CN107326904A CN201710732333.7A CN201710732333A CN107326904A CN 107326904 A CN107326904 A CN 107326904A CN 201710732333 A CN201710732333 A CN 201710732333A CN 107326904 A CN107326904 A CN 107326904A
Authority
CN
China
Prior art keywords
piling
guide rail
oil cylinder
cylinder
chassis
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710732333.7A
Other languages
Chinese (zh)
Inventor
颜小荣
黄强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710732333.7A priority Critical patent/CN107326904A/en
Publication of CN107326904A publication Critical patent/CN107326904A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/20Placing by pressure or pulling power
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D13/00Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
    • E02D13/04Guide devices; Guide frames

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The invention belongs to Architectural Equipment technical field, and in particular to one kind is voluntarily without counterweight static press piling equipment.One kind is voluntarily without counterweight static press piling equipment, it is made up of chassis, clipping equilibrium system, piling system and mobile system, characterized in that, the clipping equilibrium system is made up of the positional cylinder and clamping plate for being arranged on tray bottom both sides, clamping plate steps up by positional cylinder control;Described mobile system is made up of the Shift cylinder and moving guide rail for being arranged on the jacking cylinder of the extreme end of chassis and being arranged on chassis, and described piling system is made up of pile driving frame and the guide rail bracket, piling fixture, vibrating device, the piling oil cylinder that are fixed on pile driving frame.The present invention has reasonable in design, easy to use, flexible and convenient operation, plants stake precision controlling precisely, improves operating efficiency, safe and reliable, good engineering quality is small to surrounding environment and effect on building, not the characteristics of damage to land structure.

Description

One kind is voluntarily without counterweight static press piling equipment
Technical field
The invention belongs to Architectural Equipment technical field, and in particular to one kind is voluntarily without counterweight static press piling equipment.
Background technology
Pile press machine is the equipment commonly used in architectural engineering, and it is the piling machinery that stake is pressed into stratum using static pressure.With In Soft Soil Layer piling, the stake work of such as underground railway, harbour, bridge, reservoir power station, offshore production platform and defence engineering is applied Work.Existing pile press machine is divided to mechanical and two kinds of fluid pressure type.
Mechanical pile press machine, during operation, stake is placed under press beam, and press beam both sides are equipped with piling assembly pulley.Steel wire rope from Hoist engine is drawn, and bypasses the leading block on pile frame back timber, then sequentially bypass movable pulley in press beam and pile frame bottom determine cunning Wheel, hoist engine involves in steel wire rope, progressively tightens up piling assembly pulley, is applied the weight and counterweight of whole pile press machine by press beam In in stake top, overcoming the frictional resistance between stake and soil, stake is gradually pressed into soil.There is lifting pulley group on pile frame back timber, use It is in place to hang stake, there is gantry in the middle of pile frame, to guide pile sinking direction.Steel wire rope, which is passed around, rationally to make stress equalization.Two volumes Machine power is raised to seek common ground step.There is equalizer pulley group to offset the difference of hauling speed, on back timber, and by the steel of the piling assembly pulley of left and right two Cord is connected.Pile frame bottom both sides are the ship shape rail chair for being laid with rail.During operation, rail chair is sling, complete machine is supported on central machine On seat.During displacement, ground is put in rail chair reach in both sides, and road wheel is rolled on rail.It is adapted to press in clay, silt soil and sand and sets Concrete-pile and piling bar.
Fluid pressure type pile press machine, by pile frame, hangs the parts such as a crane, hydraulic pile-clamp apparatus, piling hydraulic cylinder and electrical equipment Composition.Pile frame is complete machine supporting part, equipped with main platform, guide table, column and lower running chassis.A crane is hung to be loaded on Column top, it is in place to hang stake.During operation, hydraulic pile-clamp apparatus clamps pile crown, then pushes pile chuck by a pair of piling hydraulic cylinders, Stake is set to sink.One machine can press some piles simultaneously equipped with some to piling hydraulic cylinder.Electrical equipment be used for drive main pump operating, Machine-walking.Suitable for setting shaped steel or steel H pile in the places such as backfill, mud, clay pressure, it is suitable for municipal construction.
Both the above pile press machine, it is huge to there is equipment volume, and own wt more than the even upper kiloton of hundreds of tons, makes Used time needs to take larger work-yard, and the requirement to construction site is extremely harsh, and plant stake speed is slow, and pile precision is difficult To control, transition dismounts and transported very inconvenient defect.
The content of the invention
The invention aims to solve the deficiencies in the prior art there is provided a kind of small volume, working face requirement when using It is smaller, to the requirement of construction site condition the bottom of compared with, plant stake speed soon, pile quality is good, transition convenient disassembly, is readily transported voluntarily Without counterweight static press piling equipment.
What practicality of the invention was realized by following technical solution:
One kind is made up of, institute voluntarily without counterweight static press piling equipment chassis, clipping equilibrium system, piling system and mobile system State clipping equilibrium system to be made up of the positional cylinder and clamping plate for being arranged on tray bottom both sides, clamping plate steps up by positional cylinder control System;Described mobile system is by the Shift cylinder and moving guide rail that are arranged on the jacking cylinder of the extreme end of chassis He are arranged on chassis Composition, described piling system is by pile driving frame and the guide rail bracket being fixed on pile driving frame, piling fixture, vibrating device, piling oil Cylinder is constituted, and pile driving frame is arranged on chassis front end, and guide rail bracket is provided with piling guide rail, piling guide rail slidably provided with piling folder Fixture oil cylinder is provided with inside tool, piling fixture, piling oil cylinder and vibrating device are arranged on piling guide rail.
Described positional cylinder is at least two groups, and every group is two and is symmetrical arranged.
Described guide rail bracket bottom is also symmetrically provided with the anti-band oil cylinder of two clip piles.
Described piling oil cylinder is at least one group, and every group is at least one.
Described fixture oil cylinder is at least one group, every group at least two.
Described positional cylinder, jacking cylinder, Shift cylinder, piling oil cylinder, fixture oil cylinder, the anti-band oil cylinder of clip pile are liquid Compressing cylinder.
Compared with prior art, the present invention has the advantages that:1st, small volume of the invention, own wt is light, makes Used time occupancy construction site is smaller, and the requirement to construction site is relatively low, and scene dismounting is quick, and convenient transportation is simple to operate, Plant stake speed fast, pile precision is high, good engineering quality greatly reduces production cost;2nd, the present invention operationally, passes through folder Fair balance system is fixed on the top for the semi-finished product stake for being implanted into underground, with the frictional force and Ben Fa of semi-finished product stake side wall and the soil body The bright weight of itself is reaction force, and stake is implanted into design attitude and absolute altitude by the pressure of piling system.When a stake is pressed onto After certain depth, discharge clipping equilibrium system, piling system does not discharge, while the upward jacking of jacking cylinder, make equipment chassis from Semi-finished product stake top is opened, opens and pushes oil cylinder, cylinder efficient is pushed and chassis is pushed to precalculated position, put down chassis, open clamping Balance system, withdraws and pushes oil cylinder, top opening is recovered into precalculated position, subsequently into next working condition;3rd, due to There is provided the anti-band oil cylinder of clip pile so that the precision of present invention control stake position is higher, and horizontal error is no more than the 1/3 of stake footpath, stake Top mark height is no more than 3cm;4th, the present invention has reasonable in design, easy to use, flexible and convenient operation, plants stake precision controlling accurately Feature, piling is carried out using the equipment of the present invention, also has safe and reliable, good engineering quality while improving operating efficiency, right Surrounding environment and effect on building are small, not the features such as damage to land structure.5th, during piling machine operation of the invention, stake is not damaged Head, pile body is not by curved, noiseless, impact without friction.Can directly be read from pressure gauge during piling stake bearing capacity, no Need to separately it do experiment.Stable working, energy pressure energy is pulled out, and equipment is light and handy, only fixture need to slightly be adjusted and be gone for currently building Build the piling operation of the various stakes such as concrete square pile, pile tube, U-shaped stake, plate that market is generally used.
Brief description of the drawings
Fig. 1 is structural representation of the invention,
In figure:1- clamping plates, 2- jacking cylinders, 3- Shift cylinders, 4- chassis, 5- piling fixtures, 6- piling guide rails, 7- fixtures oil Cylinder, 8- guide rail brackets, the anti-band oil cylinder of 9- clip piles, 10- positional cylinders, the stake of 11- semi-finished product, 12- moving guide rails, 13- piling oil cylinders.
Embodiment
The present invention will be further described with reference to the accompanying drawings and examples, but protection scope of the present invention is not by embodiment Limited.
Embodiment 1
One kind is made up of, institute voluntarily without counterweight static press piling equipment chassis, clipping equilibrium system, piling system and mobile system State clipping equilibrium system to be made up of the positional cylinder and clamping plate for being arranged on tray bottom both sides, clamping plate steps up by positional cylinder control System;Described mobile system is by the Shift cylinder and moving guide rail that are arranged on the jacking cylinder of the extreme end of chassis He are arranged on chassis Composition, described piling system is by pile driving frame and the guide rail bracket being fixed on pile driving frame, piling fixture, vibrating device, piling oil Cylinder is constituted, and pile driving frame is arranged on chassis front end, and guide rail bracket is provided with piling guide rail, piling guide rail slidably provided with piling folder Fixture oil cylinder is provided with inside tool, piling fixture, piling oil cylinder and vibrating device are arranged on piling guide rail.
Described positional cylinder is two groups, and every group is two and to be symmetrical arranged.
Described track frame bottom is also symmetrically provided with the anti-band oil cylinder of two clip piles.
Described piling oil cylinder is one group, and every group is one.
Described fixture oil cylinder is one group, and every group is two.
During work, the top for the semi-finished product stake for being implanted into underground is fixed on by clipping equilibrium system, with semi-finished product stake side The frictional force and the weight of itself of the invention of wall and the soil body are reaction force, and stake implantation is designed into position by the pressure of piling system Put and absolute altitude.After a stake is pressed onto certain depth, clipping equilibrium system is discharged, piling system does not discharge, while jacking cylinder Upward jacking, makes equipment chassis leave semi-finished product stake top, opens and pushes oil cylinder, pushes cylinder efficient and chassis is pushed into pre-determined bit Put, put down chassis, opening clamp maintains an equal level balance system, withdraws and pushes oil cylinder, top opening is recovered into precalculated position, subsequently under One working condition.
By the way that the pile compacting equipment of same model and the present embodiment of disposal ability and traditional fluid pressure type pile press machine are carried out Compare and understand, the 1/4 of the not enough fluid pressure type pile press machine of weight of the pile compacting equipment of the present embodiment, floor space not enough machinery during work The 1/20 of formula pile press machine.The stake top absolute altitude for the stake pressed by the present embodiment is no more than 3cm, and is pressed using fluid pressure type pile press machine Stake stake top absolute altitude be 4.3-4.9cm;The deviation for the stake horizontal level pressed using the pile compacting equipment of the present embodiment is no more than The 1/3 of stake footpath, and the deviation of the stake horizontal level for the stake that fluid pressure type pile press machine pressed is used for the 1/2 of stake footpath.
Embodiment 2
One kind is made up of, institute voluntarily without counterweight static press piling equipment chassis, clipping equilibrium system, piling system and mobile system State clipping equilibrium system to be made up of the positional cylinder and clamping plate for being arranged on tray bottom both sides, clamping plate steps up/unclamped by positioning Oil cylinder is controlled;Described mobile system is by the Shift cylinder for being arranged on the jacking cylinder of the extreme end of chassis and being arranged on chassis and shifting Dynamic guide rail composition, described piling system by pile driving frame and the guide rail bracket being fixed on pile driving frame, piling fixture, vibrating device, Piling oil cylinder is constituted, and pile driving frame is arranged on chassis front end, and guide rail bracket is provided with piling guide rail, piling guide rail and is slidably provided with Fixture oil cylinder is provided with inside piling fixture, piling fixture, piling oil cylinder and vibrating device are arranged on piling guide rail.
Described positional cylinder is four groups, and every group is two and to be symmetrical arranged.
Described track frame bottom is also symmetrically provided with the anti-band oil cylinder of two clip piles.
Described piling oil cylinder is two groups, and every group is two and to be symmetrical arranged.
Four groups of described fixture oil cylinder, every group is four.
By the way that the pile compacting equipment of same model and the present embodiment of disposal ability and traditional mechanical pile press machine are carried out Compare and understand, the 1/6 of the not enough mechanical pile press machine of weight of the pile compacting equipment of the present embodiment, floor space not enough machinery during work The 1/15 of formula pile press machine.The stake top absolute altitude for the stake pressed by the present embodiment is no more than 3cm, and is pressed using mechanical pile press machine Stake stake top absolute altitude be 4.5-5.2cm;The deviation for the stake horizontal level pressed using the pile compacting equipment of the present embodiment is no more than The 1/3 of stake footpath, and the deviation of the stake horizontal level for the stake that mechanical pile press machine pressed is used for the 1/2 of stake footpath.
The building site at certain urban transportation thoroughfare is entered simultaneously using the pile press machine of the present embodiment and using fluid pressure type pile press machine Row piling operation contrast, the pile press machine of the present embodiment is walked in stake top, not influenceed by space, can be normally carried out piling behaviour Make.And fluid pressure type pile press machine needs to fix on the ground that piling operation could be carried out, and the building site is located at traffic main artery, wagon flow With it is crowded, surrounding is building, it is impossible to carry out piling operation.

Claims (5)

1. one kind is made up of voluntarily without counterweight static press piling equipment chassis, clipping equilibrium system, piling system and mobile system, Characterized in that, the clipping equilibrium system is made up of the positional cylinder and clamping plate for being arranged on tray bottom both sides, clamping plate plus Tightly by positional cylinder control;Described mobile system is by the movement that is arranged on the jacking cylinder of the extreme end of chassis He is arranged on chassis Oil cylinder and moving guide rail composition, described piling system by pile driving frame and the guide rail bracket being fixed on pile driving frame, piling fixture, shake Dynamic device, piling oil cylinder composition, pile driving frame are arranged on chassis front end, and guide rail bracket is provided with piling guide rail, piling guide rail and can slided Dynamic being provided with inside piling fixture, piling fixture is provided with fixture oil cylinder, and piling oil cylinder and vibrating device are arranged at piling guide rail On.
2. one kind according to claim 1 is voluntarily without counterweight static press piling equipment, it is characterised in that described positional cylinder At least two groups, every group is two and to be symmetrical arranged.
3. one kind according to claim 1 is voluntarily without counterweight static press piling equipment, it is characterised in that described guide rail bracket bottom Portion is also symmetrically provided with the anti-band oil cylinder of two clip piles.
4. one kind according to claim 1 is voluntarily without counterweight static press piling equipment, it is characterised in that described piling oil cylinder At least one group, every group is at least one.
5. one kind according to claim 1 is voluntarily without counterweight static press piling equipment, it is characterised in that described fixture oil cylinder At least one group, every group at least two.
CN201710732333.7A 2017-08-24 2017-08-24 One kind is voluntarily without counterweight static press piling equipment Pending CN107326904A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710732333.7A CN107326904A (en) 2017-08-24 2017-08-24 One kind is voluntarily without counterweight static press piling equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710732333.7A CN107326904A (en) 2017-08-24 2017-08-24 One kind is voluntarily without counterweight static press piling equipment

Publications (1)

Publication Number Publication Date
CN107326904A true CN107326904A (en) 2017-11-07

Family

ID=60228478

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710732333.7A Pending CN107326904A (en) 2017-08-24 2017-08-24 One kind is voluntarily without counterweight static press piling equipment

Country Status (1)

Country Link
CN (1) CN107326904A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110130342A (en) * 2019-05-22 2019-08-16 游军 A kind of pile driving equipment of underwater reinforced concrete prefabricated board pile driving construction and pile-driving method
CN110424389A (en) * 2019-08-30 2019-11-08 宁波易和桩基工程技术开发有限公司 Pile compacting equipment
CN113338283A (en) * 2021-07-09 2021-09-03 山东临工工程机械有限公司 Walking mechanism and supplementary device of piling on stake
EP3872266A4 (en) * 2018-10-24 2021-12-22 Byung Kwan Kang Annular cofferdam using tapered square pipes, temporary structure for pit excavation construction, and construction method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2038611A1 (en) * 1990-03-11 1992-09-12 Jianrong Hu Hydraulic pressure pile drive
CN1337500A (en) * 2000-08-11 2002-02-27 萧树棠 Oil pressure static pile press
CN102493453A (en) * 2011-12-06 2012-06-13 湖南新天和工程设备有限公司 Hydraulic dynamic and static cooperation pile pressing machine
CN106013150A (en) * 2016-07-11 2016-10-12 王闯 Pile pressing machine
CN106468058A (en) * 2015-08-16 2017-03-01 天津宇昊建设工程集团有限公司 A kind of architectural engineering fluid pressure type static pile press
CN106930287A (en) * 2015-12-29 2017-07-07 浙江大学城市学院 A kind of full hydraulic static pile press
CN207211146U (en) * 2017-08-24 2018-04-10 颜小荣 One kind is voluntarily without counterweight static press piling equipment

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2038611A1 (en) * 1990-03-11 1992-09-12 Jianrong Hu Hydraulic pressure pile drive
CN1337500A (en) * 2000-08-11 2002-02-27 萧树棠 Oil pressure static pile press
CN102493453A (en) * 2011-12-06 2012-06-13 湖南新天和工程设备有限公司 Hydraulic dynamic and static cooperation pile pressing machine
CN106468058A (en) * 2015-08-16 2017-03-01 天津宇昊建设工程集团有限公司 A kind of architectural engineering fluid pressure type static pile press
CN106930287A (en) * 2015-12-29 2017-07-07 浙江大学城市学院 A kind of full hydraulic static pile press
CN106013150A (en) * 2016-07-11 2016-10-12 王闯 Pile pressing machine
CN207211146U (en) * 2017-08-24 2018-04-10 颜小荣 One kind is voluntarily without counterweight static press piling equipment

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3872266A4 (en) * 2018-10-24 2021-12-22 Byung Kwan Kang Annular cofferdam using tapered square pipes, temporary structure for pit excavation construction, and construction method
US11371204B2 (en) 2018-10-24 2022-06-28 Byung Kwan Kang Ring-shaped cofferdam and temporary pit excavation structure using tapered square pipe, and construction method thereof
CN110130342A (en) * 2019-05-22 2019-08-16 游军 A kind of pile driving equipment of underwater reinforced concrete prefabricated board pile driving construction and pile-driving method
CN110130342B (en) * 2019-05-22 2021-03-23 游军 Piling equipment and piling method for underwater reinforced concrete prefabricated sheet pile construction
CN110424389A (en) * 2019-08-30 2019-11-08 宁波易和桩基工程技术开发有限公司 Pile compacting equipment
CN113338283A (en) * 2021-07-09 2021-09-03 山东临工工程机械有限公司 Walking mechanism and supplementary device of piling on stake
CN113338283B (en) * 2021-07-09 2022-08-16 山东临工工程机械有限公司 Walking mechanism and supplementary device of piling on stake

Similar Documents

Publication Publication Date Title
CN107326904A (en) One kind is voluntarily without counterweight static press piling equipment
CN103669351B (en) Full-stroke hole-leading hydraulic static pile driver
CN101736699B (en) Accurate positioning method of sliding of full-support frame steel box girder
CN201924360U (en) Multifunctional hydraulic static pile press
CN201915824U (en) Truck-mounted rotary drilling rig with construction function of diaphragm wall
CN204530661U (en) Deep water bedding compacting system
CN201738321U (en) Multifunctional pile machine
IL280092B2 (en) Mobile onshore construction platform and method for wharf reconstruction
CN101761081A (en) Construction method and equipment of holding and pressing type static-pressure driven cast-in-place pile
CN207211146U (en) One kind is voluntarily without counterweight static press piling equipment
CN106930315A (en) A kind of moving tower crane foundation structure and construction method
CN207609374U (en) Lift self-travel type full-sleeve full-rotation drill
CN107663859B (en) pile driver
CN101949169B (en) Large pipeline sludge dredging machine
CN111894448A (en) Portable rotary digging equipment for construction of tower foundation pile hole in mountainous and hilly land
CN208934591U (en) Integral type full-sleeve full-rotation drill
CN108532654B (en) Crawler-type movable stacking platform for static load and flat plate load test method
CN107587853B (en) Full-rotation full-casing drilling machine
CN206753488U (en) A kind of artificial digging pile reaming auxiliary equipment
CN106703031A (en) Pile press for architectural engineering
CN103147437A (en) Section steel soil cement mixing pile with longitudinal displacement mechanism
CN208121589U (en) Large-tonnage highway ramp spells wide beam construction equipment
CN107460876B (en) Improved pile driver platform
CN206128160U (en) Operation device that open caisson sinks unearthedly
CN214667623U (en) Indoor simulation test device for pipe jacking construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20171107