CN107313788B - The method and device of grouting for water blocking under strong hydraulic connection - Google Patents

The method and device of grouting for water blocking under strong hydraulic connection Download PDF

Info

Publication number
CN107313788B
CN107313788B CN201710707390.XA CN201710707390A CN107313788B CN 107313788 B CN107313788 B CN 107313788B CN 201710707390 A CN201710707390 A CN 201710707390A CN 107313788 B CN107313788 B CN 107313788B
Authority
CN
China
Prior art keywords
water
grouting
drilling
slip casting
hydraulic connection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710707390.XA
Other languages
Chinese (zh)
Other versions
CN107313788A (en
Inventor
李峰
吕目晓
高凯
韩创业
孟凡林
胡永涛
刘涛
张建浩
龚翰林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinjiang Guici Mining Industry Co Ltd
Original Assignee
Xinjiang Guici Mining Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinjiang Guici Mining Industry Co Ltd filed Critical Xinjiang Guici Mining Industry Co Ltd
Priority to CN201710707390.XA priority Critical patent/CN107313788B/en
Publication of CN107313788A publication Critical patent/CN107313788A/en
Application granted granted Critical
Publication of CN107313788B publication Critical patent/CN107313788B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • E21B17/10Wear protectors; Centralising devices, e.g. stabilisers
    • E21B17/1085Wear protectors; Blast joints; Hard facing
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • E21B17/22Rods or pipes with helical structure
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Physics & Mathematics (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention discloses a kind of method and devices of grouting for water blocking under strong hydraulic connection, including by Water in mined area area physical prospecting situation, obtain the position of water passage, and the parameter of the position of the Position Design drill site according to water passage and inlet well;According to the parameter of the drilling, bore operation is carried out and carries out orifice tube to divide into;After orifice tube is divided into, slip casting operation is carried out;After slip casting terminates solidification, pressure test is carried out to drilling using clear water.The present invention provides a kind of method and device of grouting for water blocking under strong hydraulic connection, is blocked by the slip casting to water passage, eliminates the hidden water dezaster in unknown goaf.

Description

The method and device of grouting for water blocking under strong hydraulic connection
Technical field
The invention belongs to coal mine gob water damage integrated control field, in particular to the side of grouting for water blocking under strong hydraulic connection Method and device.
Background technique
Grouting and sealing technique be Pitwater disaster administer important means, due to rock mass have various structures, anisotropy, The features such as hydrogeologic condition otherness is big proposes severe challenge for mine water disaster grouting treatment.Grouting theory is to flow Grow up in the theoretical basis of mechanics, hydraulics, Solid Mechanics etc., the liquid form and process of setting to slurries carry out Analytic process.In fact, the liquid form multiplicity of slurries in the earth formation, and these forms of motion are along with the change of formation properties Change, the variation of the property of slurries and pressure and constantly change or and deposit, and subsurface contains a variety of geological stratifications, especially the Four systems rush in diluvial formation, and bored grouting water blockoff is more difficult;Currently, being bored as that drills under the conditions of complicated geological environment increases Bar part serious wear causes scrapping for drilling rod, or even causes down-hole equipment failure or accident occur.
Summary of the invention
Goal of the invention: in order to overcome the deficiencies in the prior art, the present invention provides slip casting under a kind of strong hydraulic connection The method and device of water blockoff is blocked by the slip casting to water passage, eliminates the hidden water dezaster in unknown goaf.
Technical solution: to achieve the above object, technical scheme is as follows:
The method of grouting for water blocking under strong hydraulic connection, comprising the following steps:
By Water in mined area area physical prospecting situation, the position of water passage is obtained, and is bored according to the Position Design of water passage The position of field and the parameter of inlet well;
According to the parameter of the drilling, bore operation is carried out and carries out orifice tube to divide into;
After orifice tube is divided into, slip casting operation is carried out;
After slip casting terminates solidification, pressure test is carried out to drilling using clear water;
Slip casting method is recycled using segmented in the bore operation, comprising the following steps:
1. carrying out aperture using start bit, drilling occurs stopping creeping into immediately when the phenomenon that not returning water, mentions brill and accurate Measure ruler more than drilling rod;
2. it is determined as the leak that drills if drilling rod and drill bit are unplugged, it need to be to carrying out grouting and reinforcing around hole wall;
3. after hole wall is reinforced, if drilling starts to return water, continuing to implement drilling, being carried out before drilling drilling to predeterminated position last Once grouting Reinforcing hole wall;
4. the last time hole wall that drills uses the drill bit of No.1 smaller than start bit to carry out cleaning bottom of hole after reinforcing;
5. then dividing into the orifice tube less than boring aperture, and orifice tube divides into the half depth that length is not more than hole depth.
Further, concrete foundation is arranged in the construction, this inlet well includes several drillings, and the drilling It is arranged by single row of holes, and position of opening is respectively positioned in concrete foundation.
Further, design arrangement inlet well 10, borehole bottom location spacing 4.5m~10m, hole depth 20.3m~35.5m.
Further, when slip casting operation, cement grout is injected into drilling using grouting pump, wait until pressure reach 3MPa and After holding time no less than 3 minutes, slip casting can be stopped;
Cement has solidified after first time slip casting terminates 8h, carries out second of slip casting until hole wall surrounding rock crack is full of water Mud;
After slip casting terminates 16h to be solidified, pressure test is carried out to drilling using clear water, test pressure control is 3MPa, such as Fruit test pressure maintains the 3MPa duration to be no less than 30min, then hole Cementer work terminates.
Further, the slip casting includes the slurries of the three-level ratio of mud, the water ash weight ratio of the slurries be respectively 2:1, 1:1、0.5:1。
Further, the slurries include cement slurry and/or admixture;The admixture is sand, waterglass, soybean and stone Son.
Further, the sand is the hard natural sand or artificial sand that partial size is not more than 2.5mm, and gravel fineness modulus is little In 2.0, clay content is not more than 3%;The modulus of the waterglass is 2.4~3.0, and concentration is 30~45 Baume degrees;The stone Partial size be 5mm~15mm.
Further, under strong hydraulic connection grouting for water blocking device, including drilling rod, the drilling rod is auger stem, described Drilling rod middle section is polished rod portion, and spacing is provided with two shoulders in the polished rod portion, is provided on the outside of two shoulders resistance to The outer diameter of grinding set, the wear-resistant sleeve is equal with auger stem outer diameter;Limbers, the drilling rod are offered along axis in the drilling rod Both ends be respectively arranged with male connector screw thread and female screw thread.
Further, the helical blade of identical pitch, the helical-blade are provided on the spiral part of the auger stem The outer diameter of piece is less than the spire outer diameter of auger stem.
The utility model has the advantages that the present invention, which solves the 4th system, rushes diluvial formation grouting reinforcement difficulty, winter construction concrete setting speed The problems such as slow is spent, slip casting is improved by adjusting the slurry ratio of mud, interval slip casting, injection the methods of admixture and a variety of aggregates and applies Work efficiency rate;And in such a way that segmented recycles slip casting method and surface grout injection borehole sealing river and the strong water passage in goaf; Guarantee that orifice tube divides into quality by resistance test, improves slip casting effect;A kind of drilling rod of probing, middle part are provided simultaneously It is provided with wearing layer, increases the wearability of drilling rod, double helix blade improves the service life of drilling rod.
Detailed description of the invention
Attached drawing 1 is the flow chart of grouting water blocking method under the strong hydraulic connection of the present invention;
Attached drawing 2 is the jackrod structure figure of grouting for water blocking under the strong hydraulic connection of the present invention;
Attached drawing 3 is the drilling rod half-section diagram of grouting for water blocking under the strong hydraulic connection of the present invention.
Specific embodiment
The present invention will be further explained with reference to the accompanying drawing.
Such as the flow chart that attached drawing 1 is grouting water blocking method under the strong hydraulic connection of the present invention.
The method of grouting for water blocking under strong hydraulic connection, comprising the following steps:
By Water in mined area area physical prospecting situation, the position of water passage is obtained, and is bored according to the Position Design of water passage The position of field and the parameter of inlet well;
According to the parameter of the drilling, bore operation is carried out and carries out orifice tube to divide into;
After orifice tube is divided into, slip casting operation is carried out;
After slip casting terminates solidification, pressure test is carried out to drilling using clear water.
The drill site position construction setting concrete foundation, this inlet well include several drillings, and the drilling It is arranged by single row of holes, and position of opening is respectively positioned in concrete foundation.The construction of this slip casting drill site Position Design concrete foundation Drill site, the long 5m of concrete foundation, wide 4m, plane is in rectangle, and drill site is arranged in above old dead zone EXIT POINT.
This design arrangement inlet well 10, borehole bottom location spacing 4.5m~10m, hole depth 20.3m~35.5m.Aperture Length of tube is the depth of 0.2m to subterrane or less 1m on earth's surface.The borehole bottom location that drills is to enter auxiliary coal seam 1m.It can make WithDrill bit construction drill, construction drill depth is up to 200m.
Slip casting method is recycled using segmented in the bore operation, comprising the following steps:
1. carrying out aperture using start bit, drilling occurs stopping creeping into immediately when the phenomenon that not returning water, mentions brill and accurate Measure ruler more than drilling rod;
2. it is determined as the leak that drills if drilling rod and drill bit are unplugged, it need to be to carrying out grouting and reinforcing around hole wall;
3. after hole wall is reinforced, if drilling starts to return water, continuing to implement drilling, being carried out before drilling drilling to predeterminated position last Once grouting Reinforcing hole wall;
4. the last time hole wall that drills uses the drill bit of No.1 smaller than start bit to carry out cleaning bottom of hole after reinforcing;
5. then dividing into the orifice tube less than boring aperture, and orifice tube divides into the half depth that length is not more than hole depth.
Drilling construction circular order is that orifice tube-drilling is divided into drilling-slip casting-, is crept into the position 2m at present after aperture If first segment orifice tube, later every drilling 2m divides into an orifice pipe, until creeping into design position.
After orifice tube is divided into, slip casting operation is carried out, cement grout is injected into drilling using grouting pump, waits until pressure After reaching 3MPa and holding time no less than 3 minutes, slip casting can be stopped;
Cement has solidified after first time slip casting terminates 8h, carries out second of slip casting until hole wall surrounding rock crack is full of water Mud;
After slip casting terminates 16h to be solidified, pressure test is carried out to drilling using clear water, test pressure control is 3MPa, such as Fruit test pressure maintains the 3MPa duration to be no less than 30min, then hole Cementer work terminates.
Grouting pressure uses 1.5~2MPa during drilling drilling, and the slip casting operational pressure behind the whole hole that drills uses 3MPa, pressure Power can adjust determination during mortar depositing construction.Design pressure should be reached when slip casting as early as possible, classification is taken to rise when injection rate is big Pressure.
The slip casting includes the slurries of the three-level ratio of mud, and the water ash weight ratio of the slurries is respectively 2:1,1:1,0.5:1. The ratio of mud of initial grouting serous fluid is 2:1.
The slurries include cement slurry and/or admixture;The admixture is sand, waterglass, soybean and stone.The sand It is not more than the hard natural sand or artificial sand of 2.5mm for partial size, gravel fineness modulus is not more than 2.0, and clay content is not more than 3%; The modulus of the waterglass is 2.4~3.0, and concentration is 30~45 Baume degrees;The partial size of the stone is 5mm~15mm.Slip casting Slurries transformation: when grouting pressure remains unchanged, and injection rate is persistently reduced, or when injection rate is constant and pressure persistently increases, The ratio of mud must not be changed;When a certain injection rate than grade slurries is up to 20 tons or more, and grouting pressure and injection rate are without obvious When variation, change dense level-one, if after improving slurries rank, grouting pressure and injection rate still without significant change when continue to improve slurries The aggregates such as rank or injection stone, soybean.
Physical prospecting early period of the method for grouting for water blocking includes verifying water guide by transient electromagnetic detecting technology under strong hydraulic connection Channel low-resistance band singularly, utilizes Water in mined area area physical prospecting achievement, it is contemplated that the quiet reserves of water in gob area are dredged by unrestrained water drilling hole Waterdrainage amount analysis determines that goaf exists and stablizes nourishment source, abnormal in conjunction with transient electromagnetic low-resistance, determines feed channel position; By determining and mending to the water-bearing layers such as goaf water, Quaternary aquifer water, library vehicle river water and water quality chemical examination and signature analysis Water-supply source is analyzed by mining overburden structural analysis, the analysis of mining induced fissure spreading fracture and solid-liquid coupling Percolation Law, establishes library Vehicle river water seepage flow feeds old dead zone mechanical model.Bored grouting slurries seepage flow mechanics theory in rock stratum hole, crack is analyzed, is built Vertical slurries flow model in porous media, then simultaneously construction ground inlet well blocks river and the strong water passage in goaf for design.
The device of grouting for water blocking under strong hydraulic connection, including drilling rod, the drilling rod are auger stem, the drilling rod middle part It is divided into polished rod portion, spacing is provided with two shoulders 3 in the polished rod portion, is provided with wear-resistant sleeve 4, institute on the outside of two shoulders 3 The outer diameter for stating wear-resistant sleeve 4 is equal with auger stem outer diameter;Limbers 5 is offered along axis in the drilling rod, the two of the drilling rod End is respectively arranged with male connector screw thread and female screw thread.Male connector threaded portion is provided with baffle 6, is provided with gasket on baffle 6, Limit and sealing function are played when mostly connecting with drilling rod;The male connector screw thread and female screw thread are the rectangular thread with screw pitch, are made When more drilling rods are used in conjunction with each other, existing common 60 ° of screw threads and taper thread are compared, more stable torque can be provided and passed It is dynamic, it is particularly suitable for using in more rock stratum areas.Drilling rod ontology is process by high-quality 42CrMoV material through entirety is quenched, is provided Higher hardness and intensity, wearing layer can increase the service life of drilling rod, while reduce the abrasion of spire 1.
The helical blade 2 of identical pitch, the outer diameter of the helical blade 2 are provided on the spiral part of the auger stem Less than 1 3~5mm of outer diameter of spire of auger stem.After the abrasion of spire 1, the dynamics of the intensity of drilling rod and lower brill will be big Big to reduce, unworn helical blade 2 can replace spire 1 carry out lower brill at this time, increase the service life of drilling rod, save at This.
The above is only a preferred embodiment of the present invention, it should be pointed out that: for the ordinary skill people of the art For member, various improvements and modifications may be made without departing from the principle of the present invention, these improvements and modifications are also answered It is considered as protection scope of the present invention.

Claims (9)

  1. The method of grouting for water blocking under the last 1. hydraulic connection, it is characterised in that: the following steps are included:
    By Water in mined area area physical prospecting situation, the position of water passage is obtained, and the Position Design drill site according to water passage The parameter of position and inlet well;
    According to the parameter of the drilling, bore operation is carried out and carries out orifice tube to divide into;
    After orifice tube is divided into, slip casting operation is carried out;
    After slip casting terminates solidification, pressure test is carried out to drilling using clear water;
    Slip casting method is recycled using segmented in the bore operation, comprising the following steps:
    1. carrying out aperture using start bit, drilling occurs stopping creeping into immediately when the phenomenon that not returning water, mentions and bore and accurately measure Ruler more than drilling rod;
    2. it is determined as the leak that drills if drilling rod and drill bit are unplugged, it need to be to carrying out grouting and reinforcing around hole wall;
    3. after hole wall is reinforced, if drilling starts to return water, continuing to implement drilling, carrying out last time before drilling drilling to predeterminated position Grouting and reinforcing hole wall;
    4. the last time hole wall that drills uses the drill bit of No.1 smaller than start bit to carry out cleaning bottom of hole after reinforcing;
    5. then dividing into the orifice tube less than boring aperture, and orifice tube divides into the half depth that length is not more than hole depth.
  2. 2. the method for grouting for water blocking under strong hydraulic connection according to claim 1, it is characterised in that: apply the drill site position Concrete foundation is arranged in work, this inlet well includes several drillings, and the drilling is arranged by single row of holes, and position of opening It is respectively positioned in concrete foundation.
  3. 3. the method for grouting for water blocking under strong hydraulic connection according to claim 2, it is characterised in that: design arrangement slip casting is bored 10, hole, borehole bottom location spacing 4.5m~10m, hole depth 20.3m~35.5m.
  4. 4. the method for grouting for water blocking under strong hydraulic connection according to claim 1, it is characterised in that: when slip casting operation, make Cement grout is injected into drilling with grouting pump, after waiting until that pressure reaches 3MPa and holds time no less than 3 minutes, can be stopped Slip casting;
    Cement has solidified after first time slip casting terminates 8h, carries out second of slip casting until hole wall surrounding rock crack is full of cement Slurry;
    After slip casting terminates 16h to be solidified, pressure test is carried out to drilling using clear water, test pressure control is 3MPa, if examination Testing pressure maintains the 3MPa duration to be no less than 30min, then hole Cementer work terminates.
  5. 5. the method for grouting for water blocking under strong hydraulic connection according to claim 1, it is characterised in that: the slip casting includes three The slurries of the grade ratio of mud, the water ash weight ratio of the slurries is respectively 2:1,1:1,0.5:1.
  6. 6. the method for grouting for water blocking under strong hydraulic connection according to claim 5, it is characterised in that: the slurries include water Mud and/or admixture;The admixture is sand, waterglass, soybean and stone.
  7. 7. the method for grouting for water blocking under strong hydraulic connection according to claim 6, it is characterised in that: the sand be partial size not Hard natural sand or artificial sand greater than 2.5mm, gravel fineness modulus are not more than 2.0, and clay content is not more than 3%;The water glass The modulus of glass is 2.4~3.0, and concentration is 30~45 Baume degrees;The partial size of the stone is 5mm~15mm.
  8. 8. implementing the device of the method for grouting for water blocking under the described in any item strong hydraulic connections of Claims 1-4 4, feature exists In: including drilling rod, the drilling rod is auger stem, and the drilling rod middle section is polished rod portion, spacing setting in the polished rod portion Have two shoulders (3), is provided with wear-resistant sleeve (4) on the outside of two shoulders (3), the outer diameter and auger of the wear-resistant sleeve (4) Bar outer diameter is equal;Is offered limbers (5) along axis in the drilling rod, the both ends of the drilling rod be respectively arranged with male connector screw thread and Female screw thread.
  9. 9. the device according to claim 8 for implementing the method for grouting for water blocking under strong hydraulic connection, it is characterised in that: described The helical blade (2) of identical pitch is provided on the spiral part of auger stem, the outer diameter of the helical blade (2) is less than spiral Spire (1) outer diameter of drilling rod.
CN201710707390.XA 2017-08-17 2017-08-17 The method and device of grouting for water blocking under strong hydraulic connection Active CN107313788B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710707390.XA CN107313788B (en) 2017-08-17 2017-08-17 The method and device of grouting for water blocking under strong hydraulic connection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710707390.XA CN107313788B (en) 2017-08-17 2017-08-17 The method and device of grouting for water blocking under strong hydraulic connection

Publications (2)

Publication Number Publication Date
CN107313788A CN107313788A (en) 2017-11-03
CN107313788B true CN107313788B (en) 2019-05-10

Family

ID=60177155

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710707390.XA Active CN107313788B (en) 2017-08-17 2017-08-17 The method and device of grouting for water blocking under strong hydraulic connection

Country Status (1)

Country Link
CN (1) CN107313788B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108915690B (en) * 2018-07-06 2020-01-17 中钢集团马鞍山矿山研究院有限公司 Novel method for preventing water gushing of vertical shaft well wall in vertical shaft aquifer tunneling
CN109098688B (en) * 2018-10-15 2020-07-07 山东交通学院 Safe anti-blocking construction process for soft aggregate in underground ultra-deep drill hole of mine
CN109723466A (en) * 2018-12-10 2019-05-07 中交一公局桥隧工程有限公司 Tunnel primary support seepage grouting treatment construction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102071886A (en) * 2011-01-13 2011-05-25 河南理工大学 Drill rod of double helix anti-lock drill
CN102330567A (en) * 2011-08-19 2012-01-25 山西省交通规划勘察设计院 Goaf slip casting treatment method of road
CN104213853A (en) * 2014-10-07 2014-12-17 王永龙 Drilling interval variable-diameter spiral drill pipe for soft-hard composite coal seam
CN206309304U (en) * 2016-11-22 2017-07-07 北京市地质工程公司 A kind of long screw drill rod

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20120125728A (en) * 2011-05-09 2012-11-19 송기용 Screw file having joining part

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102071886A (en) * 2011-01-13 2011-05-25 河南理工大学 Drill rod of double helix anti-lock drill
CN102330567A (en) * 2011-08-19 2012-01-25 山西省交通规划勘察设计院 Goaf slip casting treatment method of road
CN104213853A (en) * 2014-10-07 2014-12-17 王永龙 Drilling interval variable-diameter spiral drill pipe for soft-hard composite coal seam
CN206309304U (en) * 2016-11-22 2017-07-07 北京市地质工程公司 A kind of long screw drill rod

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
上公山隧洞破碎富水白云岩地段超前固结灌浆处理;曹劝绩等;《小水电》;20130415(第2期);第81-86页
分段循环压力灌浆技术的应用;于军等;《山东冶金》;20091031;第31卷(第5期);第104-105页
岩溶富水地层隧道施工处治技术研究;刘彦波;《中国优秀硕士学位论文全文数据库》;20081015(第10期);C034-170
构皮滩水电站KM1溶蚀破碎带水泥-环氧复合灌浆施工;周发海等;《西部劣质地基与基础化学灌浆技术—第十三次全国化学灌浆学术交流会论文集》;20101023;第167-171页

Also Published As

Publication number Publication date
CN107313788A (en) 2017-11-03

Similar Documents

Publication Publication Date Title
CN104453913B (en) A kind of Shaft Stopes front pre-grouting method
CN104694746B (en) A kind of method of ion adsorption type re in_situ leaching and leaching ore deposit system thereof
CN103821544B (en) Tunneling and underground engineering high-pressure high-flow is dashed forward Water outburst treatment method
CN103334770B (en) One is grown up reverse-slope tunnel ultra high water pressure rich water zone of fracture construction method
CN103835729B (en) Deep distance roadway surrounding rock pre grouting from the surface reinforcement process
CN110318674B (en) Method for preventing outburst caused by cracking of roadway roof
CN101575983A (en) Directional fracturing permeability improvement outburst elimination method in coal mine and device thereof.
CN102561950B (en) Process for realizing grouting consolidation for aggregates filled in cavities of strata and jetting drill bit
CN108915736A (en) The water damage control method of digging laneway under the strong weak cementing water-bearing layer of rich water
CN107313788B (en) The method and device of grouting for water blocking under strong hydraulic connection
CN114233385B (en) Treatment method for mud-bursting water of inclined shaft
CN114060036B (en) Horizontal positioning grouting reinforcement construction process suitable for municipal construction of muddy soft soil stratum
CN108590706A (en) One kind being used for speciality single-track railway tunnel drifter with booms Construction Techniques of Grouting in Heavy Curtain
CN115126441B (en) Vertical deep drilling grouting and stopping process
CN101793154A (en) Method for grouting for stopping up water by using geological parameters of tunnel surrounding rocks and setting relief holes
CN104389559A (en) Method and device for preventing and controlling gas transfinite in thick-coal-seam mining process
CN106837382A (en) A kind of subway tunnel country rock pre grouting from the surface reinforcement process
CN113374440A (en) Rapid plugging method and construction method for water inrush channel of hidden collapse column
CN114108609B (en) Construction method for multistage segmented precise filling and deep pile forming in goaf
Xiumin et al. Research and application of gas-lift reverse circulation drilling technology to geothermal well construction in Dalian Jiaoliu Island
CN207377561U (en) The bad water-bearing layer positioning targeting slip casting Mine Shaft Lining of rock section and constructing device
CN109611098A (en) A kind of shaft of vertical well quick freezing method under the conditions of deep layer runoff water is larger
CN201183950Y (en) Self-propelling type anchor rod of seamless steel pipe
CN106968664A (en) A kind of floor undulation destruction band deep drilling water filling detection method
CN114622874B (en) Method for removing blockage and increasing yield of coal bed gas development well injection liquid carbon dioxide

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Cui Junjian

Inventor after: Zhang Jianhao

Inventor after: Gong Hanlin

Inventor after: Wei Hongwei

Inventor after: Li Feng

Inventor after: Lv Muxiao

Inventor after: Gao Kai

Inventor after: Han Chuangye

Inventor after: Meng Fanlin

Inventor after: Hu Yongtao

Inventor after: Liu Tao

Inventor before: Li Feng

Inventor before: Lv Muxiao

Inventor before: Gao Kai

Inventor before: Han Chuangye

Inventor before: Meng Fanlin

Inventor before: Hu Yongtao

Inventor before: Liu Tao

Inventor before: Zhang Jianhao

Inventor before: Gong Hanlin

CB03 Change of inventor or designer information