CN107315131A - AT power supply trouble ranging data acquisition methods based on IEC61850 and fault waveform - Google Patents

AT power supply trouble ranging data acquisition methods based on IEC61850 and fault waveform Download PDF

Info

Publication number
CN107315131A
CN107315131A CN201710543152.XA CN201710543152A CN107315131A CN 107315131 A CN107315131 A CN 107315131A CN 201710543152 A CN201710543152 A CN 201710543152A CN 107315131 A CN107315131 A CN 107315131A
Authority
CN
China
Prior art keywords
fault
descending
location device
institute
fault location
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710543152.XA
Other languages
Chinese (zh)
Other versions
CN107315131B (en
Inventor
周小金
陈林
雷杭州
邵鹏飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHENGDU SOUTHWEST JIAOTONG UNIVERSITY XUJI ELECTRIC Co Ltd
Original Assignee
CHENGDU SOUTHWEST JIAOTONG UNIVERSITY XUJI ELECTRIC Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHENGDU SOUTHWEST JIAOTONG UNIVERSITY XUJI ELECTRIC Co Ltd filed Critical CHENGDU SOUTHWEST JIAOTONG UNIVERSITY XUJI ELECTRIC Co Ltd
Priority to CN201710543152.XA priority Critical patent/CN107315131B/en
Publication of CN107315131A publication Critical patent/CN107315131A/en
Application granted granted Critical
Publication of CN107315131B publication Critical patent/CN107315131B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/08Locating faults in cables, transmission lines, or networks
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
    • Y04S10/52Outage or fault management, e.g. fault detection or location

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Locating Faults (AREA)

Abstract

The invention discloses the AT power supply trouble ranging data acquisition methods based on IEC61850 and fault waveform, including be arranged on the fault location device of electric substation and be arranged on son fault location device, son included AT institutes, the subregion institute, it is characterized in that, the fault location device of the electric substation and son institute gathers analog quantity and switching value data using IEC61850 92 and GOOSE agreements, and acquisition method comprises the following steps:A:When the fault location device of electric substation determines protection act tripping operation, according to itself pair when mode be that " clock synchronous " or " Voltage Drop is synchronous " calculates relative shift time T0;B:The newest COMTRADE fault waveforms file produced during according to protection act; the fault location device of electric substation searches the sampled point moment of T0 times after the total Startup time of protection in quantity of state recording, calculates absolute time T3, voltage, electric current, reactance and the position of the switch at the moment.

Description

AT power supply trouble ranging data acquisition methods based on IEC61850 and fault waveform
Technical field
The present invention relates to railway ranging technology, and in particular to the AT power supply trouble rangings based on IEC61850 and fault waveform Collecting method.
Background technology
Automatization Technology in Transformer Substation passes through the development in more than 10 years, has been mature on the whole at present, has obtained substantial amounts of work Cheng Yingyong, obtains huge success.As IEC61850 transformer stations model issuing and implementation and the electricity of communication standard system standard The development of sub- mutual inductance technology, the digital transformer substation pilot of the various application models in various regions, engineering construction is flourishing like the mushrooms after rain Carry out, Substation Automation System enters digital times.
Fault localization system is the nucleus equipment of tractive power supply system, and main function is broken down in contact net or locomotive When the trouble point of the property of failure and reality is accurately positioned, for shortening the repair time, the normal operation of guarantee high ferro, With vital effect.Fault location device used realizes number by ranging communication processor in existing fault localization system According to transmission.Data will be got between two fault location devices by protocol conversion twice, and system architecture is complicated, communication Link is more, and system reliability is not high.
Led in traditional Traction networks fault localization system between fault location device and ranging communication processor with 104 stipulations Communicated between letter, institute between ranging supervisor with producer's self-defined stipulations.Although 104 stipulations are Standards Codes, but extension Partial data structure is that producer freely defines, and which results in can not direct communication between the range-measurement system of different manufacturers, it is necessary to increases Plus special stipulations conversion equipment, it is difficult to meet the application requirement of Special field.
For problem above, Traction networks fault localization system and its data based on GOOSE are disclosed in the prior art and is passed Transmission method (application number CN201510733290.5), the system installs fault location device in electric substation and son respectively, and adopts With the GOOSE message transmission mechanism in IEC61850 standards, electric substation is carried out using the communication network based on IEC61850 standards Information is mutually handed over, and realizes data between system equipment, information sharing.
The system is only studied to ranging data transmission, but the data acquisition modes of whole fault localization are not goed deep into Research, optimizes to the system so being badly in need of a set of failure data acquisition mode at present, makes new fault localization system perfecting.
The content of the invention
It is an object of the invention to provide the AT power supply trouble ranging datas collection side based on IEC61850 and fault waveform Method, realizes that one kind can guarantee that electric substation and sub- institute's ranging number when falling the road method of synchronization using gps clock synchronization or voltage According to synchronism, adapt to the purpose of the acquisition method of complicated field condition.
The present invention is achieved through the following technical solutions:
AT power supply trouble ranging data acquisition methods based on IEC61850 and fault waveform, including it is arranged on electric substation Fault location device and the fault location device for being arranged on sub- institute, AT institutes, subregion institute, the electric substation and son included by the son Fault location device using IEC61850 9-2 and GOOSE agreement collection analog quantity and switching value data, acquisition method Comprise the following steps:
A:When the fault location device of electric substation determine protection act tripping operation when, according to itself pair when mode be " when Clock synchronization " or " Voltage Drop is synchronous " calculate relative shift time T0;
B:The newest COMTRADE fault waveforms file produced during according to protection act, the fault location device of electric substation is looked into Look for the sampled point moment of T0 times after the total Startup time of protection in quantity of state recording, calculate the moment absolute time T3, Voltage, electric current, reactance and the position of the switch, then by absolute moment T3 and calling data type with Transmission Control Protocol be sent to son Fault location device is to call their fault data, wherein data type is called together including primary fault, secondary failure is called together, tried for calling Test to call together and called together again with failure;
C:The fault location device of sub- institute receives the calling data command and number of the fault location device transmission of electric substation Calculated according to rear beginning data acquisition, and by the data of collection, by the false voltage after the completion of calculating, electric current, reactance with opening Off position information is transferred to the fault location device of electric substation as fault data;
D:The fault location device of electric substation receives the fault data of the fault location device transmission of son institute, when the sub- institutes of whole The fault data that transmits in the same time of fault location device receive completely after fault data is handled, calculate failure away from From.
Further, the present invention based on existing fault localization system, using IEC61850 9-2 and GOOSE agreement come Analog quantity and switching value data are gathered, specific fault localization data collection steps are as noted above.Adopted using IEC61850 9-2 Sample value Network Transmitting mode realizes the sampled value exported through combiner from electric mutual inductor and is transferred to interval with network mode The digitized sampling value output access procedure layer network of layer equipment, i.e. combining unit, the equipment such as protection, observing and controlling, metering no longer with Combining unit is joined directly together, but by Network Capture sampled value, has thus reached the information sharing of sample values.Compare Prior art, EC61850 9-2 sampled value Network Transmitting patterns efficiently solve under point-to-point transmission pattern some lack Fall into, be such as easy to implement such as bus protection, tranformer protection and protected across interval, be easy to implement whole station or zonal concentration is protected Shield;The content of flexibly configurable data set, frame format can be defined flexibly, and support mode of unicast;Combining unit can be lowered into Ground terminal case is installed, only needs an optical fiber that the combining unit at this interval can be accessed easily to the process layer net of main control room Network, facilitates in-site collecting device to the light pricker of combining unit and connects.
And analog quantity and switching value are gathered using IEC61850 9-2 sampled values and the networking mode of GOOSE common networks transmission Data, so can save substantial amounts of network communication equipment, such as industrial switch, this is to numeral on the premise of performance is ensured Change transformer station reduction cost of investment, quickening popularization and application are significant;And networking protection and control function, voltage are cut Change/PT side by side etc. miscellaneous function implement also more facilitate.
Importantly, the present invention falls the synchronous point situation in road using gps clock synchronization or voltage calculates relative skew Time T0, the fault location device of electric substation is issued when calling sub- institute's ranging data order while can issue T0, sub- institute's ranging The data for protecting the T0 moment after startup are sent to the fault location device of electric substation according to the time by device, and survey is ensure that with this Synchronism away from data, can avoid influence of the field condition of complexity to ranging data.
In step, the calculation procedure of the relative shift time T0 is as follows:
A1:If mode is during current failure range unit pair " clock synchronous " and signal is normal at external GPS pairs, will Protection definite value synchronization positioning time T1 is assigned to T0;
A2:If mode is during current failure range unit pair " Voltage Drop synchronous " or current failure range unit pair When mode when being " clock synchronous " and external GPS pairs during abnormal signal, then divide situation to calculate the T0 times:
1) when fault location device has protection to start, if the protection of first startup is o-volt protection, T0=T1;
2) when fault location device the protection act time limit then, if o-volt protection is all during the protection starts to action Do not started, then T0=T1;
3) during the protection act for first start when the non-o-volt protection of fault location device, starting after o-volt protection and first starting Limit is not arrived, calculates both startup time difference T2, T0=T1+T2.Further, the present invention is surveyed according to the failure of electric substation Away from device pair when mode be " clock synchronous " or " Voltage Drop is synchronous " and consider whether signal normal at external GPS pairs To divide situation with respect to shift time T0, it is ensured that the accuracy and integrality for the T0 that this programme is measured.
It is preferred that, the definite value initial value of the synchronous positioning time T1 is 28~35ms.Further, prolong after protection starts When T1 times when take analog value, start the data unstable with the protection act moment to avoid getting protection, pass through the present invention People's research finds that synchronous positioning time T1 definite value initial value design is less than the actuation time of protection and during closer to protection act Between the data got it is more accurate, according to the actuation time of protection, preferably definite value initial value value is 28~35ms.
In stepb, the voltage, electric current, reactance and the calculation procedure of the position of the switch are as follows:
B1:Using 20 milliseconds before the T3 moment as starting point, using the T3 moment as terminal, amount passage is entered to the mould in fault waveform Carry out Fourier transform, by 32 points of calculating of 1 cycle obtain Ut1, Uf1, It1, If1, Iat1, Ut2, Uf2, It2, If2, Iat2 virtual values and angle, wherein under to be designated as 1 expression descending, under to be designated as 2 expressions up;
B2:The position of the switch that ranging needs has been recorded in wave file as digital quantity, upper when extracting T3 moment Row feeder breaker position, descending feeder breaker position, the point position of the switch in parallel, the descending AT position of the switch are switched with up AT Position;
B3:Using Ut1, Uf1, It1, If1, Iat1, Ut2, Uf2, It2, If2, Iat2 computing impedance, obtain impedance X's Formula is as follows:
In formula (1), Ut1 is descending T line voltages, and Uf1 is descending F line voltages, and Utf1 is descending TF line voltages, IT1For Descending T lines protective current, IF1For descending F lines protective current, ITF1For descending TF lines protective current;Ut2 is up T line voltages, Uf2 is up F line voltages, and Utf2 is up TF line voltages, IT2For up T lines protective current, IF2For up F lines protective current, ITF2For up TF lines protective current.Further, voltage, the electric current at absolute time T3 moment have been calculated in B1 steps; All kinds of position of the switch at absolute time T3 moment have been calculated in B2 steps;In B3 steps using Ut1, Uf1, It1, If1, Iat1, Ut2, Uf2, It2, If2, Iat2 computing impedance, Computational methods see formula (2), (3), (4),Computational methods see formula (5), voltage, electric current carry out ratio and take its imaginary part, have calculated absolute time T3 The impedance value at moment.
In the formula (1)Including following several calculations:
1) when " descending feeder breaker position ", " up feeder breaker position " are conjunction position, " standby feeder breaker position Put " for point position when:
In formula (2), Iat1 is that descending AT sucts electric current, and Iat2 is that up AT sucts electric current, and It1 is descending T lines electricity Stream, If1 is descending F line currents, and It2 is up T line currents, and If2 is up F line currents;
2) when " descending feeder breaker position ", " standby feeder breaker position " are conjunction position, " up feeder breaker position Put " for point position when:
In formula (3), Itb is standby T line currents, and Ifb is standby F line currents;
3) when " up feeder breaker position ", " standby feeder breaker position " are conjunction position, " descending feeder breaker position Put " for point position when:
4) when three kinds of situations are all unsatisfactory for above by " descending feeder breaker position ", " up feeder breaker position " To close position, " standby feeder breaker position " is a point position processing.
In the formula (1)Calculation formula is as follows:
In step C, the fault data includes following several acquisition modes:
C1:The method of synchronization when calling data type for " primary fault is called together " or " secondary failure is called together " and sub- institute's failure During for " clock is synchronous ", COMTRADE whole in device are traveled through according to the time-division date seconds value in the absolute time T3 of reception Fault waveform file, finds corresponding fault moment wave file, then navigates in file the fault localization dress with electric substation Sampled point in the same time is put, false voltage, electric current, reactance and position of the switch information this moment is calculated;
C2:It is " Voltage Drop synchronous " mode or calling data type is " failure is called together again " when fault location device is actual When, using the fault waveform file being newly generated, sampled point therein is determined with the T1 times after the total startup of protection, is calculated False voltage, electric current, reactance and position of the switch information this moment;
C3:When it is " experiment is called together " to call data type, with the analog quantity of the current real-time collection of fault location device with Switching value calculates false voltage, electric current, reactance and position of the switch information this moment.Further, son institute is according to calling data Type and method of synchronization type are acquired calculating to fault data, to ensure that the calling numerical nomenclature with electric substation is matched, And call that data type is called together including primary fault, secondary failure is called together, is tested to call together and is called together again with failure, it is synchronous that the method for synchronization includes clock It is synchronous with Voltage Drop.
The step D comprises the following steps:
D1:Switching value in power transformation in one's power sub- institute's fault data judges the method for operation of supply arm;
D2:Using fault moment electric substation with it is each son institute electrical data progress fault distance calculating.Further , the first step that electric substation range unit receives progress ranging computing after the fault data of complete portion's institute in the same time is exactly to judge The method of operation of supply arm, then after the method for operation, which is calculated, to be finished, using fault moment electric substation with it is each sub electric Measure the calculating that data carry out fault distance, its Computing Principle is identical with traditional approach, mainly horizontal link current than principle, suct electricity Stream is than principle, up-downgoing electric current than principle and reactance range measurement principle.
The method of operation in the step D1 includes complete in parallel, full direct-furnish, descending AT, up direct-furnish, up AT, descending straight For, up-downgoing list AT, AT institute is not in parallel, subregion institute is in parallel, AT institutes are in parallel, the full direct-furnish of subregions institute, AT institutes are in parallel, subregions institute is up The descending direct-furnish of AT, AT institutes in parallel, the descending up direct-furnish of AT of subregion institute, AT institutes in parallel, subregion institute list AT, AT institute parallel connections and without AT, unknown operation, unit mode.
In step D1, the method for operation is carried out to judge to include following several calculations:
1) during fault location device setting control word " parallel connection point biswitch " input of electric substation, using AT institutes and subregion institute Respective up feeder breaker position, descending feeder breaker position, the point position of the switch in parallel, the descending AT position of the switch with it is upper The row AT position of the switch calculates the method for operation;
2) when the fault location device setting control word " parallel connection point biswitch " of electric substation is exited, using AT institutes and subregion institute The respective point position of the switch in parallel, the descending AT position of the switch calculate the method for operation with the up AT position of the switch;
3) it is the unknown method of operation when substation protection definite value " ranging group device quantity " is less than 2.
The present invention compared with prior art, has the following advantages and advantages:
AT power supply trouble ranging data acquisition methods of the invention based on IEC61850 and fault waveform, have filled up existing skill The Traction networks fault localization system based on GOOSE is to the blank of fault localization data acquisition in art, and it utilizes IEC61850 9-2 Analog quantity and switching value data are gathered with GOOSE agreements, substantial amounts of network service can be saved on the premise of performance is ensured Equipment, such as industrial switch, this is significant to digital transformer substation reduction cost of investment, quickening popularization and application;And Miscellaneous function is implemented and also more facilitated side by side etc. by networking protection and control function, voltage switching/PT;We are utilized simultaneously Method ranging, the synchronization of ranging data is can guarantee that when range-measurement system falls the road method of synchronization using gps clock synchronization or voltage Property, it is suitable for the field condition of complexity.
Brief description of the drawings
Accompanying drawing described herein is used for providing further understanding the embodiment of the present invention, constitutes one of the application Point, do not constitute the restriction to the embodiment of the present invention.In the accompanying drawings:
Fig. 1 is the structural representation of fault localization networking of the present invention;
Fig. 2 reports one for electric substation's ranging of the embodiment of the present invention;
Fig. 3 reports two for electric substation's ranging of the embodiment of the present invention;
Fig. 4 reports one for the AT institutes ranging of the embodiment of the present invention;
Fig. 5 reports two for the AT institutes ranging of the embodiment of the present invention;
Fig. 6 reports one for the subregion institute ranging of the embodiment of the present invention;
Fig. 7 reports two for the subregion institute ranging of the embodiment of the present invention.
Embodiment
For the object, technical solutions and advantages of the present invention are more clearly understood, with reference to embodiment and accompanying drawing, to this Invention is described in further detail, and exemplary embodiment and its explanation of the invention is only used for explaining the present invention, does not make For limitation of the invention.
Embodiment 1
As shown in figure 1, the AT power supply trouble ranging data acquisition methods of the invention based on IEC61850 and fault waveform, bag Include the fault location device for being arranged on the fault location device of electric substation and being arranged on sub- institute, AT institutes, subregion included by the son The fault location device of institute, the electric substation and son institute is using IEC61850 9-2 and GOOSE agreement collection analog quantity with opening Data are measured in pass, and acquisition method comprises the following steps:
A:When the fault location device of electric substation determine protection act tripping operation when, according to itself pair when mode be " when Clock synchronization " or " Voltage Drop is synchronous " calculate relative shift time T0;
B:The newest COMTRADE fault waveforms file produced during according to protection act, the fault location device of electric substation is looked into Look for the sampled point moment of T0 times after the total Startup time of protection in quantity of state recording, calculate the moment absolute time T3, Voltage, electric current, reactance and the position of the switch, then by absolute moment T3 and calling data type with Transmission Control Protocol be sent to son Fault location device is to call their fault data, wherein data type is called together including primary fault, secondary failure is called together, tried for calling Test to call together and called together again with failure;
C:The fault location device of sub- institute receives the calling data command and number of the fault location device transmission of electric substation Calculated according to rear beginning data acquisition, and by the data of collection, by the false voltage after the completion of calculating, electric current, reactance with opening Off position information is transferred to the fault location device of electric substation as fault data;
D:The fault location device of electric substation receives the fault data of the fault location device transmission of son institute, when the sub- institutes of whole The fault data that transmits in the same time of fault location device receive completely after fault data is handled, calculate failure away from From.
Embodiment 2
As shown in figure 1, the AT power supply trouble ranging data acquisition methods of the invention based on IEC61850 and fault waveform, On the basis of embodiment 1, in step, the calculation procedure of the relative shift time T0 is as follows:
A1:If mode is during current failure range unit pair " clock synchronous " and signal is normal at external GPS pairs, will Protection definite value synchronization positioning time T1 is assigned to T0;
A2:If mode is during current failure range unit pair " Voltage Drop synchronous " or current failure range unit pair When mode when being " clock synchronous " and external GPS pairs during abnormal signal, then divide situation to calculate the T0 times:
1) when fault location device has protection to start, if the protection of first startup is o-volt protection, T0=T1;
2) when fault location device the protection act time limit then, if o-volt protection is all during the protection starts to action Do not started, then T0=T1;
3) during the protection act for first start when the non-o-volt protection of fault location device, starting after o-volt protection and first starting Limit is not arrived, calculates both startup time difference T2, T0=T1+T2.The definite value initial value of the synchronous positioning time T1 is 30ms。
In stepb, the voltage, electric current, reactance and the calculation procedure of the position of the switch are as follows:
B1:Using 20 milliseconds before the T3 moment as starting point, using the T3 moment as terminal, amount passage is entered to the mould in fault waveform Carry out Fourier transform, by 32 points of calculating of 1 cycle obtain Ut1, Uf1, It1, If1, Iat1, Ut2, Uf2, It2, If2, Iat2 virtual values and angle, wherein under to be designated as 1 expression descending, under to be designated as 2 expressions up;
B2:The position of the switch that ranging needs has been recorded in wave file as digital quantity, upper when extracting T3 moment Row feeder breaker position, descending feeder breaker position, the point position of the switch in parallel, the descending AT position of the switch are switched with up AT Position;
B3:Using Ut1, Uf1, It1, If1, Iat1, Ut2, Uf2, It2, If2, Iat2 computing impedance, obtain impedance X's Formula is as follows:
In formula (1), Ut1 is descending T line voltages, and Uf1 is descending F line voltages, and Utf1 is descending TF line voltages, IT1For Descending T lines protective current, IF1For descending F lines protective current, ITF1For descending TF lines protective current;Ut2 is up T line voltages, Uf2 is up F line voltages, and Utf2 is up TF line voltages, IT2For up T lines protective current, IF2For up F lines protective current, ITF2For up TF lines protective current.
In the formula (1)Including following several calculations:
1) when " descending feeder breaker position ", " up feeder breaker position " are conjunction position, " standby feeder breaker position Put " for point position when:
In formula (2), Iat1 is that descending AT sucts electric current, and Iat2 is that up AT sucts electric current, and It1 is descending T lines electricity Stream, If1 is descending F line currents, and It2 is up T line currents, and If2 is up F line currents;
2) when " descending feeder breaker position ", " standby feeder breaker position " are conjunction position, " up feeder breaker position Put " for point position when:
In formula (3), Itb is standby T line currents, and Ifb is standby F line currents;
3) when " up feeder breaker position ", " standby feeder breaker position " are conjunction position, " descending feeder breaker position Put " for point position when:
4) when three kinds of situations are all unsatisfactory for above by " descending feeder breaker position ", " up feeder breaker position " To close position, " standby feeder breaker position " is a point position processing.
In the formula (1)Calculation formula is as follows:
In step C, the fault data includes following several acquisition modes:
C1:The method of synchronization when calling data type for " primary fault is called together " or " secondary failure is called together " and sub- institute's failure During for " clock is synchronous ", COMTRADE whole in device are traveled through according to the time-division date seconds value in the absolute time T3 of reception Fault waveform file, finds corresponding fault moment wave file, then navigates in file the fault localization dress with electric substation Sampled point in the same time is put, false voltage, electric current, reactance and position of the switch information this moment is calculated;
C2:It is " Voltage Drop synchronous " mode or calling data type is " failure is called together again " when fault location device is actual When, using the fault waveform file being newly generated, sampled point therein is determined with the T1 times after the total startup of protection, is calculated False voltage, electric current, reactance and position of the switch information this moment;
C3:When it is " experiment is called together " to call data type, with the analog quantity of the current real-time collection of fault location device with Switching value calculates false voltage, electric current, reactance and position of the switch information this moment.
The step D comprises the following steps:
D1:Switching value in power transformation in one's power sub- institute's fault data judges the method for operation of supply arm;The operation side Formula include complete in parallel, full direct-furnish, descending AT, up direct-furnish, up AT, descending direct-furnish, up-downgoing list AT, AT institute it is not in parallel, point Institute of area is in parallel, AT parallel connections, the full direct-furnish of subregion, the parallel connection of AT institutes, the up descending direct-furnish of AT of subregion, AT in parallel, subregion institutes The descending up direct-furnish of AT, AT institutes in parallel, subregion institute list AT, AT institute parallel connections and without AT, unknown operation, unit mode;
The method of operation is carried out to judge to include following several calculations:
1) during fault location device setting control word " parallel connection point biswitch " input of electric substation, using AT institutes and subregion institute Respective up feeder breaker position, descending feeder breaker position, the point position of the switch in parallel, the descending AT position of the switch with it is upper The row AT position of the switch calculates the method for operation;
2) when the fault location device setting control word " parallel connection point biswitch " of electric substation is exited, using AT institutes and subregion institute The respective point position of the switch in parallel, the descending AT position of the switch calculate the method for operation with the up AT position of the switch;
3) it is the unknown method of operation when substation protection definite value " ranging group device quantity " is less than 2;
D2:Using fault moment electric substation with it is each son institute electrical data carry out fault distance calculating, mainly wrap Include horizontal link current than principle, suct electric current than principle, up-downgoing electric current than principle and reactance range measurement principle.
Embodiment 3
As shown in Fig. 1~7, the AT power supply trouble ranging datas collection side of the invention based on IEC61850 and fault waveform Method, on the basis of embodiment 1, when the fault location device of electric substation determines protection act tripping operation, what is taken is that clock is same Step mode calculates relative shift time T0.The fault location device of electric substation collect all son on the ranging data sent Afterwards, start ranging logic to calculate.Electric substation's control word " parallel connection point biswitch " input, thus according to AT with subregion on send be total to It is full parallel running mode that 10 position of the switch, which calculate now system,;Have under full parallel running mode horizontal link current ratio with Electric current is sucted than two kinds of distance-finding methods of ranging, because control word " horizontal link current is preferential " is not put into, therefore takes and sucts electric current ratio Ranging.Ask for sucting current ratio first, fault distance is calculated for 1.527km further according to Q-L tables, trouble point kilometer is designated as K101+427.Electric substation's ranging report sees Fig. 2, and Fig. 3 is shown in electric substation's ranging report two, and the ranging report of AT institutes sees Fig. 4, AT institutes Fig. 5 is shown in ranging report two, and the ranging report of subregion institute sees Fig. 6, and Fig. 7 is shown in subregion institute ranging report two.
Embodiment 4
As shown in figure 1, the AT power supply trouble ranging data acquisition methods of the invention based on IEC61850 and fault waveform, On the basis of embodiment 1, interchanger, Sport Administration machine, control centre, local monitoring, the fault localization of electric substation are additionally provided with Device, Sport Administration machine, local monitoring are connected with interchanger, and control centre is connected with Sport Administration machine, motion pipe here Reason machine is a kind of communication processor, and control centre is communicated by Sport Administration machine, interchanger with the fault location device of electric substation, And the ranging data of the fault location device of electric substation is transferred, it is more convenient and practical to realize the remote management to electric substation.
Above-described embodiment, has been carried out further to the purpose of the present invention, technical scheme and beneficial effect Describe in detail, should be understood that the embodiment that the foregoing is only the present invention, be not intended to limit the present invention Protection domain, within the spirit and principles of the invention, any modification, equivalent substitution and improvements done etc. all should be included Within protection scope of the present invention.

Claims (10)

1. the AT power supply trouble ranging data acquisition methods based on IEC61850 and fault waveform, including it is arranged on the event of electric substation Barrier range unit and the fault location device for being arranged on sub- institute, AT institutes, subregion institute included by the son, it is characterised in that described The fault location device of electric substation and son institute is using IEC61850 9-2 and GOOSE agreement collection analog quantity and switching value number According to acquisition method comprises the following steps:
A:When the fault location device of electric substation determine protection act tripping operation when, according to itself pair when mode be that " clock is same Step " or " Voltage Drop is synchronous " calculate relative shift time T0;
B:The newest COMTRADE fault waveforms file produced during according to protection act, the fault location device of electric substation searches shape The sampled point moment of T0 times after the total Startup time of protection in state amount recording, calculate the absolute time T3 at the moment, voltage, Absolute moment T3 and calling data type, are then sent to the failure survey of sub- institute by electric current, reactance and the position of the switch with Transmission Control Protocol Away from device to call their fault data, wherein calling data type is called together including primary fault, secondary failure is called together, experiment is called together and Failure is called together again;
C:After calling data command and data that the fault location device that the fault location device of sub- institute receives electric substation is sent Start data acquisition, and the data of collection are calculated, by the false voltage after the completion of calculating, electric current, reactance and switch position Confidence ceases the fault location device that electric substation is transferred to as fault data;
D:The fault location device of electric substation receives the fault data of the fault location device transmission of son institute, when whole sons event The fault data that barrier range unit is transmitted in the same time is handled fault data after receiving completely, calculates fault distance.
2. the AT power supply trouble ranging data acquisition methods according to claim 1 based on IEC61850 and fault waveform, Characterized in that, in step, the calculation procedure of the relative shift time T0 is as follows:
A1:If mode is during current failure range unit pair " clock synchronous " and signal is normal at external GPS pairs, will protection Definite value synchronization positioning time T1 is assigned to T0;
A2:If mode is during current failure range unit pair " Voltage Drop synchronous " or current failure range unit pair when side When formula is " clock is synchronous " and external GPS pairs during abnormal signal, then situation is divided to calculate the T0 times:
1) when fault location device has protection to start, if the protection of first startup is o-volt protection, T0=T1;
2) when fault location device the protection act time limit then, if o-volt protection was all not during the protection starts to action Started, then T0=T1;
3) first start when the non-o-volt protection of fault location device, o-volt protection after protection act time limit for starting and first starting not Arrive, calculate both startup time difference T2, T0=T1+T2.
3. the AT power supply trouble ranging data acquisition methods according to claim 2 based on IEC61850 and fault waveform, Characterized in that, the definite value initial value of the synchronous positioning time T1 is 28~35ms.
4. the AT power supply trouble ranging data acquisition methods according to claim 1 based on IEC61850 and fault waveform, Characterized in that, in stepb, the voltage, electric current, reactance and the calculation procedure of the position of the switch are as follows:
B1:Using 20 milliseconds before the T3 moment as starting point, using the T3 moment as terminal, the progress of amount passage is entered to the mould in fault waveform Fourier transform, Ut1, Uf1, It1, If1, Iat1, Ut2, Uf2, It2, If2, Iat2 are obtained by 32 points of calculating of 1 cycle Virtual value and angle, wherein under to be designated as 1 expression descending, under to be designated as 2 expressions up;
B2:The position of the switch that ranging needs has been recorded in wave file as digital quantity, extracts up feedback during T3 moment Line circuit breaker position, descending feeder breaker position, the point position of the switch in parallel, the descending AT position of the switch switch position with up AT Put;
B3:Using Ut1, Uf1, It1, If1, Iat1, Ut2, Uf2, It2, If2, Iat2 computing impedance, impedance X formula is obtained It is as follows:
In formula (1), Ut1 is descending T line voltages, and Uf1 is descending F line voltages, and Utf1 is descending TF line voltages, IT1To be descending T line protective currents, IF1For descending F lines protective current, ITF1For descending TF lines protective current;Ut2 is up T line voltages, and Uf2 is Up F line voltages, Utf2 is up TF line voltages, IT2For up T lines protective current, IF2For up F lines protective current, ITF2For Up TF lines protective current.
5. the AT power supply trouble ranging data acquisition methods according to claim 4 based on IEC61850 and fault waveform, Characterized in that, in the formula (1)Including following several calculations:
1) when " descending feeder breaker position ", " up feeder breaker position " are conjunction position, " standby feeder breaker position " To divide during position:
In formula (2), Iat1 is that descending AT sucts electric current, and Iat2 is that up AT sucts electric current, and It1 is descending T line currents, If1 is descending F line currents, and It2 is up T line currents, and If2 is up F line currents;
2) when " descending feeder breaker position ", " standby feeder breaker position " are conjunction position, " up feeder breaker position " To divide during position:
In formula (3), Itb is standby T line currents, and Ifb is standby F line currents;
3) when " up feeder breaker position ", " standby feeder breaker position " are conjunction position, " descending feeder breaker position " To divide during position:
4) it is conjunction by " descending feeder breaker position ", " up feeder breaker position " when three kinds of situations are all unsatisfactory for above Position, " standby feeder breaker position " is a point position processing.
6. the AT power supply trouble ranging data acquisition methods according to claim 4 based on IEC61850 and fault waveform, Characterized in that, in the formula (1)Calculation formula is as follows:
7. the AT power supply trouble ranging data acquisition methods according to claim 1 based on IEC61850 and fault waveform, Characterized in that, in step C, the fault data includes following several acquisition modes:
C1:When call data type for " primary fault is called together " or " secondary failure is called together " and sub- institute's failure when the method for synchronization be When " clock is synchronous ", COMTRADE events whole in device are traveled through according to the time-division date seconds value in the absolute time T3 of reception Hinder wave file, find corresponding fault moment wave file, then navigate in file the fault location device with electric substation Sampled point in the same time, calculates false voltage, electric current, reactance and position of the switch information this moment;
C2:When it for " Voltage Drop synchronous " mode or calling data type is " failure is called together " that fault location device is actual again, Using the fault waveform file being newly generated, sampled point therein is determined with the T1 times after the total startup of protection, this is calculated False voltage, electric current, reactance and the position of the switch information at quarter;
C3:When it is " experiment is called together " to call data type, with the analog quantity and switch of the current real-time collection of fault location device Gauge calculates false voltage, electric current, reactance and position of the switch information this moment.
8. the AT power supply trouble ranging data acquisition methods according to claim 1 based on IEC61850 and fault waveform, Characterized in that, the step D comprises the following steps:
D1:Switching value in power transformation in one's power sub- institute's fault data judges the method for operation of supply arm;
D2:Using fault moment electric substation with it is each son institute electrical data progress fault distance calculating.
9. the AT power supply trouble ranging data acquisition methods according to claim 8 based on IEC61850 and fault waveform, Characterized in that, the method for operation in the step D1 include complete in parallel, full direct-furnish, descending AT, up direct-furnish, up AT, under Row direct-furnish, up-downgoing list AT, AT institute not in parallel, the parallel connection of subregion institute, AT institutes in parallel, the full direct-furnish of subregion institute, AT in parallel, subregion institutes The up descending direct-furnish of AT, AT institutes in parallel, the descending up direct-furnish of AT of subregion institute, AT institutes in parallel, subregion institute list AT, AT institute parallel connections and not Band AT, unknown operation, unit mode.
10. the AT power supply trouble ranging data acquisition methods according to claim 8 based on IEC61850 and fault waveform, Characterized in that, in step D1, carrying out judging to include following several calculations to the method for operation:
1) it is respective using AT institutes and subregion institute during fault location device setting control word " biswitch is put in parallel connection " input of electric substation Up feeder breaker position, descending feeder breaker position, the point position of the switch in parallel, the descending AT position of the switch and up AT The position of the switch calculates the method for operation;
2) it is respective using AT institutes and subregion institute when the fault location device setting control word " point biswitch in parallel " of electric substation is exited The point position of the switch in parallel, the descending AT position of the switch calculate the method for operation with the up AT position of the switch;
3) it is the unknown method of operation when substation protection definite value " ranging group device quantity " is less than 2.
CN201710543152.XA 2017-07-05 2017-07-05 AT power supply trouble ranging data acquisition method based on IEC61850 and fault waveform Active CN107315131B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710543152.XA CN107315131B (en) 2017-07-05 2017-07-05 AT power supply trouble ranging data acquisition method based on IEC61850 and fault waveform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710543152.XA CN107315131B (en) 2017-07-05 2017-07-05 AT power supply trouble ranging data acquisition method based on IEC61850 and fault waveform

Publications (2)

Publication Number Publication Date
CN107315131A true CN107315131A (en) 2017-11-03
CN107315131B CN107315131B (en) 2019-11-19

Family

ID=60180584

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710543152.XA Active CN107315131B (en) 2017-07-05 2017-07-05 AT power supply trouble ranging data acquisition method based on IEC61850 and fault waveform

Country Status (1)

Country Link
CN (1) CN107315131B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108152669A (en) * 2017-12-06 2018-06-12 中国铁建电气化局集团第五工程有限公司 The method that high ferro dimension pipe traction substation promotes fault localization precision
CN109901018A (en) * 2019-03-26 2019-06-18 国电南瑞南京控制***有限公司 A kind of fault distance-finding method and system suitable for high-speed railway sectional power supply mode
CN111541227A (en) * 2020-03-18 2020-08-14 天津凯发电气股份有限公司 Wide area protection system of AT full parallel power supply network based on artificial intelligence
CN111796164A (en) * 2020-07-16 2020-10-20 西南交通大学 Fault location method for full-parallel AT traction network
CN114062853A (en) * 2021-11-19 2022-02-18 许昌许继软件技术有限公司 Feeder line fault distance measurement method and device under compound line direct supply 50% standby mode

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101923138A (en) * 2010-07-23 2010-12-22 南京国电南自轨道交通工程有限公司 AT (Autotransformer) line fault ranging system with built-bin GPS (Global Positioning System) module
CN104184207A (en) * 2013-05-27 2014-12-03 北京太格时代自动化***设备有限公司 Integrated control method of digitalized traction substation of electrified railway
CN104316832A (en) * 2014-10-08 2015-01-28 成都交大许继电气有限责任公司 Traction power supply system fault location method applied to multiple operation modes
CN205070601U (en) * 2015-07-29 2016-03-02 四川艾德瑞电气有限公司 Based on intelligence traction substation overall framework system of IEC61850 system
CN105388395A (en) * 2015-11-03 2016-03-09 成都交大许继电气有限责任公司 GOOSE-based traction network fault distance measurement system and data transmission method thereof
CN105425102A (en) * 2015-11-03 2016-03-23 成都交大许继电气有限责任公司 High speed railway fault distance measuring system based on power supply arms
CN105790235A (en) * 2016-03-28 2016-07-20 南京国电南自轨道交通工程有限公司 Novel high-way traction power supply system capable of selective feed line tripping
CN106124937A (en) * 2016-08-23 2016-11-16 南京南瑞继保电气有限公司 A kind of railway fault localization system and method based on wireless communication mode

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101923138A (en) * 2010-07-23 2010-12-22 南京国电南自轨道交通工程有限公司 AT (Autotransformer) line fault ranging system with built-bin GPS (Global Positioning System) module
CN104184207A (en) * 2013-05-27 2014-12-03 北京太格时代自动化***设备有限公司 Integrated control method of digitalized traction substation of electrified railway
CN104316832A (en) * 2014-10-08 2015-01-28 成都交大许继电气有限责任公司 Traction power supply system fault location method applied to multiple operation modes
CN205070601U (en) * 2015-07-29 2016-03-02 四川艾德瑞电气有限公司 Based on intelligence traction substation overall framework system of IEC61850 system
CN105388395A (en) * 2015-11-03 2016-03-09 成都交大许继电气有限责任公司 GOOSE-based traction network fault distance measurement system and data transmission method thereof
CN105425102A (en) * 2015-11-03 2016-03-23 成都交大许继电气有限责任公司 High speed railway fault distance measuring system based on power supply arms
CN105790235A (en) * 2016-03-28 2016-07-20 南京国电南自轨道交通工程有限公司 Novel high-way traction power supply system capable of selective feed line tripping
CN106124937A (en) * 2016-08-23 2016-11-16 南京南瑞继保电气有限公司 A kind of railway fault localization system and method based on wireless communication mode

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108152669A (en) * 2017-12-06 2018-06-12 中国铁建电气化局集团第五工程有限公司 The method that high ferro dimension pipe traction substation promotes fault localization precision
CN108152669B (en) * 2017-12-06 2021-03-30 中国铁建电气化局集团第五工程有限公司 Method for improving fault location precision of high-speed rail traction substation
CN109901018A (en) * 2019-03-26 2019-06-18 国电南瑞南京控制***有限公司 A kind of fault distance-finding method and system suitable for high-speed railway sectional power supply mode
CN111541227A (en) * 2020-03-18 2020-08-14 天津凯发电气股份有限公司 Wide area protection system of AT full parallel power supply network based on artificial intelligence
CN111541227B (en) * 2020-03-18 2022-04-26 天津凯发电气股份有限公司 Wide area protection system of AT full parallel power supply network based on artificial intelligence
CN111796164A (en) * 2020-07-16 2020-10-20 西南交通大学 Fault location method for full-parallel AT traction network
CN111796164B (en) * 2020-07-16 2021-04-13 西南交通大学 Fault location method for full-parallel AT traction network
CN114062853A (en) * 2021-11-19 2022-02-18 许昌许继软件技术有限公司 Feeder line fault distance measurement method and device under compound line direct supply 50% standby mode

Also Published As

Publication number Publication date
CN107315131B (en) 2019-11-19

Similar Documents

Publication Publication Date Title
CN107315131B (en) AT power supply trouble ranging data acquisition method based on IEC61850 and fault waveform
CN107681642B (en) A kind of substation's site protection system
CN105281435B (en) Distributed fault detection and shielding system and method for work towards intelligent distribution network
CN102306953B (en) Test method for secondary injection of power distribution automatization system
CN102937685A (en) Real-time simulation technique-based integrated testing platform for substation
CN105467277B (en) A kind of power distribution network mixed fault distance measuring method and device based on PMU
CN105527540B (en) A kind of fault detector and the matched overhead distribution network fault positioning method of distributed intelligent terminal
CN104569657A (en) Simulation testing device for mutual inductor of LTE wireless communication intelligent substation
CN102290865A (en) Integrated intelligent unit of intelligent substation
CN105140894A (en) Phase difference principle based power distribution network differential protection method
CN106556759A (en) A kind of power distribution automation apparatus debugging method and debugging system
CN103904779A (en) Intelligent substation intelligent terminal analog device and using method thereof
CN104701979B (en) One kind protection observing and controlling integrating device and protection investigating method
CN107069681B (en) A kind of multi-point circuit differential protecting method and system
CN110568275B (en) Open-phase fault studying and judging method and system based on public and private power distribution network variable data
CN112540259A (en) Distribution network disconnection fault identification method and system suitable for intelligent power distribution terminal
CN104485736A (en) Intelligent protection center-based wide-area backup protection system and method
CN109470994A (en) Faulty line judgement system and method for power distribution network
CN103746304B (en) The remodeling method of Intelligent transformer station
CN110380378A (en) Distributed 10KV power distribution network monitoring and protection system and guard method
CN104535853A (en) Distributed test terminal of LET wireless communication intelligent substation test system
CN102608494B (en) Monitoring method for arc light monitoring intelligent component system of medium-low voltage switch of intelligent substation
CN205670180U (en) Based on zero sequence transient analysis low current neutral grounding system fault alignment system
CN103094986A (en) Distributed detection method of intelligent substation relay protection devices based on digital dynamic real time simulator (DDRTS)
CN205539316U (en) Distribution network mixes trouble range unit based on PMU

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant