CN107326769A - One kind has draining and automatic snow-melting road surface and piping lane combined system concurrently - Google Patents
One kind has draining and automatic snow-melting road surface and piping lane combined system concurrently Download PDFInfo
- Publication number
- CN107326769A CN107326769A CN201710779198.1A CN201710779198A CN107326769A CN 107326769 A CN107326769 A CN 107326769A CN 201710779198 A CN201710779198 A CN 201710779198A CN 107326769 A CN107326769 A CN 107326769A
- Authority
- CN
- China
- Prior art keywords
- piping lane
- draining
- road surface
- gutter
- combined system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C11/00—Details of pavings
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C11/00—Details of pavings
- E01C11/22—Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
- E01C11/224—Surface drainage of streets
- E01C11/227—Gutters; Channels ; Roof drainage discharge ducts set in sidewalks
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C11/00—Details of pavings
- E01C11/24—Methods or arrangements for preventing slipperiness or protecting against influences of the weather
- E01C11/26—Permanently installed heating or blowing devices ; Mounting thereof
- E01C11/265—Embedded electrical heating elements ; Mounting thereof
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C7/00—Coherent pavings made in situ
- E01C7/08—Coherent pavings made in situ made of road-metal and binders
- E01C7/32—Coherent pavings made in situ made of road-metal and binders of courses of different kind made in situ
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/10—Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F5/00—Sewerage structures
- E03F5/04—Gullies inlets, road sinks, floor drains with or without odour seals or sediment traps
- E03F5/0401—Gullies for use in roads or pavements
Landscapes
- Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Architecture (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Chemical & Material Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Oil, Petroleum & Natural Gas (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- General Engineering & Computer Science (AREA)
- Health & Medical Sciences (AREA)
- Hydrology & Water Resources (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- Road Paving Structures (AREA)
Abstract
One kind has draining and automatic snow-melting road surface and piping lane combined system, including road concurrently(1), gutter(2), piping lane(3), cover plate(10), greenbelt(12), sewage pipe(14), rain pipe(15), passage(21), drainage pipeline(22);The road(1)Both sides be provided with top cover plate(10)Gutter(2), gutter(2)Side be provided with greenbelt(12), greenbelt(12)Inside it is provided with passage(21), passage(21)With road(1)The piping lane of lower section(3)It is connected, piping lane(3)Inside is provided with sewage pipe(14)And rain pipe(15), rain pipe(15)Pass through drainage pipeline(22)With gutter(2)It is connected.Beneficial effects of the present invention are:The effect for ponding of regulating and storing is realized, summer has discharged ground surface ponding and provides enough thermals source for winter easy ice-patch surface in time, by pavement temperature control on freezing temperature.
Description
Technical field
The invention belongs to road deicing or snow melting field, more particularly to one kind has draining and automatic snow-melting road surface and pipe concurrently
Corridor combined system.
Background technology
Sponge city, is new generation of city storm water man- agement concept, refers to that city is adapting to environmental change and reply rainwater band
There is good " elasticity ", also referred to as " water elasticity city " in terms of the natural calamity come.International term is " low shadow
Ring exploitation storm-water system to build ".Water suction when raining, retaining, infiltration, water purification, it is necessary to when by the water stored " release " and be subject to profit
With.
Meanwhile, there is snowfall and is easy for icy road phenomenon occur in road surface, and icy road readily occurs in November to next
In a period of time in April in year., usually there is road knot in the northern area of China, especially the Northeast and Inner Mongol northern territory
Ice phenomenon.And south China is regional, snowfall is generally " snow slush ", tends to belong to 0~4 DEG C of mixed state water, and landing becomes frozen water
Starchiness, one to nighttime temperature declines, and will be frozen into large stretch of ice cube, as long as local winter minimum temperature is less than 0 DEG C, just having can
Icy road phenomenon can occur, be enough to make ice sheet thaw as long as temperature is not gone back up to, will just be as solid as rocks always.In general,
Severe winter, when a wide range of strong cold air activity of appearance causes the weather of mercury dropped, if with sleet, being easiest to occur
The trip that will be given people after icy road phenomenon, icy road brings great inconvenience, or even has an accident, although
People just appreciate the harm for leading the way and freezing and bringing a long time ago, and also take certain measure, wherein there is artificial shovel
Snow and chemical thaw etc., but it is artificial be suitable only for small range and small-scale snowfall, chemical thaw then can road pavement cause one
Fixed corrosion, it is therefore desirable to more preferable method.
The content of the invention
In order to solve above-mentioned technical problem, the present invention provides one kind and has draining and automatic snow-melting road surface and piping lane concurrently
Combined system, solves the technical problem that traffic safety hidden danger is easily brought after sponge city in the prior art and icy road.
One kind has draining and automatic snow-melting road surface and piping lane combined system concurrently, including:Road(1), gutter(2), piping lane
(3), cover plate(10), greenbelt(12), sewage pipe(14), rain pipe(15), passage(21), drainage pipeline(22);The road
Road(1)Both sides be provided with top cover plate(10)Gutter(2), gutter(2)Side be provided with greenbelt(12), greenbelt
(12)Inside it is provided with passage(21), passage(21)With road(1)The piping lane of lower section(3)It is connected, piping lane(3)Inside is provided with
Sewage pipe(14)And rain pipe(15), rain pipe(15)Pass through drainage pipeline(22)With gutter(2)It is connected.
Wherein, described road(1)Bitumen layer is followed successively by from top to bottom(4), foam cement layer(5), metalling(6), element
Soil layer(7), foam cement layer(5)Interior upper surface is provided with some grooves(9), each groove(9)Inside it is equipped with carbon fiber
(8), groove(9)Designed using " u "-shaped, plain soil layer(7)It is interior to be provided with piping lane(3).
Wherein, described carbon fiber(8)It is connected using connected mode in parallel with power supply, carbon fiber (8) is set to some
Root, independent heating, adjacent two carbon fibers (8) are arranged along the current direction interval 5-10cm in road surface.
Wherein, described gutter(2)Close to greenbelt(12)Side be provided with water fender(13), for preventing melt water
It is lost in.
Wherein, described piping lane(3)Inside also include illuminating lamp (16), vent window (17), maintenance track (18), tool car
(19) and support pier body (20), illuminating lamp (16) and vent window (17) are arranged at piping lane(3)Top, maintenance track (18) set
In sewage pipe(14)And rain pipe(15)Centre, maintenance track (18) on have tool car (19), sewage pipe(14)And rain pipe
(15)Bottom be equipped with support pier body (20), for supporting sewage pipe(14)And rain pipe(15), support pier body (20) every
10-20m sets one.
Wherein, described bitumen layer (4) upper surface is inclined-plane, and bitumen layer (4) is to greenbelt(12)There is passage(21)
Side tilt 5 °, bitumen layer(4)Upper surface offers oblique striped, and oblique striped is used to help melt water and quickly flows to draining
Ditch(2)It is interior.
Wherein, described cover plate(10)On be provided with the sieve aperture of hexagon(11), sieve aperture(11)For improving cover plate(10)
Bearing, and can preferably filter out impurity.
Wherein, described drainage pipeline(22)Along passage(21)Edge is set, passage(21)Set every 50-80m
One.
Wherein, described piping lane (3) is the rectangle precast frame needed for open cut prefabrication is constructed.
Compared with prior art, the beneficial effects of the invention are as follows:One aspect of the present invention realizes the effect for ponding of regulating and storing, summer
Ground surface ponding is discharged season in time and provides enough thermals source for winter easy ice-patch surface, pavement temperature control is being frozen
On temperature, on the other hand the problem of fundamentally solving the traffic safety hidden danger brought because icy on road mutually tie with piping lane
Close, the utilization rate of the underground space is improved while reduction construction cost, sponge municipal drainage and road is can be widely applied to
The field of road deicing or snow melting.
Brief description of the drawings
Fig. 1 is a kind of floor map for having draining and automatic snow-melting road surface and piping lane combined system concurrently of the present invention.
Fig. 2 is Fig. 1 A-A profiles.
In figure:1st, road;2nd, gutter;3rd, piping lane;4th, bitumen layer;5th, foam cement layer;6th, metalling;7th, plain soil layer;
8th, carbon fiber;9th, groove;10th, cover plate;11st, sieve aperture;12nd, greenbelt;13rd, water fender;14th, sewage pipe;15th, rain pipe;16th, shine
Bright lamp;17th, vent window;18th, track is overhauled;19th, tool car;20th, support pier body;21st, passage;22nd, drainage pipeline.
Embodiment
The present invention will be described in detail with specific embodiment below in conjunction with the accompanying drawings.
Embodiment 1
As illustrated in fig. 1 and 2, one kind has draining and automatic snow-melting road surface and piping lane combined system, including road concurrently(1), gutter
(2), piping lane(3);Piping lane(3)Inside it is provided with sewage pipe(14), rain pipe(15);Road(1)Structure sheaf from top to bottom successively
For bitumen layer(4), foam cement layer(5), metalling(6), plain soil layer(7);Foam cement layer(5)Inside it is provided with carbon fiber(8),
Carbon fiber(8)It is arranged at groove(9)It is interior, groove(9)Designed using class " u "-shaped;Carbon fiber(8)Using connected mode in parallel;
Carbon fiber(8)It is connected, when having sleet in winter, is detected by pavement temperature temp measuring system with external power source by electric contact
Temperature information, is manually started or automatic start carbon fiber working power, carbon fiber(8)Start heating, in foam cement layer(5)'s
Under heat-blocking action, carbon fiber(8)Major heat is dissipated to road surface, the temperature on road surface is maintained at more than apparent freezing point, makes ice and snow
It is melted into water, and prevents the frozen water regelation do not discharged in time after dissolving into ice cube;Snow-broth after thawing is drained into gutter
(2)It is interior;Gutter(2)It is interior into rain pipe (15) that interior water flows through pipeline;Greenbelt(12)Inside it is provided with passage(21);It is logical
Stomata(21)Set every 50-80m at one;Drainage pipeline(22)It is arranged on passage(21)It is interior, and along passage(21)Edge
Set;Gutter(2)With rain pipe(15)Pass through drainage pipeline(22)Connection;Described piping lane(3)It is arranged on element below road
Soil layer(7);Described piping lane(3)Also include illuminating lamp (16), vent window (17), maintenance track (18), tool car (19), support
Pier body (20), support pier body (20) is set at one every 10-20m;Piping lane (3) is prefabricated for the rectangle needed for open cut prefabrication is constructed
Framework;Described foam cement layer(5)Upper surface sets fluted(9);Described carbon fiber(8)It is arranged on groove(9)It is interior;Institute
The bitumen layer stated(4)Upper surface offers oblique striped, and oblique striped can help melt water quickly to flow to gutter(2);Institute
State the inclined-plane that is shaped as of bitumen layer (4) upper surface, and bitumen layer (4) is to greenbelt(12)There is passage(21)Side tilt be
5°;The both sides of the road are provided with gutter(2);Gutter(2)Top be provided with cover plate(10);Cover plate(10)It is provided with sieve
Hole(11), the sieve aperture of hexagon(11)Cover plate can be improved(10)Bearing, and can preferably filter out impurity;Carbon fiber
(8) some are set to, independent heating, adjacent two carbon fibers (8) are arranged along the current direction interval 5-10cm in road surface;Gutter
(2)Away from road(1)Side is provided with water fender(13), the loss of melt water is prevented, rainwater more can be quickly collected and melt
Water.
Described above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art
For member, under the premise without departing from the principles of the invention, some improvements and modifications can also be made, these improvements and modifications also should
It is considered as protection scope of the present invention.
Claims (9)
1. one kind has draining and automatic snow-melting road surface and piping lane combined system concurrently, it is characterised in that:Including road(1), gutter
(2), piping lane(3), cover plate(10), greenbelt(12), sewage pipe(14), rain pipe(15), passage(21), drainage pipeline
(22);The road(1)Both sides be provided with top cover plate(10)Gutter(2), gutter(2)Side be provided with greenbelt
(12), greenbelt(12)Inside it is provided with passage(21), passage(21)With road(1)The piping lane of lower section(3)It is connected, piping lane
(3)Inside is provided with sewage pipe(14)And rain pipe(15), rain pipe(15)Pass through drainage pipeline(22)With gutter(2)It is connected.
2. one kind according to claim 1 has draining and automatic snow-melting road surface and piping lane combined system concurrently, it is characterised in that:
Described road(1)Bitumen layer is followed successively by from top to bottom(4), foam cement layer(5), metalling(6), plain soil layer(7), foam water
Mud layer(5)Interior upper surface is provided with some grooves(9), each groove(9)Inside it is equipped with carbon fiber(8), groove(9)Using
" u "-shaped is designed, plain soil layer(7)It is interior to be provided with piping lane(3).
3. one kind according to claim 2 has draining and automatic snow-melting road surface and piping lane combined system concurrently, it is characterised in that:
Described carbon fiber(8)It is connected using connected mode in parallel with power supply, carbon fiber (8) is set to some, independent heating, phase
Adjacent two carbon fibers (8) are arranged along the current direction interval 5-10cm in road surface.
4. one kind according to claim 1 has draining and automatic snow-melting road surface and piping lane combined system concurrently, it is characterised in that:
Described gutter(2)Close to greenbelt(12)Side be provided with water fender(13), the loss for preventing melt water.
5. one kind according to claim 1 has draining and automatic snow-melting road surface and piping lane combined system concurrently, it is characterised in that:
Described piping lane(3)Inside also include illuminating lamp (16), vent window (17), maintenance track (18), tool car (19) and support pier body
(20), illuminating lamp (16) and vent window (17) are arranged at piping lane(3)Top, maintenance track (18) be arranged on sewage pipe(14)With
Rain pipe(15)Centre, maintenance track (18) on have tool car (19), sewage pipe(14)And rain pipe(15)Bottom be all provided with
There is support pier body (20), for supporting sewage pipe(14)And rain pipe(15), support pier body (20) is every 10-20m settings one.
6. one kind according to claim 2 has draining and automatic snow-melting road surface and piping lane combined system concurrently, it is characterised in that:
Described bitumen layer (4) upper surface is inclined-plane, and bitumen layer (4) is to greenbelt(12)There is passage(21)Side tilt 5 °,
Bitumen layer(4)Upper surface offers oblique striped, and oblique striped is used to help melt water and quickly flows to gutter(2)It is interior.
7. one kind according to claim 1 has draining and automatic snow-melting road surface and piping lane combined system concurrently, it is characterised in that:
Described cover plate(10)On be provided with the sieve aperture of hexagon(11), sieve aperture(11)For improving cover plate(10)Bearing, and
Impurity can preferably be filtered out.
8. one kind according to claim 1 has draining and automatic snow-melting road surface and piping lane combined system concurrently, it is characterised in that:
Described drainage pipeline(22)Along passage(21)Edge is set, passage(21)One is set every 50-80m.
9. one kind according to claim 1 has draining and automatic snow-melting road surface and piping lane combined system concurrently, it is characterised in that:
Described piping lane (3) is the rectangle precast frame needed for open cut prefabrication is constructed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710779198.1A CN107326769A (en) | 2017-09-01 | 2017-09-01 | One kind has draining and automatic snow-melting road surface and piping lane combined system concurrently |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710779198.1A CN107326769A (en) | 2017-09-01 | 2017-09-01 | One kind has draining and automatic snow-melting road surface and piping lane combined system concurrently |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107326769A true CN107326769A (en) | 2017-11-07 |
Family
ID=60204228
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710779198.1A Withdrawn CN107326769A (en) | 2017-09-01 | 2017-09-01 | One kind has draining and automatic snow-melting road surface and piping lane combined system concurrently |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107326769A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108360331A (en) * | 2018-03-06 | 2018-08-03 | 温岭市创嘉信息科技有限公司 | A kind of novel pavement device for melting snow |
CN109112927A (en) * | 2018-10-24 | 2019-01-01 | 贵州省遵义公路管理局 | A kind of anti-freezing system for highway bridge |
CN109339097A (en) * | 2018-11-08 | 2019-02-15 | 北京场道市政工程集团有限公司 | It is a kind of with waterproof, the underground pipe gallery structure of drain function |
CN111254821A (en) * | 2020-03-21 | 2020-06-09 | 东阳面世建筑工程有限公司 | Bridge for simulating terrestrial heat to automatically melt ice and snow and drain water |
CN112900493A (en) * | 2021-01-29 | 2021-06-04 | 中建三局工程设计有限公司 | From waterproof uncovered piping lane |
CN113089409A (en) * | 2021-04-17 | 2021-07-09 | 贵州省安顺公路管理局 | Construction method and structure of anti-skid surface of pavement |
-
2017
- 2017-09-01 CN CN201710779198.1A patent/CN107326769A/en not_active Withdrawn
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108360331A (en) * | 2018-03-06 | 2018-08-03 | 温岭市创嘉信息科技有限公司 | A kind of novel pavement device for melting snow |
CN109112927A (en) * | 2018-10-24 | 2019-01-01 | 贵州省遵义公路管理局 | A kind of anti-freezing system for highway bridge |
CN109339097A (en) * | 2018-11-08 | 2019-02-15 | 北京场道市政工程集团有限公司 | It is a kind of with waterproof, the underground pipe gallery structure of drain function |
CN111254821A (en) * | 2020-03-21 | 2020-06-09 | 东阳面世建筑工程有限公司 | Bridge for simulating terrestrial heat to automatically melt ice and snow and drain water |
CN111254821B (en) * | 2020-03-21 | 2020-10-27 | 东阳面世建筑工程有限公司 | Bridge for simulating terrestrial heat to automatically melt ice and snow and drain water |
CN112900493A (en) * | 2021-01-29 | 2021-06-04 | 中建三局工程设计有限公司 | From waterproof uncovered piping lane |
CN113089409A (en) * | 2021-04-17 | 2021-07-09 | 贵州省安顺公路管理局 | Construction method and structure of anti-skid surface of pavement |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107326769A (en) | One kind has draining and automatic snow-melting road surface and piping lane combined system concurrently | |
CN207259888U (en) | A kind of sponge urban road sinking greenbelt | |
CN207512532U (en) | A kind of sponge-type road drainage structure | |
CN102900205B (en) | Automatic-reversing overflow anti-freezing compound rainwater drainage and collection eaves gutter system and construction method | |
CN207210872U (en) | One kind has draining and automatic snow-melting road surface and piping lane combined system concurrently | |
CN108894277A (en) | Highway rainwater-collecting and exhaust system based on sponge urban construction | |
CN205557647U (en) | Utilization function's fixed anti -icing, deicing system are collected again to collection bridge floor rainwater | |
CN201217851Y (en) | Underground structure roof plate expansion joint water-proof structure used as urban highway base | |
CN208763116U (en) | Highway rainwater-collecting and exhaust system based on sponge urban construction | |
CN203440731U (en) | Combined snow melting and ice melting device for road | |
CN202265891U (en) | Permeable rainwater drainage pipe | |
CN101988283A (en) | Highway ice, snow and fog disaster removing facility | |
CN109736194A (en) | A kind of anti-fall ice production apparatus of intelligence suitable for overpass discharge outlet | |
CN205711731U (en) | A kind of anti-freeze collection drainage system | |
CN110397227A (en) | A kind of gutter system of stock ground arch covering | |
CN207210890U (en) | One kind has sponge municipal drainage and automatic snow-melting roadnet concurrently | |
CN101994288A (en) | Safety device for weather factors in airport | |
JP2018188915A (en) | Antifreezing liquid circulation apparatus | |
CN207512546U (en) | A kind of storage oozes integrated sponge-type road drainage system | |
CN206858986U (en) | Town road bituminous paving | |
CN205874895U (en) | Be used for overpass pitch layer snow melt thawing apparatus of mating formation | |
CN108532849A (en) | It collects sleet and utilizes roofing | |
CN114263146A (en) | Highway road surface cooling and deicing system | |
CN107338697A (en) | One kind has sponge municipal drainage and automatic snow-melting roadnet concurrently | |
CN209669696U (en) | A kind of anti-fall ice production apparatus of intelligence suitable for overpass discharge outlet |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20171107 |
|
WW01 | Invention patent application withdrawn after publication |