CN107313357A - A kind of bridge top construction safety protection column - Google Patents

A kind of bridge top construction safety protection column Download PDF

Info

Publication number
CN107313357A
CN107313357A CN201710762905.6A CN201710762905A CN107313357A CN 107313357 A CN107313357 A CN 107313357A CN 201710762905 A CN201710762905 A CN 201710762905A CN 107313357 A CN107313357 A CN 107313357A
Authority
CN
China
Prior art keywords
guardrail
rectangular shaped
shaped rim
strut
safety protection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710762905.6A
Other languages
Chinese (zh)
Inventor
钟伟权
张�杰
赵光萍
宁宏翔
朱若愚
冯丽云
黄俊云
陈明青
李�杰
叶娇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YUNNAN GENERAL CONSTRUCTION ENGINEERING CONTRACT Co
Original Assignee
YUNNAN GENERAL CONSTRUCTION ENGINEERING CONTRACT Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YUNNAN GENERAL CONSTRUCTION ENGINEERING CONTRACT Co filed Critical YUNNAN GENERAL CONSTRUCTION ENGINEERING CONTRACT Co
Priority to CN201710762905.6A priority Critical patent/CN107313357A/en
Publication of CN107313357A publication Critical patent/CN107313357A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/32Safety or protective measures for persons during the construction of buildings
    • E04G21/3204Safety or protective measures for persons during the construction of buildings against falling down

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

A kind of bridge top construction safety protection column, includes the guardrail and the strut (5) of support guardrail of one group of interconnection;The guardrail includes the metal patch sole (3) of the rectangular shaped rim (1) that square steel tube is welded into, the wire netting (2) for being installed on rectangular shaped rim internal upper part and bottom, and adjacent guardrail passes through bolt (4) connection through rectangular shaped rim vertical rod (1a);The strut (5) is installed on two sides of rectangle guardrail, and strut upper end is bolted to connection in rectangular shaped rim vertical rod, and embedded bar (6) interior blending bolt of strut lower end insertion bridge protecting wall tightens fixation.The present invention is simple in construction, safe and reliable, and dismounting is quick, and firm and durable after shaping is flexible and convenient to use, and protective is good, revolving strong.

Description

A kind of bridge top construction safety protection column
Technical field
The invention belongs to safety protection device for building construction technical field, it is mainly used in being related in highway engineering bridge construction Safety guide rail.
Background technology
For a long time, the Superstructure Construction of bridge always is high-risk work, due to not yet construction bridges anticollision revetment, So that bridge superstructure is filled with potential safety hazard, existing frontier defense shield of facing is main by scaffold building, exists and sets up complexity, tears open Except difficulty, cost of labor is high, construction safety hidden danger is big, it is lack of standardization the shortcomings of.
The content of the invention
Face the not enough flexibly square there is provided one kind dismounting of side protective equipment in being constructed present invention aim to address existing highway bridge Just, good, the safe and reliable bridge top construction safety protection column of barrier propterty.
To achieve the above object, the technical solution adopted by the present invention is as follows:
A kind of bridge top construction safety protection column, includes the guardrail and the strut of support guardrail of one group of interconnection;Institute The wire netting and the metal patch pin of bottom for state rectangular shaped rim that guardrail is welded into including square steel tube, being installed on rectangular shaped rim internal upper part Plate, adjacent guardrail passes through the bolt connection through rectangular shaped rim vertical rod;The strut is installed on two sides of rectangle guardrail Face, strut upper end is bolted to connection in rectangular shaped rim vertical rod, and the embedded bar of bridge protecting wall is inserted in strut lower end Interior blending bolt tightens fixation.
The present invention is welded with horizontal square steel tube as enhancing muscle in rectangular shaped rim.Insulation is provided with bolt to hang Hook.
The present invention is simple in construction, safe and reliable, and dismounting is quick, firm and durable after shaping, flexible and convenient to use, protective It is good, it is revolving strong.
Brief description of the drawings
Fig. 1 is elevational schematic view of the invention;
Fig. 2 present invention is installed on the left view on bridge.
Embodiment
See that the bridge top construction safety protection column shown in Fig. 1, Fig. 2, including the guardrail of one group of interconnection and support are protected The strut 5 on column;The guardrail includes the rectangular shaped rim 1 that square steel tube is welded into, is installed on the and of wire netting 2 of rectangular shaped rim internal upper part The metal patch sole 3 of bottom, is welded with horizontal square steel tube as enhancing muscle 7 in rectangular shaped rim 1.Metal patch sole is used to prevent Only article tumbles pendant thing and hurted sb.'s feelings, sprayable paint red and white, not only attractive in appearance but also antirust.Adjacent guardrail is by through rectangular edges Frame vertical rod 1a bolt 4 is connected.The strut 5 is made using round steel pipe, is installed on two sides of rectangle guardrail, strut End is bolted to connection in rectangular shaped rim vertical rod, and the embedded bar 6 of strut lower end insertion bridge protecting wall 9 is interior and uses spiral shell Bolt tightens fixation, it is ensured that whole safety guide rail is stable not to be shaken.Insulating hanger 8 is provided with bolt 4, it is interim for hanging With electric wire and avoid electric wire mop floor cause electric leakage.
Stabilized structure of the present invention, it is safe and reliable, reliable protection can be provided for bridge construction, and be easy to dismounting, construction Quickness and high efficiency.The guard rail neat appearance assembled is attractive in appearance, meets job specfication.The present invention is repeatable to be used in turn, and reduction is applied Work cost.

Claims (3)

1. a kind of bridge top construction safety protection column, it is characterised in that guardrail and support guardrail including one group of interconnection Strut (5);The guardrail includes the rectangular shaped rim (1) that square steel tube is welded into, is installed on the wire netting of rectangular shaped rim internal upper part (2) and bottom metal patch sole (3), the bolt (4) that adjacent guardrail passes through through rectangular shaped rim vertical rod (1a) connects;Institute Two sides that strut (5) is installed on rectangle guardrail are stated, strut upper end is bolted to connection in rectangular shaped rim vertical rod, supportted Embedded bar (6) interior blending bolt of bar lower end insertion bridge protecting wall tightens fixation.
2. a kind of bridge top construction safety protection column according to claim 1, it is characterised in that in rectangular shaped rim (1) Horizontal square steel tube is inside welded with as enhancing muscle (7).
3. a kind of bridge top construction safety protection column according to claim 1 or 2, it is characterised in that at bolt (4) place It is provided with insulating hanger (8).
CN201710762905.6A 2017-08-30 2017-08-30 A kind of bridge top construction safety protection column Pending CN107313357A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710762905.6A CN107313357A (en) 2017-08-30 2017-08-30 A kind of bridge top construction safety protection column

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710762905.6A CN107313357A (en) 2017-08-30 2017-08-30 A kind of bridge top construction safety protection column

Publications (1)

Publication Number Publication Date
CN107313357A true CN107313357A (en) 2017-11-03

Family

ID=60175976

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710762905.6A Pending CN107313357A (en) 2017-08-30 2017-08-30 A kind of bridge top construction safety protection column

Country Status (1)

Country Link
CN (1) CN107313357A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109914270A (en) * 2019-04-26 2019-06-21 四川路桥华东建设有限责任公司 A kind of steel truss girder installation process is winded up channel dismountable safety protective device and its operating method

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6039150A (en) * 1995-05-03 2000-03-21 Palmer; Theodore R. Building guard rail scaffold assembly
ES1048984U (en) * 2001-05-16 2001-10-16 Diaz Anastasio Cuenca Improved support for the installation of guardrails on buildings under construction and the like. (Machine-translation by Google Translate, not legally binding)
US6336623B1 (en) * 2000-08-21 2002-01-08 Mccarthy John J. Portable safety barrier
CN103899133A (en) * 2014-04-08 2014-07-02 国家电网公司 Fixed-type extensible safety fence for transformer substation
CN203821870U (en) * 2014-03-31 2014-09-10 中建八局大连建设工程有限公司 All-steel composite protective net
CN204386197U (en) * 2015-01-05 2015-06-10 中建三局第二建设工程有限责任公司 The horizontal protective platform of a kind of Super High alien invasion steel work
CN205531414U (en) * 2016-02-05 2016-08-31 中建五局土木工程有限公司 Safety protection guardrail net
CN205713186U (en) * 2016-05-09 2016-11-23 中国建筑一局(集团)有限公司 A kind of deep foundation pit construction faces frontier defense and protects removable regularization railing
CN205804171U (en) * 2016-07-05 2016-12-14 北京野缘野生动物繁育有限公司 A kind of overpass guard rail with steel wire rope fastening piece
CN205893911U (en) * 2016-07-01 2017-01-18 中交第二航务工程局有限公司 Interim people's bank of china guardrail
CN206328693U (en) * 2016-12-19 2017-07-14 中交路桥建设有限公司 A kind of anti-throwing web frame of bridge on highway steel guard rail
CN207277207U (en) * 2017-08-30 2018-04-27 云南工程建设总承包股份有限公司 A kind of bridge top construction safety protection column

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6039150A (en) * 1995-05-03 2000-03-21 Palmer; Theodore R. Building guard rail scaffold assembly
US6336623B1 (en) * 2000-08-21 2002-01-08 Mccarthy John J. Portable safety barrier
ES1048984U (en) * 2001-05-16 2001-10-16 Diaz Anastasio Cuenca Improved support for the installation of guardrails on buildings under construction and the like. (Machine-translation by Google Translate, not legally binding)
CN203821870U (en) * 2014-03-31 2014-09-10 中建八局大连建设工程有限公司 All-steel composite protective net
CN103899133A (en) * 2014-04-08 2014-07-02 国家电网公司 Fixed-type extensible safety fence for transformer substation
CN204386197U (en) * 2015-01-05 2015-06-10 中建三局第二建设工程有限责任公司 The horizontal protective platform of a kind of Super High alien invasion steel work
CN205531414U (en) * 2016-02-05 2016-08-31 中建五局土木工程有限公司 Safety protection guardrail net
CN205713186U (en) * 2016-05-09 2016-11-23 中国建筑一局(集团)有限公司 A kind of deep foundation pit construction faces frontier defense and protects removable regularization railing
CN205893911U (en) * 2016-07-01 2017-01-18 中交第二航务工程局有限公司 Interim people's bank of china guardrail
CN205804171U (en) * 2016-07-05 2016-12-14 北京野缘野生动物繁育有限公司 A kind of overpass guard rail with steel wire rope fastening piece
CN206328693U (en) * 2016-12-19 2017-07-14 中交路桥建设有限公司 A kind of anti-throwing web frame of bridge on highway steel guard rail
CN207277207U (en) * 2017-08-30 2018-04-27 云南工程建设总承包股份有限公司 A kind of bridge top construction safety protection column

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109914270A (en) * 2019-04-26 2019-06-21 四川路桥华东建设有限责任公司 A kind of steel truss girder installation process is winded up channel dismountable safety protective device and its operating method
CN109914270B (en) * 2019-04-26 2023-12-15 四川路桥华东建设有限责任公司 Detachable safety protection device for steel truss girder installation process winding passage and operation method thereof

Similar Documents

Publication Publication Date Title
CN105088979B (en) Demolition blasting method for large bridge
CN107313357A (en) A kind of bridge top construction safety protection column
CN104278828B (en) A kind of concrete chimney dismantling operation platform
CN207277207U (en) A kind of bridge top construction safety protection column
CN207295477U (en) A kind of bridge lower part construction safety protection column
CN208430425U (en) A kind of high-speed railway pier top protective device of installation easy to disassemble
CN206722211U (en) A kind of construction steel structure assembled wallboard
CN205025124U (en) Standardized limit of facing can be dismantled and is prevented guardrail bar
CN204023422U (en) A kind of assembling Coping Construction operating platform
CN206815876U (en) A kind of safety and stability protection network
CN208310273U (en) A kind of sliding slot assembled goes along with sb. to guard him shielding system
CN201574499U (en) Fireproof seal structure of aluminum veneer curtain wall
CN207568321U (en) Easy-to-mount protection guardrail
CN206621673U (en) Regularization escape device for temporary building
CN105735624A (en) Cage for installing roof ceiling sheet
CN206220649U (en) Construction guard fender
CN107326814A (en) A kind of bridge bottom construction safety protection column
CN206015862U (en) A kind of house catches fire emergency danger-avoiding escape platform
CN204370828U (en) Tool-type protective screening
CN204767120U (en) Suspension type fire extinguisher steel reinforcement cage
CN207749848U (en) A kind of fall arrest construction holder
CN203961323U (en) Quick lap joint formula guard system
CN207144531U (en) Tall building drop preventing falls behind anchoring from extension double-layer horizontal safety net device
CN205348824U (en) Outer facade safety plain net device of prefabricated construction
CN204290128U (en) Omnibearing stereo formula electric power safety cover bar

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20171103

WD01 Invention patent application deemed withdrawn after publication