CN107327015A - A kind of assembled cylinder Tower Building and its construction method - Google Patents
A kind of assembled cylinder Tower Building and its construction method Download PDFInfo
- Publication number
- CN107327015A CN107327015A CN201710535957.XA CN201710535957A CN107327015A CN 107327015 A CN107327015 A CN 107327015A CN 201710535957 A CN201710535957 A CN 201710535957A CN 107327015 A CN107327015 A CN 107327015A
- Authority
- CN
- China
- Prior art keywords
- arc
- prefabricated panel
- floor
- hole
- arc prefabricated
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
- E04B1/61—Connections for building structures in general of slab-shaped building elements with each other
- E04B1/6108—Connections for building structures in general of slab-shaped building elements with each other the frontal surfaces of the slabs connected together
- E04B1/612—Connections for building structures in general of slab-shaped building elements with each other the frontal surfaces of the slabs connected together by means between frontal surfaces
- E04B1/6145—Connections for building structures in general of slab-shaped building elements with each other the frontal surfaces of the slabs connected together by means between frontal surfaces with recesses in both frontal surfaces co-operating with an additional connecting element
- E04B1/6162—Connections for building structures in general of slab-shaped building elements with each other the frontal surfaces of the slabs connected together by means between frontal surfaces with recesses in both frontal surfaces co-operating with an additional connecting element the connection made by an additional locking key
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
- E04B1/66—Sealings
- E04B1/68—Sealings of joints, e.g. expansion joints
- E04B1/6806—Waterstops
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B2001/0053—Buildings characterised by their shape or layout grid
- E04B2001/0061—Buildings with substantially curved horizontal cross-section, e.g. circular
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
- E04B1/61—Connections for building structures in general of slab-shaped building elements with each other
- E04B2001/6195—Connections for building structures in general of slab-shaped building elements with each other the slabs being connected at an angle, e.g. forming a corner
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B10/00—Integration of renewable energy sources in buildings
- Y02B10/30—Wind power
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Load-Bearing And Curtain Walls (AREA)
Abstract
The present invention is intended to provide a kind of assembled cylinder Tower Building and its construction method.The assembled cylinder Tower Building is mainly assembled successively from bottom to top by multilayer floor, and horizontal joint is formed between adjacent two layers floor, and per floor, layer is circularized by polylith arc prefabricated panel by connector splicing;The arc prefabricated panel includes wallboard body, and the wallboard body has intrados and extrados;The end up and down of the intrados of the wallboard body is provided with the hole being provided with multiple holes, the intrados of the wallboard body on multiple holes, the end face up and down of the wallboard body and connected with the hole on corresponding end face by curved channel.The present invention is creatively using arc splicing prefabricated wallboard building, stabilized structure, easy construction.
Description
Technical field
The present invention relates to a kind of assembled cylinder Tower Building and its construction method, belong to PC housing industries field(Build
Build).
Background technology
Current assembled low-rise dwelling form is more and more, and the layer such as steel skeleton construction, concrete splicing structure, timber structure goes out
It is not poor but general all using rectangle living space.The construction cost of this Rectangle building is still higher, and long construction period,
It is difficult to full assembled and wet trade is exempted from scene, therefore, how develops that a kind of construction cost is low, and short construction period is built
Thing is built as industry problem to be solved.
The content of the invention
The present invention is intended to provide a kind of assembled cylinder Tower Building and its construction method, this tin Tower Building are used for reference among the people
Cylinder building and castellated building architectural style, creatively using arc splicing prefabricated wallboard building, stabilized structure, construction party
Just.
To achieve these goals, the technical solution adopted in the present invention is:
A kind of assembled cylinder Tower Building, is mainly assembled, between adjacent two layers floor successively from bottom to top by multilayer floor
Horizontal joint is formed, it is structurally characterized in that, layer is circularized by polylith arc prefabricated panel by connector splicing per floor;The arc
Shape prefabricated panel includes wallboard body, and the wallboard body has intrados and extrados;The intrados of the wallboard body
End, which is provided with multiple holes, the end face up and down of the wallboard body, up and down is provided with multiple holes, the wallboard sheet
Hole on the intrados of body is connected with the hole on corresponding end face by curved channel;It is preferred that the adjacent two pieces of arc prefabricated panels in left and right
Between formed same lengthwise position between vertical seam, different floors arc prefabricated panel the connection of vertical seam and form elongated
Vertical seam;
It is preferred that being connected between the two pieces of arc prefabricated panels in left and right by the connecting screw rod of arc;The wherein arc prefabricated panel on the left side
Positioned at the left side of the prefabricated panel on the right, the hole of the arc prefabricated panel right part on the left side and the prefabricated panel left part on the right
Hole is connected by corresponding curved channel;The connecting screw rod is horizontally through the curved channel of the arc prefabricated panel on the left side
With the curved channel of the prefabricated panel on the right and two pieces of left and right arc prefabricated panel is fixed together;And/or
It is connected up and down between two pieces of arc prefabricated panels by the connecting screw rod of arc;The arc prefabricated panel of wherein top is located at
On following prefabricated panel, the hole of the hole of the arc prefabricated panel bottom of top and following prefabricated panel upper end passes through
Corresponding curved channel connection;The connecting screw rod is vertically through the curved channel of arc prefabricated panel of the top and following
Prefabricated panel curved channel and will be fixed together up and down on two pieces of arc prefabricated panels.
The arc prefabricated panel of the present invention is substantially one piece of block prefabricated film, is connected by arch screw bolt, is used as building
Exterior wall.The architectural mode that the present invention breaks traditions, makes building variation, and architectural appearance is more attractive in appearance.It is assembled using prefabricated film
Construction technology, can make speed of application faster, but prefabricated required precision is higher.As clear water metope, there is more preferable facade effect.
This construction and installation dismounting is all very convenient, is adapted to height and reuses, if prefabricated section standardized production, can realize each building
The versatility of material.
Embodiments in accordance with the present invention, can also make further optimization, below the skill to be formed after optimization to the present invention
Art scheme:
Multiple inner thread sleeves are embedded with the wallboard body, the inner thread sleeve coordinates with screw rod and is connected;The screw rod
The relative wallboard inwall of a part stretches out and is used to be fixedly linked with partition wall;It is preferred that hole and hand hole hole on the intrados of wallboard body
Directly connect.Hand hole can conveniently realize being reliably connected for adjacent two pieces of prefabricated panels, the hand hole hole by curved channel with it is right
The end-face hole connection answered, thus, adjacent two pieces of prefabricated panels can be quickly realized by the arc screw rod through curved channel
Connection.
In order to improve be provided with waterproof effect, at least top end face of the arc prefabricated panel and/or side end face it is elongated
Groove, the groove is located at the outside in the wallboard body hole of end face up and down;It is preferred that above and below the arc prefabricated panel
Elongated groove is provided with the end face of left and right.Thus, it is possible to insert expansion water-stop adhesive tape in groove, connected, can reached by extruding
To reliable waterproof effect.
The upper end arc length and lower end arc length of the wallboard body are isometric, or the upper end arc length of wallboard body is less than lower end arc
It is long;It is preferred that being provided with window hole in the wallboard body.In other words, prefabricated panel is that circular arc prefabricated panel or cone arc are prefabricated
Wallboard, if lower small cone arc prefabricated panel upper greatly, then have very strong autostability, and wind resistance is excellent.
Window hole is provided with arc prefabricated panel, using arc window, the visual field is broader.
It is described to be fixed with corresponding floor in layer per floor;Set on the inside top wall of the arc prefabricated panel of floor layer
There is connecting node, the connecting node is directly fixedly linked with the end of floor and/or with supporting the support component of the floor
End is fixedly linked;The connecting node is arranged on below the top of arc prefabricated panel;It is preferred that the connecting node is selected from such as
One of lower two kinds of forms:
I, the connecting node include being opened in arc prefabricated panel inside top wall upper groove or blind hole;The floor or support
The end of element is stretched into the groove or blind hole and is fixed together with the arc prefabricated panel;It is highly preferred that described recessed
Groove is laterally set along the arc prefabricated panel inside top wall, and the support component is shaped steel, the upper surface of the shaped steel
Provided with the floor;The end of the shaped steel is inserted in the groove or blind hole;At the top of more preferably described arc prefabricated panel
Inner thread sleeve is embedded with, the screw rod that the inner thread sleeve stretches into the groove or blind hole with part is fixedly linked, the screw rod
Extension be fixedly linked with the shaped steel;
Ii, the connecting node include being embedded on multiple inner thread sleeves at the top of arc prefabricated panel, the inner thread sleeve
Be fixedly linked by one side of fastener and corner connector, the another side of the corner connector be directly fixedly linked with the end of floor and/
Or with supporting the end of the support component of the floor to be fixedly linked;It is preferred that the support component be shaped steel, the shaped steel it is upper
Surface is provided with the floor.
The end of floor or support component is stretched into the groove or blind hole, it is possible to achieve the firm company of floor and wallboard
Connect, stressed effect is good.
The present invention can facilitate and be carried out with floor by being provided with connecting node on the inside top wall of arc prefabricated panel
Connection, so as to improve the efficiency of construction of building, is especially suitable for the construction of opposite sex building.
The upper surface of shaped steel is provided with the floor, can more facilitate site operation, facilitate insertion into groove or blind hole, and
This structure be inserted directly into respect to floor it is more advantageous, operate it is easier, stress is more preferable.
The extension of the screw rod and the shaped steel are fixedly linked and can be better achieved between wallboard and floor or shaped steel
Connection, thus, scene by fastener is that can be achieved to be reliably connected, wet-less operation.
The support component is shaped steel, and the upper surface of the shaped steel is provided with the floor, can more facilitate site operation,
It is easy to be fixedly linked with corner connector, this structure is directly connected advantageously with respect to floor with corner connector, operates easier, stress
More preferably.
In order to form different room units in each floor, described be provided with per floor in layer is fixed on floor and correspondence arc
Partition wall on shape prefabricated panel;The inwall of the wallboard body of the arc prefabricated panel is provided with least one vertical arranged for interval of row
Connector;The connecting hole extended internally perpendicular to outer face is provided with the outer face of the partition wall, the connecting hole and the arc
The connector of shape prefabricated panel, which coordinates, to be connected;It is preferred that the part of the connector is embedded in wallboard body, the portion of the connector
Split-phase stretches out to form extension to the internal face of wallboard body;The connector is more selected to be embedded in arc prefabricated panel and
Vertical arranged for interval inner thread sleeve, the inner thread sleeve coordinates with corresponding screw rod and is connected;A part for the screw rod is relative
Wallboard inwall stretches out and is fixedly linked with partition wall.
Thus, by this structure, wallboard can be facilitated to be attached with partition wall, so as to improve the construction effect of building
Rate, is especially suitable for the construction of opposite sex building.
Construct for convenience, the hand hole connected with the connecting hole is provided with the side wall of the outer end of the partition wall, it is described
The extension of connector is fixedly linked through connecting hole and with the fastener in the hand hole;It is preferred that each hand hole of same row
Connection forms vertically arranged groove.This structure type is disadvantageous in that the Structural strength calls of wallboard more with respect to hand hole
It is high.
In order to improve the reliability of connection, backing plate is provided with the hand hole, the fastener is by backing plate and screw rod by institute
State wallboard and partition wall is securely removably connected at together.
Based on same inventive concept, present invention also offers a kind of construction method of the assembled cylinder Tower Building,
It comprises the following steps:
S1, plant produced arc prefabricated panel, job site do basis and provide smooth hardened place as requested, and arc is pre-
Wallboard processed is transported to behind job site in hardened place first unwrapping wire, and arc prefabricated panel is lifted into design attitude, and temporarily solid
It is fixed;
S2, splicing first layer floor, the curved channel docked by arc screw rod through the adjacent two pieces of arc prefabricated panels in left and right
It is interior, and the adjacent two pieces of arcs in left and right are fixed together, until first layer floor forms overall annular;
S3, in first layer floor floor is installed, by the inwall of the circumferentially fixed arc prefabricated panel in first layer floor of floor
On face;
S4, first layer floor top install the second floor, the arc of the bottom of each arc prefabricated panel of the second floor is led to
The curved channel in road and the top of each arc prefabricated panel of first layer floor is corresponded, and is passed through by corresponding arc screw rod
In the curved channel of neighbouring two pieces of arc prefabricated panels docking and neighbouring two pieces of arc prefabricated panels are fixed on one
Rise;
S5, repetition S2- S4, until design height is arrived in the construction of all floors.
Further, partition wall is installed on floor after step s 3, before step S4, the outer end of the partition wall is fixed on
On the internal face of arc prefabricated panel.
By said structure, building structure exterior wall of the invention passes through arc by polylith circular arc or conical prefabricated panel
Bolt, which is attached, to be formed.Door-window opening, and the hole and hand hole of reserved drawknot bolt are opened up on prefabricated board as needed.It is prefabricated
The surrounding of plate, which is stayed, sets groove, and expansion sealing strip can be put into groove, the purpose of waterproof can be reached after the completion of splicing.Prefabricated board
Middle and upper part point(Floor location)The groove or advance pre-buried inner thread sleeve for shelving floor system are set, and floor is by just supporting
Shelve in a groove or angle steel is screwed on by inner thread sleeve and shelve the firm strong point.Arc prefabricated panel is needing assembled partition wall
Position also pre-buried inner thread sleeve, install and screw rod be screwed into before prefabricated partition wall, wallboard is tightened after installing by bolt makes two panels wall
Connection.All hand hole holes are all closed using flexible mortar or plastic cover plate after wallboard connection.
Compared with prior art, the beneficial effects of the invention are as follows:
The job site of the present invention does not have any wet trade, and construction tool is simple, and consumption attaching material is few.
The structure type of the present invention is unique, can be assembled into various graceful camber lines, and stress performance is good, if it is lower it is big on
Small arcuate structure, there is very strong autostability, and wind resistance is excellent.
The prefabricated section node seam of the present invention has reserved groove, and expansion water-stop adhesive tape is inserted in centre, is connected by extruding, energy
Reach reliable waterproof effect.
The present invention uses arc window, and the visual field is broader.
Construction period of the present invention is short, convenient disassembly, and dismounting cost is low, can realize that low-loss is reused.
Brief description of the drawings
Fig. 1 is the structure principle chart of one embodiment of the invention;
Fig. 2 is the overall schematic of one embodiment of the invention;
Fig. 3 is the circular arc wallboard schematic diagram of the present invention;
Fig. 4 is the cone arc wallboard schematic diagram of the present invention;
Fig. 5 is the attachment structure schematic diagram between the connected two blocks of wallboards in left and right of the invention;
Fig. 6 is the wallboard of an embodiment of the present invention and the attachment structure schematic diagram of floor;
Fig. 7 is the drawing in side sectional elevation of Fig. 6 deadlights and floor junction;
Fig. 8 is profilograph of the wallboard with floor junction of another embodiment;
Fig. 9 is the wallboard of the present invention and the attachment structure schematic diagram of partition wall;
Figure 10 is drawing in side sectional elevation of the wallboard with partition wall junction of the present invention.
In figure:
1- wallboards;3- floors;11- window holes;12- floor mounting grooves;13- grooves;14- screw holes;15- hand holes hole;Spiral shell in 16-
Line sleeve;21- partition walls;22- backing plates;24- screw rods;25- bolts;31- arc screw rods;32- waterstops;33- mortars;41- shaped steel;
42- screw rods;43- inner thread sleeves;81- horizontal joints;82- is vertically stitched;83- pieces;100- buildings;200- rooms.
Embodiment
Describe the present invention in detail below with reference to accompanying drawing and in conjunction with the embodiments.It should be noted that in the feelings not conflicted
Under condition, the embodiment in the present invention and the feature in embodiment can be mutually combined.For sake of convenience, hereinafter as occurred
" on ", " under ", "left", "right" printed words, only represent that the upper and lower, left and right direction with accompanying drawing in itself is consistent, does not limit structure
It is set for using.
A kind of assembled cylinder Tower Building, as illustrated in fig. 1 and 2, is mainly assembled successively from bottom to top by multilayer floor,
Horizontal joint 82 is formed between adjacent two layers floor, it is characterised in that layer passes through connector by polylith arc prefabricated panel 1 per floor
Splicing is circularized;The arc prefabricated panel includes wallboard body, and the wallboard body has intrados and extrados;The wall
The end up and down of the intrados of plate body be provided with multiple holes, the end face up and down of the wallboard body be provided with it is many
Hole on individual hole, the intrados of the wallboard body is connected with the hole on corresponding end face by curved channel.
As shown in figure 5, being connected between the arc prefabricated panel of two pieces of left and right by the connecting screw rod of arc;The wherein arc on the left side
Shape prefabricated panel is located at the left side of the prefabricated panel on the right, the hole of the arc prefabricated panel right part on the left side and the dry wall on the right
The hole of plate left part is connected by corresponding curved channel;The connecting screw rod is horizontally through the arc prefabricated panel on the left side
Curved channel and the right prefabricated panel curved channel and two pieces of left and right arc prefabricated panel is fixed together.On
It is connected between lower two pieces of arc prefabricated panels by the connecting screw rod of arc;Wherein the arc prefabricated panel of top is located at below
On prefabricated panel, the hole of the hole of the arc prefabricated panel bottom of top and following prefabricated panel upper end passes through corresponding
Curved channel is connected;The connecting screw rod vertically passes through the curved channel and below prefabricated of the arc prefabricated panel of the top
The curved channel of wallboard will be simultaneously fixed together on two pieces of arc prefabricated panels up and down.
The connection of adjacent two pieces of prefabricated panels is thus achieved, between the top of the prefabricated panel and the connecting node
Interior sidewall surface on, on the inside top wall of prefabricated panel and on the madial wall at prefabricated panel both ends be equipped with hand hole hole
15, the hand hole hole 15 is connected by the screw hole 14 of arc with corresponding end face.It is prefabricated through connected two pieces by arc screw rod
The screw hole 14 of the arc of wallboard, is then locked by bolt, realizes being reliably connected for two blocks of wallboards.
As shown in Figures 3 and 4, the arc prefabricated panel includes wallboard body, and the wallboard body has intrados and outer
Cambered surface;The end up and down of the intrados of the wallboard body is provided with multiple holes, and each mono- hand hole hole 15 of Kong Douyu is direct
Connection, with convenient construction.It is provided with the end face up and down of the wallboard body on multiple holes, the intrados of the wallboard body
Hole connected with the hole on corresponding end face by curved channel.
As shown in Figures 3 and 4, multiple inner thread sleeves 16 are embedded with the wallboard body, the inner thread sleeve 16 and spiral shell
Bar, which coordinates, to be connected;The relative inwall of wallboard 1 of a part of the screw rod stretches out and is used to be fixedly linked with partition wall.It is preferred that wallboard body
Intrados on hole directly connected with hand hole hole 15.
As shown in figure 3, in order to improve be provided with waterproof effect, the side end face up and down of the prefabricated panel it is elongated recessed
Groove 13, the groove 13 is located at the outside in the wallboard body hole of end face up and down.Expansion sealing strip is placed in groove 13.
Window hole 11 is provided with daylighting for convenience, the prefabricated panel.
In order to realize in the connection of adjacent two pieces of prefabricated panels, the interior sidewall surface of the top ends of the prefabricated panel, it is prefabricated
Hand hole hole 15 is equipped with the inside top wall of wallboard and on the madial wall at prefabricated panel both ends, the hand hole hole 15 passes through
The screw hole 14 of arc is connected with corresponding end face.Thus, the arc for the two pieces of prefabricated panels that are connected is passed through by arc screw rod
Screw hole 14, is then locked by bolt, realizes being reliably connected for two blocks of wallboards.
As shown in figure 5, being provided with expansion water-stop band 32 in the groove of the docking end of the adjacent two blocks of arc wallboards in left and right, then
By the arc screw rod 31 of screw hole 14 and the nut in corresponding hand hole hole 15 through correspondence arc by left and right adjacent two
Block arc wallboard is fixed together.After connection is finished, filling seal sand slurry or fluid sealant in corresponding hand hole hole 15.
As illustrated in fig. 1 and 2, the building structure exterior wall that the present invention is formed is led to by polylith circular arc or conical prefabricated panel 1
Cross arch screw bolt and be attached and form.Open up door-window opening 11 as needed on prefabricated board, and the hole of reserved drawknot bolt and
Hand hole.Four end faces of prefabricated board, which are stayed, sets groove 13.Polylith prefabricated panel 1 or so, splice up and down, and fixed by arch screw bolt
Together, formed between the adjacent two blocks of wallboards in left and right between vertical seam 81, neighbouring two blocks of wallboards and form horizontal joint 81.Wherein
Expansion sealing strip can be put into groove in vertical seam 81 and horizontal joint 82, the purpose of waterproof can be reached after the completion of splicing.
The middle and upper part of prefabricated board point(Floor location)The groove or advance pre-buried inner thread sleeve for shelving floor system are set, and floor passes through
Just support, which has been shelved in a groove or screwed on angle steel by inner thread sleeve, shelves the firm strong point.Arc prefabricated panel is needing to spell
The position also pre-buried inner thread sleeve of partition wall is filled, installs and screw rod is screwed into before prefabricated partition wall, wallboard is tightened after installing by bolt to be made
Two panels wall is connected.All hand hole holes are all closed using flexible mortar or plastic cover plate after wallboard connection.
The upper end arc length and lower end arc length of the wallboard body are isometric, or the upper end arc length of wallboard body is less than lower end arc
It is long.The upper end arc length of wallboard body is less than lower end arc length formation cone arc prefabricated panel, and the building of this prefabricated board is more steady
Gu.Window hole 11 is provided with daylighting for convenience, the wallboard body.
As shown in fig. 6, described be fixed with corresponding floor 3 per floor in layer;The top of the arc prefabricated panel 1 of floor layer
Portion's madial wall is provided with connecting node, and the connecting node is directly fixedly linked with the end of floor 3 and/or with supporting the floor
The end of 3 support component is fixedly linked;The connecting node is arranged on below the top of arc prefabricated panel 1.The connection
Node is selected from one of the following two kinds form:
As shown in Figures 6 and 7, the connecting node of the first structure type includes being opened on the inside top wall of arc prefabricated panel 1
Groove 12 or blind hole;The end of the floor 3 or support component is stretched into the groove 12 or blind hole and prefabricated with the arc
Wallboard 1 is fixed together;It is highly preferred that the groove 12 is laterally set along the inside top wall of arc prefabricated panel 1, institute
Support component is stated for shaped steel, the upper surface of the shaped steel is provided with the floor 3;The end of the shaped steel insert the groove 12 or
In blind hole;The more preferably described top of arc prefabricated panel 1 is embedded with inner thread sleeve, and the inner thread sleeve stretches into institute with part
The screw rod 42 for stating groove 12 or blind hole is fixedly linked, and the extension of the screw rod 42 is fixedly linked with the shaped steel 41.
Thus, laterally it is provided with groove 12 on the inside top wall of the prefabricated panel 1.Institute is stretched into the end of the floor 3
State in groove 12 and be fixed together with the prefabricated panel 1.As a kind of preferred scheme, floor 3 is supported by shaped steel 41;It is described
The end of shaped steel is inserted in the groove 12.The top of prefabricated panel 1 is embedded with inner thread sleeve, the inner thread sleeve and portion
Point stretch into the groove 12 or the screw rod 42 of blind hole is fixedly linked, the extension of the screw rod 42 and the stationary phase of shaped steel 41
Even.Alternatively, groove 12 is replaced by blind hole.
As shown in figure 8, the connecting node of second of structure type includes being embedded in the multiple interior of the top of arc prefabricated panel 1
It is fixedly linked on screw shell, the inner thread sleeve by one side of fastener and corner connector 44, the another side of the corner connector 44
Directly it is fixedly linked with the end of floor 3 and/or with supporting the end of the support component of the floor 3 to be fixedly linked;It is preferred that institute
Support component is stated for shaped steel, the upper surface of the shaped steel is provided with the floor 3.
Thus, it is pre-buried by multiple inner thread sleeves 16, the inner thread sleeve 16 in the inside top wall of the prefabricated panel 1
It is upper to pass through screw rod 42 and corner connector 44(Preferably angle steel)One side be fixedly linked, the another side of the corner connector 44 is directly and floor
3 end is fixedly linked.As a kind of preferred scheme, floor 3 is supported by shaped steel 41;The upper surface of shaped steel 41 is provided with the floor
3。
As shown in Figures 9 and 10, it is described per floor in layer provided be fixed on floor 3 and correspondence arc prefabricated panel 1 every
Wall 21;The inwall of the wallboard body of the arc prefabricated panel 1 is provided with the vertical spaced apart connector of two row;The partition wall
The connecting hole extended internally perpendicular to outer face is provided with 21 outer face, the company of the connecting hole and the arc prefabricated panel 1
Fitting, which coordinates, to be connected;It is preferred that the part of the connector is embedded in wallboard body, the part of the connector is with respect to wallboard body
Internal face stretch out to form extension;It is to be embedded in arc prefabricated panel 1 and vertical arranged for interval more to select the connector
Inner thread sleeve, the inner thread sleeve coordinates with corresponding screw rod 24 and is connected;The relative inwall of wallboard 1 of a part of the screw rod 24
Stretch out and be fixedly linked with partition wall 21.
The hand hole connected with the connecting hole, the stretching of the connector are provided with the side wall of the outer end of the partition wall 21
Portion is fixedly linked through connecting hole and with the fastener in the hand hole;It is preferred that each hand hole of same row connects to form vertical
The groove of setting;
In order to ensure the reliability of connection, backing plate 22 is provided with the hand hole, the fastener is by backing plate 22 and screw rod by institute
State wallboard 1 and partition wall 21 is securely removably connected at together.
The construction method of above-mentioned assembled cylinder Tower Building, it comprises the following steps:
S1, plant produced arc prefabricated panel, job site do basis and provide smooth hardened place as requested, and arc is pre-
Wallboard processed is transported to behind job site in hardened place first unwrapping wire, and arc prefabricated panel is lifted into design attitude, and temporarily solid
It is fixed;
S2, splicing first layer floor, the curved channel docked by arc screw rod through the adjacent two pieces of arc prefabricated panels in left and right
It is interior, and the adjacent two pieces of arcs in left and right are fixed together, until first layer floor forms overall annular;
S3, in first layer floor floor is installed, by the inwall of the circumferentially fixed arc prefabricated panel in first layer floor of floor
On face;Then partition wall 21 is installed on floor 3, the outer end of the partition wall 21 is fixed on the internal face of arc prefabricated panel;
S4, first layer floor top install the second floor, the arc of the bottom of each arc prefabricated panel of the second floor is led to
The curved channel in road and the top of each arc prefabricated panel of first layer floor is corresponded, and is passed through by corresponding arc screw rod
In the curved channel of neighbouring two pieces of arc prefabricated panels docking and neighbouring two pieces of arc prefabricated panels are fixed on one
Rise;
S5, repetition S2- S4, until design height is arrived in the construction of all floors.
The present invention is according to architectural design, plant produced arc prefabricated panel (or cone arc prefabricated panel), arc is prefabricated
Wallboard is stayed as requested sets screw hole, preformed groove, waterproof groove, door-window opening and inner thread sleeve.Job site is only needed to
Basis being done as requested smooth hardened place being provided, arc prefabricated panel is transported to the first unwrapping wire in ground on the scene behind scene, in arc
Expansion water-stop band is stained with the waterproof groove of prefabricated panel surrounding, wallboard is lifted into by design using satisfactory hoisting machinery
Position, and fixed with interim.
Wallboard is penetrated with arch screw bolt between wallboard and reserve arcuate socket, tighten bolt and assembly is connected to drawing.Outer shroud is spelled
Screw rod is screwed at the embedded sleeve in the reserved connection partition wall position of arc wallboard according to design requirement after dress, is screwed into after screw rod and lifts
Partition wall, the reserving hole of partition wall, which penetrates to be tightened with nut after screw rod, makes partition wall be connected with arc wallboard.Partition wall subregion is installed
Afterwards, the inner thread sleeve for being caught in shaped steel in the groove that curved wall is reserved and being screwed into by screw rod in groove is fixed, and makes type
Steel forms the frame body of three-dimensional with outer arcuate wall.
The setting of shaped steel can be arranged according to design requirement, arrange that what is be not limited to is stuck in the groove of arc prefabricated panel,
The short shaped steel in part can also be fixed in the middle of the shaped steel being stuck on arc wallboard according to the horizontal layout in room.Type steel support body
System assembled steel stair or bimber stair or precast concrete stair after having set up, the strong point of stair is on support shaped steel and ground
On face.While assembled stair on type steel support floor spiced layer, floor layer can according to design using steel plate, wood floor or
Person's prefabricated concrete floor.Next layer is installed successively according to this order, design height is arrived in construction always.
The content that above-described embodiment is illustrated should be understood to that these embodiments are only used for being illustrated more clearly that the present invention, without
For limiting the scope of the present invention, after the present invention has been read, the various equivalent form of values of the those skilled in the art to the present invention
Modification each fall within the application appended claims limited range.
Claims (10)
1. a kind of assembled cylinder Tower Building, is mainly assembled successively from bottom to top by multilayer floor, adjacent two layers floor it
Between form horizontal joint(82), it is characterised in that per floor, layer is by polylith arc prefabricated panel(1)Cyclization is spliced by connector
Shape;The arc prefabricated panel includes wallboard body, and the wallboard body has intrados and extrados;The wallboard body
The end up and down of intrados is provided with multiple holes, the end face up and down of the wallboard body and is provided with multiple holes, institute
The hole stated on the intrados of wallboard body is connected with the hole on corresponding end face by curved channel;It is preferred that the adjacent two pieces of arcs in left and right
Vertical seam is formed between prefabricated panel(81), the vertical seam of the arc prefabricated panel of the same lengthwise position between different floors connects
Lead to and form elongated vertical seam(81);
It is preferred that being connected between the two pieces of arc prefabricated panels in left and right by the connecting screw rod of arc;The wherein arc prefabricated panel on the left side
Positioned at the left side of the prefabricated panel on the right, the hole of the arc prefabricated panel right part on the left side and the prefabricated panel left part on the right
Hole is connected by corresponding curved channel;The connecting screw rod is horizontally through the curved channel of the arc prefabricated panel on the left side
With the curved channel of the prefabricated panel on the right and two pieces of left and right arc prefabricated panel is fixed together;And/or
It is connected up and down between two pieces of arc prefabricated panels by the connecting screw rod of arc;The arc prefabricated panel of wherein top is located at
On following prefabricated panel, the hole of the hole of the arc prefabricated panel bottom of top and following prefabricated panel upper end passes through
Corresponding curved channel connection;The connecting screw rod is vertically through the curved channel of arc prefabricated panel of the top and following
Prefabricated panel curved channel and will be fixed together up and down on two pieces of arc prefabricated panels.
2. assembled cylinder Tower Building according to claim 1, it is characterised in that be embedded with the wallboard body multiple
Inner thread sleeve, the inner thread sleeve coordinates with screw rod and is connected;The relative wallboard of a part of the screw rod(1)Inwall, which stretches out, to be used in combination
It is fixedly linked in partition wall;It is preferred that hole and hand hole hole on the intrados of wallboard body(15)Directly connect.
3. assembled cylinder Tower Building according to claim 1 or 2, it is characterised in that the arc prefabricated panel is extremely
Elongated groove is provided with few top end face and/or side end face(13), the groove(13)Held up and down positioned at the wallboard body
The outside in the hole in face;It is preferred that being provided with elongated groove on the end face up and down of the arc prefabricated panel(13).
4. assembled cylinder Tower Building according to claim 1 or 2, it is characterised in that the upper end arc of the wallboard body
Length is isometric with lower end arc length, or the upper end arc length of wallboard body is less than lower end arc length;It is preferred that being provided with window opening in the wallboard body
Mouthful(11).
5. assembled cylinder Tower Building according to claim 1 or 2, it is characterised in that described to be fixed with per floor in layer
Corresponding floor(3);The arc prefabricated panel of floor layer(1)Inside top wall be provided with connecting node, the connecting node
Directly and floor(3)End be fixedly linked and/or with supporting the floor(3)The end of support component be fixedly linked;Institute
State connecting node and be arranged on arc prefabricated panel(1)Top below;It is preferred that the connecting node be selected from the following two kinds form it
One:
I, the connecting node include being opened in arc prefabricated panel(1)Inside top wall upper groove(12)Or blind hole;The building
Plate(3)Or the groove is stretched into the end of support component(12)Or blind hole in and with the arc prefabricated panel(1)It is fixed on one
Rise;It is highly preferred that the groove(12)Along the arc prefabricated panel(1)Inside top wall is laterally set, the support member
Part is shaped steel, and the upper surface of the shaped steel is provided with the floor(3);The groove is inserted in the end of the shaped steel(12)Or blind hole
It is interior;More preferably described arc prefabricated panel(1)Top is embedded with inner thread sleeve, and the inner thread sleeve stretches into described with part
Groove(12)Or the screw rod of blind hole(42)It is fixedly linked, the screw rod(42)Extension and the shaped steel(41)It is fixedly linked;
Ii, the connecting node include being embedded in arc prefabricated panel(1)Multiple inner thread sleeves at top, the inner thread sleeve
It is upper to pass through fastener and corner connector(44)One side be fixedly linked, the corner connector(44)Another side directly and floor(3)End
Portion is fixedly linked and/or with supporting the floor(3)The end of support component be fixedly linked;It is preferred that the support component is type
Steel, the upper surface of the shaped steel is provided with the floor(3).
6. assembled cylinder Tower Building according to claim 1 or 2, it is characterised in that described to be provided with solid in layer per floor
It is scheduled on floor(3)With correspondence arc prefabricated panel(1)On partition wall(21);The arc prefabricated panel(1)Wallboard body
Inwall is provided with the vertical spaced apart connector of at least one row;The partition wall(21)Outer face on be provided with perpendicular to outer face
The connecting hole extended internally, the connecting hole and the arc prefabricated panel(1)Connector coordinate be connected;It is preferred that the connector
Part be embedded in wallboard body, the part of the connector is stretched out to form extension with respect to the internal face of wallboard body;More have
The connector is selected to be embedded in arc prefabricated panel(1)Interior and vertical arranged for interval inner thread sleeve, the inner thread sleeve with
Corresponding screw rod(24)Coordinate and be connected;The screw rod(24)The relative wallboard of a part(1)Inwall stretches out and and partition wall(21)Gu
It is fixed to be connected.
7. assembled cylinder Tower Building according to claim 6, it is characterised in that the partition wall(21)Outer end side
Be provided with the hand hole connected with the connecting hole on wall, the extension of the connector through connecting hole and with the hand hole
Fastener be fixedly linked;It is preferred that each hand hole of same row connects to form vertically arranged groove.
8. assembled cylinder Tower Building according to claim 7, it is characterised in that backing plate is provided with the hand hole(22),
The fastener passes through backing plate(22)With screw rod by the wallboard(1)And partition wall(21)It is securely removably connected at together.
9. a kind of construction method of cylinder Tower Building assembled as any one of claim 1-8, it is characterised in that including
Following steps:
S1, plant produced arc prefabricated panel, job site do basis and provide smooth hardened place as requested, and arc is pre-
Wallboard processed is transported to behind job site in hardened place first unwrapping wire, and arc prefabricated panel is lifted into design attitude, and temporarily solid
It is fixed;
S2, splicing first layer floor, the curved channel docked by arc screw rod through the adjacent two pieces of arc prefabricated panels in left and right
It is interior, and the adjacent two pieces of arcs in left and right are fixed together, until first layer floor forms overall annular;
S3, in first layer floor floor is installed, by the inwall of the circumferentially fixed arc prefabricated panel in first layer floor of floor
On face;
S4, first layer floor top install the second floor, the arc of the bottom of each arc prefabricated panel of the second floor is led to
The curved channel in road and the top of each arc prefabricated panel of first layer floor is corresponded, and is passed through by corresponding arc screw rod
In the curved channel of neighbouring two pieces of arc prefabricated panels docking and neighbouring two pieces of arc prefabricated panels are fixed on one
Rise;
S5, repetition S2- S4, until design height is arrived in the construction of all floors.
10. the construction method of assembled cylinder Tower Building according to claim 9, it is characterised in that after step s 3, step
In floor before rapid S4(3)Upper installation partition wall(21), the partition wall(21)Outer end be fixed on the internal face of arc prefabricated panel
On.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210900184.1A CN115126079B (en) | 2017-07-04 | 2017-07-04 | Cylindrical tower type building and construction method thereof |
CN201710535957.XA CN107327015B (en) | 2017-07-04 | 2017-07-04 | Assembled drum tower type building and construction method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710535957.XA CN107327015B (en) | 2017-07-04 | 2017-07-04 | Assembled drum tower type building and construction method thereof |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202210900184.1A Division CN115126079B (en) | 2017-07-04 | 2017-07-04 | Cylindrical tower type building and construction method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107327015A true CN107327015A (en) | 2017-11-07 |
CN107327015B CN107327015B (en) | 2022-10-18 |
Family
ID=60198057
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202210900184.1A Active CN115126079B (en) | 2017-07-04 | 2017-07-04 | Cylindrical tower type building and construction method thereof |
CN201710535957.XA Active CN107327015B (en) | 2017-07-04 | 2017-07-04 | Assembled drum tower type building and construction method thereof |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202210900184.1A Active CN115126079B (en) | 2017-07-04 | 2017-07-04 | Cylindrical tower type building and construction method thereof |
Country Status (1)
Country | Link |
---|---|
CN (2) | CN115126079B (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107724542A (en) * | 2017-11-27 | 2018-02-23 | 三筑工科技有限公司 | Walling system |
CN107938856A (en) * | 2017-12-29 | 2018-04-20 | 三筑工科技有限公司 | Walling system |
CN108005269A (en) * | 2017-11-24 | 2018-05-08 | 沈阳建筑大学 | Modularization haydite concrete internal partition wall and its installation method |
CN108018953A (en) * | 2017-11-30 | 2018-05-11 | 中建八局第三建设有限公司 | The plugging device and method for blocking of prefabricated assembled precast beam and prefabricated board piece |
CN108952162A (en) * | 2018-07-20 | 2018-12-07 | 呼和浩特市中朵兴泰远大建筑工业有限公司 | A kind of method of construction of assembled yurt |
CN113404342A (en) * | 2021-08-02 | 2021-09-17 | 徐州工程学院 | Grassland protection shed convenient to dismantle |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1544376A2 (en) * | 2003-12-19 | 2005-06-22 | Rund-Stahl-Bau Gesellschaft M.B.H. | Inner shuttering section for the erection of a construction section |
CN203175133U (en) * | 2013-04-19 | 2013-09-04 | 北京金风科创风电设备有限公司 | Prefabricated concrete fan tower |
CN105545609A (en) * | 2015-12-29 | 2016-05-04 | 北京金风科创风电设备有限公司 | Tower of wind generating set and construction method of tower |
CN106400966A (en) * | 2016-11-21 | 2017-02-15 | 安徽建筑大学 | Assembly method of prefabricated integral assemble type portable house |
CN106545343A (en) * | 2016-10-28 | 2017-03-29 | 江西中恒地下空间科技有限公司 | A kind of construction method of tunneling underground pipe gallery and storage well |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB788808A (en) * | 1955-05-12 | 1958-01-08 | George Meredith Marrow | Improvements in or relating to prefabricated buildings |
DE10255335A1 (en) * | 2002-11-27 | 2004-06-17 | Zipp House Gmbh | Building constructed from individual building modules |
DE102010010868A1 (en) * | 2010-03-10 | 2011-09-15 | Cosmohelvetia Ag | Multi-story building has closed outer facade, which is attached to supporting frame with ring-shaped ceilings, where supporting frame is made of multiple peripheral cores and multiple ceilings |
CN106869539A (en) * | 2017-03-23 | 2017-06-20 | 黄河科技学院 | A kind of assembled factory building |
CN106836469B (en) * | 2017-03-23 | 2020-08-11 | 黄河科技学院 | Assembly type building |
CN207003656U (en) * | 2017-07-04 | 2018-02-13 | 三能集成房屋股份有限公司 | A kind of assembled tower building |
-
2017
- 2017-07-04 CN CN202210900184.1A patent/CN115126079B/en active Active
- 2017-07-04 CN CN201710535957.XA patent/CN107327015B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1544376A2 (en) * | 2003-12-19 | 2005-06-22 | Rund-Stahl-Bau Gesellschaft M.B.H. | Inner shuttering section for the erection of a construction section |
CN203175133U (en) * | 2013-04-19 | 2013-09-04 | 北京金风科创风电设备有限公司 | Prefabricated concrete fan tower |
CN105545609A (en) * | 2015-12-29 | 2016-05-04 | 北京金风科创风电设备有限公司 | Tower of wind generating set and construction method of tower |
CN106545343A (en) * | 2016-10-28 | 2017-03-29 | 江西中恒地下空间科技有限公司 | A kind of construction method of tunneling underground pipe gallery and storage well |
CN106400966A (en) * | 2016-11-21 | 2017-02-15 | 安徽建筑大学 | Assembly method of prefabricated integral assemble type portable house |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108005269A (en) * | 2017-11-24 | 2018-05-08 | 沈阳建筑大学 | Modularization haydite concrete internal partition wall and its installation method |
CN107724542A (en) * | 2017-11-27 | 2018-02-23 | 三筑工科技有限公司 | Walling system |
CN108018953A (en) * | 2017-11-30 | 2018-05-11 | 中建八局第三建设有限公司 | The plugging device and method for blocking of prefabricated assembled precast beam and prefabricated board piece |
CN108018953B (en) * | 2017-11-30 | 2024-01-19 | 中建八局第三建设有限公司 | Plugging device and plugging method for prefabricated assembled precast beam and precast slab joint |
CN107938856A (en) * | 2017-12-29 | 2018-04-20 | 三筑工科技有限公司 | Walling system |
CN107938856B (en) * | 2017-12-29 | 2023-10-27 | 三一筑工科技股份有限公司 | wall system |
CN108952162A (en) * | 2018-07-20 | 2018-12-07 | 呼和浩特市中朵兴泰远大建筑工业有限公司 | A kind of method of construction of assembled yurt |
CN113404342A (en) * | 2021-08-02 | 2021-09-17 | 徐州工程学院 | Grassland protection shed convenient to dismantle |
Also Published As
Publication number | Publication date |
---|---|
CN107327015B (en) | 2022-10-18 |
CN115126079A (en) | 2022-09-30 |
CN115126079B (en) | 2023-07-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107327015A (en) | A kind of assembled cylinder Tower Building and its construction method | |
CN207739480U (en) | A kind of sustainable full module-assembled building system of green | |
CN106638963A (en) | Rapid assembly type integrated house and building method thereof | |
CN107044179B (en) | Decorative panel and template integrated heat-preservation decorative composite wall and construction method thereof | |
CN105569355B (en) | It is a kind of to include the assembly method of prefabricated components modularization house | |
CN105756369B (en) | A kind of structure built-in heat insulation decorates integrated prefabricated buildings and its construction method | |
CN108277917A (en) | A kind of sustainable full module-assembled building system of green and construction method | |
CN106013584A (en) | Modular ceiling cascade device and mounting method | |
CN111927248B (en) | Integrally prefabricated externally hung bay window, connecting node and manufacturing method | |
CN106939646A (en) | The steel construction integrated house building system and assembly method of a kind of repeatable dismounting | |
CN108824635A (en) | Support construction and its installation method for steel construction low-rise building | |
CN207032518U (en) | A kind of attachment structure of wallboard and floor | |
CN107327027A (en) | Assembled Collapsible house | |
CN205742723U (en) | Tail margin connecting device and precast wall body for precast wall body | |
CN100357156C (en) | Shipping cabin unit and mfg. method thereof | |
CN209323800U (en) | A kind of prefabricated three-hinged arch roof boarding | |
CN207003656U (en) | A kind of assembled tower building | |
CN111927249B (en) | Integral prefabricated embedded bay window, connecting node and manufacturing method | |
CN113931458A (en) | Method for installing large-size glass brick wall | |
CN104805938A (en) | Stone curtain wall and method for assembling and mounting stone curtain wall | |
CN109098338A (en) | A kind of assembled abnormity structural system of roof and its construction method | |
CN206144018U (en) | Be suitable for opening type building bottom plate and building element of hoist and mount pendant | |
CN207063312U (en) | A kind of arc wallboard and its attachment structure, building | |
CN207032585U (en) | A kind of wallboard, partition wall and its attachment structure | |
CN102220785A (en) | Combined joint, precast box house, and construction method for reinforced concrete structure multistory and high-rise building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |