CN107324125A - One kind building cable unreeling rack - Google Patents

One kind building cable unreeling rack Download PDF

Info

Publication number
CN107324125A
CN107324125A CN201710691081.8A CN201710691081A CN107324125A CN 107324125 A CN107324125 A CN 107324125A CN 201710691081 A CN201710691081 A CN 201710691081A CN 107324125 A CN107324125 A CN 107324125A
Authority
CN
China
Prior art keywords
parts
slide rail
frame
bottom plate
raw material
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710691081.8A
Other languages
Chinese (zh)
Other versions
CN107324125B (en
Inventor
谭颖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Jinbaina construction and assembly Co., Ltd
Original Assignee
谭颖
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 谭颖 filed Critical 谭颖
Priority to CN201710691081.8A priority Critical patent/CN107324125B/en
Publication of CN107324125A publication Critical patent/CN107324125A/en
Application granted granted Critical
Publication of CN107324125B publication Critical patent/CN107324125B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H49/00Unwinding or paying-out filamentary material; Supporting, storing or transporting packages from which filamentary material is to be withdrawn or paid-out
    • B65H49/18Methods or apparatus in which packages rotate
    • B65H49/20Package-supporting devices
    • B65H49/30Swifts or skein holders
    • CCHEMISTRY; METALLURGY
    • C08ORGANIC MACROMOLECULAR COMPOUNDS; THEIR PREPARATION OR CHEMICAL WORKING-UP; COMPOSITIONS BASED THEREON
    • C08LCOMPOSITIONS OF MACROMOLECULAR COMPOUNDS
    • C08L27/00Compositions of homopolymers or copolymers of compounds having one or more unsaturated aliphatic radicals, each having only one carbon-to-carbon double bond, and at least one being terminated by a halogen; Compositions of derivatives of such polymers
    • C08L27/02Compositions of homopolymers or copolymers of compounds having one or more unsaturated aliphatic radicals, each having only one carbon-to-carbon double bond, and at least one being terminated by a halogen; Compositions of derivatives of such polymers not modified by chemical after-treatment
    • C08L27/12Compositions of homopolymers or copolymers of compounds having one or more unsaturated aliphatic radicals, each having only one carbon-to-carbon double bond, and at least one being terminated by a halogen; Compositions of derivatives of such polymers not modified by chemical after-treatment containing fluorine atoms
    • C08L27/16Homopolymers or copolymers or vinylidene fluoride
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H2701/00Handled material; Storage means
    • B65H2701/30Handled filamentary material
    • B65H2701/34Handled filamentary material electric cords or electric power cables
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H2701/00Handled material; Storage means
    • B65H2701/70Use of material
    • CCHEMISTRY; METALLURGY
    • C08ORGANIC MACROMOLECULAR COMPOUNDS; THEIR PREPARATION OR CHEMICAL WORKING-UP; COMPOSITIONS BASED THEREON
    • C08KUse of inorganic or non-macromolecular organic substances as compounding ingredients
    • C08K3/00Use of inorganic substances as compounding ingredients
    • C08K3/18Oxygen-containing compounds, e.g. metal carbonyls
    • C08K3/20Oxides; Hydroxides
    • C08K3/22Oxides; Hydroxides of metals
    • C08K2003/2227Oxides; Hydroxides of metals of aluminium
    • CCHEMISTRY; METALLURGY
    • C08ORGANIC MACROMOLECULAR COMPOUNDS; THEIR PREPARATION OR CHEMICAL WORKING-UP; COMPOSITIONS BASED THEREON
    • C08LCOMPOSITIONS OF MACROMOLECULAR COMPOUNDS
    • C08L2203/00Applications
    • C08L2203/20Applications use in electrical or conductive gadgets

Landscapes

  • Chemical & Material Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Medicinal Chemistry (AREA)
  • Polymers & Plastics (AREA)
  • Organic Chemistry (AREA)
  • Hydrogenated Pyridines (AREA)
  • Chemical And Physical Treatments For Wood And The Like (AREA)

Abstract

The present invention discloses a kind of building cable unreeling rack, including underframe, bottom plate, support bar and frame, the bottom plate is located in the middle part of underframe, the bottom plate and welding of underframe, the frame is located on bottom plate, the frame is fixedly connected with bottom plate, slide rail is installed in the frame, the support bar is located at slide rail both sides, the support bar is fixedly connected with underframe and slide rail respectively, hydraulic cylinder is installed in the middle part of the bottom plate, the hydraulic cylinder is provided with expansion link, slide plate is installed in the slide rail, the expansion link is connected with slide plate, bearing is installed on the slide plate, the bearing is connected with slide plate clamping, the building cable unreeling rack easily adjusts height, the telescopic rod of use is corrosion-resistant, structural strength is high, lighter in weight.

Description

One kind building cable unreeling rack
Technical field
Cable unreeling rack is built the present invention relates to one kind.
Background technology
Building is people's soil, brick, watt, stone material, timber;(Modern age reinforced concrete, section bar)Constituted Deng construction material Space that is a kind of for human habitation and using, such as house, bridge, factory building, gymnasium, cave dwelling, water tower, temple etc..Broadly come Say, landscape, gardens are also wing.Say in a broad sense, the nest that animal is built consciously can also can be regarded as building.Western wise man There is cloud:Building is the music of solidification, and building is a stone history records.The classical masterpiece of Roman architecture man's Vitruvius《Building Ten books》Propose three standards of building:It is firm, practical, attractive in appearance, the architectural development of later age is affected always.
Cable unreeling rack according to purposes also referred to as, cable disk support, traverse shaft plate rail, Cable holder for distribution etc.. Cable unreeling rack according to purposes also referred to as, cable disk support, traverse shaft plate rail, Cable holder for distribution etc..According to lifting Form can be divided into, hydraulic type cable pay off rack, mechanical Cable holder for distribution.It is divided into again according to purposes and structure type, can Mode hydraulic pay-off stand, column wire-unfolding rack, post rod type cable unreeling rack, horizontal cable bobbin loader, foot brake cable drum Frame, detachable cable unreeling rack, tension pay-off creel.It is divided into according to load capacity:3T cable unreeling racks, 5T cable unreeling racks, 10T Cable unreeling rack, 15T cable hank bracing struts, the cable disc wire-unfolding rack of 20T cable disks support and more large-tonnage.Cable disk Support cable hank diameter range applicatory is:600mm-3800mm. user can close according to the diameter and tonnage selection of cable hank Suitable cable unreeling rack.Quiet disk pay off rack can be generally divided into ground cable pulley, cable sheave, towards top sheave, nylon pulley, cable Wire pulley block, major diameter releasing pulley, to do the dual-purpose releasing pulley of extension, ground wire releasing pulley, gin wheel etc. several.It is quiet Disk pay off rack is mainly used in playing a part of protection when laying cable conductor, time saving and energy saving.
Current existing cable unreeling rack is not easy regulation height, the structure for the telescopic rod not used.
The content of the invention
The technical problem to be solved in the present invention is to provide a kind of easily regulation height, the telescopic rod of use is corrosion-resistant, structure Intensity is high, the building cable unreeling rack of lighter in weight.
To solve the above problems, the present invention is adopted the following technical scheme that:
One kind building cable unreeling rack, including underframe, bottom plate, support bar and frame, the bottom plate are located in the middle part of underframe, the bottom Plate and welding of underframe, the frame are located on bottom plate, and the frame is fixedly connected with bottom plate, and slide rail is provided with the frame, The support bar is located at slide rail both sides, and the support bar is fixedly connected with underframe and slide rail respectively, is provided with the middle part of the bottom plate Hydraulic cylinder, the hydraulic cylinder is provided with expansion link, the slide rail and is provided with slide plate, and the expansion link is connected with slide plate, described Bearing is installed, the bearing is connected with slide plate clamping on slide plate.
Preferably, the support bar is set in 60 ° of inclination angles, keep support effect good, structural stability is high.
Preferably, the slide rail and welding machine frame, keep slide rail to firmly install.
Preferably, the slide plate is flexibly connected with slide rail, slide plate conveniently moving is reliable.
Preferably, the bearing is provided with three, cable is facilitated to carry out line laying work through bearing.
One kind building cable unreeling rack, the telescopic rod is made up by mass fraction proportioning of following material:Kynoar 10-15 parts, 7-8 parts of aluminium hydroxide, 30-35 parts of phosphite, 7-15 parts of alkyd resin, 2-7 parts of ethoxyquinoline, polyacrylonitrile 6-8 parts of base carbon fibre, 9-15 parts of heliotropin, 4-8 parts of salicylate, 22-25 parts of sulfydryl acid esters, 3-9 parts of lithopone, white carbon 10-17 parts, 6-9 parts of magnesite gelling, 11-14 parts of boric acid alkylolamides, 2-4 parts of p-nitrosodiphenylamine and tetrahydroisoquinoline 7-8 parts.
The preparation method of the telescopic rod comprises the following steps:
1)By 10-15 parts of Kynoar, 7-8 parts of aluminium hydroxide, 30-35 parts of phosphite, 7-15 parts of alkyd resin, ethyoxyl 2-7 parts of quinoline, 6-8 parts of polyacrylonitrile-based carbon fibre, 9-15 parts of heliotropin, 4-8 parts of salicylate, 22-25 parts of sulfydryl acid esters, 3-9 parts of lithopone, 10-17 parts of white carbon, magnesite be gelled 6-9 parts, 11-14 parts of boric acid alkylolamides, to nitroso dimethylbenzene 7-8 parts of 2-4 parts of amine and tetrahydroisoquinoline are put into oil bath pan, are preheated under 55 DEG C of states, standby;
2)In step 1)The sulfuric acid solution of mixing 0.2% in gained raw material, is 35 according to raw material and sulfuric acid solution mass ratio:1 is carried out Stirring, it is standby;
3)By step 2)Gained raw material is put into reactor, and regulation heating-up temperature is 105-110 DEG C, and mixing speed is 2250- 2500r/min, the reaction time is 3-8 minutes, standby;
4)By step 3)In gained raw material input band feeding screw, heating is in molten condition, standby;
5)By step 4)Gained raw material is put into blow moulding machine, blow moulding machine blow molding in mould by raw material, is obtained in hollow The body of rod, you can.
Beneficial effects of the present invention are:The underframe of setting, bottom plate, support bar and frame holding structure are compact, Stability Analysis of Structures Property is good;The height that expansion link facilitates adjusting slider is installed on the hydraulic cylinder of setting, the line laying work under varying environment is adapted to;If The bearing put can facilitate penetrating for cable, and cable position is stable during holding unwrapping wire, easy to operate, using telescopic rod material structure Structure is corrosion-resistant, and service life is long, and uses hollow structure, lighter relative to existing metal material weight.
Brief description of the drawings
Fig. 1 is a kind of structure chart for building cable unreeling rack of the present invention.
Embodiment
Embodiment 1
As shown in figure 1, a kind of build cable unreeling rack, including underframe 1, bottom plate 2, support bar 3 and frame 4, the bottom plate 2 is located at The middle part of underframe 1, the bottom plate 2 is welded with underframe 1, and the frame 4 is set on a base plate 2, and the frame 4 is fixedly connected with bottom plate 2, Slide rail 5 is installed, the support bar 3 is located at the both sides of slide rail 5 in the frame 4, the support bar 3 respectively with underframe 1 and slide rail 5 It is fixedly connected, the middle part of bottom plate 2 is provided with hydraulic cylinder 6, and the hydraulic cylinder 6 is provided with expansion link 7, the slide rail 5 and installed There is slide plate 8, the expansion link 7 is connected with slide plate 8, bearing 9 is installed on the slide plate 8, the bearing 9 connects with the clamping of slide plate 8 Connect.
The support bar 3 is set in 60 ° of inclination angles.
The slide rail 5 is welded with frame 4.
The slide plate 8 is flexibly connected with slide rail 5.
The bearing 9 is provided with three.
One kind building cable unreeling rack, the telescopic rod is made up by mass fraction proportioning of following material:Kynoar 10 parts, 7 parts of aluminium hydroxide, 30 parts of phosphite, 7 parts of alkyd resin, 2 parts of ethoxyquinoline, 6 parts of polyacrylonitrile-based carbon fibre, 9 parts of heliotropin, 4 parts of salicylate, 22 parts of sulfydryl acid esters, 3 parts of lithopone, 10 parts of white carbon, magnesite gelling 6 parts, boric acid alkane 7 parts of 11 parts of base alkylolamides, 2 parts of p-nitrosodiphenylamine and tetrahydroisoquinoline.
The preparation method of the telescopic rod comprises the following steps:
1)By 10 parts of Kynoar, 7 parts of aluminium hydroxide, 30 parts of phosphite, 7 parts of alkyd resin, 2 parts of ethoxyquinoline, poly- 6 parts of acrylonitrile base carbon fiber, 9 parts of heliotropin, 4 parts of salicylate, 22 parts of sulfydryl acid esters, 3 parts of lithopone, 10 parts of white carbon, 7 parts of 6 parts of magnesite gelling, 11 parts of boric acid alkylolamides, 2 parts of p-nitrosodiphenylamine and tetrahydroisoquinoline put into oil bath pan It is interior, preheated under 55 DEG C of states, it is standby;
2)In step 1)The sulfuric acid solution of mixing 0.2% in gained raw material, is 35 according to raw material and sulfuric acid solution mass ratio:1 is carried out Stirring, it is standby;
3)By step 2)Gained raw material is put into reactor, and regulation heating-up temperature is 105-110 DEG C, and mixing speed is 2250- 2500r/min, the reaction time is 3-8 minutes, standby;
4)By step 3)In gained raw material input band feeding screw, heating is in molten condition, standby;
5)By step 4)Gained raw material is put into blow moulding machine, blow moulding machine blow molding in mould by raw material, is obtained in hollow The body of rod, you can.
Embodiment 2
As shown in figure 1, a kind of build cable unreeling rack, including underframe 1, bottom plate 2, support bar 3 and frame 4, the bottom plate 2 is located at The middle part of underframe 1, the bottom plate 2 is welded with underframe 1, and the frame 4 is set on a base plate 2, and the frame 4 is fixedly connected with bottom plate 2, Slide rail 5 is installed, the support bar 3 is located at the both sides of slide rail 5 in the frame 4, the support bar 3 respectively with underframe 1 and slide rail 5 It is fixedly connected, the middle part of bottom plate 2 is provided with hydraulic cylinder 6, and the hydraulic cylinder 6 is provided with expansion link 7, the slide rail 5 and installed There is slide plate 8, the expansion link 7 is connected with slide plate 8, bearing 9 is installed on the slide plate 8, the bearing 9 connects with the clamping of slide plate 8 Connect.
The support bar 3 is set in 60 ° of inclination angles.
The slide rail 5 is welded with frame 4.
The slide plate 8 is flexibly connected with slide rail 5.
The bearing 9 is provided with three.
One kind building cable unreeling rack, the telescopic rod is made up by mass fraction proportioning of following material:Kynoar 12.5 parts, 7.5 parts of aluminium hydroxide, 32.5 parts of phosphite, 11 parts of alkyd resin, 3.5 parts of ethoxyquinoline, polyacrylonitrile-based carbon 7 parts of fiber, 12 parts of heliotropin, 6 parts of salicylate, 23.5 parts of sulfydryl acid esters, 6 parts of lithopone, 13.5 parts of white carbon, magnesite glue 7.5 parts of solidifying 7.5 parts, 12.5 parts of boric acid alkylolamides, 3 parts of p-nitrosodiphenylamine and tetrahydroisoquinoline.
The preparation method of the telescopic rod comprises the following steps:
1)By 12.5 parts of Kynoar, 7.5 parts of aluminium hydroxide, 32.5 parts of phosphite, 11 parts of alkyd resin, ethoxyquinoline 3.5 parts, 7 parts of polyacrylonitrile-based carbon fibre, 12 parts of heliotropin, 6 parts of salicylate, 23.5 parts of sulfydryl acid esters, 6 parts of lithopone, 13.5 parts of white carbon, 7.5 parts of magnesite gelling, 12.5 parts of boric acid alkylolamides, 3 parts of p-nitrosodiphenylamine and Tetrahydroisoquinoli- 7.5 parts of quinoline is put into oil bath pan, is preheated under 55 DEG C of states, standby;
2)In step 1)The sulfuric acid solution of mixing 0.2% in gained raw material, is 35 according to raw material and sulfuric acid solution mass ratio:1 is carried out Stirring, it is standby;
3)By step 2)Gained raw material is put into reactor, and regulation heating-up temperature is 105-110 DEG C, and mixing speed is 2250- 2500r/min, the reaction time is 3-8 minutes, standby;
4)By step 3)In gained raw material input band feeding screw, heating is in molten condition, standby;
5)By step 4)Gained raw material is put into blow moulding machine, blow moulding machine blow molding in mould by raw material, is obtained in hollow The body of rod, you can.
Embodiment 3
As shown in figure 1, a kind of build cable unreeling rack, including underframe 1, bottom plate 2, support bar 3 and frame 4, the bottom plate 2 is located at The middle part of underframe 1, the bottom plate 2 is welded with underframe 1, and the frame 4 is set on a base plate 2, and the frame 4 is fixedly connected with bottom plate 2, Slide rail 5 is installed, the support bar 3 is located at the both sides of slide rail 5 in the frame 4, the support bar 3 respectively with underframe 1 and slide rail 5 It is fixedly connected, the middle part of bottom plate 2 is provided with hydraulic cylinder 6, and the hydraulic cylinder 6 is provided with expansion link 7, the slide rail 5 and installed There is slide plate 8, the expansion link 7 is connected with slide plate 8, bearing 9 is installed on the slide plate 8, the bearing 9 connects with the clamping of slide plate 8 Connect.
The support bar 3 is set in 60 ° of inclination angles.
The slide rail 5 is welded with frame 4.
The slide plate 8 is flexibly connected with slide rail 5.
The bearing 9 is provided with three.
One kind building cable unreeling rack, the telescopic rod is made up by mass fraction proportioning of following material:Kynoar 15 parts, 8 parts of aluminium hydroxide, 35 parts of phosphite, 15 parts of alkyd resin, 7 parts of ethoxyquinoline, 8 parts of polyacrylonitrile-based carbon fibre, 15 parts of heliotropin, 8 parts of salicylate, 25 parts of sulfydryl acid esters, 9 parts of lithopone, 17 parts of white carbon, magnesite gelling 9 parts, boric acid alkane 8 parts of 14 parts of base alkylolamides, 4 parts of p-nitrosodiphenylamine and tetrahydroisoquinoline.
The preparation method of the telescopic rod comprises the following steps:
1)By 15 parts of Kynoar, 8 parts of aluminium hydroxide, 35 parts of phosphite, 15 parts of alkyd resin, 7 parts of ethoxyquinoline, poly- 8 parts of acrylonitrile base carbon fiber, 15 parts of heliotropin, 8 parts of salicylate, 25 parts of sulfydryl acid esters, 9 parts of lithopone, 17 parts of white carbon, 8 parts of 9 parts of magnesite gelling, 14 parts of boric acid alkylolamides, 4 parts of p-nitrosodiphenylamine and tetrahydroisoquinoline put into oil bath pan It is interior, preheated under 55 DEG C of states, it is standby;
2)In step 1)The sulfuric acid solution of mixing 0.2% in gained raw material, is 35 according to raw material and sulfuric acid solution mass ratio:1 is carried out Stirring, it is standby;
3)By step 2)Gained raw material is put into reactor, and regulation heating-up temperature is 105-110 DEG C, and mixing speed is 2250- 2500r/min, the reaction time is 3-8 minutes, standby;
4)By step 3)In gained raw material input band feeding screw, heating is in molten condition, standby;
5)By step 4)Gained raw material is put into blow moulding machine, blow moulding machine blow molding in mould by raw material, is obtained in hollow The body of rod, you can.
Experimental example
Experimental subjects:The support bar for choosing common support bar, special support bar and the present invention carries out test comparison.
Requirement of experiment:The support bar of common support bar, special support bar and the present invention is used into equal length and diameter Detected.
Experimental method:Anticorrosive detection is carried out to support bar, detected by corrosion test chamber, and adjusts test temperature It is 120 DEG C to spend temperature, and relative humidity is 85%, and air pressure is 106kPa, and ozone concentration is 45%, and ultraviolet illumination intensity is 25uw/ Cm2, obtains etching time;Density is detected by density tester;Compression strength is examined using GBT228-2002 methods Survey.
Detect data such as following table:
With reference to upper table, the data of different support bars gained under identical experimental method, supporting bar structure of the invention are contrasted Intensity is higher, and density is lower, and anti-corrosion effects are more preferable.
Beneficial effects of the present invention are:The underframe of setting, bottom plate, support bar and frame holding structure are compact, Stability Analysis of Structures Property is good;The height that expansion link facilitates adjusting slider is installed on the hydraulic cylinder of setting, the line laying work under varying environment is adapted to;If The bearing put can facilitate penetrating for cable, and cable position is stable during holding unwrapping wire, easy to operate, using telescopic rod material structure Structure is corrosion-resistant, and service life is long, and uses hollow structure, lighter relative to existing metal material weight.
The foregoing is only a specific embodiment of the invention, but protection scope of the present invention is not limited thereto, any The change or replacement expected without creative work, should all be included within the scope of the present invention.

Claims (7)

1. one kind building cable unreeling rack, it is characterised in that:Including underframe, bottom plate, support bar and frame, the bottom plate is located at bottom In the middle part of frame, the bottom plate and welding of underframe, the frame are located on bottom plate, and the frame is fixedly connected with bottom plate, the frame On slide rail is installed, the support bar is located at slide rail both sides, and the support bar is fixedly connected with underframe and slide rail respectively, the bottom Hydraulic cylinder is installed in the middle part of plate, the hydraulic cylinder, which is provided with expansion link, the slide rail, is provided with slide plate, the expansion link and cunning Plate is connected, and is provided with bearing on the slide plate, the bearing is connected with slide plate clamping.
2. building cable unreeling rack according to claim 1, it is characterised in that:The support bar is set in 60 ° of inclination angles.
3. building cable unreeling rack according to claim 1, it is characterised in that:The slide rail and welding machine frame.
4. building cable unreeling rack according to claim 1, it is characterised in that:The slide plate is flexibly connected with slide rail.
5. building cable unreeling rack according to claim 1, it is characterised in that:The bearing is provided with three.
6. one kind building cable unreeling rack, it is characterised in that:The telescopic rod is made up by mass fraction proportioning of following material:It is poly- 10-15 parts of vinylidene, 7-8 parts of aluminium hydroxide, 30-35 parts of phosphite, 7-15 parts of alkyd resin, 2-7 parts of ethoxyquinoline, 6-8 parts of polyacrylonitrile-based carbon fibre, 9-15 parts of heliotropin, 4-8 parts of salicylate, 22-25 parts of sulfydryl acid esters, lithopone 3-9 Part, 10-17 parts of white carbon, magnesite be gelled 6-9 parts, 11-14 parts of boric acid alkylolamides, 2-4 parts of p-nitrosodiphenylamine and 7-8 parts of tetrahydroisoquinoline.
7. building cable unreeling rack according to claim 6, it is characterised in that:The preparation method of the telescopic rod include with Lower step:
1)By 10-15 parts of Kynoar, 7-8 parts of aluminium hydroxide, 30-35 parts of phosphite, 7-15 parts of alkyd resin, ethyoxyl 2-7 parts of quinoline, 6-8 parts of polyacrylonitrile-based carbon fibre, 9-15 parts of heliotropin, 4-8 parts of salicylate, 22-25 parts of sulfydryl acid esters, 3-9 parts of lithopone, 10-17 parts of white carbon, magnesite be gelled 6-9 parts, 11-14 parts of boric acid alkylolamides, to nitroso dimethylbenzene 7-8 parts of 2-4 parts of amine and tetrahydroisoquinoline are put into oil bath pan, are preheated under 55 DEG C of states, standby;
2)In step 1)The sulfuric acid solution of mixing 0.2% in gained raw material, is 35 according to raw material and sulfuric acid solution mass ratio:1 is carried out Stirring, it is standby;
3)By step 2)Gained raw material is put into reactor, and regulation heating-up temperature is 105-110 DEG C, and mixing speed is 2250- 2500r/min, the reaction time is 3-8 minutes, standby;
4)By step 3)In gained raw material input band feeding screw, heating is in molten condition, standby;
5)By step 4)Gained raw material is put into blow moulding machine, blow moulding machine blow molding in mould by raw material, is obtained in hollow The body of rod, you can.
CN201710691081.8A 2017-08-14 2017-08-14 Building cable pay-off rack Active CN107324125B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710691081.8A CN107324125B (en) 2017-08-14 2017-08-14 Building cable pay-off rack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710691081.8A CN107324125B (en) 2017-08-14 2017-08-14 Building cable pay-off rack

Publications (2)

Publication Number Publication Date
CN107324125A true CN107324125A (en) 2017-11-07
CN107324125B CN107324125B (en) 2020-06-12

Family

ID=60225792

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710691081.8A Active CN107324125B (en) 2017-08-14 2017-08-14 Building cable pay-off rack

Country Status (1)

Country Link
CN (1) CN107324125B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110980399A (en) * 2019-12-26 2020-04-10 国网山东省电力公司临沂供电公司 Power cable pay-off device and use method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0341731B1 (en) * 1988-05-13 1993-09-22 E.I. Du Pont De Nemours And Company Thermoplastic elastomeric compositions
EP0382401B1 (en) * 1989-01-31 1994-03-30 Du Pont-Mitsui Polychemicals Co., Ltd. Ionomer composition
CN101720329A (en) * 2007-07-13 2010-06-02 科莱恩金融(Bvi)有限公司 Alkylphosphonous acids, salts and esters, methods for the production thereof, and use of same
CN102859863A (en) * 2009-07-31 2013-01-02 纳幕尔杜邦公司 Cross-linkable encapsulants for photovoltaic cells
CN103025820A (en) * 2010-07-30 2013-04-03 纳幕尔杜邦公司 Cross-linkable ionomeric encapsulants for photovoltaic cells

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0341731B1 (en) * 1988-05-13 1993-09-22 E.I. Du Pont De Nemours And Company Thermoplastic elastomeric compositions
EP0382401B1 (en) * 1989-01-31 1994-03-30 Du Pont-Mitsui Polychemicals Co., Ltd. Ionomer composition
CN101720329A (en) * 2007-07-13 2010-06-02 科莱恩金融(Bvi)有限公司 Alkylphosphonous acids, salts and esters, methods for the production thereof, and use of same
CN102859863A (en) * 2009-07-31 2013-01-02 纳幕尔杜邦公司 Cross-linkable encapsulants for photovoltaic cells
CN103025820A (en) * 2010-07-30 2013-04-03 纳幕尔杜邦公司 Cross-linkable ionomeric encapsulants for photovoltaic cells

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110980399A (en) * 2019-12-26 2020-04-10 国网山东省电力公司临沂供电公司 Power cable pay-off device and use method thereof

Also Published As

Publication number Publication date
CN107324125B (en) 2020-06-12

Similar Documents

Publication Publication Date Title
CN101845882A (en) Combined device of a mould frame for hanging and casting cement for high-rise buildings and handling and hanging box for building materials
CN107324125A (en) One kind building cable unreeling rack
CN106639608A (en) Built-in tower for construction for prestress steel strand concrete tower barrel and installation method
CN205766794U (en) A kind of end, web reinforcement overall binding moulding bed
CN208394600U (en) A kind of prefabricated part hanging device
CN210976512U (en) Building scaffold convenient to disassemble
CN206244301U (en) A kind of architectural engineering tower crane anti-sway control device
CN209493215U (en) A kind of building boom hoisting
CN207228591U (en) A kind of architectural engineering scaffold
CN207090845U (en) Conveying boom hoisting in a kind of Industrial Engineering
CN202829361U (en) Small-size hoisting machine
CN104453243A (en) Erection device and method for steadily feeding cast-in-place concrete beam into mold
CN210723913U (en) Box-type substation with good rain shielding effect
CN206564939U (en) A kind of Combined rattan class Flower support
CN207295480U (en) Bridge chamber prestressed stretch-draw jack positioning apparatus
CN203715161U (en) Mobile multifunctional crane
CN210067423U (en) Aluminum alloy template hangs mould system
CN206908189U (en) A kind of 500kV livewire work hoisting platform
CN218507429U (en) Building material lifting machine
CN206143919U (en) Tensile membrane structure
CN106382039B (en) A kind of construction method of cement bunker top steel mesh frame support structure
CN201818035U (en) Novel intelligent exterior wall lifting scaffold
CN214087288U (en) High-stability hoisting head mechanism
CN206279855U (en) Rod-adjurstable formula steel column correcting structure
CN111396693B (en) A assembled support for outdoor monitoring facilities of carrying on

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20200515

Address after: 224763 No.22, Jinli Road, science and Technology Pioneer Park, Hengji Town, Jianhu County, Yancheng City, Jiangsu Province

Applicant after: Jiangsu Jinbaina construction and assembly Co., Ltd

Address before: 241000 No. 5, No. 2, No. 3, Unit 102, Jinghu District, Wuhu City, Anhui Province

Applicant before: Tan Ying

GR01 Patent grant
GR01 Patent grant