CN107313743A - One kind is using coal bed gas well to seat earth water barrier weak area band method for repairing and mending - Google Patents

One kind is using coal bed gas well to seat earth water barrier weak area band method for repairing and mending Download PDF

Info

Publication number
CN107313743A
CN107313743A CN201710535523.XA CN201710535523A CN107313743A CN 107313743 A CN107313743 A CN 107313743A CN 201710535523 A CN201710535523 A CN 201710535523A CN 107313743 A CN107313743 A CN 107313743A
Authority
CN
China
Prior art keywords
bed gas
coal bed
gas well
slip casting
repairing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710535523.XA
Other languages
Chinese (zh)
Other versions
CN107313743B (en
Inventor
孟召平
姚爱军
白建平
田永东
李超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology Beijing CUMTB
Shanxi Jincheng Anthracite Mining Group Co Ltd
Original Assignee
China University of Mining and Technology Beijing CUMTB
Shanxi Jincheng Anthracite Mining Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology Beijing CUMTB, Shanxi Jincheng Anthracite Mining Group Co Ltd filed Critical China University of Mining and Technology Beijing CUMTB
Priority to CN201710535523.XA priority Critical patent/CN107313743B/en
Publication of CN107313743A publication Critical patent/CN107313743A/en
Application granted granted Critical
Publication of CN107313743B publication Critical patent/CN107313743B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices or the like

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Earth Drilling (AREA)

Abstract

Technical field is adopted altogether the invention belongs to coal and coal bed gas resource, in order to make full use of grouting and reinforcing repairing is carried out to intending the weak zone of working seam water-resisting floor, the invention provides one kind using coal bed gas well to seat earth water barrier weak area band method for repairing and mending, this method is to reinforce coal seam water-resisting floor using discarded coal bed gas well, first passes through and creeps into form the extension slip casting repairing section drilling that coal bed gas well extends downwardly section in discarded coal bed gas well bottom;Then section drilling progress high-pressure slip-casting is repaired by extending slip casting, fills the water producing fractures in seat earth water barrier, reinforced the weak water barrier intensity of seat earth, water producing fractures closing, feed channel of cutting off the water supply reduces the possibility of coal seam bottom water bursting.

Description

One kind is using coal bed gas well to seat earth water barrier weak area band method for repairing and mending
Technical field
Technical field is adopted altogether the invention belongs to coal and coal bed gas resource, and in particular to one kind is using coal bed gas well to coal seam bottom Plate water barrier weak area band method for repairing and mending.
Background technology
With the expansion of cbm development scale, influence of the cbm development to following coal mining is increasingly highlighted, as Sleeve pipe is left in face coal bed gas extraction drilling well, is unfavorable for coal mining;Ground drilling and hydraulic fracturing etc. are anti-reflection, and measure destroys coal Layer roof and floor condition, easily links up water-bearing layer, potential safety hazard etc. is carried out to following coal mining belt.Cbm development straight well typically all exists 40-50m completions under seat earth, CBM Drilling plays the role of disturbance destruction to seat earth, and after coal bed gas extraction, The exploitation effect of coal causes the secondary destruction of bottom plate.If coal seam is small to interlamellar spacing between water-bearing layer, in cbm development Afterwards there is Water Inrush danger in coal mining.
Such as in the southern Jincheng Mining Area of Qinshui Basin In Shanxi Province into village field with "nine squares", CBM Drilling is typically lower to arrive Taiyuan group 15# coals bottom 40m-50m or so.According to geologic information, area's aquifer in Ordovician limestone water level elevation is 454.70m ~ 535m;And coal seam Mining elevation is between 420 ~ 730m, the water level of aquifer in Ordovician limestone will be higher by each 0 ~ 112m of seat earth.In this case, coal Layer pneumatic drill well has the possibility of conducting Ordovician karst water.At present, Shanxi blue-flame coal bed gas company is in Jincheng Mining Area into applying in the range of the ore deposit of the village The mouth of work coal bed gas well more than 260, area's cbm development is using connection floor mining type, i.e. 3#, 9#, 15# coal while working seam Gas.Production practices show that some well liquid faces delay to decline, and maintain always above 3# coal seams, and liquid level reduction is difficult, and having can Communication can be formd with bottom Ordovician limestone aquifer water, be possible in progress of coal mining deposit after cbm development In gushing water hidden danger.
Therefore, existing coal bed gas well is made full use of, reinforcing and repairing is carried out for the weak area of seat earth water barrier, no Production cost can be only reduced, can also effectively prevent Water Inrush, the safety guarantee energy of following coal mining is obviously improved Power.
The content of the invention
The invention solves the problems that key technical problem be:
(1)Existing discarded coal bed gas well how is made full use of, is noted to intending the weak zone of working seam water-resisting floor Starch reinforcing and repairing.Obviously, slip casting intensive treatment is carried out to seat earth water barrier band, it is broken that it can increase seat earth construction Ore deposit pressure and destruction of the pressure-bearing hydraulic pressure to water-resisting floor are adopted in area and the rock strength of weak water barrier band, reduction, reach safe life The purpose of production.Under normal circumstances, frequently with down-hole drilling grouting and reinforcing and surface drilling grouting and reinforcing, wherein underground bottom in engineering Plate grouting reinforcement technique is crept into using convolution, and perforate inclination angle is certain, and pore-forming is also straight hole, and hole mark is not easily controlled, slip casting section ratio Shorter, slip casting effect is not fine, and drilling utilization rate is also than relatively low, and underground sets up interim slip casting station and compares labor intensive thing Power, mechanization degree is not also high.Surface drilling slip casting, comparatively preferably, operating efficiency is greatly improved working environment, but will Significantly increase borehole engineering expense and extension duration.Therefore, coal bed gas well is made full use of to carry out slip casting, it will to reduce drilling expense With raising slip casting efficiency and quality play the multifunctionality of coal bed gas well, realize the high usage of coal bed gas well.
(2)The scope and quality of grouting and reinforcing repairing are carried out to the water barrier weak area band of seat earth 4 using coal bed gas well Control technology.Coal bed gas well is the drilling well dug for the characteristic distributions of coal bed gas resource, and its well location spacing and layout can not be covered Lid seat earth water barrier weak area, therefore present invention needs are in coal bed gas well drilling extension 16, grouting pressure, injecting paste material In terms of take measures, the scope and quality of strict control grouting and reinforcing repairing, repairing enhancing seat earth 4 is strong to greatest extent Degree, reduces the hydraulic conductivity of the rock mass of seat earth 4.
The specific of the present invention adopts the following technical scheme that:
One kind is using coal bed gas well to seat earth water barrier weak area band method for repairing and mending, and this method is to utilize discarded coal bed gas well To reinforce coal seam water-resisting floor, first pass through and creep into form the extension that coal bed gas well extends downwardly section in discarded coal bed gas well bottom Slip casting repairing section drilling;Then repaired by extending slip casting in section drilling progress high-pressure slip-casting, filling seat earth water barrier Water producing fractures, are reinforced the weak water barrier intensity of seat earth, water producing fractures closing, feed channel of cutting off the water supply, reduction The possibility of coal seam bottom water bursting.
Specific construction technique is as follows:
1)Coal bed gas well is chosen, rig and construction material prepare;
2)Along coal bed gas well tripping in pneumatic down-hole hammer, coal bed gas well extension slip casting section drilling drilling is carried out, construction extension slip casting is repaiied When mending section drilling, spud in hole by the two of former discarded coal bed gas well or three hole bottom holes of spudding in continue to creep into, pass through seat earth water proof The seat earth water producing fractures of layer, to bottom hole formation extension slip casting repairing section drilling;
3)Packer permeability test is done in well, the permeability of extension slip casting section drilling is determined;
4)Tripping in high-pressure slip-casting device sets stop grouting plug, hole inner high voltage note to bottom hole at the top of extension slip casting repairing section drilling Slurry;
5)Slip casting is finished, Hou Ning;
6)Using pneumatic down-hole hammer, cleaning bottom of hole is carried out to extension slip casting repairing section drilling, bottom hole is drilled into;
7)Packer permeability test is done in well again, the permeability of extension slip casting section drilling is determined, if permeability is unsatisfactory for requiring, repeats 4)-5);If permeating sexual satisfaction requirement, repair grouting is terminated, and coal bed gas well is filled to roof using cement grout More than, form closure slurry;
8)Seal and protect coal bed gas well well head up for safekeeping.
If segmenting slip casting, since hole-bottom slurry-injection, bottom slip casting is finished, then carries out top slip casting, repeats 4)-5)Step Suddenly, until the whole grouting and reinforcings of extension slip casting repairing section drilling, Hou Ning.
The final depth of drill hole of the extension slip casting repairing section drilling is 40 ~ 60m below seat earth or drilled to aqueous Layer top plate.
Grouting serous fluid uses neat slurry, and the ratio of mud is 1:1.6, density is 1.65t/m3
Final grouting pressure is 6-10MPa.
After coal bed gas well mining is finished, the pipe well of coal bed gas well is carried out transformation re-using by the present invention, in bottom hole(Two open Drill or three open foot of hole)Continue to drill, pass through seat earth water producing fractures, until close to water-bearing layer, forming extension slip casting Repair section drilling.The form that section drilling carries out complete opening or segmentation high-pressure slip-casting is repaired by extending slip casting, it is weak to seat earth Area and its water producing fractures carry out grouting and reinforcing, gradually to reduce the water penetration of water producing fractures, and feed channel of cutting off the water supply increases coal The mechanical strength of layer bottom plate, greatly promotes the protrusion-dispelling outlet capacity of seat earth.
Brief description of the drawings
Fig. 1 is that Hole cross-section plotting is repaired in slip casting(Bottom slip casting);
Fig. 2 is that Hole cross-section plotting is repaired in slip casting(Top slip casting);
Fig. 3 is that Hole cross-section plotting is repaired in slip casting(Shaft bottom is backfilled);
In figure:1. the 4th is;2. Strata Overlying The Seam;3. coal seam;4. seat earth water barrier;5. water-bearing layer;6. aperture;7. one Spud in hole;8. surface pipe;9. outer layer sleeve shell material;10. two spud in hole;11. protective casing;12. the outer injecting cement paste of protective casing; 13. three spud in hole;14. production casing;15. the outer injecting cement paste of production casing;16. extend slip casting repairing section drilling;17. stop grouting plug; 18. seat earth water producing fractures;19. bottom hole;20. injecting cement paste;21. block slurry.
Embodiment
With reference to accompanying drawing, the embodiment to the present invention is described further:
The present invention recycles problem for discarded coal bed gas well, based on coal bed gas well bottom injected hole extension drilling, extension The ancillary techniques such as slip casing by pressure, coal bed gas well filling, solve and utilize discarded coal bed gas well repairing and reinforcing seat earth water barrier The technical barrier of weak area.It is characterized in that, in discarded coal bed gas well bottom(Spud in the bottom of hole 13 in two holes 10 or three of spudding in Portion)Continue to creep into using pneumatic down-hole hammer(94 ~ φ of bore diameter φ 75), form coal bed gas well and extend downwardly section injected hole 16. Then, slip casting section high-pressure slip-casting is extended by coal bed gas well, fills the water producing fractures 18 of the water barrier of seat earth 4(Weathering fissures, Structural fracture, Karst Fissures or solution cavity), reinforced weak water barrier intensity, water producing fractures closing, supply of cutting off the water supply is logical Road, reduces the possibility of coal seam bottom water bursting, realizes the comprehensive recycling of discarded coal bed gas well.
The construction technology of the present invention is as follows:
1)Coal bed gas well is chosen, rig and construction material prepare;
2)Along coal bed gas well tripping in pneumatic down-hole hammer, carry out coal bed gas well extension slip casting section drilling 16 and creep into, pass through seat earth Water barrier 4 and its water producing fractures 18, to bottom hole 19, final depth of drill hole Hz is perturbing area below seat earth(Desirable 40 ~ 60m) Or close to water-bearing layer top plate, carry brill;
3)Packer permeability test is done in well, the permeability of extension slip casting section drilling 16 is determined;
4)Tripping in high-pressure slip-casting device sets stop grouting plug 17, hole inner high voltage slip casting, note to bottom hole 19 at the top of slip casting section drilling Starch parameter as follows:
1. grouting serous fluid is matched:Neat slurry, with the ratio of mud 1:, can be according to drilling midge on the basis of 1.6, density 1.65t/m3 The parameter adjustment concentration such as amount, pore pressure, optimum proportioning is determined by grouting test;
2. final grouting pressure Pz:By aperture, pressure is defined, and final grouting pressure can use 6-10MPa, should specifically carry out grouting test determination;
3. maximum grouting amount Qz:Maximum grouting amount is estimated by range of grouting with crack rate.
5)Slip casting is finished, Hou Ning;
6), need to be since hole-bottom slurry-injection if segmenting slip casting, bottom slip casting is finished, then carries out top slip casting, repeats 4)-5)Step Suddenly, until the whole grouting and reinforcings of extension slip casting repairing section drilling 16, Hou Ning;
7)Using pneumatic down-hole hammer, cleaning bottom of hole is carried out to extension slip casting repairing section drilling 16, bottom hole 19 is drilled into;
8)Packer permeability test is done in well again, the permeability of extension slip casting section drilling 16 is determined.If permeability is unsatisfactory for requiring, repeat 4)-6);If permeating sexual satisfaction requirement, repair grouting is terminated, and coal bed gas well is filled to roof using cement grout More than, form closure slurry 21;
9)Seal and protect coal bed gas well well head up for safekeeping.

Claims (6)

1. one kind is using coal bed gas well to seat earth water barrier weak area band method for repairing and mending, it is characterised in that this method is profit Coal seam water-resisting floor is reinforced with discarded coal bed gas well, first pass through crept into discarded coal bed gas well bottom to be formed coal bed gas well to The extension slip casting repairing section drilling of lower extension;Then section drilling progress high-pressure slip-casting is repaired by extending slip casting, fills coal seam Water producing fractures in water-resisting floor, are reinforced the weak water barrier intensity of seat earth, and water producing fractures closing is cut off the water supply Feed channel, reduces the possibility of coal seam bottom water bursting.
2. utilization coal bed gas well according to claim 1 is to seat earth water barrier weak area band method for repairing and mending, its feature It is, Specific construction technique is as follows:
1)Coal bed gas well is chosen, rig and construction material prepare;
2)Along coal bed gas well tripping in pneumatic down-hole hammer, coal bed gas well extension slip casting section drilling drilling is carried out, construction extension slip casting is repaiied When mending section drilling, spud in hole by the two of former discarded coal bed gas well or three hole bottom holes of spudding in continue to creep into, pass through seat earth water proof The seat earth water producing fractures of layer, to bottom hole formation extension slip casting repairing section drilling;
3)Packer permeability test is done in well, the permeability of extension slip casting section drilling is determined;
4)Tripping in high-pressure slip-casting device sets stop grouting plug, hole inner high voltage note to bottom hole at the top of extension slip casting repairing section drilling Slurry;
5)Slip casting is finished, Hou Ning;
6)Using pneumatic down-hole hammer, cleaning bottom of hole is carried out to extension slip casting repairing section drilling, bottom hole is drilled into;
7)Packer permeability test is done in well again, the permeability of extension slip casting section drilling is determined, if permeability is unsatisfactory for requiring, repeats 4)-5);If permeating sexual satisfaction requirement, repair grouting is terminated, and coal bed gas well is filled to roof using cement grout More than, form closure slurry;
8)Seal and protect coal bed gas well well head up for safekeeping.
3. utilization coal bed gas well according to claim 2 is to seat earth water barrier weak area band method for repairing and mending, its feature It is:If segmenting slip casting, since hole-bottom slurry-injection, bottom slip casting is finished, then carries out top slip casting, repeats 4)-5)Step, directly To the whole grouting and reinforcings of extension slip casting repairing section drilling, Hou Ning.
4. utilization coal bed gas well according to claim 3 is to seat earth water barrier weak area band method for repairing and mending, its feature It is:Extend the final depth of drill hole of slip casting repairing section drilling for 40 ~ 60m below seat earth or drill to water-bearing layer top plate.
5. utilization coal bed gas well according to claim 4 is to seat earth water barrier weak area band method for repairing and mending, its feature It is:Grouting serous fluid uses neat slurry, and the ratio of mud is 1:1.6, density is 1.65t/m3
6. utilization coal bed gas well according to claim 5 is to seat earth water barrier weak area band method for repairing and mending, its feature It is:Final grouting pressure is 6-10MPa.
CN201710535523.XA 2017-07-04 2017-07-04 Method for repairing weak zone of coal seam floor water-resisting layer by utilizing coal seam gas well Active CN107313743B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710535523.XA CN107313743B (en) 2017-07-04 2017-07-04 Method for repairing weak zone of coal seam floor water-resisting layer by utilizing coal seam gas well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710535523.XA CN107313743B (en) 2017-07-04 2017-07-04 Method for repairing weak zone of coal seam floor water-resisting layer by utilizing coal seam gas well

Publications (2)

Publication Number Publication Date
CN107313743A true CN107313743A (en) 2017-11-03
CN107313743B CN107313743B (en) 2020-05-12

Family

ID=60180699

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710535523.XA Active CN107313743B (en) 2017-07-04 2017-07-04 Method for repairing weak zone of coal seam floor water-resisting layer by utilizing coal seam gas well

Country Status (1)

Country Link
CN (1) CN107313743B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110630211A (en) * 2018-08-31 2019-12-31 中国矿业大学 Method for blocking overburden mining-induced fracture by ultrasonic in-situ slurry making
CN112664159A (en) * 2020-12-24 2021-04-16 北京大地高科地质勘查有限公司 Horizontal directional leaking stoppage method for small-sized cracks of coal seam roof
CN113464144A (en) * 2021-06-16 2021-10-01 枣庄矿业(集团)有限责任公司 Ground grouting process for treating water leakage and cracks of coal mine shaft in Lunan region

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201474608U (en) * 2009-08-19 2010-05-19 兴和鹏能源技术(北京)有限公司 Coal-bed-gas production-increase and gas water-inrush-prevention horizontal well
CN103216249A (en) * 2013-04-02 2013-07-24 中国矿业大学 Waterproof support method of water sump of water-swellable soft rock of underground coal mine
CN106437790A (en) * 2016-12-02 2017-02-22 淮北矿业股份有限公司 High-pressure-intensity water-containing layer karst fissure grouting method of difficult mining coal seam base plate thin-layer limestone
CN106545296A (en) * 2016-12-02 2017-03-29 淮北矿业股份有限公司 A kind of surface drilling grouting treatment method of deep mining coal seam base plate limestone water damage

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201474608U (en) * 2009-08-19 2010-05-19 兴和鹏能源技术(北京)有限公司 Coal-bed-gas production-increase and gas water-inrush-prevention horizontal well
CN103216249A (en) * 2013-04-02 2013-07-24 中国矿业大学 Waterproof support method of water sump of water-swellable soft rock of underground coal mine
CN106437790A (en) * 2016-12-02 2017-02-22 淮北矿业股份有限公司 High-pressure-intensity water-containing layer karst fissure grouting method of difficult mining coal seam base plate thin-layer limestone
CN106545296A (en) * 2016-12-02 2017-03-29 淮北矿业股份有限公司 A kind of surface drilling grouting treatment method of deep mining coal seam base plate limestone water damage

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110630211A (en) * 2018-08-31 2019-12-31 中国矿业大学 Method for blocking overburden mining-induced fracture by ultrasonic in-situ slurry making
CN110630211B (en) * 2018-08-31 2021-08-17 中国矿业大学 Method for blocking overburden mining-induced fracture by ultrasonic in-situ slurry making
CN112664159A (en) * 2020-12-24 2021-04-16 北京大地高科地质勘查有限公司 Horizontal directional leaking stoppage method for small-sized cracks of coal seam roof
CN113464144A (en) * 2021-06-16 2021-10-01 枣庄矿业(集团)有限责任公司 Ground grouting process for treating water leakage and cracks of coal mine shaft in Lunan region

Also Published As

Publication number Publication date
CN107313743B (en) 2020-05-12

Similar Documents

Publication Publication Date Title
CN110939442B (en) Method for treating rock burst by pressure relief source in ground fracturing area
CN108999634B (en) Surface drilling realizes that a hole of water damage prevention and treatment and surface settlement control is mostly used method
CN105332684B (en) A kind of water under high pressure is quick-fried and CO2The coal bed gas displacement extraction technique that pressure break is combined
CN101275469B (en) Yolk coal rock formation downward hole pumping and mining pressure relief mash gas construction method
CN103953386B (en) Upstream-blocking and downstream-seepage method for extracting gas in mining area
CN111535791B (en) Efficient gas extraction method for broken soft low-permeability coal seam well upper and lower combined fracturing area
CN102392677A (en) Permeability improvement technology for coal bed gas reservoir cap by using three-dimensional fracture network modification
CN101915072B (en) Method for extracting coal bed gas in stable mining region by ground well drilling
CN110318674B (en) Method for preventing outburst caused by cracking of roadway roof
CN104929567A (en) Low-cost construction process for passing through goaf
CN102852546A (en) Method for pre-pumping coal roadway stripe gas of single soft protruded coal seam of unexploited area
CN207048739U (en) A kind of low gaseous mine gas ground extraction technology drilled well bore structure
CN107620582A (en) Bilayer sleeve sand control completion technique and double-layer anti-sand completion tubular column
CN106948843A (en) A kind of double-deck multiple-limb concordant bored grouting transformation dual limestone aquifer method of roof and floor
CN105804786B (en) A kind of weak seam bottom plate layer-through drilling pressure rushes anti-reflection method
CN102493833A (en) Depressurized extraction method for cutting through roof or floor of coal seam by abrasive water jet
CN107387082A (en) A kind of method for weakening coal seam tight roof
CN108894813B (en) Gas outburst elimination method combining underground drilling, ground fracturing and underground extraction
CN101835953A (en) Well construction using small laterals
WO2019029178A1 (en) New gas control technology for ground pressure-relief borehole in abandoned coal mine
CN108412453A (en) A kind of coal mining water controls system and construction method altogether with gas
WO2017198109A1 (en) Pitshaft coal uncovering method for coal mines whose coal seam lies in main aquifer
CN107313743A (en) One kind is using coal bed gas well to seat earth water barrier weak area band method for repairing and mending
CN113107450A (en) Staged fracturing gas advanced extraction method for horizontal well of soft-hard interaction coal seam
CN106014345B (en) A kind of lower part caving method exploits the pumping method for the compound old dead zone coal bed gas to be formed

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant