | Transmission line lightning fault intelligent analysis platform and analysis method |
CN105116292A (en) * | 2015-09-09 | 2015-12-02 | 广东电网有限责任公司电力科学研究院 | Line lightning strike fault point locating method and system |
CN105590160A (en) * | 2015-10-30 | 2016-05-18 | 国网山东省电力公司青岛供电公司 | Three-dimensional emergency command method and system on the basis of GIS |
CN105894397A (en) * | 2016-04-26 | 2016-08-24 | 山东智洋电气股份有限公司 | Power transmission line management system based on WeChat platform |
CN105956105A (en) * | 2016-05-04 | 2016-09-21 | 国网山东省电力公司青岛供电公司 | Mobile application method and device, mobile terminal as well as an emergency system |
CN105915441A (en) * | 2016-05-20 | 2016-08-31 | 国家电网公司 | WeChat repair method based on distribution network emergency repair command system |
Non-Patent Citations (6)
Title |
---|
中国地质环境监测院: "应急通信平台建设", 《地质灾害防治信息化建设理论与技术方法》 * |
余尔汶: "基于GIS平台的配电网应急抢修***", 《供用电》 * |
孙健: "基于微信公众平台的智能供电服务方式应用研究", 《中国优秀硕士学位论文全文数据库经济与管理科学辑》 * |
工会干部新媒体实用手册编写组: "政务微信发展状况", 《工会干部新媒体实用手册》 * |
廖伟华: "基于微信公众平台的应急指挥***研究及应用", 《电子测试》 * |
陈光伟: "启动应急预案", 《铁路信息***应用技术》 * |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108805303A (en) * | 2018-06-19 | 2018-11-13 | 南方电网科学研究院有限责任公司 | A kind of transmission tower emergency first-aid repair method and system |
CN109741208A (en) * | 2018-12-14 | 2019-05-10 | 广州供电局有限公司 | Large area blackout emergency first-aid repair scheme determines method and apparatus |
CN109741208B (en) * | 2018-12-14 | 2021-08-10 | 广东电网有限责任公司广州供电局 | Method and device for determining emergency repair scheme of large-area power failure accident |
CN110543952A (en) * | 2019-08-28 | 2019-12-06 | 国网山东省电力公司 | power grid fault auxiliary decision system combined with ranging information and implementation method thereof |
US20220132290A1 (en) * | 2020-10-28 | 2022-04-28 | Tg-17, Llc | Systems and methods for generating emergency response |
US11653192B2 (en) * | 2020-10-28 | 2023-05-16 | Tg-17, Llc | Systems and methods for generating emergency response |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103558827B (en) | Mine emergency communication for command and management information system | |
CN103837796B (en) | The transmission line malfunction visualization report method of a kind of sing on web and GIS and system | |
CN104951585B (en) | A kind of typhoon method for early warning and device based on grid equipment | |
US9164663B1 (en) | Monitoring and reporting system for an electric power distribution and/or collection system | |
CN107292989A (en) | High voltage power transmission cruising inspection system based on 3DGIS technologies | |
CN107358562A (en) | For the electric network emergency repairing flattening command system and method under Rainfall Disaster | |
CN103150914B (en) | The visual intelligent traffic weather monitoring of sing on web GIS, pre-warning management system | |
CN106875114A (en) | The SMS platform optimization system and method for distribution repairing maneuvering platform | |
CN106815647A (en) | A kind of high efficiency distribution network failure repairing system and method based on data analysis | |
CN106056272A (en) | Power grid programming, management and controlling method and system based on mobile GIS | |
CN104835085A (en) | Tourism operation supervision and safety emergency management linkage command platform system | |
CN105160593A (en) | Power transmission and transformation equipment multidimensional heterogeneous data fusion method and system facing big data | |
US20210294826A1 (en) | Modeling Analysis Method for Equipment Management Network and Electronic Equipment | |
CN105023200A (en) | Power emergency drilling system and emergency drilling method thereof | |
CN103064895B (en) | Based on the communication resource management system computer generating method of GIS | |
CN114186834A (en) | Smart city system | |
CN103150598B (en) | Processing system and method for sudden failure of power transmission network | |
CN101902345A (en) | Digital city management system | |
CN101901394A (en) | Multilevel digital city supervisory system based on 3S | |
CN104217384A (en) | A nuclear accident emergency processing and auxiliary decision support system | |
CN108304983A (en) | Management platform is repaiied in a kind of oil and gas pipeline inspection acquired based on unmanned plane and network communication technology data | |
CN110570057A (en) | petrochemical enterprise emergency resource management and scheduling system and method | |
CN104951992B (en) | The longitudinal correlating method of electric power based on GIS-meteorology and system | |
CN112365246A (en) | AI + GIS + BIM-based intelligent pipe gallery comprehensive management platform | |
JP4637729B2 (en) | Information processing method, information processing apparatus, and program |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171117 |
|
RJ01 | Rejection of invention patent application after publication |