CN107355258A - Shallow tunnel advance core restrains system for monitoring displacement and method in advance - Google Patents

Shallow tunnel advance core restrains system for monitoring displacement and method in advance Download PDF

Info

Publication number
CN107355258A
CN107355258A CN201710759646.1A CN201710759646A CN107355258A CN 107355258 A CN107355258 A CN 107355258A CN 201710759646 A CN201710759646 A CN 201710759646A CN 107355258 A CN107355258 A CN 107355258A
Authority
CN
China
Prior art keywords
advance
displacement
steel pipe
datum mark
monitoring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710759646.1A
Other languages
Chinese (zh)
Inventor
唐勇三
林剑飞
蔡勇
张子永
夏承明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Expressway Co Ltd
Original Assignee
Fujian Expressway Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Expressway Co Ltd filed Critical Fujian Expressway Co Ltd
Priority to CN201710759646.1A priority Critical patent/CN107355258A/en
Publication of CN107355258A publication Critical patent/CN107355258A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere
    • E21F17/18Special adaptations of signalling or alarm devices
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01BMEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS
    • G01B11/00Measuring arrangements characterised by the use of optical techniques
    • G01B11/16Measuring arrangements characterised by the use of optical techniques for measuring the deformation in a solid, e.g. optical strain gauge

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

A kind of shallow tunnel advance core restrains system for monitoring displacement in advance, including ground monitoring system, displacement measurement system is restrained in advance, described ground monitoring system includes whole station type electronic distance meter and datum mark system, described datum mark system is arranged near working region, and the datum mark system in service stage must be positioned at front of tunnel heading not by construction disturbance region or face rear stratum deformation stability region;Cost of the present invention is low, simple to operate and all operate carries out outside hole, can effectively predict tunnel deformation situation in advance, comprehensive anticipation is carried out to Tunnel Stability.

Description

Shallow tunnel advance core restrains system for monitoring displacement and method in advance
Technical field
The invention belongs to tunnel deformation monitoring device or equipment technical field, and in particular to a kind of advanced core of shallow tunnel Cubsoil restrains system for monitoring displacement and method in advance.
Background technology
It is main substantially in face by the way that before, advance core just has begun to be deformed during tunnel excavation Show as extrusion deformation and Internal periphery pre- convergent deformation internally of the advance core to face direction, correlative study table Bright, the deformation of front of tunnel heading advance core can not only assess cavern's stability, and front of tunnel heading country rock can also be become Shaped reaction is made to be prejudged in advance.Advance core extrusion displacement at present can be entered by inserting slide attack in front of tunnel heading Row monitoring, but the field monitoring problem of pre- convergence displacement is not solved accordingly, can only pass through numerical simulation at this stage Or the mode of theory analysis is studied, therefore need that development is a kind of can be restrained displacement to advance core and carry out field measurement badly System and corresponding monitoring method.
The content of the invention
The technical problems to be solved by the invention are to overcome above-mentioned deficiency, provide that a kind of cost is low, simple to operate and institute There is operation to be carried out outside hole, can effectively predict tunnel deformation situation in advance, comprehensive anticipation is carried out to Tunnel Stability Shallow tunnel advance core restrains system for monitoring displacement and method in advance.
Solving the technical scheme that above-mentioned technical problem uses is:Shallow tunnel advance core restrains system for monitoring displacement in advance Including ground monitoring system, restrain displacement measurement system in advance, described ground monitoring system include whole station type electronic distance meter and Datum mark system, described datum mark system are arranged near working region, and the datum mark system in service stage is necessary Positioned at front of tunnel heading not by construction disturbance region or face rear stratum deformation stability region;Datum mark system includes mixed Solidifying soil block and connection reinforcing bar, concrete block are embedded in stratum, and connection reinforcing bar is embedded in concrete block and stretches into stratum, connects Reinforcing bar earth's surface end is provided with reflecting piece, and the electronic distance meter can accurately determine the horizontal range and vertical direction height between 2 points Difference;
Described pre- convergence displacement measurement system includes:Directly over the pre- convergence displacement measurement point drafted at earth's surface it is downward Vertical drilling, PVC sleeve pipes are installed in drilling, joint steel pipe is provided with PVC sleeve pipes, is spaced and sets on described joint steel pipe Circular orientation support is equipped with, for preventing joint steel pipe from tilting, the bottom of joint steel pipe is provided with ferromagnetism joint, and ferromagnetism connects Head is connected with being arranged on the metal anchorage installed on the anchored end concrete of drilling bottom, and drill tip, which is provided with, to be embedded in Concrete fixed block in stratum, fixed flange is provided with the top of PVC sleeve pipes, fixed flange is arranged on concrete and fixed In block, for fixing PVC sleeve pipe, top positioning component is provided with the top of joint steel pipe, is existed for measuring joint steel pipe top Vertical displacement on tunnel axis direction.
The present invention top positioning component be:Connection sleeve pipe lower end is arranged on joint steel pipe, upper end is provided with connection steel Muscle, connect and be provided with reflecting piece on reinforcing bar.
The concrete fixed block inlayed in the earth formation of the present invention is less than earth's surface, and described concrete fixed block is hollow circle Cylinder, external diameter are 15~20cm, and internal diameter is equal to the external diameter of fixed flange, is highly 15~20cm.
For the joint steel pipe of the present invention using lightweight steel and by being formed more with fastener for connection, the length of every steel pipe is 1m, It is connected through a screw thread between adjacent steel pipe.
The metal anchorage of the present invention is linked as one by middle reinforcing bar and the anchoring claw being arranged on middle reinforcing bar circumferencial direction Body is formed, and described metal anchorage is cast in anchored end concrete, and metal anchorage is by ferromagnetism joint with being connected steel Pipe is connected.
System for monitoring displacement is restrained in advance using above-mentioned shallow tunnel advance core carries out the pre- side for restraining displacement monitoring Method comprises the following steps:
S1, datum mark are set:Drilled in the position for meeting measuring condition and datum mark is set, if currently used benchmark is unsatisfactory for Datum mark more renewing in time during measuring condition, meeting requirement;
S2, measuring point drilling:According to monitoring plan, protected in earth's surface along equidistant drilling directly over tunnel axis, boring direction Tunnel vault position should be reached by holding vertical and foot of hole;
S3, point equipment installation:By in the insertion drilling of PVC sleeve pipes, casing shoe is away from 30~50cm of bottom hole;To drilling hole bottom A small amount of slurries are injected, after joint steel pipe is connected with metal anchorage one end in insertion drilling, connection paragraph by paragraph during insertion Steel pipe, until metal anchorage reach bottom hole slurries in, wherein, slurries dosage should ensure that slurries can bury metal anchorage, Anchored end concrete is formed after grout cures, so that metal anchorage is fixed in anchored end concrete;
S4, initial reading::Top positioning component is arranged on joint steel pipe top, determined with whole station type electronic distance meter Initial depth displacement h between positioning component top reflecting piece and datum mark0And record;
S5, pre- convergence displacement are surveyed:After the completion of initial reading, the amount of pre- convergence displacement is carried out according to monitoring plan frequency Survey, measurement process is consistent with initial reading process, the final height obtained after advance core deforms between reflecting piece and datum mark Path difference h;
S6, point equipment safeguard measure:Every time after the completion of measurement work, measuring point is protected using cover sheet and capping Shield.
Displacement monitoring method is restrained according to above-mentioned shallow tunnel advance core in advance, described pre- convergence displacement meter is calculated public Formula is:
U=h-h0
In formula, u is that measuring point restrains displacement, h, h in advance0The measurement discrepancy in elevation and initial height respectively between reflecting piece and datum mark Difference.
Beneficial effects of the present invention are as follows:
(1), point layout and reading are operated in earth's surface and can completed, and will not cause to measure work and the mutual of construction does Disturb;
(2), the repeatable utilization such as positioning component, joint steel pipe in the system, farthest reduces the wasting of resources;
(3), edpth of tunnel is smaller, and this method implementation cost and enforcement difficulty are lower;
(4), cost of the present invention it is low, it is simple to operate, effectively can predict in advance tunnel deformation situation, to Tunnel Stability carry out Comprehensive anticipation.
Brief description of the drawings
Fig. 1 is the schematic diagram of ground survey system of the present invention.
Fig. 2 is the structural representation of pre- convergence displacement measurement system 2 of the invention.
Fig. 3 is ferromagnetism joint 2-6 and metal anchorage 2-8 structural representation in Fig. 2.
Fig. 4 is the structural representation of top positioning component 2-1 in Fig. 2.
Fig. 5 is that pre- convergence displacement meter of the invention calculates schematic diagram.
In figure:1st, datum mark system;2nd, displacement measurement system is restrained in advance;3rd, whole station type electronic distance meter;2-1, top are fixed Hyte part;2-2, fixed flange;2-3, concrete fixed block;2-4, PVC sleeve pipe;2-5, circular orientation support;2-6, connection Steel pipe;2-7、;Ferromagnetism joint;2-8, metal anchorage;2-9, anchored end concrete;2-1-1, reflecting piece;2-1-2, connection Reinforcing bar;2-1-3, connection sleeve pipe.
Embodiment
The present invention is described in further details with reference to the accompanying drawings and examples, but the invention is not restricted to these implementations Example.
Embodiment 1
In Fig. 1,2,3,4,5, shallow tunnel advance core of the present invention restrains system for monitoring displacement, including ground prison in advance Examining system, pre- convergence displacement measurement system 2, described ground monitoring system include whole station type electronic distance meter 3 and datum system System 1, described datum mark system 1 is arranged near working region, and the datum mark system in service stage must be positioned at the palm Fang Wei is by construction disturbance region or face rear stratum deformation stability region in face of son;Datum mark system 1 includes concrete Block and connection reinforcing bar, concrete block are embedded in stratum, and connection reinforcing bar is embedded in concrete block and stretches into stratum, connects reinforcing bar Upper end is provided with reflecting piece, and the electronic distance meter 3 can accurately determine the horizontal range and the vertical direction discrepancy in elevation between 2 points;
Described pre- convergence displacement measurement system 2 includes:Directly over the pre- convergence displacement measuring points drafted at earth's surface it is downward Vertical drilling, be provided with drilling in PVC sleeve pipes 2-4, PVC sleeve pipe 2-4 and be provided with joint steel pipe 2-6, the company of the present embodiment Steel pipe 2-6 is met using lightweight steel and by being formed more with fastener for connection, the length of every steel pipe is 1m, is passed through between adjacent steel pipe It is threadedly coupled, interval is provided with circular orientation support 2-5 on described joint steel pipe 2-6, for preventing joint steel pipe 2-6 from inclining Tiltedly, joint steel pipe 2-6 bottom is provided with ferromagnetism joint 2-7, and ferromagnetism joint 2-7 mixes with the anchored end poured in the earth formation Coagulate the metal anchorage 2-8 installed on native 2-9 to be connected, the metal anchorage 2-8 of the present embodiment by middle reinforcing bar and is arranged on Anchoring claw on middle reinforcing bar circumferencial direction is connected as a single entity composition, and described metal anchorage 2-8 is cast in anchored end concrete In, metal anchorage 2-8 upper ends are connected by ferromagnetism joint 2-7 with joint steel pipe 2-6.Drill tip, which is provided with, to be embedded in Concrete fixed block 2-3 in stratum, the concrete fixed block 2-3 inlayed in the earth formation should be less than earth's surface, and the present embodiment mixes It is hollow circular cylinder to coagulate native fixed block 2-3, and external diameter is 15~20cm, internal diameter equal to fixed flange external diameter, highly for 15~ 20cm;Fixed flange 2-2 is machined with the top of PVC sleeve pipes 2-4, fixed flange 2-2 is arranged on concrete fixed block 2-3 In, for fixing PVC sleeve pipe 2-4, top positioning component 2-1 is installed, for measuring joint steel pipe at the top of joint steel pipe 2-6 The vertical displacement on top;The top positioning component 2-1 of the present embodiment is by reflecting piece 2-1-1, connection reinforcing bar 2-1-2, connection sleeve pipe 2-1-3 is connected and composed, and the connection sleeve pipe 2-1-3 of the present embodiment is PVC material sleeve pipe, and connection sleeve pipe 2-1-3 lower ends are arranged on company Connect on steel pipe 2-6, upper end is provided with connection reinforcing bar 2-1-2, be connected with reflecting piece 2-1-3 on connection reinforcing bar 2-1-2.
System for monitoring displacement is restrained in advance using above-mentioned shallow tunnel advance core carries out the pre- side for restraining displacement monitoring Method comprises the following steps:
S1, datum mark are set:Drilled in the position for meeting measuring condition and datum mark is set, if currently used datum mark is discontented with Datum mark more renewing in time during sufficient measuring condition, meeting condition;
S2, measuring point drilling:According to monitoring plan, drilled in earth's surface along directly over tunnel axis, boring direction keeps vertical And foot of hole should reach tunnel vault position;
S3, point equipment installation:By in the insertion drilling of PVC sleeve pipes, casing shoe is away from 30~50cm of bottom hole;To drilling hole bottom A small amount of slurries are injected, after joint steel pipe is connected with metal anchorage one end in insertion drilling, connection paragraph by paragraph during insertion Steel pipe, until metal anchorage reach bottom hole slurries in, wherein, slurries dosage should ensure that slurries can bury metal anchorage, Anchored end concrete is formed after grout cures, so that metal anchorage is fixed in anchored end concrete;
S4, initial reading:Top positioning component is arranged on joint steel pipe top, it is fixed to be determined with whole station type electronic distance meter Initial depth displacement h between hyte part top reflecting piece and datum mark reflecting piece0And record;
S5, pre- convergence displacement are surveyed:After the completion of initial reading, the amount of pre- convergence displacement is carried out according to monitoring plan frequency Survey, measurement process is consistent with initial reading process, final to obtain after advance core deforms between reflecting piece center and datum mark Depth displacement h;
S6, point equipment safeguard measure:Every time after the completion of measurement work, measuring point is protected using cover sheet and capping Shield.
7th, shallow tunnel advance core according to claim 6 restrains displacement monitoring method in advance, it is characterised in that Described pre- convergence displacement meter calculates formula:
U=h-h0
In formula, u is that measuring point restrains displacement, h, h in advance0The measurement discrepancy in elevation and initial height respectively between reflecting piece and datum mark Difference.

Claims (7)

1. a kind of shallow tunnel advance core restrains system for monitoring displacement in advance, it is characterised in that:Including ground monitoring system, in advance Displacement measurement system is restrained, described ground monitoring system includes whole station type electronic distance meter and datum mark system, described base System is arranged near working region on schedule, and the datum mark system in service stage must be positioned at front of tunnel heading and not applied Work disturbance region or face rear stratum deformation stability region;Datum mark system includes concrete block and connection reinforcing bar, mixes Solidifying soil block is embedded in stratum, and connection reinforcing bar is embedded in concrete block and stretches into stratum, and connection reinforcing bar earth's surface end is provided with instead Mating plate, the electronic distance meter can accurately determine the horizontal range and the vertical direction discrepancy in elevation between 2 points;
Described pre- convergence displacement measurement system includes:Hung down downward at earth's surface directly over the pre- convergence displacement measurement point drafted It is straight to drill, PVC sleeve pipes are installed in drilling, joint steel pipe is provided with PVC sleeve pipes, is arranged at intervals with described joint steel pipe Circular orientation support, for preventing joint steel pipe from tilting, the bottom of joint steel pipe is provided with ferromagnetism joint, ferromagnetism joint with It is arranged on the metal anchorage installed on the anchored end concrete of drilling bottom to be connected, drill tip, which is provided with, is embedded in stratum In concrete fixed block, be provided with fixed flange at the top of PVC sleeve pipes, fixed flange is arranged on concrete fixed block In, for fixing PVC sleeve pipe, top positioning component is provided with the top of joint steel pipe, for measuring joint steel pipe top in tunnel Vertical displacement on road axis direction.
2. shallow tunnel advance core according to claim 1 restrains system for monitoring displacement in advance, it is characterised in that described Top positioning component be:Connection sleeve pipe lower end is arranged on joint steel pipe, upper end is provided with connection reinforcing bar, is connected and is set on reinforcing bar It is equipped with reflecting piece.
3. shallow tunnel advance core according to claim 1 restrains system for monitoring displacement in advance, it is characterised in that:It is described The concrete fixed block inlayed in the earth formation be less than earth's surface, described concrete fixed block is hollow circular cylinder, external diameter 15 ~20cm, internal diameter are equal to the external diameter of fixed flange, are highly 15~20cm.
4. shallow tunnel advance core according to claim 1 restrains system for monitoring displacement in advance, it is characterised in that:It is described Joint steel pipe using lightweight steel and by being formed more with fastener for connection, the length of every steel pipe be 1m, logical between adjacent steel pipe Cross threaded connection.
5. shallow tunnel advance core according to claim 1 restrains system for monitoring displacement in advance, it is characterised in that:It is described Metal anchorage be connected as a single entity and form by middle reinforcing bar and the anchoring claw that is arranged on middle reinforcing bar circumferencial direction, described gold Category anchoring piece is cast in anchored end concrete, and metal anchorage is connected by ferromagnetism joint with joint steel pipe.
6. it is advance to restrain system for monitoring displacement progress in advance using the shallow tunnel advance core described in the claims 1~5 The method for holding back displacement monitoring comprises the following steps:
S1, datum mark are set:Drilled in the position for meeting measuring condition and datum mark is set, if currently used benchmark is unsatisfactory for measuring Datum mark more renewing in time during condition, meeting requirement;
S2, measuring point drilling:According to monitoring plan, in earth's surface along equidistant drilling directly over tunnel axis, boring direction keeps perpendicular Straight and foot of hole should reach tunnel vault position;
S3, point equipment installation:By in the insertion drilling of PVC sleeve pipes, casing shoe is away from 30~50cm of bottom hole;Enter to drilling hole rising pouring A small amount of slurries, inserted after joint steel pipe is connected with metal anchorage one end in drilling, during insertion piecewise joint steel pipe, Until metal anchorage reach bottom hole slurries in, wherein, slurries dosage should ensure that slurries can bury metal anchorage, and slurries coagulate Gu anchored end concrete is formed after, so that metal anchorage is fixed in anchored end concrete;
S4, initial reading::Top positioning component is arranged on joint steel pipe top, is determined and positioned with whole station type electronic distance meter Initial depth displacement h between component top reflecting piece and datum mark0And record;
S5, pre- convergence displacement are surveyed:After the completion of initial reading, the measurement of pre- convergence displacement, amount are carried out according to monitoring plan frequency Survey process is consistent with initial reading process, the final depth displacement h obtained after advance core deforms between reflecting piece and datum mark;
S6, point equipment safeguard measure:Every time after the completion of measurement work, measuring point is protected using cover sheet and capping.
7. shallow tunnel advance core according to claim 6 restrains displacement monitoring method in advance, it is characterised in that described Pre- convergence displacement meter calculate formula be:
U=h-h0
In formula, u is that measuring point restrains displacement, h, h in advance0The measurement discrepancy in elevation and the initial discrepancy in elevation respectively between reflecting piece and datum mark.
CN201710759646.1A 2017-08-30 2017-08-30 Shallow tunnel advance core restrains system for monitoring displacement and method in advance Pending CN107355258A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710759646.1A CN107355258A (en) 2017-08-30 2017-08-30 Shallow tunnel advance core restrains system for monitoring displacement and method in advance

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710759646.1A CN107355258A (en) 2017-08-30 2017-08-30 Shallow tunnel advance core restrains system for monitoring displacement and method in advance

Publications (1)

Publication Number Publication Date
CN107355258A true CN107355258A (en) 2017-11-17

Family

ID=60289682

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710759646.1A Pending CN107355258A (en) 2017-08-30 2017-08-30 Shallow tunnel advance core restrains system for monitoring displacement and method in advance

Country Status (1)

Country Link
CN (1) CN107355258A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108007764A (en) * 2017-12-29 2018-05-08 上海岩土工程勘察设计研究院有限公司 Lower embedding type concrete component intensity Indirect testing devices and methods therefor
CN108562253A (en) * 2018-03-05 2018-09-21 淮阴工学院 A kind of method of Support System in Soft Rock Tunnels face stability distinguishing

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04264228A (en) * 1991-02-18 1992-09-21 Shigeki Nagatomo Underground subsidence measuring apparatus
CN102877447A (en) * 2012-09-24 2013-01-16 中铁建设集团有限公司 Shallow stratum multi-point settlement real-time monitoring device and method
CN205154263U (en) * 2015-12-06 2016-04-13 中铁二十局集团第三工程有限公司 Structure is monitored with surrouding rock deformation to shallow tunnel construction
CN105806310A (en) * 2016-04-25 2016-07-27 绍兴文理学院 Method for monitoring earth surface three-dimensional displacement of slope around tunnel entrance by using laser distance measurement instrument
CN106050242A (en) * 2016-07-13 2016-10-26 同济大学 On-site measurement device for extrusion deformation of front of tunnel face
CN207177973U (en) * 2017-08-30 2018-04-03 福建省高速公路有限责任公司 Shallow tunnel advance core restrains system for monitoring displacement in advance

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04264228A (en) * 1991-02-18 1992-09-21 Shigeki Nagatomo Underground subsidence measuring apparatus
CN102877447A (en) * 2012-09-24 2013-01-16 中铁建设集团有限公司 Shallow stratum multi-point settlement real-time monitoring device and method
CN205154263U (en) * 2015-12-06 2016-04-13 中铁二十局集团第三工程有限公司 Structure is monitored with surrouding rock deformation to shallow tunnel construction
CN105806310A (en) * 2016-04-25 2016-07-27 绍兴文理学院 Method for monitoring earth surface three-dimensional displacement of slope around tunnel entrance by using laser distance measurement instrument
CN106050242A (en) * 2016-07-13 2016-10-26 同济大学 On-site measurement device for extrusion deformation of front of tunnel face
CN207177973U (en) * 2017-08-30 2018-04-03 福建省高速公路有限责任公司 Shallow tunnel advance core restrains system for monitoring displacement in advance

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108007764A (en) * 2017-12-29 2018-05-08 上海岩土工程勘察设计研究院有限公司 Lower embedding type concrete component intensity Indirect testing devices and methods therefor
CN108007764B (en) * 2017-12-29 2023-12-29 上海勘察设计研究院(集团)股份有限公司 Non-excavation detection device and method for strength of buried concrete member
CN108562253A (en) * 2018-03-05 2018-09-21 淮阴工学院 A kind of method of Support System in Soft Rock Tunnels face stability distinguishing

Similar Documents

Publication Publication Date Title
CN109630137B (en) An a kind of tunnel high position passes through the backfill processing construction method of huge molten chamber
CN109653755B (en) Construction method for large-diameter slurry shield to pass through ballastless track roadbed without settlement
CN103293560B (en) A kind of method of testing adopting triple stress court
CN110106868B (en) Karst geology large-diameter pile foundation pore-forming process method
CN104929146B (en) A kind of multilayer karst growth zone pile foundation engineering method
CN105137488B (en) Ground water field based on artificial fluid injection describes method
CN103410522A (en) Continuous close-range underpass railway bridge construction method employing shallow tunneling method
CN105064381A (en) High-low cutting edge double-wall steel cofferdam reinforced concrete once bottom sealing construction method
CN111810198A (en) Tunnel earth surface directional large-caliber deep hole grouting device and grouting method
CN111485544A (en) Disposal detection structure and method for karst cave under rock-socketed pile base
CN107938649A (en) A kind of solution cavity foundation reinforcement method
CN108678753B (en) Reverse-slope tunnel construction method
CN106871866A (en) A kind of excavation face bottom sinking deformation monitoring device and its application method
CN107339122A (en) A kind of steel pipe column handles goaf engineering method
CN110499757A (en) A kind of water-rich sand layer three axes agitating pile construction method
CN107355258A (en) Shallow tunnel advance core restrains system for monitoring displacement and method in advance
CN104121895A (en) Soft soil area plane height measurement control point and embedding method thereof
CN113431039A (en) Construction method of bridge implanted pile
CN110145309B (en) Shallow coal seam grouting filling green coal mining method and settlement observation device thereof
CN109596112B (en) Measuring method for controlling long-distance construction of large-diameter shield tunneling machine to smoothly go out of tunnel
CN105300721A (en) Anti-earth-bearing test device of quasi-rectangular shield heading machine and test method thereof
CN207177973U (en) Shallow tunnel advance core restrains system for monitoring displacement in advance
CN113174942A (en) Precise positioning device for cage core bag anti-floating anchor rod of deep foundation pit and construction method
CN113431016A (en) Soft rock large deformation section tunnel shallow-buried underground surface-penetrating building surface monitoring method
CN209512710U (en) Deep displacement prefabricated inclination measurement device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20171117

WD01 Invention patent application deemed withdrawn after publication