CN107324231B - Endless rope winch wire rope distributing technique - Google Patents

Endless rope winch wire rope distributing technique Download PDF

Info

Publication number
CN107324231B
CN107324231B CN201710613792.3A CN201710613792A CN107324231B CN 107324231 B CN107324231 B CN 107324231B CN 201710613792 A CN201710613792 A CN 201710613792A CN 107324231 B CN107324231 B CN 107324231B
Authority
CN
China
Prior art keywords
rope
wire
winch
wirerope
coarse
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710613792.3A
Other languages
Chinese (zh)
Other versions
CN107324231A (en
Inventor
张凯
张军胜
许勤贵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jincheng Blue Flame Coal Industry Co., Ltd.
Original Assignee
Shanxi Jincheng Anthracite Mining Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Jincheng Anthracite Mining Group Co Ltd filed Critical Shanxi Jincheng Anthracite Mining Group Co Ltd
Priority to CN201710613792.3A priority Critical patent/CN107324231B/en
Publication of CN107324231A publication Critical patent/CN107324231A/en
Application granted granted Critical
Publication of CN107324231B publication Critical patent/CN107324231B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66DCAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
    • B66D1/00Rope, cable, or chain winding mechanisms; Capstans
    • B66D1/28Other constructional details

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Ropes Or Cables (AREA)

Abstract

The invention belongs to underground coal mine assistant conveyance technical fields, installation effectiveness is low, has the problems such as security risk in order to solve existing for existing wire rope distributing technique by the present invention, provide a kind of endless rope winch wire rope distributing technique, using wirerope insertion method, more seizing wires are sequentially connected in series grafting, again replace the seizing wire of endless rope winch after endless rope winch drives seizing wire to work well.The method that the present invention uses wirerope grafting, the wirerope of more 15.5mm is linked together, and the 24mm wirerope of endless rope winch is towed out again after driving 15.5mm wirerope to work well and replaced by endless rope winch, accelerates the installation speed of endless rope winch.Meanwhile the link of installation recycling puffer is eliminated, while avoiding security risk of the equipment such as winch, switch, cable in transport, lifting, installation, removal process, accident rate is reduced, the labor intensity of worker is alleviated.

Description

Endless rope winch wire rope distributing technique
Technical field
The invention belongs to underground coal mine assistant conveyance technical fields, and in particular to a kind of endless rope winch wire rope distributing work Skill.
Background technique
Using the transport of mine endless rope winch as one of underground important transportation mode, not only transported using endless rope haulage It is high-efficient, operation safety coefficient is big;And the operating personnel needed is few, and labor efficiency is high.Endless rope winch mounting process are as follows: twist Installation → winch cable installation → test running of vehicle, tensioning apparatus, control system, wheel group and safety devices, wirerope installation When need to use puffer intermediate haulage mode wirerope be towed out.
In the installation of fully mechanized coal face equipment, as mine endless rope winch promotes and applies, current winch cable is found There are problems for installation, as shown in figure 5, to install endless rope winch in the rail transport lane for not installing puffer, need elder generation Puffer is installed, then drags wirerope to install using puffer intermediate haulage, need to be mounted so that, recycling winch, and puffer Installation has accounted for the half of entire endless rope winch set-up time, extends the set-up time of endless rope winch, leads to nothing The installation effectiveness of pole rope winch is low, and the equipment such as winch, switch, cable have peace in transport, lifting, installation, removal process Full blast danger.
Summary of the invention
Installation effectiveness is low, has the problems such as security risk in order to solve existing for existing wire rope distributing technique by the present invention, into And provide a kind of endless rope winch wire rope distributing technique as shown in Figure 4.
The present invention adopts the following technical scheme:
A kind of endless rope winch wire rope distributing technique is successively gone here and there more seizing wires using wirerope insertion method Join grafting, again replaces the seizing wire of endless rope winch after endless rope winch drives seizing wire to work well, cloth rope work Skill process is as follows:
1) it is laid with wirerope:, will be corresponding after the length of seizing wire needed for determining according to the transportation lengths of endless rope winch The seizing wire of disk number is laid with expansion at the scene;
2) grafting of seizing wire
Broken stock: first breaking stock certain length for two rope end of seizing wire to grafting, and does not break in broken stock and sharp at stock alternating It is carried out tightening processing with tied silk;Wirerope rope strand half after broken stock is stand-by rope strand, and half is useless rope strand, and useless rope strand is made Truncation;
To rope end: by two rope ends after broken stock to putting, according to a first from left, right, short long and wirerope rotation direction is handed over one by one Fork docking;
Draw-string core buries rope end: the wire rope core of the steel wire of extraction two sides after the completion of docking, and rope end is pressed into the sky of former wire rope core Between;
3) operating and debugging of seizing wire: after the completion of seizing wire grafting, by seizing wire pass through press rope wheel, tail wheel, Tensioning apparatus, winch drum, and be then passed through tensioning apparatus after three circle of winding on winch drum and be fixed on shuttle car, then tightly Rope anti-slip;
4) it the replacement of coarse-wire rope: after endless rope winch drives seizing wire to work well, is replaced using coarse-wire rope thin Wirerope.
When seizing wire grafting, section chief's degree L > 200d is broken, d is seizing wire diameter.
The mode for taking short rope to move back when to rope end into long rope walks the first strand;Until the remaining part of long rope is wirerope At 60 times of diameter, short rope is also pressed to 60 times of truncations of wirerope diameter;It goes further the second strand steel wire rope, until the second strand steel wire rope Long short rope overlapped points away from the long short rope overlapped points of the first strand be 140 times of wirerope diameter when, stop fall line, the second section chief rope with it is short The length of rope presses 60 times of truncations of wirerope diameter;When walking third strand steel wire rope, to the long short rope overlapped points of third strand steel wire rope Away from the long short rope overlapped points of the second strand be 120 times of wirerope diameter when, stop fall line, equally will by rope diameter 60 leave and take again it is equal Length is simultaneously truncated;Other side steel wire is similar to rope end mode.
Draw-string core, when burying rope end, it is positive and negative with flat file by the broken rope in three strands of every side since the long rope rope end that first is left and taken Rotation cutting wire rope core, after going out wire rope core with hook file hook, insertion square file is reversely rotated, and another people, which takes advantage of a situation, extracts wire rope core out, is evacuated to third root Until at the rope end that short rope leaves, the other side also extracts wire rope core out with same method;Then rope end is inserted into from the rope back side with flat file Lap-joint, hook file are inserted into from lap-joint and are hooked in the rope back side, and flat file point is depressed rope end and reversely rotated, and rope end is pressed into former wire rope core Space.
Coarse-wire rope cheese is placed on close to the position of endless rope winch first, and cheese is fixed on track using anchor chain On, prevent coarse-wire rope cheese vehicle during cloth rope from sliding down or overturning;Secondly shuttle car draws coarse-wire rope cloth pair rope, passes through The main rope of cloth again after tail wheel, tail wheel rotation direction and thicker wire when preventing shuttle car coarse-wire rope being run to endless rope winch direction in tow Traffic direction of restricting is inconsistent, and seizing wire and coarse-wire rope, which force together, at tail wheel occurs rope-broken accident, finally by coarse-wire rope It stops after being dragged to cheese position;Pair rope coarse-wire rope is manually finally hauled out 80-120 meters from cheese, by seizing wire from shuttle It removes on vehicle, is hauled out out of tensioning apparatus, winch, the secondary rope coarse-wire rope of hauling-out is manually passed through into deflecting roller, tensioning apparatus, strand Vehicle roller is fixed on shuttle car, after three circles are wound on winch drum, is then passed through tensioning apparatus, and deflecting roller is fixed on shuttle car, Coarse-wire rope replacement terminates.
The invention has the following beneficial effects:
(1) method for using wirerope grafting, the wirerope of more 15.5mm is linked together, and endless rope winch drives The 24mm wirerope of endless rope winch is towed out again after working well and is replaced by 15.5mm wirerope, accelerates endless rope winch Installation speed.
(2) link of installation recycling puffer is eliminated, while avoiding the equipment such as winch, switch, cable and transporting, rising It hangs, install, the security risk in removal process, reducing accident rate, alleviating the labor intensity of worker.
Detailed description of the invention
Fig. 1 is the structural schematic diagram that wirerope breaks head;
Fig. 2 is wirerope to rope end sectional view;
Fig. 3 is wirerope to rope end schematic diagram;
Fig. 4 is the contrast schematic diagram before and after endless rope winch wire rope distributing process modification;
Fig. 5 is endless rope winch transportation system schematic;
In figure: 1- tied silk, the stand-by rope strand of 2-, 3- wire rope core, the useless rope strand of 4-, 5- short rope, 6- long rope, 7- tail wheel, 8- pressure rope Wheel, 9- torr rope sheave, 10- shuttle car, 11- tensioning apparatus, 12- winch;
The right long rope end of A/C/E-, the right short rope head of B/D/F-, 1./3./5.-left long rope end;2./4./6.-left short rope head.
Specific embodiment
In conjunction with attached drawing, specific embodiments of the present invention will be further explained:
The present invention is analyzed the cloth rope technique of original wirerope, is started with from the thinking of " cord drags hawser ", cord For usually drag endless rope winch wirerope 11.4KW winch wirerope (diameter 15.5mm), hawser be endless rope winch steel Cord (diameter 24mm), the principle fast in line with construction speed, cost input is low are thin by more using the method for wirerope grafting Wirerope links together, and coarse-wire rope is towed out again after driving seizing wire to work well and replaced by endless rope winch.
The specific process is as follows:
1, the laying of seizing wire
1000 meters of the every disk length of seizing wire, weight are 1 ton, we determine institute according to the transportation lengths of endless rope winch After needing seizing wire length, the seizing wire of respective disc number is filled into car-haul to scene, is worn using preprepared frame pipe It is fixed on mine car after crossing wirerope cheese, by manually towing out seizing wire.
, seizing wire grafting
Broken stock: first wanting two rope end of wirerope of grafting to break stock, not according to " safety regulations in coal mine " wirerope inserting depth Less than 1000 times of regulation of wirerope diameter, in broken stock, 500 times of length for being greater than wirerope diameter is measured from rope end, And (see figure 1) is tightened with tied silk at this;A strand steel wire rope and coil are taken every one according to the rotation direction of wirerope when broken stock, wait take Under three stranded rope length when reaching 500 times of wirerope diameter, stop broken rope, by the wirerope of another three strand wire rope core from tied silk Locate to be truncated at 150~200mm.
To rope end: the two rope end enemies broken are put together, right, short long and wirerope the rotation according to a first from left To the (see figure 2) that intersects one by one;Some of the staff hold up the main rope in two sides, catch three section chief's rope ends of two sides respectively, pull at Tightly.
When long rope moves towards consistent with the lay pitch of short rope, one side tied silk is unlocked, the mode for taking short rope to move back into long rope walks One strand (see figure 3);Until short rope also to be pressed to the 60 of wirerope diameter when the remaining part of long rope is 60 times of wirerope diameter It is truncated again;It goes further the second strand steel wire rope, until the long short rope overlapped points of the second strand steel wire rope are away from the long short rope overlapped points of the first strand At 140 times of wirerope diameter, stop fall line, the second section chief, which restricts, presses 60 times of truncations of wirerope diameter with the length of short rope;It walks When third strand steel wire rope, to the long short rope overlapped points of third strand steel wire rope away from the long short rope overlapped points of the second strand be wirerope diameter At 120 times, stop fall line, equally to leave and take equal length and truncation again by rope diameter 60, the three stranded rope of the other side to rope end Mode is similar.
Draw-string core buries rope end: since the long rope rope end that first is left and taken, with flat file by the broken rope in three strands of every side, positive and reverse return Turn cutting wire rope core, after going out wire rope core with hook file hook, insertion square file is reversely rotated, and another people, which takes advantage of a situation, extracts wire rope core out, and it is short to be evacuated to third root Until at the rope end that rope leaves.Also wire rope core is extracted out with same method in the other side.It is noted that keeping square file both sides when rotating square file It is three strands.Before burying rope end, the length of per share rope end is measured in advance, prevent the two strand crowns of embedment together;With fiber crops Rope or adhesive plaster wrapping rope end 50mm or so, prevent rope end from exposing.It is inserted into rope end lap-joint from the rope back side with flat file, hook is filed from overlap joint Place is inserted into and is hooked in the rope back side, and flat file point is depressed rope end and reversely rotated, and rope end is pressed into the space of former wire rope core.Other rope ends are successively By this operation, until rope end fully enters main rope body.
, seizing wire operating and debugging
After the completion of seizing wire is laid with, seizing wire is passed through into backing pressure rope sheave, tail wheel, tensioning apparatus, winch drum, is being twisted On vehicle roller after three circle of winding, it is then passed through tensioning apparatus and is fixed on (see figure 5) on shuttle car, finally carry out tight rope using chain sling, protect Wirerope when card seizing wire operating on winch drum does not have skidded phenomenon.
, coarse-wire rope replacement
After endless rope winch drives seizing wire to work well, start " cord drags hawser ", first by coarse-wire rope cheese It is placed on close to the position of endless rope winch, and using anchor chain that cheese is fixed in orbit, prevents coarse-wire rope during cloth rope Cheese vehicle slides down or overturns;Secondly shuttle car draws coarse-wire rope cloth pair rope, passes through the main rope of cloth again after tail wheel, prevents shuttle car from dragging Coarse-wire rope to endless rope winch direction run when tail wheel rotation direction and coarse-wire rope traffic direction it is inconsistent, it is thin at tail wheel Wirerope and coarse-wire rope, which force together, occurs rope-broken accident, stops after coarse-wire rope is finally dragged to cheese position;Most descendant Pair rope coarse-wire rope is hauled out 80-120 meters by work from cheese, seizing wire is removed from shuttle car, from tensioning apparatus, winch The secondary rope coarse-wire rope of hauling-out is manually passed through deflecting roller, tensioning apparatus, winch drum and is fixed on shuttle car, twisted by interior hauling-out On vehicle roller after three circle of winding, it is then passed through tensioning apparatus, deflecting roller is fixed on shuttle car, and coarse-wire rope replacement terminates.

Claims (5)

1. a kind of endless rope winch wire rope distributing technique, which is characterized in that wirerope insertion method is used, by more finer wires Rope be sequentially connected in series grafting, when endless rope winch drive seizing wire work well after again by the seizing wire of endless rope winch more It changes, cloth rope technical process is as follows:
1) it is laid with wirerope: after the length of seizing wire needed for determining according to the transportation lengths of endless rope winch, by respective disc number Seizing wire be laid with expansion at the scene;
2) grafting of seizing wire
Broken stock: first breaking stock certain length for two rope end of seizing wire to grafting, and utilizes bundle in broken stock and at not broken stock alternating Silk carries out tightening processing;Wirerope rope strand half after broken stock is stand-by rope strand, and half is useless rope strand, and useless rope strand is truncated Processing;
To rope end: by two rope ends after broken stock to putting, right, short long and wirerope the rotation direction cross-pair one by one according to a first from left It connects;
Draw-string core buries rope end: the wire rope core of the steel wire of extraction two sides after the completion of docking, and rope end is pressed into the space of former wire rope core;
3) after the completion of seizing wire grafting, seizing wire the operating and debugging of seizing wire: is passed through into press rope wheel, tail wheel, tensioning Device, winch drum, and be then passed through tensioning apparatus after three circle of winding on winch drum and be fixed on shuttle car, then tight rope is anti- It skids;
4) replacement of coarse-wire rope: after endless rope winch drives seizing wire to work well, finer wire is replaced using coarse-wire rope Rope.
2. endless rope winch wire rope distributing technique according to claim 1, it is characterised in that: when seizing wire grafting, Broken section chief's degree L > 200d, d are seizing wire diameter.
3. endless rope winch wire rope distributing technique according to claim 2, which is characterized in that take short rope when to rope end The mode moved back into long rope, walks the first strand;Until short rope is also pressed steel when the remaining part of long rope is 60 times of wirerope diameter 60 times of truncations of cord diameter;It goes further the second strand steel wire rope, until the long short rope overlapped points of the second strand steel wire rope are long away from the first strand When short rope overlapped points are 140 times of wirerope diameter, stop fall line, the second section chief rope and the length of short rope press wirerope diameter 60 times of truncations;When walking third strand steel wire rope, it is away from the long short rope overlapped points of the second strand to the long short rope overlapped points of third strand steel wire rope At 120 times of wirerope diameter, stop fall line, equally to leave and take equal length and truncation again by rope diameter 60;Other side steel wire pair Rope end mode is similar.
4. endless rope winch wire rope distributing technique according to claim 3, which is characterized in that draw-string core, when burying rope end, Since the long rope rope end that first is left and taken, with flat file by the broken rope in three strands of every side, positive and negative rotation cuts off wire rope core, files hook rope stretching with hook After core, insertion square file is reversely rotated, and another people, which takes advantage of a situation, extracts wire rope core out, another until being evacuated at the rope end that third root short rope leaves Also wire rope core is extracted out with same method in side;Then it is inserted into rope end lap-joint from the rope back side with flat file, hook file is inserted into simultaneously from lap-joint It is hooked in the rope back side, flat file point is depressed rope end and reversely rotated, and rope end is pressed into the space of former wire rope core.
5. endless rope winch wire rope distributing technique according to claim 4, which is characterized in that replacement coarse-wire rope process It is as follows: coarse-wire rope cheese is placed on close to the position of endless rope winch first, and using anchor chain that cheese is fixed in orbit, Prevent coarse-wire rope cheese vehicle during cloth rope from sliding down or overturning;Secondly shuttle car draws coarse-wire rope cloth pair rope, passes through tail The main rope of cloth again after wheel, tail wheel rotation direction and coarse-wire rope when preventing shuttle car coarse-wire rope being run to endless rope winch direction in tow Traffic direction is inconsistent, and seizing wire and coarse-wire rope, which force together, at tail wheel occurs rope-broken accident, finally drags coarse-wire rope It stops after to cheese position;Pair rope coarse-wire rope is manually finally hauled out 80-120 meters from cheese, by seizing wire from shuttle car On remove, hauled out out of tensioning apparatus, winch, the secondary rope coarse-wire rope of hauling-out manually passed through into deflecting roller, tensioning apparatus, winch Roller is fixed on shuttle car, wherein secondary rope coarse-wire rope is then passed through tensioning apparatus, deflecting roller after winding three circles on winch drum It is fixed on shuttle car, coarse-wire rope replacement terminates.
CN201710613792.3A 2017-07-25 2017-07-25 Endless rope winch wire rope distributing technique Active CN107324231B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710613792.3A CN107324231B (en) 2017-07-25 2017-07-25 Endless rope winch wire rope distributing technique

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710613792.3A CN107324231B (en) 2017-07-25 2017-07-25 Endless rope winch wire rope distributing technique

Publications (2)

Publication Number Publication Date
CN107324231A CN107324231A (en) 2017-11-07
CN107324231B true CN107324231B (en) 2019-04-19

Family

ID=60227239

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710613792.3A Active CN107324231B (en) 2017-07-25 2017-07-25 Endless rope winch wire rope distributing technique

Country Status (1)

Country Link
CN (1) CN107324231B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111172799A (en) * 2020-02-24 2020-05-19 福建农林大学 Method for long-connection and short-insertion of steel wire rope
CN113830111B (en) * 2021-10-30 2022-08-02 浙江天弘机器人科技有限公司 Low-carbon cableway for power transmission line construction and working method thereof
CN114261915B (en) * 2021-12-21 2023-12-26 淮南矿业(集团)有限责任公司 Method for quickly replacing overhead man-vehicle steel wire rope

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3809659A1 (en) * 1988-03-23 1989-10-12 Westfaelische Berggewerkschaft Drive station for cable-operated haulage conveying tracks, in particular in underground working
CN2601196Y (en) * 2002-07-29 2004-01-28 兖矿集团有限公司 Tracting transportation appts. of endless rope shuttle car
CN100341766C (en) * 2003-10-10 2007-10-10 淄博矿业集团有限责任公司许厂煤矿 Technology for exchanging hoisting cable wire of floor type friction hoist
CN101323421B (en) * 2008-07-25 2011-02-16 宝鸡石油机械有限责任公司 Winch intelligent control rope guiding method and digital intelligent control rope guiding apparatus
CN104071678B (en) * 2014-07-01 2015-10-28 南通力威机械有限公司 A kind of friction hoisting winch method of replacing rope

Also Published As

Publication number Publication date
CN107324231A (en) 2017-11-07

Similar Documents

Publication Publication Date Title
CN107324231B (en) Endless rope winch wire rope distributing technique
CN100440660C (en) Mechanical laying method for overlength large section cable
CN103274323B (en) A kind of crane pulley group and steel wire rope quick-replaceable method
CN107792790A (en) Installation and application for the aerial cableway of mountain region construction material transport
CN108216491B (en) Cable laying ship traction system
CN105417296B (en) A kind of safe draw off gear of hawser and hawser lay recovery method
CN105672138A (en) Through type stayed cable installation circulation system and cable threading construction method thereof
CN205474866U (en) Through suspension cable installation circulation system
CN210003305U (en) Construction system for achieving traction in place in narrow anchor space of ultra-long tunnel in modes
CN108974772A (en) A kind of method of the main tunnel rubber belt conveyor replacement adhesive tape in underground
CN105743013B (en) The method of charged for replacement ± 500kV AC line anchor support insulator chains
CN206768626U (en) A kind of steel hinge line lashing accessory system
CN211908320U (en) Coal-winning machine cable anti-running device under big inclination angle stoping condition
CN107176548A (en) A kind of cable crane overhead traveling crane closed circulation trailer system and traction method
CN205916922U (en) Cable machine walking dolly is supplementary to be pull ropeway carrying -rope and crosses river structure
CN106741605A (en) A kind of pipeline for carrying out load test on hull pulls system
CN206986731U (en) A kind of suspension cable lashing trailer system
CN108385524A (en) The method of revolution steel strand wires bivector traction in the same direction
CN107178044A (en) A kind of method that I-shaped gooseneck is worn under during jacking bridge and culvert track strengthening
CN211655433U (en) Concrete construction safety protection case
CN107190544A (en) The insertion method of steel wire rope
CN108130859B (en) Beam end installation method of stay cable
CN103407903A (en) Automatic traction system for large-size tower crane mounting and dismounting standard knot and traction method thereof
CN202429734U (en) Traction mechanism of bulk cargo car loader conveying device
CN105350782B (en) A kind of semi-mechanization steel strand wires laying method for round silo

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20191021

Address after: 048006, Shanxi City, Jincheng Province North Stone Shop

Patentee after: Jincheng Blue Flame Coal Industry Co., Ltd.

Address before: 048006, Shanxi City, Jincheng Province North Stone Town Jin coal group

Patentee before: Shanxi Jincheng Anthracite Mining Industry Group Co., Ltd.