CN107326868A - A kind of large reservoir concrete dam body fracture plugging method - Google Patents

A kind of large reservoir concrete dam body fracture plugging method Download PDF

Info

Publication number
CN107326868A
CN107326868A CN201710582283.9A CN201710582283A CN107326868A CN 107326868 A CN107326868 A CN 107326868A CN 201710582283 A CN201710582283 A CN 201710582283A CN 107326868 A CN107326868 A CN 107326868A
Authority
CN
China
Prior art keywords
crack
dam body
holdfast
concrete
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710582283.9A
Other languages
Chinese (zh)
Inventor
钱祖其
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Yibo Waterproof Anti-Corrosion Engineering Co Ltd
Original Assignee
Jiangsu Yibo Waterproof Anti-Corrosion Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Yibo Waterproof Anti-Corrosion Engineering Co Ltd filed Critical Jiangsu Yibo Waterproof Anti-Corrosion Engineering Co Ltd
Priority to CN201710582283.9A priority Critical patent/CN107326868A/en
Publication of CN107326868A publication Critical patent/CN107326868A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/16Sealings or joints

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

The invention belongs to architectural engineering crack recovery technique field, and in particular to a kind of large reservoir concrete dam body fracture plugging method.Comprise the following steps:Remove the water sealing structure of reservoir concrete upstream face crack in dam body circumferential surface;Baltimore groove, and embedded bullet modeling dilatancy sealing rod are cut into along crack using cutting machine, while fracture carries out cementing operations;In the drilling of Baltimore groove both sides, steel holdfast of riding is anchored in hole with high-performance complex cement epoxy resin mortar;Ride holdfast surface and around assembling reinforcement net, spraying interfacial agents after, with high-performance complex cement epoxy mortar application;In addition in concrete dam body crack upper water plane, well cementing reinforcement and repair is carried out.The present invention is closed using well cementing and blocks the method being combined with surface, and crack is not only reached and obtains the effect of reparation and leak stopping, and strengthens the deformation intensity of large reservoir concrete, can the larger waterproof effect for improving dam body;There is fast blockage, good endurance simultaneously.

Description

A kind of large reservoir concrete dam body fracture plugging method
Technical field
The invention belongs to architectural engineering crack recovery technique field, and in particular to a kind of large reservoir concrete dam body crack Blocking method.
Background technology
Concrete dam body crack is due to the effect of concrete structure internal and external factor and the physical arrangement change that produces, and is split Seam is the main cause of concrete structure bearing capacity, durability and water proofing property reduction.General concrete crack in dam body occurs The position of percolating water, mainly appears on construction joint, attractive joint, malformation seam and concrete defect position, when concrete occurs During crack, serious percolating water situation will be produced, in some Code in Hazardous Special Locations such as subway tunnel, reservoir, underground storehouses, to metope Barrier performance require it is very high, once concrete wall surface crack occur seepage, often directly influence the peace of whole building engineering Full stable operation, it is also possible to larger engineering accident can be caused.
At present, the reparation for large reservoir concrete dam body crack-leakage water mainly uses slip casting restorative procedure, table Face closure method, flexible sealing method etc., but the problem of grouting for water plugging method maximum can be existed between injecting paste material and concrete Gap, it is difficult to prevent seepage, and surface sealing method durability is bad, so existing large reservoir concrete dam body crack is repaiied Compound method still has certain defect.
The content of the invention
In order to solve some existing at present technical elements defects, a kind of construction of present invention offer is simple, plugging effect Well, good endurance, a kind of large reservoir concrete dam body fracture plugging method of anti-permeation cracking-resistant.
Technical scheme:
In order to solve the above-mentioned technical problem, a kind of large reservoir concrete dam body fracture plugging method of the present invention, it is wrapped Include following steps:
(1)The water sealing structure of reservoir concrete upstream face crack in dam body circumferential surface is removed, fracture situation is examined after dismounting Look into, find out seepage crack.
(2)Baltimore groove is cut into along crack using cutting machine, first opened during raggle along crack, then is widened to both sides, after having dug The debris such as concrete chip, the dust in groove are cleaned out.
(3)In the Baltimore groove dug, embedded bullet modeling dilatancy sealing rod, while fracture carries out cementing operations.
(4)In the drilling of Baltimore groove both sides appropriate location, steel is ridden holdfast anchor with high-performance complex cement epoxy resin mortar It is fixed in hole.
(5)Ride holdfast surface and around assembling reinforcement net, spraying interfacial agents after, with high-performance complex cement epoxy sand Slurry is wiped one's face.
(6)After the completion of concrete dam body upstream face crack repairing, in concrete dam body crack upper water plane, drilled Consolidation by grouting leak stopping.
The width that Baltimore groove is cut into described crack is 30-80mm, and depth is 50-120mm.
Described steel is ridden a diameter of 10-32mm of holdfast, and holdfast gos deep into wall length for 80-200mm, holdfast width For 150-300mm.Each holdfast is separated by spacing for 50-200mm.
The sealing rod of described insertion Baltimore groove is that BW-96S bullets mould dilatancy sealing rod, by hydrophilic polyurethane material It is made with compounding rubber.
Described concrete dam body crack upper water plane well cementing, Specific construction be along crack both sides each 80~ Carrying out vertical core and inclined hole cross-pair at 120mm respectively should drill, and pitch-row is in 250~300mm, and bit diameter is 24~60mm, tiltedly Orifice angle and flaw level angle are 30-45 °, and drilling depth is through whole concrete structure;Then by hole and crack Fine dusts purging is clean, and grout nipple is installed in the hole being drilled and is tightened, dead-end fracture surface, retains peephole and pressure release goes out Stomata;High-performance complex cement epoxy resin mortar is irrigated into hole, is progressively irrigated from a lateral opposite side, when adjacent holes or crack table Face peephole starts after pulp, pulp situation in 15~25s of pressure, observation crack, then appropriate progress supplementary irrigation is kept, until grouting Pressure change than just stopping grouting after shallower.Grouting is finished, and is confirmed that high-performance complex cement epoxy resin mortar is fully cured, is gone Fall exposed grout nipple;Last device to hole is sealed.
Beneficial effects of the present invention
The invention provides a kind of large reservoir concrete dam body fracture plugging method, blocked using well cementing closing and surface The method being combined, makes crack obtain repairing the effect with leak stopping, while the deformation intensity of large reservoir concrete is also strengthened, Waterproof effect can be greatly improved, there is fast blockage, good endurance.
Accompanying drawing one illustrates:
Fig. 1 is cross-sectional configuration schematic diagram of the invention
Fig. 2 is longitudinal plane structure schematic diagram of the invention
Wherein in figure:1st, crack, 2, groove, 3, holdfast, 4, steel wire, 5, composite cement epoxy resin mortar, 6, bullet modeling dilatancy Sealing rod, 7, leak stopping slip casting vertical core, 8, leak stopping slip casting inclined hole.
Embodiment
In order that technical scheme and construction method step get across, below in conjunction with embodiment pair The present invention is described in further detail below.
(1)The water sealing structure of reservoir concrete upstream face crack in dam body circumferential surface is removed using drill rod and pneumatic pick.
(2)Cutting machine is used to be cut into width along crack for 30-80mm, depth is 50-120mm Baltimore groove, it is first during raggle Open, then widen to both sides along crack, the debris such as concrete chip, the dust in groove are all purged with compressed air after having dug Clean out.
(3)In the Baltimore groove dug, embedded BW-96S bullets modeling dilatancy sealing rod is segmented from the bottom up, 300- is spaced 500mm reserves 50-80mm grout holes, and beats with wooden mallet sealing rod to solid, meanwhile, use high property using grout hole fracture Energy complex cement epoxy resin mortar cementing operations, after the curing be complete, dilatancy sealing rod plugging grouting hole are moulded using BW-96S bullets.
(4)In Baltimore groove both sides 150-300mm positions, the electric drill for being 10-32mm with bit diameter drills, and hole depth length is 80-200mm, purges debris in hole with compressed air clean.Then will be with aperture using high-performance complex cement epoxy resin mortar The consistent prefabricated steel of size holdfast of riding is anchored in hole, and each holdfast is separated by spacing for 50-200mm.
(5)Ride holdfast surface and around cover bar-mat reinforcement, spraying acrylic emulsion interfacial agents after, it is multiple with high-performance Cement epoxy mortar application.
(6)After the completion of concrete dam body upstream face crack repairing, in concrete dam body crack upper water plane, along crack two At each 80~120mm in side, carrying out vertical core and inclined hole cross-pair respectively using screw rod grouter should drill, pitch-row 250~ 300mm, aperture is 24~60mm, and inclined hole angle and flaw level angle are 30-45 °, and drilling depth is through whole concrete Structure;Then it is fine dusts in hole and crack are clean with compressed air purging, grout nipple is installed in the hole being drilled and twisted Tightly, while moulding dilatancy sealing rod dead-end fracture surface using BW-96S bullets, peephole and pressure release venthole are retained;Filled into hole High-performance complex cement epoxy resin mortar is noted, is progressively irrigated from a lateral opposite side, when adjacent holes or fracture faces peephole start After pulp, pulp situation in 15~25s of pressure, observation crack, then appropriate progress supplementary irrigation are kept, until the pressure change ratio of grouting Just stop grouting after shallower, it is ensured that concrete dam body vestibule and crack are fully filled with slurry.Grouting is finished, and confirms that high-performance is answered Cement epoxy resin mortar is fully cured, and removes exposed grout nipple;Last device to hole is entered using BW-96S bullets modeling dilatancy sealing rod Row sealing.
The invention provides a kind of thinking and method, the method and approach for implementing the technical scheme are a lot, it is described above only It is the preferred embodiment of the present invention.It should be pointed out that to those of ordinary skill in the art, not departing from original of the invention On the premise of reason, some improvements and modifications can also be made, these improvements and modifications also should be regarded as in protection scope of the present invention, Each part being not known in the present embodiment can use prior art to be realized.

Claims (5)

1. a kind of large reservoir concrete dam body fracture plugging method, it is characterised in that it comprises the following steps:
(1)The water sealing structure of reservoir concrete upstream face crack in dam body circumferential surface is removed, fracture situation is examined after dismounting Look into, find out seepage crack;
(2)Baltimore groove is cut into along crack using cutting machine, first opened during raggle along crack, then is widened to both sides, groove after having dug The debris such as interior concrete chip, dust are cleaned out;
(3)In the Baltimore groove dug, embedded bullet modeling dilatancy sealing rod, while fracture carries out cementing operations;
(4)In the drilling of Baltimore groove both sides appropriate location, steel holdfast of riding is anchored in high-performance complex cement epoxy resin mortar In hole;
(5)Ride holdfast surface and around assembling reinforcement net, spraying interfacial agents after, smeared with high-performance complex cement epoxy resin mortar Face;
(6)After the completion of concrete dam body upstream face crack repairing, in concrete dam body crack upper water plane, well cementing is carried out Reinforce leak stopping.
2. a kind of large reservoir concrete dam body fracture plugging method according to claim 1, it is characterised in that described The width that Baltimore groove is cut into crack is 30~80mm, and depth is 50~120mm.
3. a kind of large reservoir concrete dam body fracture plugging method according to claim 1, it is characterised in that described Steel is ridden a diameter of 10~32mm of holdfast, and holdfast gos deep into wall length for 80~200mm, and holdfast width is 150~ 300mm, each holdfast is separated by spacing for 50~200mm.
4. a kind of large reservoir concrete dam body fracture plugging method according to claim 1, it is characterised in that described The sealing rod of embedded Baltimore groove moulds dilatancy sealing rod for BW-96S bullets, by hydrophilic polyurethane material and compounding rubber system .
5. a kind of large reservoir concrete dam body fracture plugging method according to claim 1, it is characterised in that described Concrete dam body crack upper water plane well cementing, Specific construction is to be erected respectively along each 80~120mm in crack both sides Hole and inclined hole cross-pair should drill, and pitch-row is in 250~300mm, and bit diameter is 24~60mm, and inclined hole angle is pressed from both sides with flaw level Angle is 30~45 °, and drilling depth is through whole concrete structure;Then fine dusts in hole and crack are purged totally, Grout nipple is installed in the hole being drilled and tightened, dead-end fracture surface, retains peephole and pressure release venthole;Irrigated into hole high Performance complex cement epoxy resin mortar, is progressively irrigated from a lateral opposite side, when adjacent holes or fracture faces peephole start pulp Afterwards, pulp situation in 15~25s of pressure, observation crack, then appropriate progress supplementary irrigation are kept, until the pressure change of grouting is relatively put down Just stop grouting after slow;Grouting is finished, and is confirmed that high-performance complex cement epoxy resin mortar is fully cured, is removed exposed grout nipple; Last device to hole is sealed.
CN201710582283.9A 2017-07-17 2017-07-17 A kind of large reservoir concrete dam body fracture plugging method Pending CN107326868A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710582283.9A CN107326868A (en) 2017-07-17 2017-07-17 A kind of large reservoir concrete dam body fracture plugging method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710582283.9A CN107326868A (en) 2017-07-17 2017-07-17 A kind of large reservoir concrete dam body fracture plugging method

Publications (1)

Publication Number Publication Date
CN107326868A true CN107326868A (en) 2017-11-07

Family

ID=60227262

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710582283.9A Pending CN107326868A (en) 2017-07-17 2017-07-17 A kind of large reservoir concrete dam body fracture plugging method

Country Status (1)

Country Link
CN (1) CN107326868A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108049651A (en) * 2017-12-22 2018-05-18 武汉固立达建筑科技有限公司 A kind of distress in concrete blocking method
CN108729414A (en) * 2018-05-14 2018-11-02 中水电第十工程局(郑州)有限公司 A kind of concrete gravity dam transverse joint seepage treatment method
CN108755334A (en) * 2018-06-11 2018-11-06 中水电第十工程局(郑州)有限公司 A kind of method that concrete road planar defect is quickly repaired
CN109339067A (en) * 2018-11-20 2019-02-15 杭州江润科技有限公司 Concrete dam mask increases structure and construction method
CN109765354A (en) * 2018-12-14 2019-05-17 重庆市排水有限公司 A kind of pond body crack repairing test pond
CN111424613A (en) * 2020-03-16 2020-07-17 中电建十一局工程有限公司 Method for treating through cracks of roller compacted concrete dam
CN111485922A (en) * 2020-05-13 2020-08-04 陕西上坤蓝箭科技有限公司 E L F railway tunnel water leakage, block falling and grout turnover disease treatment method
CN112727142A (en) * 2021-01-05 2021-04-30 三峡大学 Device and method for repairing underwater crack by using superfine magnetic cement mortar
CN113294008A (en) * 2021-05-29 2021-08-24 重庆海发工程项目管理咨询有限公司 Building crack repairing method
CN114607167A (en) * 2022-03-15 2022-06-10 中国水利水电科学研究院 Crack repairing method and device combining microbial cement and chemical grouting technology

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103174112A (en) * 2013-03-28 2013-06-26 葛洲坝集团试验检测有限公司 Grouting method of penetrability concrete cracks
CN104746479A (en) * 2015-02-03 2015-07-01 中国水利水电第十四工程局有限公司 Diversion tunnel concrete water seepage leaking stoppage construction method
CN106013259A (en) * 2016-06-30 2016-10-12 陈梦圆 Method for plugging deformation joint of underground engineering concrete structure in vibration disturbing environment
RU2611805C1 (en) * 2015-11-24 2017-03-01 Федеральное государственное бюджетное образовательное учреждение высшего образования "Волгоградский государственный технический университет" (ВолгГТУ) Ground dams, erected on weak bases in regions with high seismic activity
CN106544961A (en) * 2016-11-03 2017-03-29 辽宁工程技术大学 A kind of distress in concrete blocking method
CN106759116A (en) * 2017-01-04 2017-05-31 中国电建集团华东勘测设计研究院有限公司 A kind of method for repairing and mending in the roomy crack of concrete

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103174112A (en) * 2013-03-28 2013-06-26 葛洲坝集团试验检测有限公司 Grouting method of penetrability concrete cracks
CN104746479A (en) * 2015-02-03 2015-07-01 中国水利水电第十四工程局有限公司 Diversion tunnel concrete water seepage leaking stoppage construction method
RU2611805C1 (en) * 2015-11-24 2017-03-01 Федеральное государственное бюджетное образовательное учреждение высшего образования "Волгоградский государственный технический университет" (ВолгГТУ) Ground dams, erected on weak bases in regions with high seismic activity
CN106013259A (en) * 2016-06-30 2016-10-12 陈梦圆 Method for plugging deformation joint of underground engineering concrete structure in vibration disturbing environment
CN106544961A (en) * 2016-11-03 2017-03-29 辽宁工程技术大学 A kind of distress in concrete blocking method
CN106759116A (en) * 2017-01-04 2017-05-31 中国电建集团华东勘测设计研究院有限公司 A kind of method for repairing and mending in the roomy crack of concrete

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘勇: "《外墙外保温墙面裂缝成因及质量控制》", 31 May 2011, 西南交通大学出版社 *
魏涛等: "《化灌法》", 31 January 2006, 中国水利水电出版社 *

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108049651A (en) * 2017-12-22 2018-05-18 武汉固立达建筑科技有限公司 A kind of distress in concrete blocking method
CN108729414A (en) * 2018-05-14 2018-11-02 中水电第十工程局(郑州)有限公司 A kind of concrete gravity dam transverse joint seepage treatment method
CN108755334A (en) * 2018-06-11 2018-11-06 中水电第十工程局(郑州)有限公司 A kind of method that concrete road planar defect is quickly repaired
CN109339067A (en) * 2018-11-20 2019-02-15 杭州江润科技有限公司 Concrete dam mask increases structure and construction method
CN109339067B (en) * 2018-11-20 2021-01-15 杭州江润科技有限公司 Concrete dam facing heightening structure and construction method
CN109765354A (en) * 2018-12-14 2019-05-17 重庆市排水有限公司 A kind of pond body crack repairing test pond
CN109765354B (en) * 2018-12-14 2023-12-22 重庆市排水有限公司 Cell body crack repair test pool
CN111424613B (en) * 2020-03-16 2022-08-23 中电建十一局工程有限公司 Method for treating through cracks of roller compacted concrete dam
CN111424613A (en) * 2020-03-16 2020-07-17 中电建十一局工程有限公司 Method for treating through cracks of roller compacted concrete dam
CN111485922A (en) * 2020-05-13 2020-08-04 陕西上坤蓝箭科技有限公司 E L F railway tunnel water leakage, block falling and grout turnover disease treatment method
CN112727142A (en) * 2021-01-05 2021-04-30 三峡大学 Device and method for repairing underwater crack by using superfine magnetic cement mortar
CN113294008A (en) * 2021-05-29 2021-08-24 重庆海发工程项目管理咨询有限公司 Building crack repairing method
CN114607167A (en) * 2022-03-15 2022-06-10 中国水利水电科学研究院 Crack repairing method and device combining microbial cement and chemical grouting technology
CN114607167B (en) * 2022-03-15 2023-09-08 中国水利水电科学研究院 Crack repairing method and device by combining microorganism cement and chemical grouting technology

Similar Documents

Publication Publication Date Title
CN107326868A (en) A kind of large reservoir concrete dam body fracture plugging method
CN108060908B (en) Long-distance horizontal directional drilling and grouting reinforcement process for water-rich sand layer under building group
CN109162152B (en) Method for remedying slurry pumping disease of ballastless track bed of high-speed rail
CN107217691A (en) For city underground leak stopping and the method for strengthening construction
CN106321121A (en) Vibration disturbance resistant crack leaking stoppage and reinforcement method applied to underground works
CN106381840B (en) Fracture plugging grouting method under a kind of high pressure moving water state
CN107620312A (en) High hydraulic pressure precipitation well construction and hydrostatic slip casting method for blocking in a kind of Metro station excavation
CN105484110B (en) Method for treating slurry leakage of gap between base plate of CRTSI type plate ballastless track of high-speed railway and surface layer of roadbed
CN106761835A (en) A kind of Karst Tunnel leak segmenting slip casting construction method
CN106480993B (en) Administration structure and construction method in a kind of construction exterior wall leak repairing reinforcement
CN205422815U (en) Big flood underground mine tunnel waterwall
CN111395263B (en) Leakage treatment method for roller compacted concrete dam body
CN110685716A (en) Sleeve valve pipe grouting method after boulder blasting treatment
CN113090068A (en) Vacuum pouring process for rush-repairing deep-buried building top concrete structure under limited conditions
CN112593726A (en) Anti-frost heaving leaking stoppage and reinforcement method for cold region
CN206616711U (en) A kind of waterproof construction at subway station main body and accessory interface
CN108867895A (en) Distress in concrete blocking method
CN106939619A (en) A kind of anti-vibration for underground engineering disturbs the leak stopping reinforcement means of voids and pits
CN210288284U (en) Dual water stop system connected with new and old water outlet box culvert
CN105714739B (en) Preventing secondary cracking process of repairing in fluting method seepage treatment
CN112360518A (en) Rapid maintenance structure and maintenance method for tunnel circumferential construction joint
CN116411573A (en) Method for repairing main rail section embedded part of main rail section of dam mesopore accident access door slot
CN105781580A (en) Tunnel crack repair method
CN111927494B (en) Subway tunnel ballast bed and drainage ditch structure reinforcing method
CN113914874A (en) Large-scale geological abnormal fault zone roadway surrounding rock ultra-long distance pre-reinforcement method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20171107